CN107829482A CN201711271657.1A CN201711271657A CN107829482A CN 107829482 A CN107829482 A CN 107829482A CN 201711271657 A CN201711271657 A CN 201711271657A CN 107829482 A CN107829482 A CN 107829482A
Authority
CN
China
Prior art keywords
depression
ditch
cut
tidal channel
karst
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711271657.1A
Other languages
Chinese (zh)
Inventor
沈志平
朱军
袁江文
孙洪
陈德茂
王鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zhengye Engineering & Investment Inc Ltd
Original Assignee
Guizhou Zhengye Engineering & Investment Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zhengye Engineering & Investment Inc Ltd filed Critical Guizhou Zhengye Engineering & Investment Inc Ltd
Priority to CN201711271657.1A priority Critical patent/CN107829482A/en
Publication of CN107829482A publication Critical patent/CN107829482A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters, including Cut-off ditch and tidal channel, Cut-off ditch is arranged on depression side slope or slope top, and tidal channel is arranged on depression and is interconnected with Cut-off ditch, and tidal channel is communicated to the sinkhole on depression.The present invention sets interconnected Cut-off ditch and tidal channel in karst depression in mima type microrelief landforms, tidal channel drains into water in karst depression in leak hole, Cut-off ditch plays a part of to collect rainfall rainwash, tidal channel, which rises, to be collected, dredge the effect of flowing water, Karst Mountain rainfall can effectively be slowed down soil erosion is caused to surface erosion, the effect that rainfall flowing water avoids occurring in karst depression waterlogging and Secondary Geological Hazards is dredged simultaneously, it is plentiful that the present invention is applied to rainfall, and the large-scale karst depression that ground unit is complicated, engineering-built is easy, cost is relatively low, it is easily managed maintenance.

Description

A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters
Technical field
The present invention relates to a kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters, belong in large-scale karst depression and drain off floodwaters Technical field.
Background technology
Karst depression is the common negative land form in the karst area formed under corrosion, by peak cluster positive form and funnel-form What negative land form common combination was formed.Radius scale can be also formed in the area that karst is developed by force to reach hundreds of meters, or even has 1~2 The large-scale depression of kilometer.This kind of depression is typically under strong vertical circulation effect, caves in what is formed by cavern.In low-lying area Widely distributed in ground to have a large amount of molten Study on Rock that collapse, depression bottom then deposits thicker clay layer.Moreover, it is hollow in large-scale karst The rubble collapse deposit area formed recently, and the high slope area being made up of the peak cluster mountain ridge in ground also be present.This causes large-scale Extremely complex ground unit interface and different microreliefs are then constituted in karst depression.Under condition of raining, rainwater passes through Different ground units is pooled to depression bottom, and is drained by sinkhole to underground underground river system.Due to large-scale karst depression face The catchment area of the larger each ground unit of product is different, and the rainwash formed after rainfall is also different.Especially for the pine in depression Dissipate accumulation area and easily cause soil erosion under Rainfall simulator erosion.At present, drainning off floodwaters in face of this kind of large-scale karst depression complicated landform Preventing waterlogging, there has been no the technology of maturation for disposal facility.
The content of the invention
The technical problem to be solved in the present invention is:A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters are provided, with Solve present in prior art in large-scale karst depression due to rainfall cause in depression table soil wash away cause soil erosion with And depression waterlogging problem.
The technical scheme that the present invention takes is:A kind of large-scale karst depression flood drainage system, including Cut-off ditch and tidal channel, cut Great Gulch is arranged on depression side slope or incompact-deposit bodies top, and tidal channel is arranged on depression and is interconnected with Cut-off ditch, drained off floodwaters Ditch is communicated to the sinkhole on depression.
Preferably, above-mentioned Cut-off ditch section is trapezium structure.
Preferably, above-mentioned tidal channel is rectangular configuration.
Preferably, drop step is provided with above-mentioned tidal channel, to play energy dissipating flowing water, alleviates washing away for insulated stream Effect.
Preferably, tenon is provided with above-mentioned tidal channel, to play energy dissipating flowing water, alleviates the work washed away of insulated stream With.
Preferably, above-mentioned Cut-off ditch and tidal channel are built by laying bricks or stones using stone masonry and formed, and its outer surface is provided with concrete and wiped one's face Layer.
A kind of method of drainning off floodwaters of large-scale karst depression flood drainage system, this method comprise the following steps:
(1)Microgeomorphologyd in karst depression is determined, depression can be divided into peak cluster side slope area, depression sloped region, depression gentle slope Area, karst depression is divided into by multiple charge for remittance cellular zones according to hypsography in zoning and watershed;
(2)According to the position of multiple charge for remittance cellular zone areas and mima type microrelief condition selection Cut-off ditch, select on depression peak cluster side Slope area and depression sloped region top set Cut-off ditch, and Cut-off ditch section is trapezoidal, Cut-off ditch cross-sectional width B1With height H1According to cut Charge for remittance cellular zone catchment area where Great Gulch is calculated using the computational methods of small watershed crest discharge and obtained, according to depression gathering ground The quantity of long-pending size increase and decrease Cut-off ditch, catchment area are less than 0.5km2One of Cut-off ditch is set, and catchment area is in 1km2Extremely 0.5km2Twice Cut-off ditch is set, and catchment area is more than 1km2Three Cut-off ditch are set;
(3)According to microrelief partitioning scenario in depression, the low-lying place in the sloped region of depression lays the row perpendicular to depression bottom Great Gulch, tidal channel one end are connected with Cut-off ditch, and one end is connected with sinkhole, tidal channel rectangular cross-section, tidal channel width B2 With height H2Obtained according to connected Cut-off ditch size, i.e., tidal channel area of section is twice of Cut-off ditch, to meet draining need Will;
(4)Tidal channel is located to set drop step or tenon more suddenly in the gradient, to play energy dissipating flowing water, alleviates washing away for insulated stream Effect;
(5)Expand the original sinkhole entrance in depression, tidal channel is connected with sinkhole.
Beneficial effects of the present invention:Compared with prior art, effect of the invention is as follows:
(1)The present invention sets interconnected Cut-off ditch and tidal channel in karst depression in mima type microrelief landforms, tidal channel is by water Drain into karst depression in leak hole, Cut-off ditch plays a part of to collect rainfall rainwash, and tidal channel, which rises, to be collected, dredges flowing water Effect, can effectively slow down Karst Mountain rainfall and soil erosion is caused to surface erosion, while dredge rainfall flowing water and keep away Exempt from the effect of generation waterlogging and Secondary Geological Hazards in karst depression, the present invention is plentiful suitable for rainfall, and ground unit is complicated Large-scale karst depression, engineering-built is easy, and cost is relatively low, is easily managed maintenance;
(2)According to the fine cutting zonule of mima type microrelief landforms in large-scale karst depression, take and calculate public affairs suitable for small watershed flood peak Formula, crest discharge corresponding to each region catchment area is calculated, and combine topography and geomorphology feature design Cut-off ditch and row in depression Great Gulch section, rainfall will be collected and dredged into the original sinkhole in depression.
Brief description of the drawings
Fig. 1 is planar structure schematic diagram of the embodiment of the present invention;
Fig. 2 is karst depression block plan of the embodiment of the present invention;
Fig. 3 is Cut-off ditch schematic diagram of the embodiment of the present invention;
Fig. 4 is tidal channel schematic diagram of the embodiment of the present invention;
Fig. 5 is tidal channel tenon schematic diagram of the embodiment of the present invention;
Fig. 6 is tidal channel of embodiment of the present invention drop step schematic diagram.
Embodiment
Below in conjunction with the accompanying drawings and the present invention is described further specific embodiment.
Embodiment 1:As shown in Fig. 1 ~ Fig. 6, a kind of large-scale karst depression flood drainage system, including Cut-off ditch 1 and tidal channel 2, Cut-off ditch 1 is arranged on depression side slope area or depression sloped region top, and tidal channel 2 is arranged on depression and interconnected with the phase of Cut-off ditch 1 Logical, tidal channel 2 is communicated to the sinkhole 3 on depression, and Cut-off ditch 1 plays a part of to collect rainfall rainwash, and tidal channel 2 plays remittance Collect, dredge the effect of flowing water.
Preferably, above-mentioned Cut-off ditch 1 sets at least eight, and section is trapezium structure, and width B is in 600~1300mm, height H is spent in 400~1000mm.
Preferably, above-mentioned tidal channel 2 sets at least four, and rectangular cross-section structure, width B is in 300~900mm, height H is spent in 300~900mm.
Preferably, drop step 4 is provided with above-mentioned tidal channel 2, drop 4 high 400~450mm of step, to play energy dissipating Flowing water, alleviate the effect washed away of insulated stream.
Preferably, tenon 5, tenon 5 high 90~100mm, spacing 150mm, to play energy dissipating are provided with above-mentioned tidal channel 2 Flowing water, alleviate the effect washed away of insulated stream.
Preferably, above-mentioned Cut-off ditch 1 and tidal channel 2 are built by laying bricks or stones using stone masonry forms, and its outer surface is provided with concrete and smeared Surface layer.
A kind of method of drainning off floodwaters of large-scale karst depression flood drainage system, this method comprise the following steps:
(1)Microgeomorphologyd in karst depression is determined, depression can be divided into peak cluster side slope area, depression sloped region, depression gentle slope Area, karst depression is divided into by multiple charge for remittance cellular zones according to hypsography in zoning and watershed;
(2)According to the position of multiple charge for remittance cellular zone areas and mima type microrelief condition selection Cut-off ditch, select on depression peak cluster side Slope area and depression sloped region top set Cut-off ditch, and Cut-off ditch section is trapezoidal, Cut-off ditch cross-sectional width B1With height H1According to cut Charge for remittance cellular zone catchment area where Great Gulch uses the computational methods suitable for small watershed crest discharge to calculate and obtained.According to depression The size of catchment area can increase and decrease the quantity of Cut-off ditch, and catchment area is less than 0.5km2One of Cut-off ditch, catchment area are set In 1km2To 0.5km2Twice Cut-off ditch is set, and catchment area is more than 1km2Three Cut-off ditch are set;
(3)According to microrelief partitioning scenario in depression, the low-lying place in the sloped region of depression lays the row perpendicular to depression bottom Great Gulch.Tidal channel one end is connected with Cut-off ditch, and one end is connected with sinkhole, tidal channel rectangular cross-section, tidal channel width B2 With height H2Obtained according to connected Cut-off ditch size, i.e., tidal channel area of section is twice of Cut-off ditch, to meet draining need Will;
(4)Tidal channel is located to set drop step or tenon more suddenly in the gradient;
(5)Expand the original sinkhole entrance in depression, tidal channel is connected with sinkhole.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention, therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (7)

  1. A kind of 1. large-scale karst depression flood drainage system, it is characterised in that:Including Cut-off ditch(1)And tidal channel(2), Cut-off ditch(1) It is arranged on depression side slope or incompact-deposit bodies top, tidal channel(2)It is arranged on depression and and Cut-off ditch(1)It is interconnected, row Great Gulch(2)The sinkhole being communicated on depression(3).
  2. A kind of 2. large-scale karst depression flood drainage system according to claim 1, it is characterised in that:Cut-off ditch(1)Section is Trapezium structure.
  3. A kind of 3. large-scale karst depression flood drainage system according to claim 1, it is characterised in that:Tidal channel(2)For rectangle Structure.
  4. A kind of 4. large-scale karst depression flood drainage system according to claim 1, it is characterised in that:Tidal channel(2)Interior setting There is drop step(4).
  5. A kind of 5. large-scale karst depression flood drainage system according to claim 1, it is characterised in that:Tidal channel(2)Interior setting There is tenon(5).
  6. A kind of 6. large-scale karst depression flood drainage system according to claim 1, it is characterised in that:Cut-off ditch(1)With drain off floodwaters Ditch(2)Built by laying bricks or stones and formed using stone masonry, its outer surface is provided with concrete float coat.
  7. 7. according to a kind of method of drainning off floodwaters of any described large-scale karst depression flood drainage systems of claim 1-6, it is characterised in that: This method comprises the following steps:
    (1)Microgeomorphologyd in karst depression is determined, depression can be divided into peak cluster side slope area, depression sloped region, depression gentle slope Area, karst depression is divided into by multiple charge for remittance cellular zones according to hypsography in zoning and watershed;
    (2)According to the position of multiple charge for remittance cellular zone areas and mima type microrelief condition selection Cut-off ditch, select on depression peak cluster side Slope area and depression sloped region top set Cut-off ditch, and Cut-off ditch section is trapezoidal, Cut-off ditch cross-sectional width B1With height H1According to cut Charge for remittance cellular zone catchment area where Great Gulch is calculated using the computational methods of small watershed crest discharge and obtained, according to depression gathering ground The quantity of long-pending size increase and decrease Cut-off ditch, catchment area are less than 0.5km2One of Cut-off ditch is set, and catchment area is in 1km2Extremely 0.5km2Twice Cut-off ditch is set, and catchment area is more than 1km2Three Cut-off ditch are set;
    (3)According to microrelief partitioning scenario in depression, the low-lying place in the sloped region of depression lays the row perpendicular to depression bottom Great Gulch, tidal channel one end are connected with Cut-off ditch, and one end is connected with sinkhole, tidal channel rectangular cross-section, tidal channel width B2 With height H2Obtained according to connected Cut-off ditch size, i.e., tidal channel area of section is twice of Cut-off ditch;
    (4)Tidal channel is located to set drop step or tenon more suddenly in the gradient;
    (5)Expand the original sinkhole entrance in depression, tidal channel is connected with sinkhole.
CN201711271657.1A 2017-12-05 2017-12-05 A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters Pending CN107829482A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711271657.1A CN107829482A (en) 2017-12-05 2017-12-05 A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711271657.1A CN107829482A (en) 2017-12-05 2017-12-05 A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters

Publications (1)

Publication Number Publication Date
CN107829482A true CN107829482A (en) 2018-03-23

Family

ID=61641529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711271657.1A Pending CN107829482A (en) 2017-12-05 2017-12-05 A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters

Country Status (1)

Country Link
CN (1) CN107829482A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110432083A (en) * 2019-08-30 2019-11-12 贵州正业工程技术投资有限公司 A kind of karst depression surface vegetation ecological restoration device and its restorative procedure
CN111236139A (en) * 2020-02-17 2020-06-05 兰州交通大学 Comprehensive treatment method for debris flow in catchment power area by water interception and drainage method
CN112031119A (en) * 2020-09-03 2020-12-04 中铁二局集团有限公司 Large-section flood discharge ditch for mountainous terrain and construction method thereof
CN113944223A (en) * 2021-12-06 2022-01-18 中国地质科学院岩溶地质研究所 Drought and flood disaster treatment method based on karst peak-cluster depression group water flow combined regulation and control
CN110432083B (en) * 2019-08-30 2024-04-30 贵州正业工程技术投资有限公司 Karst depression ground surface vegetation ecological restoration device and restoration method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105103843A (en) * 2015-07-27 2015-12-02 中国科学院、水利部成都山地灾害与环境研究所 Vegetation configuration method for preventing water and soil loss of mine dump of dry-hot valley
CN105369832A (en) * 2015-12-08 2016-03-02 贵州正业工程技术投资有限公司 Protective device for karst depression sinkhole
CN107401205A (en) * 2017-08-09 2017-11-28 贵州正业工程技术投资有限公司 A kind of karst depression rainfall utilizes system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105103843A (en) * 2015-07-27 2015-12-02 中国科学院、水利部成都山地灾害与环境研究所 Vegetation configuration method for preventing water and soil loss of mine dump of dry-hot valley
CN105369832A (en) * 2015-12-08 2016-03-02 贵州正业工程技术投资有限公司 Protective device for karst depression sinkhole
CN107401205A (en) * 2017-08-09 2017-11-28 贵州正业工程技术投资有限公司 A kind of karst depression rainfall utilizes system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110432083A (en) * 2019-08-30 2019-11-12 贵州正业工程技术投资有限公司 A kind of karst depression surface vegetation ecological restoration device and its restorative procedure
CN110432083B (en) * 2019-08-30 2024-04-30 贵州正业工程技术投资有限公司 Karst depression ground surface vegetation ecological restoration device and restoration method thereof
CN111236139A (en) * 2020-02-17 2020-06-05 兰州交通大学 Comprehensive treatment method for debris flow in catchment power area by water interception and drainage method
CN112031119A (en) * 2020-09-03 2020-12-04 中铁二局集团有限公司 Large-section flood discharge ditch for mountainous terrain and construction method thereof
CN113944223A (en) * 2021-12-06 2022-01-18 中国地质科学院岩溶地质研究所 Drought and flood disaster treatment method based on karst peak-cluster depression group water flow combined regulation and control
CN113944223B (en) * 2021-12-06 2022-07-26 中国地质科学院岩溶地质研究所 Drought and flood disaster treatment method based on karst peak-cluster depression group water flow combined regulation and control

Similar Documents

Publication Publication Date Title
CN106801403B (en) A method of preventing mud-stone flow disaster and mudstone apoblema recycles
CN206928163U (en) A kind of municipal road surface drainage device
CN114319401A (en) Foundation pit slope drainage system
CN107829482A (en) A kind of large-scale karst depression flood drainage system and its method of drainning off floodwaters
CN102107990A (en) Stepped riverine wetland water purification method
CN103866774A (en) Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation
CN103061327A (en) Comprehensive water control technique for dump
CN207567892U (en) A kind of large size karst depression flood drainage system
CN103266633A (en) Seepage-proof sewage discharging and floodwater draining method for tailing reservoir in wet metallurgy
CN215593525U (en) Roadbed cross section structure capable of changing road surface drainage mode and drainage system thereof
CN110145007A (en) The drainage system of Dumping Sites
CN110130180A (en) A kind of road road shoulder water draining-collecting pparatus
CN107700523B (en) Drainage system of prefabricated upward inclined retaining wall and construction method
CN203755322U (en) Channel pipe network guarded body used for slope protection and drainage and soil fixation of slope collapse
CN203716064U (en) Roadbed sewer convenient for dredging
CN206529660U (en) A kind of water proof road structure
CN206428785U (en) It is a kind of to remove the Multifunctional rain management and control facility become silted up
CN202787282U (en) Step type wet masonry rock berm roadbed side slope
CN104818734B (en) Control completely decomposed granite side slope damage by water waterproof and water drainage system and construction method thereof
CN107724201A (en) A kind of novel water permeable brick structure and method for paving
CN203977495U (en) The anti-rainwater impact system of garden type for residential quarter road
CN207003458U (en) Foundation ditch publicly price-reduction water system in a kind of basic engineering construction
CN206503213U (en) Scattered collection mating type waterproof and water drainage system for highway median strip
CN212427186U (en) Slide-resistant plate retaining wall for slope protection
CN105178133B (en) Permafrost region dish Demonstration for Ecological Sanitation facility and its construction process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination