CN205610083U - Dismantlement formula pay off rack that electric power construction used - Google Patents

Dismantlement formula pay off rack that electric power construction used Download PDF

Info

Publication number
CN205610083U
CN205610083U CN201620184722.1U CN201620184722U CN205610083U CN 205610083 U CN205610083 U CN 205610083U CN 201620184722 U CN201620184722 U CN 201620184722U CN 205610083 U CN205610083 U CN 205610083U
Authority
CN
China
Prior art keywords
rack
pay
hole
base
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620184722.1U
Other languages
Chinese (zh)
Inventor
潘弘扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing First Construction Engineering Co., Ltd.
Original Assignee
潘弘扬
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 潘弘扬 filed Critical 潘弘扬
Priority to CN201620184722.1U priority Critical patent/CN205610083U/en
Application granted granted Critical
Publication of CN205610083U publication Critical patent/CN205610083U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a dismantlement formula pay off rack that electric power construction used, module including two symmetries set up reaches the cooperation the axostylus axostyle of two modules, the module includes the support body, the bottom of support body is provided with the base, four apex angle position departments of the top surface of base are provided with the installation piece, the top surface of base is close to right side position department and is provided with the walking groove, be provided with the bracing piece on the walking groove, be provided with the screw rod on the top face of bracing piece, the top surface of base is close to the left side position department and is provided with first bracing piece, the top of first bracing piece is provided with the bracket, the top of bracket is provided with the cooperation the swivelling chute of axostylus axostyle, when work -site need connect up, will use the pay off rack, because the pay off rack need prop up the weight of propping up whole bundle of coil, so that pay off rack itself must have is certain important, could steady support starting line circle, the parts of this pay off rack all can be dismantled, and are lighter when letting the operating personnel transport.

Description

A kind of dismountable pay off rack of power construction
Technical field
This utility model relates to the dismountable pay off rack of a kind of power construction.
Background technology
In work progress, often in the steps such as wiring, unwrapping wire, the too many time is spent, such as, during unwrapping wire in the case of a lot, during due to most power construction, the thick line of the cable etc often used, and the weight of a volume cable can reach hundreds of jin, for workman, single cannot be carried out operates, many people operate simultaneously, need the most skilled cooperation, and according to pay off rack, the carrying of pay off rack is also a problem.
Based on the problems referred to above, it is desirable to provide a kind of demountable pay off rack.
Summary of the invention
The technical problems to be solved in the utility model is to provide the dismountable pay off rack of a kind of power construction, when construction site needs wiring, pay off rack will be used, owing to pay off rack needs to support the weight of entire bundle coil, so pay off rack itself have to have certain important, could support coil smoothly, the parts of this pay off rack are all detachable, lighter when allowing operator carry.
For solving the problems referred to above, this utility model adopts the following technical scheme that
nullA kind of dismountable pay off rack of power construction,Including two symmetrically arranged modules,And coordinate the axostylus axostyle of said two module,Described module includes support body,The bottom of described support body is provided with base,It is provided with installation sheet at four corner positions of the end face of described base,It is provided with through hole on described installation sheet,The end face of described base is provided with walking trough at right positions,It is provided with support bar in described walking trough,It is provided with handle at the close apical position of described support bar outer ring,It is provided with rubber case on described handle,It is provided with screw rod on the top end face of described support bar,The described screw flight hole of cooperation it is provided with in described support bar,Described screw rod is provided through hole at tip position,The end face of described base is provided with the first support bar at left position,Described first support bar is provided with the first through hole at bottom position,Described first through hole is connected with described through hole bolt,The top of described first support bar is provided with bracket,The top of described bracket is provided with the swivelling chute coordinating described axostylus axostyle,It is provided with the first through hole at the close bottom position of described bracket,It is connected between described first through hole and described through hole and has the first bolt.
Preferably, it is welded and fixed between described installation sheet and described base.
Preferably, described bracket is V-shaped.
Preferably, described walking trough and described base are integral type structure.
The beneficial effects of the utility model are: when construction site needs wiring, pay off rack will be used, owing to pay off rack needs to support the weight of entire bundle coil, so pay off rack itself have to have certain important, could support coil smoothly, the parts of this pay off rack are the most detachable, when allowing operator carry lighter, the structure of this device is relatively simple, and cost is the cheapest, is suitable for promoting the use of.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in describing below is only embodiments more of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the partial enlarged drawing of A.
Detailed description of the invention
Below in conjunction with the accompanying drawings preferred embodiment of the present utility model is described in detail, so that advantage of the present utility model and feature can be easier to be readily appreciated by one skilled in the art, thus protection domain of the present utility model is made apparent clear and definite defining.
nullDismountable pay off rack refering to a kind of power construction shown in Fig. 1 and Fig. 2,Including two symmetrically arranged modules 1,And coordinate the axostylus axostyle 101 of said two module 1,Described module 1 includes support body 6,The bottom of described support body 6 is provided with base 2,It is provided with installation sheet 201 at four corner positions of the end face of described base 2,It is provided with through hole 202 on described installation sheet 201,The end face of described base 2 is provided with walking trough 203 at right positions,It is provided with support bar 3 in described walking trough 203,It is provided with handle 301 at the close apical position of described support bar 3 outer ring,It is provided with rubber case 302 on described handle 301,It is provided with screw rod 4 on the top end face of described support bar 3,The screwed hole coordinating described screw rod 4 it is provided with in described support bar 3,Described screw rod 4 is provided through hole (not shown) at tip position,The end face of described base 2 is provided with the first support bar 5 at left position,Described first support bar 5 is provided with the first through hole (not shown) at bottom position,Described first through hole (not shown) is connected with described through hole 202 bolt 502,The top of described first support bar 5 is provided with bracket 503,The top of described bracket 503 is provided with the swivelling chute 102 coordinating described axostylus axostyle 101,The first through hole (not shown) it is provided with at the close bottom position of described bracket 503,It is connected between described first through hole (not shown) and described through hole (not shown) and has the first bolt 402.
In this utility model, a preferably practical example, is welded and fixed between described installation sheet 201 and described base 2.
A preferably practical example in this utility model, described bracket 503 is V-shaped.
A preferably practical example in this utility model, described walking trough 203 is integral type structure with described base 2.
The beneficial effects of the utility model are: when construction site needs wiring, pay off rack will be used, owing to pay off rack needs to support the weight of entire bundle coil, so pay off rack itself have to have certain important, could support coil smoothly, the parts of this pay off rack are the most detachable, when allowing operator carry lighter, the structure of this device is relatively simple, and cost is the cheapest, is suitable for promoting the use of.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.Skilled person will appreciate that of the industry; this utility model is not restricted to the described embodiments; described in above-described embodiment and description, principle of the present utility model is simply described; on the premise of without departing from this utility model spirit and scope, this utility model also has various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model claims scope and is defined by appending claims and equivalent thereof.

Claims (4)

  1. null1. the dismountable pay off rack of a power construction,It is characterized in that: include two symmetrically arranged modules,And coordinate the axostylus axostyle of said two module,Described module includes support body,The bottom of described support body is provided with base,It is provided with installation sheet at four corner positions of the end face of described base,It is provided with through hole on described installation sheet,The end face of described base is provided with walking trough at right positions,It is provided with support bar in described walking trough,It is provided with handle at the close apical position of described support bar outer ring,It is provided with rubber case on described handle,It is provided with screw rod on the top end face of described support bar,The described screw flight hole of cooperation it is provided with in described support bar,Described screw rod is provided through hole at tip position,The end face of described base is provided with the first support bar at left position,Described first support bar is provided with the first through hole at bottom position,Described first through hole is connected with described through hole bolt,The top of described first support bar is provided with bracket,The top of described bracket is provided with the swivelling chute coordinating described axostylus axostyle,It is provided with the first through hole at the close bottom position of described bracket,It is connected between described first through hole and described through hole and has the first bolt.
  2. The dismountable pay off rack of power construction the most according to claim 1, it is characterised in that: it is welded and fixed between described installation sheet and described base.
  3. The dismountable pay off rack of power construction the most according to claim 1, it is characterised in that: described bracket is V-shaped.
  4. The dismountable pay off rack of power construction the most according to claim 1, it is characterised in that: described walking trough and described base are integral type structure.
CN201620184722.1U 2016-03-11 2016-03-11 Dismantlement formula pay off rack that electric power construction used Expired - Fee Related CN205610083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620184722.1U CN205610083U (en) 2016-03-11 2016-03-11 Dismantlement formula pay off rack that electric power construction used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620184722.1U CN205610083U (en) 2016-03-11 2016-03-11 Dismantlement formula pay off rack that electric power construction used

Publications (1)

Publication Number Publication Date
CN205610083U true CN205610083U (en) 2016-09-28

Family

ID=56961911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620184722.1U Expired - Fee Related CN205610083U (en) 2016-03-11 2016-03-11 Dismantlement formula pay off rack that electric power construction used

Country Status (1)

Country Link
CN (1) CN205610083U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109466968A (en) * 2018-09-20 2019-03-15 国网安徽省电力有限公司六安市叶集供电公司 A kind of packaged type wire-unfolding rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109466968A (en) * 2018-09-20 2019-03-15 国网安徽省电力有限公司六安市叶集供电公司 A kind of packaged type wire-unfolding rack

Similar Documents

Publication Publication Date Title
CN205294663U (en) Hoisting device for isolation switch
CN205036066U (en) A aerial work platform for construction of steel cylinder body structure
CN205610083U (en) Dismantlement formula pay off rack that electric power construction used
CN204552054U (en) A kind of telescopic work high above the ground hanger bracket
CN203774703U (en) Cable head trimming supporting device
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN206376854U (en) Well testing operating platform
CN203674618U (en) Dedicated ladder facilitating operation of 220 KV/ 66 KV in-and-out wire
CN205104835U (en) A auxiliary device for power line erects
CN207108176U (en) Wind-driven generator and its instrument conveying device
CN209082950U (en) A kind of construction security platform
CN204982632U (en) Novel pontic
CN105502174A (en) Transformer on-load tap-changer (OLTC) suspended core tool
CN211004327U (en) Portable pole wire lifter
CN104131777B (en) A kind of upright ladder
CN209099739U (en) A kind of construction scaffold
CN209481105U (en) It is a kind of large size ball screw assembly, assembly use device
CN205259558U (en) Novel scaffold for fitment
CN205693249U (en) Allocated radio bridge joint line lift work device
CN206769780U (en) Emergency staircase and maintenance of equipment
CN110562871A (en) Portable pole wire lifter
CN205595718U (en) Crane span structure supports structure for inside plant installation
CN205605362U (en) Blade web lifts by crane frock
CN203951101U (en) A kind of double electric pole aerial work platform
CN205502549U (en) Split type scaffold of hanging

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Small Guanzhuang town Baoying County Industrial Zone, Jiangsu city of Yangzhou province 225800

Patentee after: Pan Hongyang

Address before: Yuhang District of Hangzhou City, Zhejiang province 311113 Liangzhu street pumpellyite village 13 groups of 15 villages in Shenjiamen

Patentee before: Pan Hongyang

CB03 Change of inventor or designer information

Inventor after: Lu Xiaoqing

Inventor after: Lou Jianqiang

Inventor after: Liu Changchun

Inventor before: Pan Hongyang

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170427

Address after: 102600 Daxing District, Zhongguancun science and Technology Park Daxing biomedical base, Tian Rong Street, No. 21

Patentee after: Beijing First Construction Engineering Co., Ltd.

Address before: Small Guanzhuang town Baoying County Industrial Zone, Jiangsu city of Yangzhou province 225800

Patentee before: Pan Hongyang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20200311

CF01 Termination of patent right due to non-payment of annual fee