CN205605220U - A adjustable construction platform for work is strutted in tunnel - Google Patents
A adjustable construction platform for work is strutted in tunnel Download PDFInfo
- Publication number
- CN205605220U CN205605220U CN201620441020.7U CN201620441020U CN205605220U CN 205605220 U CN205605220 U CN 205605220U CN 201620441020 U CN201620441020 U CN 201620441020U CN 205605220 U CN205605220 U CN 205605220U
- Authority
- CN
- China
- Prior art keywords
- platform
- tunnel
- leg
- work
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a tunnel supporting construction's adjustable work platform, this adjustable work platform is by the platform, braced system and stair are constituteed, the platform includes a middle part platform and two lateral part platforms, braced system includes the stand, platform leg and regulation leg, adjust the leg setting in this adjustable work platform lower part, it is middle porose to adjust the leg, through the fixed altitude mixture control that can realize adjusting the leg of bolt, each slope about the one side of keeping away from the face of this adjustable work platform sets up two sections stair, connect ground and lateral part platform and lateral part platform and middle part platform respectively. This adjustable work platform and the adaptation of tunnel profile phase, top platform are applicable to vault construction work, and the lateral part platform is suitable for both sides haunch position construction work, can be through adjusting packing up and putting down the height of adjusting the platform in order to adapt to the different execution conditions of face in the tunnel of leg to satisfy the normal current of special machines equipment, the commonality is strong.
Description
Technical field
This utility model relates to technical field of construction, particularly relates to the construction used during tunnel support operation
Platform, specifically, is a kind of scalable operation platform for tunnel support work.
Background technology
During constructing tunnel, owing to geological condition can change along with drilling depth, thus affect tunnel excavation
Support types.If running into weak broken wall rock, tunnel face need to reserve a large amount of Core Soil to ensure to open
Dig the safety of supporting construction.In current tunnel support work, generally use a kind of by shaped steel and reinforcing bar
The work platforms in fixed form being welded, but when running into loose wall rock, tunnel face reserves core
During cubsoil, this platform near face, or cannot level steadily cannot be placed after face,
It is difficult to ensure that support work is effectively carried out.And for meeting the current, in this platform of construction equipment
Portion's work surface is higher, causes top construction space narrow, affects being smoothed out of support work.Therefore
Need badly and work platforms is improved, to adapt to the normal construction of different face condition, improve construction
Efficiency.
Utility model content
For the problems referred to above, this utility model provides a kind of scalable construction for tunnel support work
Platform, this scalable operation platform can adapt to the normal construction of different tunnel face condition, improves
Efficiency of construction.
To achieve these goals, this utility model adopts the following technical scheme that
This utility model provides a kind of scalable work platforms for tunnel support construction, this scalable
Work platforms is made up of platform, support system and stair, and platform includes a middle deck and two sides
Portion's platform, support system include column, platform lower limb and 4 regulation lower limbs, 4 regulation lower limb be arranged on this can
Regulation work platforms bottom, this scalable work platforms is tilting to set away from each about the side of face
Put halfpace stair, connect ground and side locating platforms and side locating platforms and middle deck respectively.
Described regulation lower limb is middle porose, by the fixing altitude mixture control that can realize regulating lower limb of latch.
Compared with prior art, this utility model has the beneficial effect that
1, top platform of the present utility model is applicable to tunnel vault construction working, and two side locating platforms are fitted
With haunch position, tunnel both sides construction working, a middle deck and the work of two side locating platforms compositions
Face adapts with tunnel excavation profile, can meet the support work of whole tunnel section.And top construction
Space is big, it is possible to ensure being smoothed out of tunnel support work.
2, use this utility model, can by regulation lower limb pack up and put down regulation platform height,
Plateau levels is made steadily to place, the execution conditions different to adapt to tunnel face, and meet other machines
The normal pass of tool equipment, highly versatile.
In sum, this utility model is simple and practical, conveniently moving, and cost is low, adapts to
Property strong, supporting construction and the normal pass of other construction equipment of varying environment condition in hole can be met.
Accompanying drawing explanation
Fig. 1 is this utility model front view;
Fig. 2 is this utility model side view;
Fig. 3 is this utility model top view;
Fig. 4 is this utility model working state figure when tunnel face wall rock condition is preferable;
Fig. 5 is this utility model working state figure when tunnel face wall rock condition is poor.
Reference in figure:
1 middle deck, 2 side locating platforms, 3 stair, 4 regulation lower limbs, 5 latches.
Detailed description of the invention
With reference to Fig. 1 Fig. 3, this utility model provides a kind of scalable work for tunnel support construction
Platform, this scalable work platforms is made up of platform, support system and stair 3, and platform includes one
Middle deck 1 and two side locating platforms 2, middle deck 1 is suitable for the supporting construction of tunnel vault, sidepiece
Platform 2 is suitable for the supporting construction of both sides haunch, the work surface of three platform compositions and tunnel excavation profile
Adapt, the support work of whole section can be met.Support system includes column, platform lower limb and 4
Regulation lower limb 4,4 regulation lower limb 4 is arranged on this scalable work platforms bottom, porose in the middle of regulation lower limb 4,
By the fixing altitude mixture control that can realize regulating lower limb 4 of latch 5.Thus realize work platforms four direction
Altitude mixture control, the execution conditions that tunnel is different can be met.And when constructions such as excavation, explosions with platform
Car moves to beyond safe distance together, conveniently moving.Regulation lower limb 4 can be according to practice of construction feelings in hole
Condition is packed up and is put down, the needs current to adapt to supporting construction and other plant equipment in hole.This is adjustable
Joint work platforms, away from being respectively obliquely installed halfpace stair 3 about the side of face, connects ground respectively
With side locating platforms 2 and side locating platforms 2 and middle deck 1, convenient construction personnel are upper and lower.
During Specific construction, with reference to Fig. 4 Fig. 5, when tunnel face wall rock condition is preferable, without reserved
Core Soil, moves this work platforms to face by elevating conveyor, packs up regulation lower limb 4 and makes podium level
Reduce, flow out enough construction spaces for vault, in order to carry out support work and the blasting boreholes of face
Deng work.When tunnel face wall rock condition is poor have to reserved part Core Soil time, this work mobile
Making platform to face, two regulation lower limbs 4 near face directly rest on reserved Core Soil,
Put down the regulation lower limb 4 away from face, and the position, hole of regulating pin 5 highly makes middle deck 1 with regulation
Approximate horizontal with side locating platforms 2, with convenient construction.When face supporting or boring end-of-job after,
Move this work platforms by loader and recess face, put down all regulation lower limbs 4, raise platform with side
Just other construction equipment passes through.Contrasting former work platforms in fixed form, this utility model can be adjusted flexibly
Joint work platforms anterior and posterior height, to adapt to the construction of face different condition, is ensureing other machine simultaneously
Tool equipment maximum possible can ensure construction space under conditions of passing through smoothly, and the suitability is strong.
Claims (2)
1. the scalable work platforms for tunnel support construction, it is characterised in that: this scalable
Work platforms is made up of platform, support system and stair (3), and described platform includes a middle deck
(1) and two side locating platforms (2), described support system includes column, platform lower limb and 4 regulation lower limbs
(4), 4 regulations lower limb (4) are arranged on this scalable work platforms bottom, this scalable work platforms
Away from being respectively obliquely installed halfpace stair (3) about the side of face, connect ground and sidepiece respectively
Platform (2) and side locating platforms (2) and middle deck (1).
A kind of scalable work platforms for tunnel support construction the most according to claim 1,
It is characterized in that: porose in the middle of described regulation lower limb (4), regulation can be realized by latch (5) is fixing
The altitude mixture control of lower limb (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620441020.7U CN205605220U (en) | 2016-05-15 | 2016-05-15 | A adjustable construction platform for work is strutted in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620441020.7U CN205605220U (en) | 2016-05-15 | 2016-05-15 | A adjustable construction platform for work is strutted in tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205605220U true CN205605220U (en) | 2016-09-28 |
Family
ID=56967597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620441020.7U Active CN205605220U (en) | 2016-05-15 | 2016-05-15 | A adjustable construction platform for work is strutted in tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205605220U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457666A (en) * | 2018-03-20 | 2018-08-28 | 中建隧道建设有限公司 | A kind of liftable adjustable type tunnel multi-step excavates rack |
CN112360498A (en) * | 2020-11-25 | 2021-02-12 | 国家电网有限公司 | Underground cavern moving operation platform and operation method thereof |
-
2016
- 2016-05-15 CN CN201620441020.7U patent/CN205605220U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108457666A (en) * | 2018-03-20 | 2018-08-28 | 中建隧道建设有限公司 | A kind of liftable adjustable type tunnel multi-step excavates rack |
CN112360498A (en) * | 2020-11-25 | 2021-02-12 | 国家电网有限公司 | Underground cavern moving operation platform and operation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102364048B (en) | Comprehensive mechanized rock roadway tunneling machine | |
RU2358111C1 (en) | Double-support protecting lining with low disposed foundation for mining working face with fall from top | |
CN104863591B (en) | Goaf controls inbreak and earth's surface filling administering method | |
CN103899319B (en) | Pick anchor continuous and automatic fast digging technique | |
CN104088639A (en) | Large-inclination angle thick coal seam strike long-wall workface large-mining height mining method | |
CN110541705B (en) | Crawler type excavating, supporting and anchoring combined unit and application method thereof | |
CN104912557A (en) | High-efficiency thin coal seam complete-set coal mining equipment and coal mining method | |
CN205605220U (en) | A adjustable construction platform for work is strutted in tunnel | |
CN109763861A (en) | One kind cutting intraocular fault belt treatment of roof collapse method | |
CN201915980U (en) | Mine temporary support device for roadway excavation | |
CN111396101B (en) | Front support device for soft coal rock roadway tunneling and bolting machine and alternate support method | |
CN103306697A (en) | Three-column paste body filling hydraulic bracket for underground thin coal seam and four-step paste body filling process | |
CN107605487A (en) | Half-edge coal seam is appeared flame range subsidence area administering method | |
CN114382483A (en) | Method for preventing and controlling strong mine pressure of hard roof working face under left coal pillar | |
CN114320417A (en) | Anchoring forward-moving type rapid tunneling and supporting device and working method thereof | |
CN211692338U (en) | Tunnel safety blasting construction device | |
CN210509159U (en) | Crawler-type digging, supporting and anchoring combined unit | |
CN110004953A (en) | A kind of side slope or retaining wall construction trolley | |
CN205876368U (en) | Roof cutting stays lane complete set to strut equipment | |
CN203114338U (en) | Supporting equipment for filling | |
CN205977257U (en) | Mining excavation is walking prop and entry driving machine for working face | |
CN102587904B (en) | Comprehensive mechanical rock lane tunneling machine | |
CN205638501U (en) | Above coal tunnel supporting device | |
CN212376676U (en) | Safety device for coal mining | |
CN213574165U (en) | Coal mine tunneling and supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |