- Publication number
- CN205693249U CN205693249U CN201620591531.7U CN201620591531U CN205693249U CN 205693249 U CN205693249 U CN 205693249U CN 201620591531 U CN201620591531 U CN 201620591531U CN 205693249 U CN205693249 U CN 205693249U
- Authority
- CN
- China
- Prior art keywords
- lifting
- support rods
- lifting support
- operation device
- foot plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种配电台架接线用升降作业装置,包括固定脚板,所述固定脚板开设有连接固定孔,所述连接固定孔内穿设有连接固定螺栓,所述固定脚板上销轴连接两对称设置的下升降支撑杆,两所述下升降支撑杆分别销轴连接有两对称设置上升降支撑杆,所述下升降支撑杆与所述上升降支撑杆之间对应的两连接处分别设有丝杠座,两所述丝杠座之间穿设有升降调节丝杠,所述升降调节丝杠的端部插接有升降摇把,两所述上升降支撑杆销轴连接有升降站台,所述升降站台上围设有围护机构。本实用新型摆脱了斗臂作业车的束缚,提高了劳动效率,降低了机械成本,取代了传统的施工作业方式,可以保证施工人员脱离第一层横担,方便接线作业,保证安全施工。
The utility model discloses an elevating operation device for distribution rack wiring. The shaft is connected to two symmetrically arranged lower lifting support rods, and the two lower lifting support rods are respectively connected with two symmetrically arranged upper lifting support rods, and the corresponding two connections between the lower lifting support rods and the upper lifting support rods There are lead screw seats respectively, and a lifting adjustment screw is inserted between the two screw seats. The end of the lifting adjustment screw is plugged with a lifting crank, and the two upper lifting support rods are connected by a pin shaft. There is a lifting platform, and an enclosure mechanism is arranged around the lifting platform. The utility model gets rid of the shackles of the bucket arm operation vehicle, improves the labor efficiency, reduces the mechanical cost, replaces the traditional construction operation method, can ensure that the construction personnel are separated from the first layer of cross arms, facilitates the wiring operation, and ensures safe construction.
Description
技术领域technical field
本实用新型涉及一种电力建设设备,尤其涉及一种配电台架接线用升降作业装置。The utility model relates to electric power construction equipment, in particular to an elevating operation device for distribution frame wiring.
背景技术Background technique
随着10kV柱上变压器台架广泛推广使用,对于中间下线配电台架就是高压架空导线从台架双杆中间下引,低压架空导线从电杆两侧出线,高低压互不交叉,使用范围极广。其中高压线从电杆顶端下引经过三层横担接入变压器,第一层横担距主线的距离根据国网公司典型设计要求是2900mm,传统的作业模式是:(1)人工爬至杆顶通过释放安全带的长度,靠近中相进行接线,中相接线处距离电杆1400mm,一般施工人员很难达到这个距离,即使达到接线也很困难,身体几乎倾斜70度,安全很难保证。(2)采用斗臂作业车,施工人员在作业台上施工,进行接线,但是作业车一方面受地形限制,有些位置不能进入作业,另一方面作业车使用费用较高,斗臂上升较慢,灵活性差。With the widespread use of 10kV pole-mounted transformer benches, for the middle off-line distribution station, the high-voltage overhead wires are led down from the middle of the double poles of the bench, and the low-voltage overhead wires come out from both sides of the poles. The high and low voltages do not cross each other. The scope is extremely wide. Among them, the high-voltage line is led down from the top of the pole and connected to the transformer through three-layer cross-arms. The distance between the first-layer cross-arm and the main line is 2900mm according to the typical design requirements of State Grid Corporation. The traditional operation mode is: (1) Climb to the top of the pole manually By releasing the length of the safety belt, the wiring is close to the middle phase. The distance between the middle phase wiring and the pole is 1400mm. It is difficult for ordinary construction workers to reach this distance. (2) The bucket arm operation vehicle is used, and the construction personnel work on the operation platform to carry out wiring. However, on the one hand, the operation vehicle is restricted by the terrain, and some positions cannot enter the operation. On the other hand, the operation vehicle costs are high, and the bucket arm rises slowly. , poor flexibility.
实用新型内容Utility model content
本实用新型所要解决的技术问题是提供一种摆脱了斗臂作业车的束缚,提高了劳动效率,降低了机械成本,取代了传统的施工作业方式,可以保证施工人员脱离第一层横担,方便接线作业,且能保证安全施工的配电台架接线用升降作业装置。The technical problem to be solved by the utility model is to provide a method that gets rid of the shackles of the bucket arm operation vehicle, improves the labor efficiency, reduces the mechanical cost, replaces the traditional construction operation method, and can ensure that the construction personnel are separated from the first layer of cross arms. The lifting operation device for distribution rack wiring is convenient for wiring work and can ensure safe construction.
为解决上述技术问题,本实用新型的技术方案是:配电台架接线用升降作业装置,包括固定脚板,所述固定脚板开设有连接固定孔,所述连接固定孔内穿设有连接固定螺栓,所述固定脚板上销轴连接两对称设置的下升降支撑杆,两所述下升降支撑杆分别销轴连接有两对称设置上升降支撑杆,所述下升降支撑杆与所述上升降支撑杆之间对应的两连接处分别设有丝杠座,两所述丝杠座之间穿设有升降调节丝杠,所述升降调节丝杠的端部插接有升降摇把,两所述上升降支撑杆销轴连接有升降站台,所述升降站台上围设有围护机构。In order to solve the above technical problems, the technical proposal of the utility model is: the lifting operation device for wiring of the distribution stand, including a fixed foot plate, the fixed foot plate is provided with a connection fixing hole, and a connection fixing bolt is pierced in the connection fixing hole , the pin shaft on the fixed foot plate is connected to two symmetrically arranged lower lifting support rods, and the pin shafts of the two lower lifting support rods are respectively connected to two symmetrically arranged upper lifting support rods, and the lower lifting support rod is connected to the upper lifting support rod. The corresponding two joints between the rods are respectively provided with screw seats, and a lifting adjustment screw is threaded between the two screw seats, and a lifting handle is plugged into the end of the lifting adjustment screw. The pin shaft of the upper lifting support rod is connected with a lifting platform, and an enclosure mechanism is arranged around the lifting platform.
作为优选的技术方案,所述围护机构包括若干根与所述升降站台连接的围护竖杆,所述围护竖杆的上端之间设有围护横杆。As a preferred technical solution, the enclosure mechanism includes several enclosure vertical rods connected to the lifting platform, and enclosure horizontal bars are arranged between the upper ends of the enclosure vertical rods.
作为对上述技术方案的改进,所述升降站台为正方形设置,所述围护竖杆的数量为四根,且分别位于所述升降站台的四角。As an improvement to the above technical solution, the lifting platform is arranged in a square shape, and the number of the enclosure vertical rods is four, which are respectively located at the four corners of the lifting platform.
作为对上述技术方案的进一步改进,所述升降摇把为Z型设置。As a further improvement to the above technical solution, the lifting handle is arranged in a Z shape.
作为对上述技术方案的进一步改进,所述固定脚板为角钢设置。As a further improvement to the above technical solution, the fixed foot plate is provided with angle steel.
由于采用了上述技术方案,配电台架接线用升降作业装置,包括固定脚板,所述固定脚板开设有连接固定孔,所述连接固定孔内穿设有连接固定螺栓,所述固定脚板上销轴连接两对称设置的下升降支撑杆,两所述下升降支撑杆分别销轴连接有两对称设置上升降支撑杆,所述下升降支撑杆与所述上升降支撑杆之间对应的两连接处分别设有丝杠座,两所述丝杠座之间穿设有升降调节丝杠,所述升降调节丝杠的端部插接有升降摇把,两所述上升降支撑杆销轴连接有升降站台,所述升降站台上围设有围护机构。进行接线前,将所述固定脚板固定在第一层横担的角钢上,并且通过所述连接固定螺栓将所述固定脚板与第一层横担的角钢穿设固定,一施工人员登上所述升降站台,另一施工人员操作所述升降摇把带动所述升降调节丝杠,调节所述下升降支撑杆与所述上升降支撑杆之间张开的角度,以此实现所述升降站台的上升,所述围护机构能够保证在所述升降站台上的施工人员的作业安全,另外在所述升降站台上的施工人员的安全带始终一端连接电杆上,进行高空坠落双重保护。本实用新型摆脱了斗臂作业车的束缚,提高了劳动效率,降低了机械成本,取代了传统的施工作业方式,可以保证施工人员脱离第一层横担,方便接线作业,且能保证安全施工。Due to the adoption of the above technical scheme, the lifting operation device for distribution rack wiring includes a fixed foot plate, and the fixed foot plate is provided with a connection fixing hole, and a connection fixing bolt is pierced in the connection fixing hole, and the pin on the fixed foot plate The shaft is connected to two symmetrically arranged lower lifting support rods, and the two lower lifting support rods are respectively connected with two symmetrically arranged upper lifting support rods, and the corresponding two connections between the lower lifting support rods and the upper lifting support rods There are lead screw seats respectively, and a lifting adjustment screw is inserted between the two screw seats. The end of the lifting adjustment screw is plugged with a lifting crank, and the two upper lifting support rods are connected by a pin shaft. There is a lifting platform, and an enclosure mechanism is arranged around the lifting platform. Before wiring, fix the fixed foot plate on the angle steel of the cross arm of the first layer, and pass through and fix the fixed foot plate and the angle steel of the cross arm of the first layer through the connecting bolts, and a construction worker boards the angle steel of the cross arm of the first layer. For the lifting platform, another construction worker operates the lifting handle to drive the lifting adjustment screw to adjust the opening angle between the lower lifting support rod and the upper lifting support rod, so as to realize the lifting of the lifting platform. The enclosure mechanism can ensure the safety of the construction workers on the lifting platform. In addition, the safety belts of the construction workers on the lifting platform are always connected to the pole at one end to provide double protection for falling from heights. The utility model gets rid of the shackles of the bucket arm operation vehicle, improves the labor efficiency, reduces the mechanical cost, replaces the traditional construction operation method, can ensure that the construction personnel are separated from the first layer of cross arms, facilitates the wiring operation, and can ensure safe construction .
附图说明Description of drawings
以下附图仅旨在于对本实用新型做示意性说明和解释,并不限定本实用新型的范围。其中:The following drawings are only intended to illustrate and explain the utility model schematically, and do not limit the scope of the utility model. in:
图1是本实用新型实施例的结构示意图。Fig. 1 is a schematic structural view of an embodiment of the utility model.
图中:1-固定脚板;2-连接固定孔;3-下升降支撑杆;4-上升降支撑杆;5-丝杠座;6-升降调节丝杠;7-升降摇把;8-升降站台;9-围护竖杆;10-围护横杆。In the figure: 1-fixed foot plate; 2-connection fixing hole; 3-lower lifting support rod; 4-upper lifting support rod; 5-screw seat; 6-lifting adjustment screw; 7-lifting handle; Platform; 9-enclosure vertical bar; 10-enclosure cross bar.
具体实施方式detailed description
下面结合附图和实施例,进一步阐述本实用新型。在下面的详细描述中,只通过说明的方式描述了本实用新型的某些示范性实施例。毋庸置疑,本领域的普通技术人员可以认识到,在不偏离本实用新型的精神和范围的情况下,可以用各种不同的方式对所描述的实施例进行修正。因此,附图和描述在本质上是说明性的,而不是用于限制权利要求的保护范围。Below in conjunction with accompanying drawing and embodiment, further set forth the utility model. In the following detailed description, certain exemplary embodiments of the present invention are described by way of illustration only. Needless to say, those skilled in the art would realize that the described embodiments may be modified in various different ways, all without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are illustrative in nature and not intended to limit the scope of the claims.
如图1所示,配电台架接线用升降作业装置,包括固定脚板1,所述固定脚板1开设有连接固定孔2,所述连接固定孔2内穿设有连接固定螺栓(图中未示出),所述固定脚板1上销轴连接两对称设置的下升降支撑杆3,两所述下升降支撑杆3分别销轴连接有两对称设置上升降支撑杆4,所述下升降支撑杆3与所述上升降支撑杆4之间对应的两连接处分别设有丝杠座5,两所述丝杠座5之间穿设有升降调节丝杠6,所述升降调节丝杠6的端部插接有升降摇把7,两所述上升降支撑杆4销轴连接有升降站台8,所述升降站台8上围设有围护机构。进行接线前,将所述固定脚板1固定在第一层横担的角钢上,并且通过所述连接固定螺栓将所述固定脚板1与第一层横担的角钢穿设固定,一施工人员登上所述升降站台8,另一施工人员操作所述升降摇把7带动所述升降调节丝杠6,调节所述下升降支撑杆3与所述上升降支撑杆4之间张开的角度,以此实现所述升降站台8的上升,所述围护机构能够保证在所述升降站台8上的施工人员的作业安全,另外在所述升降站台8上的施工人员的安全带始终一端连接电杆上,进行高空坠落双重保护。本实用新型摆脱了斗臂作业车的束缚,提高了劳动效率,降低了机械成本,取代了传统的施工作业方式,可以保证施工人员脱离第一层横担,方便接线作业,且能保证安全施工。As shown in Figure 1, the lifting operation device for wiring the distribution stand includes a fixed foot plate 1, and the fixed foot plate 1 is provided with a connection and fixing hole 2, and a connection and fixing bolt (not shown in the figure) is pierced in the connection and fixing hole 2. As shown), the upper pin shaft of the fixed foot plate 1 is connected to two symmetrically arranged lower lifting support rods 3, and the pin shafts of the two lower lifting support rods 3 are respectively connected to two symmetrically arranged upper lifting support rods 4. The corresponding two joints between the rod 3 and the upper lifting support rod 4 are respectively provided with a screw seat 5, and a lifting adjustment screw 6 is worn between the two screw seats 5, and the lifting adjustment screw 6 The end of the jack is plugged with a lifting handle 7, and the two upper lifting support rods 4 pin shafts are connected with a lifting platform 8, and the lifting platform 8 is provided with an enclosure mechanism. Before wiring, fix the fixed foot plate 1 on the angle steel of the cross arm of the first layer, and pass through and fix the fixed foot plate 1 and the angle steel of the cross arm of the first layer through the connecting fixing bolts. On the lifting platform 8, another construction worker operates the lifting handle 7 to drive the lifting adjustment screw 6 to adjust the opening angle between the lower lifting support rod 3 and the upper lifting support rod 4, Realize the rise of described lifting platform 8 in this way, and described enclosure mechanism can guarantee the working safety of construction personnel on described lifting platform 8, and the safety belt of the construction personnel on described lifting platform 8 is always connected to electric wire at one end in addition. on the pole for double protection against falling from high altitudes. The utility model gets rid of the shackles of the bucket arm operation vehicle, improves the labor efficiency, reduces the mechanical cost, replaces the traditional construction operation method, can ensure that the construction personnel are separated from the first layer of cross arms, facilitates the wiring operation, and can ensure safe construction .
所述围护机构包括若干根与所述升降站台8连接的围护竖杆9,所述围护竖杆9的上端之间设有围护横杆10,上述结构方便连接,能够保证在所述升降站台8上的施工人员的作业安全Described enclosure mechanism comprises several enclosure vertical rods 9 that are connected with described lifting platform 8, is provided with enclosure horizontal bar 10 between the upper ends of described enclosure vertical rods 9, and above-mentioned structure is convenient to connect, can ensure that Describe the operation safety of the construction personnel on the lifting platform 8
所述升降站台8为正方形设置,所述围护竖杆9的数量为四根,且分别位于所述升降站台8的四角,上述结构便于加工生产。The lifting platform 8 is arranged in a square, and the number of the enclosure vertical bars 9 is four, and they are respectively located at the four corners of the lifting platform 8. The above-mentioned structure is convenient for processing and production.
所述升降摇把7为Z型设置,上述结构便于操作。The lifting handle 7 is arranged in a Z shape, and the above-mentioned structure is easy to operate.
所述固定脚板1为角钢设置,上述结构便于与第一层横担的角钢连接固定。The fixed foot plate 1 is provided with angle steel, and the above-mentioned structure is convenient to be connected and fixed with the angle steel of the cross arm of the first layer.
以上显示和描述了本实用新型的基本原理、主要特征及本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620591531.7U CN205693249U (en) | 2016-06-16 | 2016-06-16 | Allocated radio bridge joint line lift work device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620591531.7U CN205693249U (en) | 2016-06-16 | 2016-06-16 | Allocated radio bridge joint line lift work device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205693249U true CN205693249U (en) | 2016-11-16 |
Family
ID=57414961
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620591531.7U Expired - Fee Related CN205693249U (en) | 2016-06-16 | 2016-06-16 | Allocated radio bridge joint line lift work device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205693249U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106880435A (en) * | 2017-03-17 | 2017-06-23 | 遵义医学院附属医院 | A kind of adjustable tractor for spine |
-
2016
- 2016-06-16 CN CN201620591531.7U patent/CN205693249U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106880435A (en) * | 2017-03-17 | 2017-06-23 | 遵义医学院附属医院 | A kind of adjustable tractor for spine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102882153B (en) | Phase replacing insulator string method in charged for replacement circuit many times towers | |
| CN210985154U (en) | Grounding wire device | |
| CN103647229B (en) | Earth potential reset suspension insulator side of wire bowl head W sells special tool utensil | |
| CN203339564U (en) | High-altitude extended wiring pliers | |
| CN207183925U (en) | Power distribution network uninterrupted operation insulating bar working system Special hanging bridge | |
| CN203607744U (en) | Special tool for resetting overhanging insulator lead-side socket W-shaped pin at ground potential | |
| CN205693249U (en) | Allocated radio bridge joint line lift work device | |
| CN205442525U (en) | Supplementary device of changing of part | |
| CN207303796U (en) | One kind is used for electric power apparatus examination Portable lifting device | |
| CN205565515U (en) | Overhead OPGW composite optical cable ground wire riser | |
| CN206775000U (en) | Wire lifts insulating support | |
| CN203119360U (en) | High-voltage cabinet maintenance electrical insulating stool | |
| CN204079401U (en) | Aloft work maintenance lift cramping arrangement | |
| CN203114144U (en) | Overhung maintenance hook ladder | |
| CN203728474U (en) | Substation special elevator | |
| CN204144786U (en) | Unmanned plane installing 110kV-500kV line security ground wire device | |
| CN203522016U (en) | Device for lifting overhead ground wire | |
| CN209169825U (en) | A kind of live working tools that multi-thread folder is general | |
| CN107196234A (en) | A kind of repair method of power equipment | |
| CN202949163U (en) | Maintenance platform for tubular busbar post insulator | |
| CN102891451B (en) | A kind of tubular busbar post insulator overhaul platform | |
| CN201802299U (en) | Special ladder for high-tension line maintenance | |
| CN104218480A (en) | Aerial maintenance lifting fixture and application method thereof | |
| CN205029217U (en) | Overhaul test device | |
| CN103474903A (en) | Method for entering 500kV common-tower double-circuit vertically-arranged compact transmission line equipotential |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161116 Termination date: 20170616 |
|