CN205592549U - Tee bend of spiral offal - Google Patents

Tee bend of spiral offal Download PDF

Info

Publication number
CN205592549U
CN205592549U CN201620366977.XU CN201620366977U CN205592549U CN 205592549 U CN205592549 U CN 205592549U CN 201620366977 U CN201620366977 U CN 201620366977U CN 205592549 U CN205592549 U CN 205592549U
Authority
CN
China
Prior art keywords
arm
mozzle
branch pipe
spiral
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620366977.XU
Other languages
Chinese (zh)
Inventor
朱立
镡爱东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tan Aidong
Original Assignee
Tan Aidong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tan Aidong filed Critical Tan Aidong
Priority to CN201620366977.XU priority Critical patent/CN205592549U/en
Application granted granted Critical
Publication of CN205592549U publication Critical patent/CN205592549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model provides a tee bend of spiral offal, including branch pipe, collar and the person in charge, the branch pipe include left branch pipe and right branch pipe, left branch pipe including left side installation pipe and left honeycomb duct, left side installation pipe establish at left honeycomb duct top, right branch pipe including right side installation pipe and right honeycomb duct, right side installation pipe establish at right honeycomb duct top, bottom and right branch pipe's the bottom of left branch pipe be linked together, left branch pipe and right branch pipe spiral intercommunication, the bottom of left branch pipe and right branch pipe's bottom are linked together with the person in charge. The utility model has the advantages of simple structure, simple to operate, avoid both sides intraductal rivers to hinder each other, consequently, can improve the drainage speed of the facility of washing one's face and rinsing one's mouth, simultaneously the utility model discloses be suitable for marketing, production and use.

Description

Water threeway under a kind of spiral
Technical field
The utility model relates to indoor drainage field, water threeway under a kind of spiral.
Background technology
Along with growth in the living standard, washing facilities updates the most frequently, and the function of this series products and kind are the most not Disconnected increase, when washing facilities is installed, is generally connected the downcomer of washing facilities with sewer pipe reserved during building construction, And in the unified public sewer pipe that waste water is entered outdoor, owing to house is in architectural process, indoor reserved sewer pipe Limited amount, and sewer pipe placement location is fixing, the installation of washing facilities for convenience, and can be more preferable Carry out draining, after generally using lower water threeway to be combined by the downcomer of multiple washing facilities, then the supervisor by lower water threeway Inserting in sewer pipe, during in-site installation, majority uses and T-shaped load water threeway soon and be together in parallel by the downcomer of two washing facilities, But when the draining simultaneously of two washing facilities, owing to the T-shaped arm axis loading water threeway both sides soon intersects in the same plane, During draining, the current in two side branch mutually hinder, and in two side branch intersection turbulization, affect the drainage speed of washing facilities, Therefore, design water threeway under a spiral and solve above not enough.
Summary of the invention
The technical problems to be solved in the utility model is: the problem that washing facilities drainage speed is slow.
This utility model solves its technical problem and be the technical scheme is that
Providing water threeway under a kind of spiral, including arm, mounting ring and supervisor, described arm includes left arm and right arm, institute The left arm stated includes that left installation is managed and left mozzle, and described left installation pipe is located at left mozzle top, described right arm bag Including right installation to manage and right mozzle, described right installation pipe is located at right mozzle top, the bottom of described left arm and right arm Bottom be connected, described left arm connects with right arm spiral;The bottom of left arm is connected with supervisor with the bottom of right arm Logical, supervisor's circumference is provided with spacing back-up ring, and the top of left arm, the top of right arm are separately installed with mounting ring, left mozzle Inwall, the inwall of right mozzle be respectively equipped with limiting stand, the top of described limiting stand respectively with top, the right side of left mozzle The top of mozzle flushes setting.
As preferably, described left installation pipe, right installation pipe are straight tube structure.
As preferably, described left arm top, the top of right arm are respectively equipped with helicitic texture.
As preferably, described left mozzle, right mozzle are respectively helical structure.
As preferably, the diameter dimension of described arm is less than the diameter dimension of supervisor.
The beneficial effects of the utility model are, this utility model has simple in construction, advantage easy for installation, it is to avoid two is collateral Current in pipe mutually hinder, therefore, it is possible to improve washing facilities drainage speed, simultaneously this utility model be suitable to marketing, Produce and use.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this reality By some novel embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, also may be used To obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the main TV structure schematic diagram that this utility model embodiment is provided;
Fig. 2 is the plan structure schematic diagram that this utility model embodiment is provided;
Fig. 3 be this utility model embodiment provided look up structural representation;
Fig. 4 is the perspective view that this utility model embodiment is provided;
Fig. 5 is that Figure 1A-A locates cutting structural representation;
In figure: 1. arm, 2. mounting ring, 3. supervisor, the spacing back-up ring of 3.1., the most left arm, the left pipe of installing of 4.1., the left mozzle of 4.2., 5. Right arm, 5.1. is right installs pipe, the right mozzle of 5.2., 6. limiting stand.
Detailed description of the invention
Below in conjunction with specific embodiment, such scheme is described further.It should be understood that these embodiments are for this practicality is described Novel rather than limit scope of the present utility model.In embodiment use implementation condition can according to the condition of concrete producer do into One successive step, not marked implementation condition is usually the condition in normal experiment.
As Figure 1-5, Fig. 1 is the main TV structure schematic diagram that this utility model embodiment is provided, and Fig. 2 is that this practicality is new The plan structure schematic diagram that type embodiment is provided, Fig. 3 be this utility model embodiment provided look up structural representation, Fig. 4 Being the perspective view that provided of this utility model embodiment, Fig. 5 is that Figure 1A-A locates cutting structural representation.
In a kind of specific embodiment, it is provided that water threeway under a kind of spiral, including arm 1, mounting ring 2 and supervisor 3, institute The arm 1 stated includes that left arm 4 and right arm 5, described left arm 4 include left installation pipe 4.1 and left mozzle 4.2, institute The left installation pipe 4.1 stated is located at left mozzle 4.2 top, and described right arm 5 includes right installation pipe 5.1 and right mozzle 5.2, Described right installation pipe 5.1 is located at right mozzle 5.2 top, and the bottom of described left arm 4 is connected with the bottom of right arm 5, Described left arm 4 connects with right arm 5 spiral;The bottom of left arm 4 is connected with supervisor 3 with the bottom of right arm 5, Being responsible for 3 circumference and be provided with spacing back-up ring 3.1, the top of left arm 4, the top of right arm 5 are separately installed with mounting ring 2, left The inwall of mozzle 4.2, the inwall of right mozzle 5.2 are respectively equipped with limiting stand 6, the top of described limiting stand 6 respectively with a left side The top of mozzle 4.2, the top of right mozzle 5.2 flush setting.
As preferably, described left installation pipe 4.1, right installation pipe 5.1 are straight tube structure, therefore, it is simple under washing facilities Water pipe coordinates installation with arm 1.
As preferably, described left arm 4 top, the top of right arm 5 are respectively equipped with helicitic texture, therefore, it is simple to peace The dismounting of dress ring 2, and washing facilities sewer pipe and the connection of arm 1 and sealing can be increased, prevent lower water from setting from washing one's face and rinsing one's mouth Execute sewer pipe and be connected in gap spilling with arm 1.
As preferably, described left mozzle 4.2, right mozzle 5.2 are respectively helical structure, it is possible to change left mozzle 4.2 Axis and the intersection location of right mozzle 5.2 axis, can change the direction of current when water is by the pipeline of helical structure, therefore, The mutual obstruction of the current in left mozzle 4.2 and the current in right mozzle 5.2 can be reduced, it is to avoid current form turbulent flow, enter And improve the drainage speed of washing facilities.
As preferably, the diameter dimension of described arm 1 is less than the diameter dimension of supervisor 3, when two washing facilities are arranged simultaneously During water, in the water in left arm 4 and right arm 5 flows to be responsible for 3 simultaneously, therefore, it is possible to increase the displacement of supervisor 3, carry The drainage speed of high washing facilities.
Specific works process, is connected the downcomer of washing facilities by the installation pipe of mounting ring 2 with arm 1 top, and And by limiting stand 6, the downcomer of washing facilities is carried out spacing, by sewer pipe indoor for supervisor 3 insertion, set when washing one's face and rinsing one's mouth When executing draining, water enters in left mozzle 4.2 or right mozzle 5.2 by the downcomer of facility is logical, by left mozzle 4.2, Right mozzle 5.2 is sped structure, and the inwall along left mozzle 4.2 or right mozzle 5.2 is entered main by inertia by current In pipe 3, therefore, current can enter in supervisor 3 by cut-in type stream, it is possible to reduces the current in left mozzle 4.2 and right mozzle The mutual obstruction of the current in 5.2, it is to avoid current form turbulent flow, and then accelerate the drainage speed of washing facilities.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff is complete Entirely can carry out various change and amendment in the range of without departing from this invention technological thought.This invention technical Scope is not limited to the content in description, it is necessary to determine its technical scope according to right.

Claims (5)

1. a water threeway under spiral, including arm, mounting ring and supervisor, it is characterised in that described arm includes left arm and the right side Arm, described left arm includes that left installation is managed and left mozzle, and described left installation pipe is located at left mozzle top, described Right arm includes that right installation is managed and right mozzle, and described right installation pipe is located at right mozzle top, the bottom of described left arm Being connected with the bottom of right arm, described left arm connects with right arm spiral;The bottom of left arm and the bottom of right arm with Supervisor is connected, and supervisor's circumference is provided with spacing back-up ring, and the top of left arm, the top of right arm are separately installed with mounting ring, The inwall of left mozzle, the inwall of right mozzle are respectively equipped with limiting stand, the top of described limiting stand respectively with left mozzle Top, the top of right mozzle flush setting.
2. water threeway under a kind of spiral as claimed in claim 1, it is characterised in that described left installation pipe, right installation pipe are directly Tubular construction.
3. water threeway under spiral as claimed in claim 1 a kind of, it is characterised in that described left arm top, the top of right arm It is respectively equipped with helicitic texture.
4. water threeway under a kind of spiral as claimed in claim 1, it is characterised in that described left mozzle, right mozzle are respectively Helical structure.
5. water threeway under a kind of spiral as claimed in claim 1, it is characterised in that the diameter dimension of described arm is less than supervisor's Diameter dimension.
CN201620366977.XU 2016-04-27 2016-04-27 Tee bend of spiral offal Expired - Fee Related CN205592549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620366977.XU CN205592549U (en) 2016-04-27 2016-04-27 Tee bend of spiral offal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620366977.XU CN205592549U (en) 2016-04-27 2016-04-27 Tee bend of spiral offal

Publications (1)

Publication Number Publication Date
CN205592549U true CN205592549U (en) 2016-09-21

Family

ID=56932283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620366977.XU Expired - Fee Related CN205592549U (en) 2016-04-27 2016-04-27 Tee bend of spiral offal

Country Status (1)

Country Link
CN (1) CN205592549U (en)

Similar Documents

Publication Publication Date Title
CN205617426U (en) Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure
CN205954679U (en) Utility tunnel's pipeline branch mouth
CN205592549U (en) Tee bend of spiral offal
CN204151824U (en) A kind of glass reinforced plastic underground comprehensive pipe network common trench
CN201437729U (en) Cross-shaped intersection for comprehensive pipe canals
CN108709019A (en) The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components
CN206558992U (en) Outlet distribution structure under a kind of assembled architecture house indoor distribution box
CN205604332U (en) A collection device for roof rainwater
CN204608904U (en) Washing machine floor drain
CN206042738U (en) Combine hidden pipe in a kind of salt-soda soil
CN201695468U (en) Air-conditioner condensed water pipe embedded in shear wall of high-rise building
CN208152213U (en) For closed-water test draining exempt from tear floor drain apparatus open
CN203514353U (en) Glass fiber reinforced plastics inspection well
CN113756523A (en) Hidden drainage system of steel-aluminum combined roof and construction method
CN208918276U (en) A kind of simple plugging device of vertical duct preformed hole
CN206418519U (en) A kind of Urban Underground intelligent comprehensive piping lane
CN203475543U (en) Improved water slot water-draining structure and different-diameter tee joint piece thereof
CN207847166U (en) Container column and container roof tissue discharge structure
CN206467688U (en) Include the pipe gallery of sewage pipe and rain pipe
CN208533671U (en) A kind of drainage pipeline networks transformation device based on BIM
CN205962139U (en) Novel gardens sprinkling irrigation device
CN206542144U (en) A kind of prefabricated integrated line box building element
CN208777370U (en) A kind of two defend the water-carriage system of type house type
CN219862910U (en) Bamboo foundation embedded part with drainage and threading functions
CN110107103A (en) The automatic maintenance device of cast-in-place concrete shear wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921

Termination date: 20200427

CF01 Termination of patent right due to non-payment of annual fee