CN208777370U - A kind of two defend the water-carriage system of type house type - Google Patents

A kind of two defend the water-carriage system of type house type Download PDF

Info

Publication number
CN208777370U
CN208777370U CN201820853989.4U CN201820853989U CN208777370U CN 208777370 U CN208777370 U CN 208777370U CN 201820853989 U CN201820853989 U CN 201820853989U CN 208777370 U CN208777370 U CN 208777370U
Authority
CN
China
Prior art keywords
branch pipe
pipeline
water
type
carriage system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820853989.4U
Other languages
Chinese (zh)
Inventor
韩超
朱军立
刘阳
郭勇
周泽峰
徐驰
刘艳钊
闻建忠
金天雷
覃磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201820853989.4U priority Critical patent/CN208777370U/en
Application granted granted Critical
Publication of CN208777370U publication Critical patent/CN208777370U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

A kind of two defend the water-carriage system of type house type, water-carriage system is spliced by the pipeline of three kinds of models, three kinds of models include long 0.8m, the I-tube road that caliber is 110mm, the III type pipeline that the II type pipeline and a length of 20cm, caliber that long 0.5m, caliber are 110mm are 50mm;Water-carriage system includes the pipeline one and pipeline two being connected with Construction Conveying Water pipeline, and pipeline one and pipeline two respectively lead to two toilets.The all material of the utility model PVC drainage system is prefabricated processing, and producer processes according to the detail list scale that unit in charge of construction provides, it is no longer necessary to the secondary scale blanking of on-site personnel, to avoid the waste and destruction of material;The material processed carries out packaging kit according to detail list, and attached detail drawing of installation, and when in-site installation only needs for the material in packaging to be assemblied together according to the requirement of installation diagram, can reduce installation difficulty, eliminate the technical threshold of installation.

Description

A kind of two defend the water-carriage system of type house type
Technical field
The utility model relates to aqueduct field, a kind of two defend the water-carriage system of type house type.
Background technique
Currently, the construction of all PVC pipelines generallys use the PVC raw material of 4M/ branch, then cut at the scene according to drawing At required size, still, because unit in charge of construction is difficult to integrated planning, the reason that the levels such as worker experience itself, quality are uneven etc., Worker can generate a large amount of waste material during cutting at the scene, and field operation condition is poor, and the pipeline after cutting also will receive not With the pollution and abrasion of degree, in addition, traditional installation method installation speed is slow, also level is uneven for quality.It therefore, should be by new The technical measures of type overcome the problems, such as that waste material is more, installation speed is slow, ropy.
Utility model content
The purpose of the utility model is to provide the water-carriage system that one kind two defends type house type, to solve the prior art two and defend type to defend The technical issues of washing basin height is consistent between life, is not suitable for special population;And prior art prefabricated pipeline process is solved, be not suitable for The problem of transport and cutting inconvenience.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of two defend the water-carriage system of type house type, it is characterised in that: the water-carriage system is spliced by the pipeline of three kinds of models It forms, three kinds of models include long 0.8m, the I-tube road that caliber is 110mm, long 0.5m, the II type pipeline that caliber is 110mm With a length of 20cm, the III type pipeline that caliber is 50mm;
The water-carriage system includes the pipeline one and pipeline two being connected with Construction Conveying Water pipeline, the pipeline one and pipeline two It respectively leads to two toilets, the pipeline one and pipeline two and is connect by I-tube road and II type pipeline by screwed connection rubber Head connects, the long 0.6 ~ 2.4m of the pipeline one, and flow direction is successively arranged branch pipe one, two branch pipe three of branch pipe downstream on the pipeline one, The tie point of the branch pipe one and pipeline one is apart from 0.5 ~ 1.6m of Construction Conveying Water pipeline, the tie point of the branch pipe two and pipeline one Apart from 0.2 ~ 1.6m of Construction Conveying Water pipeline, the long 0.5 ~ 1.2m of the branch pipe one, end is equipped with branch pipe nine;
Long 0.5 ~ the 1.8m of the pipeline two, two end of pipeline are equipped with branch pipe four, the long 0.1 ~ 0.6m of the branch pipe four, institute The end for stating branch pipe four is equipped with branch pipe five, and the pipeline two between the branch pipe four and Construction Conveying Water pipeline is equipped with branch pipe six, institute The tie point of branch pipe six and pipeline two is stated away from 0.1 ~ 0.8m of Construction Conveying Water pipeline, six end of branch pipe is equipped with branch pipe seven, described Branch pipe six between branch pipe seven and pipeline two is equipped with branch pipe eight, the tie point of the branch pipe eight and branch pipe six away from pipeline 2 0.2 ~ 0.8m;
The Construction Conveying Water pipeline, branch pipe three, branch pipe nine, branch pipe five and branch pipe seven are vertical duct, the vertical duct Road is connected by III type pipeline by screwed connection elastomer connector, the branch pipe three and seven end of branch pipe respectively with washing basin one and Washing basin two is connected to, and the branch pipe nine and five end of branch pipe are connected to closestool one and closestool two respectively;
The pipeline one, pipeline two, branch pipe one, branch pipe two, branch pipe four, branch pipe six and branch pipe eight are horizontal pipe, institute State branch pipe two and be connected to respectively with floor drain one and floor drain two with branch pipe eight, the branch pipe nine and branch pipe one, branch pipe three and pipeline one with And be connected by variable diameter two-way between branch pipe four and branch pipe five, the branch pipe two and pipeline one and branch pipe eight and branch pipe six it Between by reducing tee be connected.
It is further preferred that the branch pipe two and the long 0.2 ~ 0.3m of branch pipe eight.
Further, the long 0.1 ~ 0.6cm of the branch pipe nine, the long 0.3 ~ 0.5cm of the branch pipe five.
Further, the branch pipe three and the long 0.3 ~ 0.5cm of the branch pipe seven.
Further, the pipeline one and pipeline two pass through four-way downstream with Construction Conveying Water pipeline and are connected.
Further, it is connected between the pipeline two and branch pipe six and pipeline one and branch pipe one by down stream tee joint.
In addition, the pipeline one, pipeline two, branch pipe one and branch pipe four and the setting of patch wall.
It is further preferred that the branch pipe one and branch pipe four are in 90 ° of angle settings.The utility model has compared with prior art Following characteristics and the utility model has the advantages that
The utility model overcomes that conventional mounting process residue is more, installation speed is slow, ropy problem, solves installation The problem of no waste mine, quality, speed are fast, without mounting technique threshold.
In the installation of previous PVC drainage system, because raw material are all 4 meters/, and according to building when actual installation Build the difference of the spacing between the high difference of nitride layer and pipe fitting, required length of material be also it is various, often can not Each raw material are reasonably utilized, cause various degrees of waste, it is few, quality that the utility model provides a kind of waste material Assembled water-carriage system;In addition, the utility model is packed using integrated flush-type, and attached in order to reduce mounting technique difficulty Detailed installation diagram, it is ensured that anyone can be according to figure Fast Installation.
The all material of the utility model PVC drainage system is prefabricated processing, and producer provides bright according to unit in charge of construction Thin table scale processing, it is no longer necessary to the secondary scale blanking of on-site personnel, to avoid the waste and destruction of material;It processes Material carries out packaging kit according to detail list, and attached detail drawing of installation, and when in-site installation only needs the material in packaging according to peace The requirement of dress figure is assemblied together, and can reduce installation difficulty, eliminates the technical threshold of installation.
The utility model has the characteristics that safety, is applicable in, and has good promotion and practical value, after extensive popularization and application Good economic benefit can be generated.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the water-carriage system that the utility model one kind two defends type house type.
Appended drawing reference: 1- and Construction Conveying Water pipeline;2- pipeline one;3- pipeline two;4- branch pipe one;5- branch pipe two;6- variable diameter Threeway;7- variable diameter two-way;8- branch pipe four;9- branch pipe five;10- branch pipe three;11- branch pipe seven;12- branch pipe eight;13- branch pipe six;14- Washing basin one;15- washing basin two;16- closestool one;17- closestool two;18- floor drain one;19- floor drain two;20- branch pipe nine;21- is suitable Water threeway.
Specific embodiment
To make technological means of the utility model, character of innovation, reaching purpose and effect is easy to understand, below The present invention will be further described.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
A kind of two defend the water-carriage system of type house type, as shown in Figure 1, water-carriage system is spliced by the pipeline of three kinds of models, Three kinds of models include long 0.8m, the I-tube road that caliber is 110mm, long 0.5m, the II type pipeline and length that caliber is 110mm For the III type pipeline that 20cm, caliber are 50mm;
Water-carriage system includes the pipeline 1 and pipeline 23 being connected with Construction Conveying Water pipeline 1, pipeline 1 and 23 points of pipeline Do not lead to two toilets, pipeline 1 and pipeline 23 and is connected by I-tube road and II type pipeline by screwed connection elastomer connector It connects, the long 0.6 ~ 2.4m of pipeline 1, flow direction is successively arranged branch pipe 1, branch pipe 25 and branch pipe 3 10, branch pipe downstream on pipeline 1 One 4 build with the tie point of pipeline 1 apart from Construction Conveying Water 10.5 ~ 1.6m of pipeline, branch pipe 25 and the tie point distance of pipeline 1 10.2 ~ 1.6m of aqueduct is built, the long 0.5 ~ 1.2m of branch pipe 1, end is equipped with branch pipe 9 20;
Long 0.5 ~ the 1.8m of pipeline 23,23 end of pipeline are equipped with branch pipe 48, and branch pipe 48 grows 0.1 ~ 0.6m, branch pipe 48 End is equipped with branch pipe 59, and pipeline 23 between branch pipe 48 and Construction Conveying Water pipeline 1 is equipped with branch pipe 6 13, branch pipe 6 13 with For the tie point of pipeline 23 away from Construction Conveying Water 10.1 ~ 0.8m of pipeline, 6 13 end of branch pipe is equipped with branch pipe 7 11, branch pipe 7 11 and pipe Branch pipe 6 13 between road 23 is equipped with branch pipe 8 12, the tie point of branch pipe 8 12 and branch pipe 6 13 away from pipeline 2 30.2 ~ 0.8m;
Construction Conveying Water pipeline 1, branch pipe 3 10, branch pipe 9 20, branch pipe 59 and branch pipe 7 11 are vertical duct, vertical duct Road is connected by III type pipeline by screwed connection elastomer connector, branch pipe 3 10 and 7 11 end of branch pipe respectively with washing basin 1 It is connected to washing basin 2 15, branch pipe 9 20 and 59 end of branch pipe are connected to closestool 1 and closestool 2 17 respectively;
Pipeline 1, pipeline 23, branch pipe 1, branch pipe 25, branch pipe 48, branch pipe 6 13 and branch pipe 8 12 are horizontal tube Road, branch pipe 25 are connected to floor drain 1 and floor drain 2 19 respectively with branch pipe 8 12, branch pipe 9 20 and branch pipe 1, branch pipe 3 10 with It is connected by variable diameter two-way 7 between pipeline 1 and branch pipe 48 and branch pipe 59, branch pipe 25 and pipeline 1 and branch pipe eight It is connected by reducing tee 6 between 12 and branch pipe 6 13.
Branch pipe 25 and branch pipe 8 12 long 0.2 ~ 0.3m, the long 0.1 ~ 0.6cm of branch pipe 9 20, the long 0.3 ~ 0.5cm of branch pipe 59, Branch pipe 3 10 and the long 0.3 ~ 0.5cm of the branch pipe 7 11, pipeline 1 and pipeline 23 and Construction Conveying Water pipeline 1 are by downstream Four-way 22 is connected, and is connected between pipeline 23 and branch pipe 6 13 and pipeline 1 and branch pipe 1 by down stream tee joint 21, pipeline 1, Pipeline 23, branch pipe 1 and branch pipe 48 and the setting of patch wall, branch pipe 1 and branch pipe 48 are in 90 ° of angle settings.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (8)

1. the water-carriage system that one kind two defends type house type, it is characterised in that: the water-carriage system by the pipeline splicing of three kinds of models and Include long 0.8m, the I-tube road that caliber is 110mm at, three kinds of models, long 0.5m, the II type pipeline that caliber is 110mm and A length of 20cm, the III type pipeline that caliber is 50mm;
The water-carriage system includes the pipeline one (2) and pipeline two (3) being connected with Construction Conveying Water pipeline (1), the pipeline one (2) It is logical by I-tube road and II type pipeline that two toilets, the pipeline one (2) and pipeline two (3) are respectively led to pipeline two (3) It crosses screwed connection elastomer connector to connect, the long 0.6 ~ 2.4m of the pipeline one (2), flows on the pipeline one (2) and successively set downstream There are branch pipe one (4), branch pipe two (5) and a branch pipe three (10), the tie point distance of the branch pipe one (4) and pipeline one (2) is built defeated (1) 0.5 ~ 1.6m of waterpipe, the tie point of the branch pipe two (5) and pipeline one (2) apart from Construction Conveying Water pipeline (1) 0.2 ~ 1.6m, the long 0.5 ~ 1.2m of the branch pipe one (4), end is equipped with branch pipe nine (20);
Long 0.5 ~ the 1.8m of the pipeline two (3), pipeline two (3) end are equipped with branch pipe four (8), the branch pipe four (8) long 0.1 The end of ~ 0.6m, the branch pipe four (8) are equipped with branch pipe five (9), the pipe between the branch pipe four (8) and Construction Conveying Water pipeline (1) Road two (3) is equipped with branch pipe six (13), and the tie point of the branch pipe six (13) and pipeline two (3) is away from Construction Conveying Water pipeline (1) 0.1 ~ 0.8m, branch pipe six (13) end are equipped with branch pipe seven (11), the branch pipe six between the branch pipe seven (11) and pipeline two (3) (13) it is equipped with branch pipe eight (12), the tie point of the branch pipe eight (12) and branch pipe six (13) is away from pipeline two (3) 0.2 ~ 0.8m;
The Construction Conveying Water pipeline (1), branch pipe three (10), branch pipe nine (20), branch pipe five (9) and branch pipe seven (11) are vertical duct Road, the vertical duct are connected by III type pipeline by screwed connection elastomer connector, the branch pipe three (10) and branch pipe seven (11) end is connected to washing basin one (14) and washing basin two (15) respectively, the branch pipe nine (20) and branch pipe five (9) end part It is not connected to closestool one (16) and closestool two (17);
The pipeline one (2), pipeline two (3), branch pipe one (4), branch pipe two (5), branch pipe four (8), branch pipe six (13) and branch pipe eight It (12) is horizontal pipe, the branch pipe two (5) is connected to floor drain one (18) and floor drain two (19) respectively with branch pipe eight (12), institute It states logical between branch pipe nine (20) and branch pipe one (4), branch pipe three (10) and pipeline one (2) and branch pipe four (8) and branch pipe five (9) Variable diameter two-way (7) are crossed to be connected, it is logical between the branch pipe two (5) and pipeline one (2) and branch pipe eight (12) and branch pipe six (13) Reducing tee (6) are crossed to be connected.
2. the water-carriage system that one kind two as described in claim 1 defends type house type, it is characterised in that: the branch pipe two (5) and branch The long 0.2 ~ 0.3m of pipe eight (12).
3. the water-carriage system that one kind two as described in claim 1 defends type house type, it is characterised in that: the branch pipe nine (20) is long 0.1 ~ 0.6cm, the long 0.3 ~ 0.5cm of the branch pipe five (9).
4. the water-carriage system that one kind two as described in claim 1 defends type house type, it is characterised in that: the branch pipe three (10) and institute State the long 0.3 ~ 0.5cm of branch pipe seven (11).
5. the water-carriage system that one kind two as described in claim 1 defends type house type, it is characterised in that: the pipeline one (2) and pipe Road two (3) is connected by four-way (22) downstream with Construction Conveying Water pipeline (1).
6. the water-carriage system that one kind two as described in claim 1 defends type house type, it is characterised in that: the pipeline two (3) and branch It is connected between pipe six (13) and pipeline one (2) and branch pipe one (4) by down stream tee joint (21).
7. the water-carriage system that one kind two as described in claim 1 defends type house type, it is characterised in that: the pipeline one (2), pipeline Two (3), branch pipe one (4) and branch pipe four (8) and the setting of patch wall.
8. the water-carriage system that one kind two as described in claim 1 ~ 7 any one defends type house type, it is characterised in that: the branch pipe One (4) and branch pipe four (8) are in 90 ° of angle settings.
CN201820853989.4U 2018-06-04 2018-06-04 A kind of two defend the water-carriage system of type house type Expired - Fee Related CN208777370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820853989.4U CN208777370U (en) 2018-06-04 2018-06-04 A kind of two defend the water-carriage system of type house type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820853989.4U CN208777370U (en) 2018-06-04 2018-06-04 A kind of two defend the water-carriage system of type house type

Publications (1)

Publication Number Publication Date
CN208777370U true CN208777370U (en) 2019-04-23

Family

ID=66148829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820853989.4U Expired - Fee Related CN208777370U (en) 2018-06-04 2018-06-04 A kind of two defend the water-carriage system of type house type

Country Status (1)

Country Link
CN (1) CN208777370U (en)

Similar Documents

Publication Publication Date Title
CN205313252U (en) Pump station seal water system
CN208777370U (en) A kind of two defend the water-carriage system of type house type
CN204151824U (en) A kind of glass reinforced plastic underground comprehensive pipe network common trench
CN108709019A (en) The construction method for connecting of built-in pipe box and penetration pipe in Bars In Poured Concrete Slab in PC components
CN105519485A (en) Water-drainage and sewage-discharge system for pond culture
CN210423992U (en) Building pipe for building water supply and drainage pipeline
CN207277486U (en) A kind of mill tailings storehouse is met an urgent need self-draining arrangement
CN204826089U (en) Soil stack negative pressure balancing unit
CN203961150U (en) A kind of siphon rain water collecting system
CN103485387B (en) Canal-irrigation-area pipe water delivery irrigation system
CN206143737U (en) Novel return system in tailing storehouse
CN204959929U (en) Siphon storm -water system
CN103711119A (en) Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof
CN104251008B (en) A kind of guiding gutter and restorative procedure repairing pipe duct and back drop with water
CN205331696U (en) Ground sewer pipe of built -in toper chamfer piece current -limiting
CN205171554U (en) Chute inspection shaft is inlayed to socket joint formula
CN206242492U (en) A kind of plastic pipe necking rounding device
CN107620366A (en) A kind of emergent self-draining arrangement in mill tailings storehouse and method
CN204252254U (en) For liner, the sewage network of sewage network
CN204551511U (en) The exhaust of drainage of foundation pit pipeline is from pressurization system
CN204907546U (en) Breed pond after reforming transform old pond
CN204328234U (en) A kind of sewer assembly
CN202969543U (en) Restoration system of process water regulating reservoir
CN204370546U (en) A kind of novel drainage inspection well of the draining that crosses
CN204645161U (en) A kind of automatic pumping water tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190423