CN205606560U - Water cooling circulation rubbish equipment for heat treatment - Google Patents
Water cooling circulation rubbish equipment for heat treatment Download PDFInfo
- Publication number
- CN205606560U CN205606560U CN201620221983.6U CN201620221983U CN205606560U CN 205606560 U CN205606560 U CN 205606560U CN 201620221983 U CN201620221983 U CN 201620221983U CN 205606560 U CN205606560 U CN 205606560U
- Authority
- CN
- China
- Prior art keywords
- cooling
- outlet
- recyclegas
- cooling medium
- entrance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
The utility model discloses a water cooling circulation rubbish equipment for heat treatment fires the burning furnace oven and is equipped with bilayer structure, forming cooling chamber between the bilayer structure, firing the recycle gas that produces in the burning furnace and get into the internal cooling of cooler bin and get rid of to return behind the comdenstion water to fire and carry out the secondary in the burning furnace and fully burn, the comdenstion water gets into the condensation water tank, and coolant in the container is internal to the recycle gas cooling through the cooler bin in proper order, then get into the cooling cavity that fires burning furnace to fire return the container after the burning furnace cooling in. Through the water cooling circulation rubbish equipment for heat treatment of above -mentioned optimal design, rubbish burn in firing burning furnace the combustible gas that produces through return after getting rid of the comdenstion water fire burning furnace in, on the one hand for the combustible gas who produces in the burning fully burns, and is pollution -free to the environment, and play combustion -supporting effect to the rubbish that fires in the burning furnace, on the other hand, coolant at first cools off the recycle gas, then cools off firing burning furnace, improves coolant's heat utilization efficiency.
Description
Technical field
This utility model relates to technical field of waste treatment, particularly relates to a kind of recirculated water cooling rubbish heat treatment and sets
Standby.
Background technology
In recent years, along with the raising of living standards of the people, Municipal Domestic Garbage Output grows at top speed, over the years
Sanitary fill storage is huge.Generally use the mode of garbage loading embeading to process, cause rubbish to corrode a large amount of soils.
Burning method can realize effective process of house refuse to greatest extent, and land occupation resource is minimum, but
Direct discharge as unprocessed in incineration tail gas, can be serious to air pollution.Therefore, the most efficiently, low cost,
Contamination-freely house refuse is cleared up the most thoroughly, it has also become those skilled in the art are urgently to be resolved hurrily
Problem.
Utility model content
For solving technical problem present in background technology, the utility model proposes a kind of recirculated water cooling rubbish heat
Processing equipment.
A kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes, including: combustion furnace, circulating air
Body chiller, container;
Furnace interior has the furnace chamber for incineration firing, and described furnace chamber is provided with garbage inlet, the first circulating air
Body outlet, the first recyclegas entrance, air intake, slag-drip opening, offgas outlet, garbage inlet and first
Recyclegas outlet is positioned at described furnace chamber top, and air intake, slag-drip opening, the first recyclegas entrance are positioned at
Bottom described furnace chamber, furnace wall of combustion furnace is provided with double-decker, forms the first cooling chamber between described double-decker
Room, described first cooling chamber is provided with the first cooling medium entrance and the outlet of the first cooling medium;
Recyclegas chiller includes cooling box, gas pipeline, has receiving cooling and be situated between in cooling box
Second cooling chamber of matter, described second cooling chamber's sidewall is provided with the second cooling medium entrance and the second cooling
Media outlet, gas pipeline is arranged in cooling box, gas pipeline be provided with the second recyclegas entrance,
Second recyclegas outlet, condensation-water drain, the second recyclegas entrance and the first recyclegas of combustion furnace
Outlet, the second recyclegas outlet connects with the first recyclegas entrance of combustion furnace, condensation-water drain
Place is provided with condensation water tank;
Being provided with the storage chamber for storing cooling medium inside container, container is provided with the 3rd cooling and is situated between
Matter entrance, the 3rd cooling medium outlet;
3rd cooling medium outlet and the second cooling medium entrance are by pipeline connection, the second cooling medium outlet
Led to by pipeline connection, the first cooling medium outlet and the 3rd cooling medium entrance with the first cooling medium entrance
Cross pipeline connection.
Preferably, combustion furnace includes upper furnace body and lower furnace body;
Upper furnace body periphery is provided with peripheral wall, forms the first cooling cavity between peripheral wall and upper furnace body outer wall, the
One cooling cavity is provided with inlet exhaust gas and offgas outlet, is provided with cooling tube in described first cooling cavity, cold
But it is filled with cooling medium in pipe;
Lower furnace body outer wall includes first time coaming plate and second time coaming plate, and second time coaming plate is set in first time coaming plate
Outside, forms the second cooling cavity, in described second cooling cavity between first time coaming plate and second time coaming plate
Being filled with cooling medium, lower furnace body is provided with air intake and offgas outlet, described offgas outlet and upper furnace body
First cooling cavity gas feed connection, described second cooling cavity connects with cooling tube.
Preferably, gas pipeline is vertically arranged in cooling box, the second recyclegas entrance, the second circulation
Gas outlet, condensation-water drain set gradually from top to bottom.
Preferably, the 3rd cooling medium outlet is sequentially communicated with the second cooling cavity and cooling tube.
In this utility model, the recirculated water cooling rubbish Equipment for Heating Processing proposed, furnace wall of combustion furnace is provided with bilayer
Structure, forms cooling chamber between described double-decker, the recyclegas produced in combustion furnace enters cooler bin
Internal cooling carries out secondary in returning to combustion furnace after removing condensed water and fully burns, and the condensed water after separation enters
Condensation water tank, recyclegas is lowered the temperature in sequentially passing through cooling box, is then entered by the cooling medium in container
The cooling cavity entering combustion furnace returns in container after the cooling of combustion furnace.The circulation designed by above-mentioned optimization
Water-cooled rubbish Equipment for Heating Processing, reasonable in design, rubbish burn in combustion furnace produce fuel gas warp
Return in combustion furnace after crossing removal condensed water, on the one hand, the fuel gas produced in burning is fully burnt,
Environmentally safe, and the rubbish in combustion furnace is played combustion-supporting effect, on the other hand, cooling medium is first
First recyclegas is cooled down, then combustion furnace is cooled down, improve the heat utilization efficiency of cooling medium.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes.
Detailed description of the invention
As it is shown in figure 1, the knot that Fig. 1 is a kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes
Structure schematic diagram.
Reference Fig. 1, a kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes, including: combustion furnace
1, recyclegas chiller, container 3;
Combustion furnace 1 is internal has the furnace chamber for incineration firing, and described furnace chamber is provided with garbage inlet, the first circulation
Gas outlet, the first recyclegas entrance, air intake, slag-drip opening, offgas outlet, garbage inlet and
One recyclegas outlet is positioned at described furnace chamber top, air intake, slag-drip opening, the first recyclegas entrance position
Bottom described furnace chamber, furnace wall, combustion furnace 1 is provided with double-decker, forms first cold between described double-decker
But chamber, described first cooling chamber is provided with the first cooling medium entrance and the outlet of the first cooling medium;
Recyclegas chiller includes cooling box 21, gas pipeline 22, has appearance in cooling box 21
Receive the second cooling chamber of cooling medium, described second cooling chamber's sidewall be provided with the second cooling medium entrance and
Second cooling medium outlet, gas pipeline 22 is vertically arranged in cooling box 21, on gas pipeline 22 certainly
Upper and under be sequentially provided with the second recyclegas entrance, the second recyclegas outlet, condensation-water drain, second follows
Ring gas access and the first recyclegas outlet of combustion furnace 1, the second recyclegas outlet and combustion furnace 1
First recyclegas entrance connection, be provided with condensation water tank 23 at condensation-water drain;
Container 3 is internal is provided with the storage chamber for storing cooling medium, and it is cold that container 3 is provided with the 3rd
But medium inlet, the 3rd cooling medium outlet;
3rd cooling medium outlet and the second cooling medium entrance are by pipeline connection, the second cooling medium outlet
Led to by pipeline connection, the first cooling medium outlet and the 3rd cooling medium entrance with the first cooling medium entrance
Cross pipeline connection.
During the specific works of the recirculated water cooling rubbish Equipment for Heating Processing of the present embodiment, house refuse is from top
Insert combustion furnace intracavity, by air inlet to furnace chamber bottom gas-feeding so that rubbish fires bottom-up
Burning, the waste residue that incineration firing produces is discharged by slag-drip opening, and final tail gas is discharged by waste gas outlet;In combustion
During burning, the recyclegas that incineration firing produces enters the gas in cooling box through recyclegas outlet
Pipeline cools down, and gas forms condensed water at gas pipeline tube wall after gas pipeline cools down, it is achieved gas
Liquid separates, and the gas after cooling returns in furnace chamber, fully burns;Want according to the chilling temperature in equipment
Asking different, the cooling medium in container carries out Quench to recyclegas in initially entering cooling box, it is ensured that
Recyclegas Quick gas-liquid separates, and subsequently in the cooling cavity of body of heater periphery, cools down body of heater,
Thus effectively body of heater is lowered the temperature.
In the present embodiment, the recirculated water cooling rubbish Equipment for Heating Processing proposed, furnace wall of combustion furnace is provided with bilayer
Structure, forms cooling chamber between described double-decker, the recyclegas produced in combustion furnace enters cooler bin
Internal cooling carries out secondary in returning to combustion furnace after removing condensed water and fully burns, and condensed water enters condensation water tank,
Recyclegas is lowered the temperature, subsequently into combustion furnace in sequentially passing through cooling box by the cooling medium in container
Cooling cavity returns in container after lowering the temperature combustion furnace.The recirculated water cooling rubbish heat designed by above-mentioned optimization
Processing equipment, rubbish returns to combustion furnace at the fuel gas produced that burns in combustion furnace after removing condensed water
In, on the one hand, the fuel gas produced in burning is fully burnt, environmentally safe, and to combustion
The rubbish burnt in stove plays combustion-supporting effect, and on the other hand, first recyclegas is cooled down by cooling medium,
Then combustion furnace is cooled down, improve the heat utilization efficiency of cooling medium.
When the specific design of combustion furnace, combustion furnace 1 includes upper furnace body and lower furnace body;
Upper furnace body periphery is provided with peripheral wall 4, forms the first cooling cavity between peripheral wall 4 and upper furnace body outer wall,
First cooling cavity is provided with inlet exhaust gas and offgas outlet, is provided with cooling tube 5 in described first cooling cavity,
It is filled with cooling medium in cooling tube 5;
Lower furnace body outer wall includes first time coaming plate 61 and second time coaming plate 62, and second time coaming plate 62 is set in
Once coaming plate 61 is outside, forms the second cooling cavity, institute between first time coaming plate 61 and second time coaming plate 62
Being filled with cooling medium in stating the second cooling cavity, lower furnace body is provided with air intake and offgas outlet, described
Offgas outlet connects with the gas feed of the first cooling cavity of upper furnace body, described second cooling cavity and cooling
Pipe 5 connects.
When combustion furnace body of heater is cooled down by cooling medium, cooling medium the most successively to lower furnace body and
Upper furnace body cools down, owing to rubbish burns in combustion furnace bottom-up, therefore furnace temperature by under
Upwards gradually rising, therefore, lower furnace body is first lowered the temperature by the relatively low cooling medium of temperature, it is ensured that body of heater side
Wall temperature is lowered the temperature very well, thus extends body of heater service life.
The above, only this utility model preferably detailed description of the invention, but protection model of the present utility model
Enclose and be not limited thereto, the technology model that any those familiar with the art discloses at this utility model
In enclosing, conceive in addition equivalent or change according to the technical solution of the utility model and utility model thereof, all
Should contain within protection domain of the present utility model.
Claims (4)
1. a recirculated water cooling rubbish Equipment for Heating Processing, it is characterised in that including: combustion furnace (1), circulation
Gas chiller, container (3);
Combustion furnace (1) is internal has the furnace chamber for incineration firing, and described furnace chamber is provided with garbage inlet, first follows
Ring gas outlet, the first recyclegas entrance, air intake, slag-drip opening, offgas outlet, garbage inlet and
First recyclegas outlet is positioned at described furnace chamber top, air intake, slag-drip opening, the first recyclegas entrance
Being positioned at bottom described furnace chamber, combustion furnace (1) furnace wall is provided with double-decker, forms the between described double-decker
One cooling chamber, described first cooling chamber is provided with the first cooling medium entrance and the outlet of the first cooling medium;
Recyclegas chiller includes cooling box (21), gas pipeline (22), cooling box (21)
Inside having the second cooling chamber accommodating cooling medium, described second cooling chamber's sidewall is provided with the second cooling and is situated between
Matter entrance and the outlet of the second cooling medium, gas pipeline (22) is arranged in cooling box (21), gas
Pipeline (22) is provided with the second recyclegas entrance, the second recyclegas exports, condensation-water drain, and second
Recyclegas entrance and the first recyclegas outlet of combustion furnace (1), the second recyclegas outlet and combustion
Burn the first recyclegas entrance connection of stove (1), at condensation-water drain, be provided with condensation water tank (23);
Container (3) is internal is provided with the storage chamber for storing cooling medium, and container (3) is provided with
3rd cooling medium entrance, the 3rd cooling medium outlet;
3rd cooling medium outlet and the second cooling medium entrance are by pipeline connection, the second cooling medium outlet
Led to by pipeline connection, the first cooling medium outlet and the 3rd cooling medium entrance with the first cooling medium entrance
Cross pipeline connection.
Recirculated water cooling rubbish Equipment for Heating Processing the most according to claim 1, it is characterised in that combustion furnace
(1) upper furnace body and lower furnace body are included;
Upper furnace body periphery is provided with peripheral wall (4), forms the first cooling between peripheral wall (4) and upper furnace body outer wall
Cavity, the first cooling cavity is provided with inlet exhaust gas and offgas outlet, is provided with cold in described first cooling cavity
But pipe (5), cooling tube is filled with cooling medium in (5);
Lower furnace body outer wall includes first time coaming plate (61) and second time coaming plate (62), second time coaming plate (62)
It is set in first time coaming plate (61) outside, shape between first time coaming plate (61) and second time coaming plate (62)
Becoming the second cooling cavity, be filled with cooling medium in described second cooling cavity, lower furnace body is provided with air and enters
Mouth and offgas outlet, described offgas outlet connects with the gas feed of the first cooling cavity of upper furnace body, described
Second cooling cavity connects with cooling tube (5).
Recirculated water cooling rubbish Equipment for Heating Processing the most according to claim 1, it is characterised in that gas tube
Road (22) is vertically arranged in cooling box (21), and the second recyclegas entrance, the second recyclegas go out
Mouth, condensation-water drain set gradually from top to bottom.
Recirculated water cooling rubbish Equipment for Heating Processing the most according to claim 1, it is characterised in that the 3rd is cold
But media outlet and the second cooling cavity and cooling tube (5) are sequentially communicated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620221983.6U CN205606560U (en) | 2016-03-21 | 2016-03-21 | Water cooling circulation rubbish equipment for heat treatment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620221983.6U CN205606560U (en) | 2016-03-21 | 2016-03-21 | Water cooling circulation rubbish equipment for heat treatment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205606560U true CN205606560U (en) | 2016-09-28 |
Family
ID=56963673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620221983.6U Expired - Fee Related CN205606560U (en) | 2016-03-21 | 2016-03-21 | Water cooling circulation rubbish equipment for heat treatment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205606560U (en) |
-
2016
- 2016-03-21 CN CN201620221983.6U patent/CN205606560U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102642968A (en) | Oil-water-solid separation device for kitchen wastes | |
CN205619283U (en) | Garbage combustion furnace of high -efficient heat conduction | |
CN105674278B (en) | A kind of refuse burner of high combustion efficiency | |
CN205619271U (en) | Abundant domestic waste combustion apparatus burns | |
CN205606560U (en) | Water cooling circulation rubbish equipment for heat treatment | |
CN205619305U (en) | Garbage incinerator gas circulation device | |
CN105698191A (en) | Water circulating system for rubbish burning treatment | |
CN205619338U (en) | Categorised discharge garbage combustion furnace of solid -liquid gas three -phase result | |
CN205619311U (en) | Domestic waste pyrolysis oven | |
CN205619339U (en) | Gaseous heat exchange type garbage combustion furnace | |
CN205606561U (en) | Novel domestic waste fires burning furnace | |
CN104848262A (en) | Return air furnace capable of recycling waste heat | |
CN205619280U (en) | Garbage combustion furnace that combustion efficiency is high | |
CN205843027U (en) | The boiler that a kind of double back journey is energy-efficient | |
CN205619270U (en) | Efficient gas endless waste combustion installation | |
CN105674279B (en) | A kind of sufficient house refuse combustion apparatus of burning | |
CN201607017U (en) | Hot water boiler burning waste materials | |
CN201992696U (en) | Biomass low-carbon fire toasting furnace | |
CN105674277B (en) | A kind of incineration firing equipment of gas circulation | |
CN105716085A (en) | Garbage treatment method | |
CN106994461A (en) | A kind of environment-friendly and energy-efficient animals with diseases innocent treatment equipment and its method | |
CN205606584U (en) | Domestic waste combustion apparatus | |
CN205619345U (en) | Rubbish combustion processing water circulating system | |
CN105674294B (en) | A kind of solid-liquid-gas three phase product classification discharge refuse burner | |
CN201697213U (en) | Heating system of solar wall-mounted gas furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |