CN205606560U - Water cooling circulation rubbish equipment for heat treatment - Google Patents

Water cooling circulation rubbish equipment for heat treatment Download PDF

Info

Publication number
CN205606560U
CN205606560U CN201620221983.6U CN201620221983U CN205606560U CN 205606560 U CN205606560 U CN 205606560U CN 201620221983 U CN201620221983 U CN 201620221983U CN 205606560 U CN205606560 U CN 205606560U
Authority
CN
China
Prior art keywords
cooling
outlet
recyclegas
cooling medium
entrance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620221983.6U
Other languages
Chinese (zh)
Inventor
李启仁
曹文波
明永刚
舒志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Weiming Biological Environmental Protection Co Ltd
Original Assignee
Anhui Weiming Biological Environmental Protection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Weiming Biological Environmental Protection Co Ltd filed Critical Anhui Weiming Biological Environmental Protection Co Ltd
Priority to CN201620221983.6U priority Critical patent/CN205606560U/en
Application granted granted Critical
Publication of CN205606560U publication Critical patent/CN205606560U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a water cooling circulation rubbish equipment for heat treatment fires the burning furnace oven and is equipped with bilayer structure, forming cooling chamber between the bilayer structure, firing the recycle gas that produces in the burning furnace and get into the internal cooling of cooler bin and get rid of to return behind the comdenstion water to fire and carry out the secondary in the burning furnace and fully burn, the comdenstion water gets into the condensation water tank, and coolant in the container is internal to the recycle gas cooling through the cooler bin in proper order, then get into the cooling cavity that fires burning furnace to fire return the container after the burning furnace cooling in. Through the water cooling circulation rubbish equipment for heat treatment of above -mentioned optimal design, rubbish burn in firing burning furnace the combustible gas that produces through return after getting rid of the comdenstion water fire burning furnace in, on the one hand for the combustible gas who produces in the burning fully burns, and is pollution -free to the environment, and play combustion -supporting effect to the rubbish that fires in the burning furnace, on the other hand, coolant at first cools off the recycle gas, then cools off firing burning furnace, improves coolant's heat utilization efficiency.

Description

A kind of recirculated water cooling rubbish Equipment for Heating Processing
Technical field
This utility model relates to technical field of waste treatment, particularly relates to a kind of recirculated water cooling rubbish heat treatment and sets Standby.
Background technology
In recent years, along with the raising of living standards of the people, Municipal Domestic Garbage Output grows at top speed, over the years Sanitary fill storage is huge.Generally use the mode of garbage loading embeading to process, cause rubbish to corrode a large amount of soils. Burning method can realize effective process of house refuse to greatest extent, and land occupation resource is minimum, but Direct discharge as unprocessed in incineration tail gas, can be serious to air pollution.Therefore, the most efficiently, low cost, Contamination-freely house refuse is cleared up the most thoroughly, it has also become those skilled in the art are urgently to be resolved hurrily Problem.
Utility model content
For solving technical problem present in background technology, the utility model proposes a kind of recirculated water cooling rubbish heat Processing equipment.
A kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes, including: combustion furnace, circulating air Body chiller, container;
Furnace interior has the furnace chamber for incineration firing, and described furnace chamber is provided with garbage inlet, the first circulating air Body outlet, the first recyclegas entrance, air intake, slag-drip opening, offgas outlet, garbage inlet and first Recyclegas outlet is positioned at described furnace chamber top, and air intake, slag-drip opening, the first recyclegas entrance are positioned at Bottom described furnace chamber, furnace wall of combustion furnace is provided with double-decker, forms the first cooling chamber between described double-decker Room, described first cooling chamber is provided with the first cooling medium entrance and the outlet of the first cooling medium;
Recyclegas chiller includes cooling box, gas pipeline, has receiving cooling and be situated between in cooling box Second cooling chamber of matter, described second cooling chamber's sidewall is provided with the second cooling medium entrance and the second cooling Media outlet, gas pipeline is arranged in cooling box, gas pipeline be provided with the second recyclegas entrance, Second recyclegas outlet, condensation-water drain, the second recyclegas entrance and the first recyclegas of combustion furnace Outlet, the second recyclegas outlet connects with the first recyclegas entrance of combustion furnace, condensation-water drain Place is provided with condensation water tank;
Being provided with the storage chamber for storing cooling medium inside container, container is provided with the 3rd cooling and is situated between Matter entrance, the 3rd cooling medium outlet;
3rd cooling medium outlet and the second cooling medium entrance are by pipeline connection, the second cooling medium outlet Led to by pipeline connection, the first cooling medium outlet and the 3rd cooling medium entrance with the first cooling medium entrance Cross pipeline connection.
Preferably, combustion furnace includes upper furnace body and lower furnace body;
Upper furnace body periphery is provided with peripheral wall, forms the first cooling cavity between peripheral wall and upper furnace body outer wall, the One cooling cavity is provided with inlet exhaust gas and offgas outlet, is provided with cooling tube in described first cooling cavity, cold But it is filled with cooling medium in pipe;
Lower furnace body outer wall includes first time coaming plate and second time coaming plate, and second time coaming plate is set in first time coaming plate Outside, forms the second cooling cavity, in described second cooling cavity between first time coaming plate and second time coaming plate Being filled with cooling medium, lower furnace body is provided with air intake and offgas outlet, described offgas outlet and upper furnace body First cooling cavity gas feed connection, described second cooling cavity connects with cooling tube.
Preferably, gas pipeline is vertically arranged in cooling box, the second recyclegas entrance, the second circulation Gas outlet, condensation-water drain set gradually from top to bottom.
Preferably, the 3rd cooling medium outlet is sequentially communicated with the second cooling cavity and cooling tube.
In this utility model, the recirculated water cooling rubbish Equipment for Heating Processing proposed, furnace wall of combustion furnace is provided with bilayer Structure, forms cooling chamber between described double-decker, the recyclegas produced in combustion furnace enters cooler bin Internal cooling carries out secondary in returning to combustion furnace after removing condensed water and fully burns, and the condensed water after separation enters Condensation water tank, recyclegas is lowered the temperature in sequentially passing through cooling box, is then entered by the cooling medium in container The cooling cavity entering combustion furnace returns in container after the cooling of combustion furnace.The circulation designed by above-mentioned optimization Water-cooled rubbish Equipment for Heating Processing, reasonable in design, rubbish burn in combustion furnace produce fuel gas warp Return in combustion furnace after crossing removal condensed water, on the one hand, the fuel gas produced in burning is fully burnt, Environmentally safe, and the rubbish in combustion furnace is played combustion-supporting effect, on the other hand, cooling medium is first First recyclegas is cooled down, then combustion furnace is cooled down, improve the heat utilization efficiency of cooling medium.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes.
Detailed description of the invention
As it is shown in figure 1, the knot that Fig. 1 is a kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes Structure schematic diagram.
Reference Fig. 1, a kind of recirculated water cooling rubbish Equipment for Heating Processing that the utility model proposes, including: combustion furnace 1, recyclegas chiller, container 3;
Combustion furnace 1 is internal has the furnace chamber for incineration firing, and described furnace chamber is provided with garbage inlet, the first circulation Gas outlet, the first recyclegas entrance, air intake, slag-drip opening, offgas outlet, garbage inlet and One recyclegas outlet is positioned at described furnace chamber top, air intake, slag-drip opening, the first recyclegas entrance position Bottom described furnace chamber, furnace wall, combustion furnace 1 is provided with double-decker, forms first cold between described double-decker But chamber, described first cooling chamber is provided with the first cooling medium entrance and the outlet of the first cooling medium;
Recyclegas chiller includes cooling box 21, gas pipeline 22, has appearance in cooling box 21 Receive the second cooling chamber of cooling medium, described second cooling chamber's sidewall be provided with the second cooling medium entrance and Second cooling medium outlet, gas pipeline 22 is vertically arranged in cooling box 21, on gas pipeline 22 certainly Upper and under be sequentially provided with the second recyclegas entrance, the second recyclegas outlet, condensation-water drain, second follows Ring gas access and the first recyclegas outlet of combustion furnace 1, the second recyclegas outlet and combustion furnace 1 First recyclegas entrance connection, be provided with condensation water tank 23 at condensation-water drain;
Container 3 is internal is provided with the storage chamber for storing cooling medium, and it is cold that container 3 is provided with the 3rd But medium inlet, the 3rd cooling medium outlet;
3rd cooling medium outlet and the second cooling medium entrance are by pipeline connection, the second cooling medium outlet Led to by pipeline connection, the first cooling medium outlet and the 3rd cooling medium entrance with the first cooling medium entrance Cross pipeline connection.
During the specific works of the recirculated water cooling rubbish Equipment for Heating Processing of the present embodiment, house refuse is from top Insert combustion furnace intracavity, by air inlet to furnace chamber bottom gas-feeding so that rubbish fires bottom-up Burning, the waste residue that incineration firing produces is discharged by slag-drip opening, and final tail gas is discharged by waste gas outlet;In combustion During burning, the recyclegas that incineration firing produces enters the gas in cooling box through recyclegas outlet Pipeline cools down, and gas forms condensed water at gas pipeline tube wall after gas pipeline cools down, it is achieved gas Liquid separates, and the gas after cooling returns in furnace chamber, fully burns;Want according to the chilling temperature in equipment Asking different, the cooling medium in container carries out Quench to recyclegas in initially entering cooling box, it is ensured that Recyclegas Quick gas-liquid separates, and subsequently in the cooling cavity of body of heater periphery, cools down body of heater, Thus effectively body of heater is lowered the temperature.
In the present embodiment, the recirculated water cooling rubbish Equipment for Heating Processing proposed, furnace wall of combustion furnace is provided with bilayer Structure, forms cooling chamber between described double-decker, the recyclegas produced in combustion furnace enters cooler bin Internal cooling carries out secondary in returning to combustion furnace after removing condensed water and fully burns, and condensed water enters condensation water tank, Recyclegas is lowered the temperature, subsequently into combustion furnace in sequentially passing through cooling box by the cooling medium in container Cooling cavity returns in container after lowering the temperature combustion furnace.The recirculated water cooling rubbish heat designed by above-mentioned optimization Processing equipment, rubbish returns to combustion furnace at the fuel gas produced that burns in combustion furnace after removing condensed water In, on the one hand, the fuel gas produced in burning is fully burnt, environmentally safe, and to combustion The rubbish burnt in stove plays combustion-supporting effect, and on the other hand, first recyclegas is cooled down by cooling medium, Then combustion furnace is cooled down, improve the heat utilization efficiency of cooling medium.
When the specific design of combustion furnace, combustion furnace 1 includes upper furnace body and lower furnace body;
Upper furnace body periphery is provided with peripheral wall 4, forms the first cooling cavity between peripheral wall 4 and upper furnace body outer wall, First cooling cavity is provided with inlet exhaust gas and offgas outlet, is provided with cooling tube 5 in described first cooling cavity, It is filled with cooling medium in cooling tube 5;
Lower furnace body outer wall includes first time coaming plate 61 and second time coaming plate 62, and second time coaming plate 62 is set in Once coaming plate 61 is outside, forms the second cooling cavity, institute between first time coaming plate 61 and second time coaming plate 62 Being filled with cooling medium in stating the second cooling cavity, lower furnace body is provided with air intake and offgas outlet, described Offgas outlet connects with the gas feed of the first cooling cavity of upper furnace body, described second cooling cavity and cooling Pipe 5 connects.
When combustion furnace body of heater is cooled down by cooling medium, cooling medium the most successively to lower furnace body and Upper furnace body cools down, owing to rubbish burns in combustion furnace bottom-up, therefore furnace temperature by under Upwards gradually rising, therefore, lower furnace body is first lowered the temperature by the relatively low cooling medium of temperature, it is ensured that body of heater side Wall temperature is lowered the temperature very well, thus extends body of heater service life.
The above, only this utility model preferably detailed description of the invention, but protection model of the present utility model Enclose and be not limited thereto, the technology model that any those familiar with the art discloses at this utility model In enclosing, conceive in addition equivalent or change according to the technical solution of the utility model and utility model thereof, all Should contain within protection domain of the present utility model.

Claims (4)

1. a recirculated water cooling rubbish Equipment for Heating Processing, it is characterised in that including: combustion furnace (1), circulation Gas chiller, container (3);
Combustion furnace (1) is internal has the furnace chamber for incineration firing, and described furnace chamber is provided with garbage inlet, first follows Ring gas outlet, the first recyclegas entrance, air intake, slag-drip opening, offgas outlet, garbage inlet and First recyclegas outlet is positioned at described furnace chamber top, air intake, slag-drip opening, the first recyclegas entrance Being positioned at bottom described furnace chamber, combustion furnace (1) furnace wall is provided with double-decker, forms the between described double-decker One cooling chamber, described first cooling chamber is provided with the first cooling medium entrance and the outlet of the first cooling medium;
Recyclegas chiller includes cooling box (21), gas pipeline (22), cooling box (21) Inside having the second cooling chamber accommodating cooling medium, described second cooling chamber's sidewall is provided with the second cooling and is situated between Matter entrance and the outlet of the second cooling medium, gas pipeline (22) is arranged in cooling box (21), gas Pipeline (22) is provided with the second recyclegas entrance, the second recyclegas exports, condensation-water drain, and second Recyclegas entrance and the first recyclegas outlet of combustion furnace (1), the second recyclegas outlet and combustion Burn the first recyclegas entrance connection of stove (1), at condensation-water drain, be provided with condensation water tank (23);
Container (3) is internal is provided with the storage chamber for storing cooling medium, and container (3) is provided with 3rd cooling medium entrance, the 3rd cooling medium outlet;
3rd cooling medium outlet and the second cooling medium entrance are by pipeline connection, the second cooling medium outlet Led to by pipeline connection, the first cooling medium outlet and the 3rd cooling medium entrance with the first cooling medium entrance Cross pipeline connection.
Recirculated water cooling rubbish Equipment for Heating Processing the most according to claim 1, it is characterised in that combustion furnace (1) upper furnace body and lower furnace body are included;
Upper furnace body periphery is provided with peripheral wall (4), forms the first cooling between peripheral wall (4) and upper furnace body outer wall Cavity, the first cooling cavity is provided with inlet exhaust gas and offgas outlet, is provided with cold in described first cooling cavity But pipe (5), cooling tube is filled with cooling medium in (5);
Lower furnace body outer wall includes first time coaming plate (61) and second time coaming plate (62), second time coaming plate (62) It is set in first time coaming plate (61) outside, shape between first time coaming plate (61) and second time coaming plate (62) Becoming the second cooling cavity, be filled with cooling medium in described second cooling cavity, lower furnace body is provided with air and enters Mouth and offgas outlet, described offgas outlet connects with the gas feed of the first cooling cavity of upper furnace body, described Second cooling cavity connects with cooling tube (5).
Recirculated water cooling rubbish Equipment for Heating Processing the most according to claim 1, it is characterised in that gas tube Road (22) is vertically arranged in cooling box (21), and the second recyclegas entrance, the second recyclegas go out Mouth, condensation-water drain set gradually from top to bottom.
Recirculated water cooling rubbish Equipment for Heating Processing the most according to claim 1, it is characterised in that the 3rd is cold But media outlet and the second cooling cavity and cooling tube (5) are sequentially communicated.
CN201620221983.6U 2016-03-21 2016-03-21 Water cooling circulation rubbish equipment for heat treatment Expired - Fee Related CN205606560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620221983.6U CN205606560U (en) 2016-03-21 2016-03-21 Water cooling circulation rubbish equipment for heat treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620221983.6U CN205606560U (en) 2016-03-21 2016-03-21 Water cooling circulation rubbish equipment for heat treatment

Publications (1)

Publication Number Publication Date
CN205606560U true CN205606560U (en) 2016-09-28

Family

ID=56963673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620221983.6U Expired - Fee Related CN205606560U (en) 2016-03-21 2016-03-21 Water cooling circulation rubbish equipment for heat treatment

Country Status (1)

Country Link
CN (1) CN205606560U (en)

Similar Documents

Publication Publication Date Title
CN102642968A (en) Oil-water-solid separation device for kitchen wastes
CN205619283U (en) Garbage combustion furnace of high -efficient heat conduction
CN105674278B (en) A kind of refuse burner of high combustion efficiency
CN205619271U (en) Abundant domestic waste combustion apparatus burns
CN205606560U (en) Water cooling circulation rubbish equipment for heat treatment
CN205619305U (en) Garbage incinerator gas circulation device
CN105698191A (en) Water circulating system for rubbish burning treatment
CN205619338U (en) Categorised discharge garbage combustion furnace of solid -liquid gas three -phase result
CN205619311U (en) Domestic waste pyrolysis oven
CN205619339U (en) Gaseous heat exchange type garbage combustion furnace
CN205606561U (en) Novel domestic waste fires burning furnace
CN104848262A (en) Return air furnace capable of recycling waste heat
CN205619280U (en) Garbage combustion furnace that combustion efficiency is high
CN205843027U (en) The boiler that a kind of double back journey is energy-efficient
CN205619270U (en) Efficient gas endless waste combustion installation
CN105674279B (en) A kind of sufficient house refuse combustion apparatus of burning
CN201607017U (en) Hot water boiler burning waste materials
CN201992696U (en) Biomass low-carbon fire toasting furnace
CN105674277B (en) A kind of incineration firing equipment of gas circulation
CN105716085A (en) Garbage treatment method
CN106994461A (en) A kind of environment-friendly and energy-efficient animals with diseases innocent treatment equipment and its method
CN205606584U (en) Domestic waste combustion apparatus
CN205619345U (en) Rubbish combustion processing water circulating system
CN105674294B (en) A kind of solid-liquid-gas three phase product classification discharge refuse burner
CN201697213U (en) Heating system of solar wall-mounted gas furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20200321