CN205616477U - Novel pulley mounting fixed knot constructs for jib loading boom - Google Patents

Novel pulley mounting fixed knot constructs for jib loading boom Download PDF

Info

Publication number
CN205616477U
CN205616477U CN201521108906.1U CN201521108906U CN205616477U CN 205616477 U CN205616477 U CN 205616477U CN 201521108906 U CN201521108906 U CN 201521108906U CN 205616477 U CN205616477 U CN 205616477U
Authority
CN
China
Prior art keywords
pulley
bolt
baffle
baffle plate
round pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521108906.1U
Other languages
Chinese (zh)
Inventor
陆曹斌
黄全生
张国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Heavy Machinery Co Ltd
Original Assignee
Xuzhou Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Heavy Machinery Co Ltd filed Critical Xuzhou Heavy Machinery Co Ltd
Priority to CN201521108906.1U priority Critical patent/CN205616477U/en
Application granted granted Critical
Publication of CN205616477U publication Critical patent/CN205616477U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a novel pulley mounting fixed knot constructs for jib loading boom, include and install at the inboard pulley of four sections arm tail ends through bolt, baffle and round pin axle, the bolt passes through baffle fixed pulley, the pulley overhead has the rough cable of drive pentamera arm, the baffle is disc construction, and open at the middle part has the bolt hole, the baffle periphery highly is greater than inboard thickness, can make the bolt of installation baffle not be higher than the baffle surface, the round pin axle is through reinforcing plate fixed pulley, round pin axle and reinforcing plate agree with the position side and are the straight flange structure. The utility model discloses simple structure, the effect is obvious, is favorable to alleviating pentamera arm barrel abrupt change of cross -section degree, makes it self reach full semi -girder performance maximize, the grinding deforming and breaking of mounting hole on four sections arms has been avoided causing because the round pin axle rotates, and richened the round pin axle installation fixing form of pulley.

Description

Fixed structure installed by Novel crane boom pulley
Technical field
This utility model relates to a kind of crane arm installation auxiliary device, belongs to engineering machinery field, and fixed structure installed by specifically a kind of Novel crane boom pulley.
Background technology
At present, in the rope formula telescoping mechanism of crane arm, hoisting of five joint arms is realized by rough rope II and pulley, and pulley is fixed on four joint arm cylinders by bearing pin.The installation form of the most conventional rough rope II pulley and four joint arms is to utilize bolt fastening baffle plate and bearing pin to realize the installation of pulley, and bearing pin is with pulley rotation, we term it traditional pulley pin shaft fixed form.Traditional pulley pin shaft fixed form exacerbates the sudden change in five joint arm cylinder cross sections, is unfavorable for the maximizing performance of five joint arms, and then affects the performance of the full semi-girder of crane arm;Bearing pin is with pulley rotation simultaneously, easily causes four joint arm bearing pin installing holes for a long time and deforms because of grinding, affects hoisting of five joint arms.
Summary of the invention
The problem existed for above-mentioned prior art, this utility model provides a kind of Novel crane boom pulley to install fixed structure, can effectively alleviate five joint arm cylinder abrupt change of cross-section degree so that it is self and full semi-girder maximizing performance;Avoid and cause the grinding deformation failure of installing hole on four joint arms owing to bearing pin rotates.
To achieve these goals, the technical solution adopted in the utility model is: fixed structure installed by a kind of Novel crane boom pulley, including being arranged on the pulley inside four joint arm tail ends by bolt, baffle plate and bearing pin, described bolt passes through baffle plate fixed block, and described pulley is equipped with the rough rope driving five joint arms;Described baffle plate is disc-shaped structure, and middle part has bolt hole, and described baffle plate periphery height is more than inner thickness, and the bolt of installation baffle plate can be made to be not higher than baffle plate outer surface;Described bearing pin passes through reinforcing plate fixed block, and it is straight flange structure that described bearing pin and reinforcing plate agree with position side, by the rotation coordinating restriction bearing pin of straight flange structure.
Preferably, described reinforcing plate is high-strength steel sheet, can effectively limit the rotation of bearing pin, improves and uses durability degree.
Preferably, described baffle plate is machined piece, it is ensured that the precision of accessory size, more puts in place with bolt and coordinating of pulley.
The beneficial effects of the utility model are: be conducive to alleviating five joint arm cylinder abrupt change of cross-section degree so that it is self and full semi-girder maximizing performance;Avoid and cause the grinding deformation failure of installing hole on four joint arms owing to bearing pin rotates;And the bearing pin enriching pulley installs fixed form.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model schematic cross-section;
Fig. 3 is this utility model baffle plate schematic diagram;
Fig. 4 is this utility model baffle plate longitudinal sectional view;
Fig. 5 is this utility model pulley pin shaft fixed structure schematic diagram.
In figure: 1, bearing pin, 2, baffle plate, 3, pulley, 4, rough rope, 5, reinforcing plate, 6, four joint arm cylinders, 7, five joint arm cylinders, 8, bolt.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figures 1 to 5, fixed structure installed by a kind of Novel crane boom pulley, including being arranged on the pulley 3 inside four joint arm cylinder 6 tail ends by bolt 8, baffle plate 2 and bearing pin 1, described bolt 8, by baffle plate 2 fixed block 3, described pulley 3 is equipped with the rough rope 4 driving five joint arm cylinders 7;Described baffle plate 2 is disc-shaped structure, and centre has bolt hole, and the peripheral height of described baffle plate 2, more than inner thickness, can make the outer surface of the bolt 8 not higher than baffle plate 2 of installation baffle plate 2;Described bearing pin 1 is by reinforcing plate 5 fixed block 3, and the position side that agrees with of described bearing pin 1 and reinforcing plate 5 is straight flange structure, by the rotation coordinating restriction bearing pin 1 of straight flange structure, thus avoids installing hole and deforms because of abrasion.
Preferably, described reinforcing plate 5 is high-strength steel sheet, can effectively limit the rotation of bearing pin 1, improves and uses durability degree.
Preferably, described baffle plate 2 is machined piece, it is ensured that the precision of accessory size, more puts in place with bolt and coordinating of pulley.
In sum, this utility model simple in construction, effect is obvious, is conducive to alleviating five joint arm cylinder abrupt change of cross-section degree so that it is self and full semi-girder maximizing performance;Avoid and cause the grinding deformation failure of installing hole on four joint arms owing to bearing pin rotates;And the bearing pin enriching pulley installs fixed form.

Claims (3)

1. fixed structure installed by a Novel crane boom pulley, it is characterized in that, including being arranged on the pulley (3) inside four joint arm cylinder (6) tail ends by bolt (8), baffle plate (2) and bearing pin (1), described bolt (8) passes through baffle plate (2) fixed block (3), and described pulley (3) is equipped with the rough rope (4) driving five joints arm cylinder (7);Described baffle plate (2) is disc-shaped structure, and middle part has bolt hole, and the peripheral height of described baffle plate (2), more than inner thickness, can make the bolt (8) of installation baffle plate (2) be not higher than the outer surface of baffle plate (2);Described bearing pin (1) passes through reinforcing plate (5) fixed block (3), and the position side that agrees with of described bearing pin (1) and reinforcing plate (5) is straight flange structure.
Fixed structure installed by a kind of Novel crane boom pulley the most according to claim 1, it is characterised in that described reinforcing plate (5) is high-strength steel sheet.
Fixed structure installed by a kind of Novel crane boom pulley the most according to claim 1, it is characterised in that described baffle plate (2) is machined piece.
CN201521108906.1U 2015-12-29 2015-12-29 Novel pulley mounting fixed knot constructs for jib loading boom Active CN205616477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521108906.1U CN205616477U (en) 2015-12-29 2015-12-29 Novel pulley mounting fixed knot constructs for jib loading boom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521108906.1U CN205616477U (en) 2015-12-29 2015-12-29 Novel pulley mounting fixed knot constructs for jib loading boom

Publications (1)

Publication Number Publication Date
CN205616477U true CN205616477U (en) 2016-10-05

Family

ID=57034557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521108906.1U Active CN205616477U (en) 2015-12-29 2015-12-29 Novel pulley mounting fixed knot constructs for jib loading boom

Country Status (1)

Country Link
CN (1) CN205616477U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110812743A (en) * 2019-11-11 2020-02-21 长沙中联消防机械有限公司 Rotating wheel device, rotating wheel device mounting structure, telescopic arm and fire fighting truck

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110812743A (en) * 2019-11-11 2020-02-21 长沙中联消防机械有限公司 Rotating wheel device, rotating wheel device mounting structure, telescopic arm and fire fighting truck

Similar Documents

Publication Publication Date Title
CN202321978U (en) Combined lifting appliance for metallurgical environment
CN205616477U (en) Novel pulley mounting fixed knot constructs for jib loading boom
CN204878635U (en) Nylon pulley
CN204737595U (en) Roof beam hoist gyration hoist is hung to four hoisting point electromagnetism
CN203229338U (en) Simple auxiliary lifting device
CN202279654U (en) Pulley system for auxiliary winch of rotary drilling rig
CN207483242U (en) It is a kind of can quick adjustment length jack
CN207258974U (en) A kind of Elevator roller
CN206033085U (en) Marine bank electricity twin drum cable winch
CN206428672U (en) Two-fold cylinder linear pattern headstock gear
CN205312925U (en) Hydraulic luffing formula swing arm tower machine
CN204751863U (en) Roof beam hoist gyration hoist is hung to electromagnetism
CN209038945U (en) A kind of portable electric traction cucurbit
CN210655825U (en) Rotation type soil box lifting hook
CN204487600U (en) A kind of horizontal-vertical double-purpose formula single-shaft position changing machine
CN105502176A (en) Hydraulic luffing-type cantilever tower crane
CN2789206Y (en) Elevator balance compensation chain guider
CN206767507U (en) A kind of winch winding drum structure used for installation work of heavy lift
CN201746232U (en) Portal bridge crane and trolley thereof
CN202424366U (en) Round motor base
CN204434081U (en) A kind of novel hoisting crane electric rotary lifting hook group
CN201882828U (en) Crane provided with split rotary supporting device
CN209887427U (en) Loader transaxle main reducer follow-up flange fixing device
CN204162346U (en) A kind of pipe sling
CN210505339U (en) Large-scale ship lift reel axle and reel body positioning connection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant