CN205592267U - Location stud connection structure - Google Patents

Location stud connection structure Download PDF

Info

Publication number
CN205592267U
CN205592267U CN201620372636.3U CN201620372636U CN205592267U CN 205592267 U CN205592267 U CN 205592267U CN 201620372636 U CN201620372636 U CN 201620372636U CN 205592267 U CN205592267 U CN 205592267U
Authority
CN
China
Prior art keywords
stud
positioning sleeve
polished rod
thread segment
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620372636.3U
Other languages
Chinese (zh)
Inventor
杨萍
鲍文光
闫优胜
樊晓浒
何志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhidou Electric Vehicle Co ltd
Original Assignee
Ninghai Know Beans Electric Vehicle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ninghai Know Beans Electric Vehicle Co Ltd filed Critical Ninghai Know Beans Electric Vehicle Co Ltd
Priority to CN201620372636.3U priority Critical patent/CN205592267U/en
Application granted granted Critical
Publication of CN205592267U publication Critical patent/CN205592267U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Insertion Pins And Rivets (AREA)

Abstract

The utility model discloses a location stud connection structure, including the stud who is equipped with the main part part in threaded connection hole, the connecting element who is equipped with the bolt through -hole, connection subject part and connecting element, stud including middle connection polished rod, set up in the retaining thread section of connecting polished rod one end, set up in the connecting thread section of connecting the polished rod other end be equipped with the position sleeve on the connection polished rod, the external diameter of position sleeve progressively reduces to being close to connecting thread section one end from being close to retaining thread section one end, the maximum outer diameter of position sleeve with the internal diameter looks adaptation of connecting element's bolt through -hole is equipped with positive hexagonal prism shape's installation head coaxially at the tip of connecting thread section. The utility model discloses it lands both can to have shown improves connecting element's positioning accuracy, makes things convenient for its assembly simultaneously, is favorable to improving production efficiency.

Description

A kind of location stud attachment structure
Technical field
This utility model relates to a kind of fastener for vehicle, especially relates to a kind of stud with positioning action and connects Access node structure.
Background technology
At automobile manufacturing field, stud (being also studs) is a kind of to be commonly used between parts connection Standard component, common structure is to process screw thread respectively at the two ends of a polished rod, then adds in middle polished rod part both sides Work goes out the breach of symmetry to form flat gesture.Generally, the threaded one end of stud is first connected in a body element by people In the threaded connection hole preset, and with the flat gesture position of spanner rotation stud, stud is made to be fastened in body element, Then the union piece set being provided with bolt hole by is set on stud, then passes the one of bolt hole at stud End nut fastens, thus is fixed together with body element by union piece.Such as, open in Chinese patent literature One " stud ", notification number is CN202883632U, including the first threaded rod, roofbolt and the second threaded rod, described One threaded rod, roofbolt and the second threaded rod sequentially connect, and described first threaded rod, roofbolt and the second threaded rod are concentric, and described the The diameter of one threaded rod is more than the diameter of described second threaded rod, and the diameter of described second threaded rod is more than the straight of described roofbolt Footpath.This utility model uses the screw thread of different size at the two ends of roofbolt, thus can strengthen and be screwed into body element threaded one end Intensity, the screw thread coordinated in body element is also strengthened, and protects body element, improves service life.But it is existing Stud attachment structure have following defects that due to the bolt hole on union piece internal diameter generally be both greater than double end spiral shell The external diameter of bolt polished rod, is set to union piece set on stud to facilitate, therefore in bolt hole and the double end of union piece Bigger fit clearance can be formed between bolt, thus reduce the positioning precision between union piece and body element;Instead It, if the fit clearance reduced between bolt hole and the stud of union piece, although could correspondingly improve connection Positioning precision between part and body element, but the difficulty that union piece installs can be caused, particularly, when connecting zero When being fastenedly connected by multiple studs between part and body element, between bolt hole with stud too small coordinate between Gap can make union piece be difficult to be set on stud.
Utility model content
The purpose of this utility model is that the positioning precision in order to solve existing for existing stud attachment structure is the highest And the problem of union piece installation difficulty, it is provided that a kind of location stud attachment structure, both can significantly increase connection zero The positioning precision of part, facilitates it to assemble, to improve production efficiency simultaneously.
To achieve these goals, this utility model is by the following technical solutions:
A kind of location stud attachment structure, including being provided with the body element of threaded connection hole, being provided with bolt hole Union piece, connection body element and the stud of union piece, described stud includes the connection polished rod of centre, setting Connect the fixing thread segment of polished rod one end, be arranged on the connection thread segment of the connection polished rod other end, on described connection polished rod Being provided with positioning sleeve, the outer of described positioning sleeve progressively reduces near connection thread segment one end near fixing thread segment one end without leave, The maximum outside diameter of described positioning sleeve is suitable with the internal diameter of the bolt hole of described union piece.
This utility model is provided with positioning sleeve, and outer close fixing thread segment one end without leave of positioning sleeve on connection polished rod Progressively reduce near connection thread segment one end, say, that the lateral wall of positioning sleeve is generally conical shape.During installation, Wo Menke First the fixing thread segment of stud is fixedly connected in the threaded connection hole of body element, then union piece set is set to On stud, owing to the maximum outside diameter of positioning sleeve is suitable with the internal diameter of the bolt hole of described union piece, therefore, we Bolt hole can be made by the size of reasonable design positioning sleeve and is connected polished rod and has bigger between connection thread segment Gap, what stud diameter was less connect thread segment and connect polished rod and can conveniently enter the bolt hole of union piece In, thus greatly facilitate the assembling of union piece, it is to avoid because connecting the too small institute of fit clearance between polished rod and bolt hole The installation difficulty caused.When the bolt hole of union piece arrives positioning sleeve position, the small end of the positioning sleeve that profile is tapered Can easily enter in bolt hole under the guide effect connecting polished rod.Maximum outside diameter and bolt hole due to positioning sleeve Internal diameter is suitable, therefore connects and can be formed with, between positioning sleeve and the bolt hole of union piece on polished rod, the mistake beneficially positioned Cross cooperation, thus make that there is between union piece and body element higher positioning precision on the premise of convenient installation.
As preferably, it is provided with the mounting head of positive hexagon in the end connecting thread segment coaxially, thus conveniently passes through Stud is securely mounted in the threaded connection hole of body element by spanner.Particularly, when dismantling union piece, Wo Menke First fix stud with spanner, unscrew the clamp nut connected on thread segment the most again, to avoid stud from main body zero Get loose on part.
As preferably, being provided with the positioning head of cylinder coaxially in the end of fixing thread segment, described body element is at spiral shell The bottom of stricture of vagina connecting hole is provided with the location hole adaptive with positioning head coaxially.
When stud is fixed in the threaded connection hole of body element by we, the positioning head of stud and main body Can be formed between the hole, location of part and be accurately positioned, thus the spiral shell of the fixing thread segment because of stud and body element can be eliminated The fit clearance bigger between the stricture of vagina connecting hole impact on positioning precision, and be conducive to improving stud and body element Between perpendicularity.
As preferably, described bolt hole includes the diameter positioning section adaptive with the maximum outside diameter of positioning sleeve and diameter relatively Little conduction period, described positioning sleeve is axially movably set on connection polished rod, and the two ends of described positioning sleeve are the most equidistantly Be provided with some axially extended expansion grooves, and the expansion groove at the two ends of positioning sleeve is in the circumferencial direction layout ground layout that misplaces, The centre position being positioned at adjacent two expansion grooves on the medial wall of described positioning sleeve is equipped with axial guide groove, guide groove Bottom surface be diameter near fixing thread segment one end near connecting the taper seat that thread segment one end progressively reduces, connect polished rod It is provided with the guiding raised line adaptive with guide groove the most equally spacedly.
Owing to bolt hole includes the conducting that diameter is less with the positioning section of the maximum outside diameter of positioning sleeve adaptation and diameter Section, therefore, forms a step between conduction period and positioning section.During installation, the maximum outside diameter of positioning sleeve and bolt hole Bigger fit clearance can be formed, in order to install between the internal diameter of positioning section.We can be first by the fixing screw thread of stud Section is fixedly connected in the threaded connection hole of body element, is then set on stud by union piece set, stud Connect thread segment and connect in the bolt hole that polished rod conveniently enters union piece.Platform between conduction period and positioning section During the end face of rank conflict positioning sleeve, positioning sleeve can now guide raised line and work along connecting moving axially of polished rod, will set The positioning sleeve having expansion groove struts, thus realizes the tight fit between positioning sleeve and the positioning section of bolt hole, in order to make connection Realize gapless hi-Fix between part and body element, do not affect the convenience of installation simultaneously.
As preferably, described positioning sleeve is provided with elastic washer, outside this end face near the end face connecting thread segment one end Lateral edges is provided with guiding chamfering.
Guiding when guiding chamfering outside positioning sleeve is conducive to union piece to install, and elastic washer i.e. can ensure that location Tight fit between set and the positioning section of bolt hole, can avoid because the error of the accuracy of manufacture causes the installation of union piece simultaneously Not in place.
Therefore, this utility model has the advantages that the positioning precision that both can significantly increase union piece, simultaneously Facilitate it to assemble, be conducive to improving production efficiency.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present utility model.
Fig. 2 is a kind of structural representation of positioning sleeve.
Fig. 3 is the positioning sleeve in Fig. 2 and the mounting structure schematic diagram being connected polished rod and union piece.
In figure: 1, body element 11, threaded connection hole 12, hole 2, location, union piece 21, bolt hole 211, fixed Position section 212, conduction period 3, stud 31, connection polished rod 32, fixing thread segment 33, connection thread segment 34, mounting head 35, positioning head 36, guiding raised line 4, positioning sleeve 41, expansion groove 42, guide groove 43, guiding chamfering 44, elastic washer 5, packing ring 6, clamp nut.
Detailed description of the invention
With detailed description of the invention, this utility model is further described below in conjunction with the accompanying drawings.
As it is shown in figure 1, a kind of location stud attachment structure, including body element 1, union piece 2, connect main body zero The stud 3 of part and union piece, arranges the threaded connection hole 11 can being connected with stud bolt thread in body element, Arrange on union piece and be available for the bolt hole 21 that stud passes.Stud includes the connection polished rod 31 of centre, coaxial Be integrally disposed upon connect polished rod one end fixing thread segment 32, coaxially be integrally disposed upon connect the polished rod other end connection spiral shell Stricture of vagina section 33.For the ease of statement, we will be defined as lower end near fixing thread segment one end on stud, correspondingly, and will be double It is defined as upper end near connection thread segment one end on hook bolt.During installation, we can be first solid by the fixing thread segment of stud Surely it is connected in the threaded connection hole of body element, then union piece set is set on stud, now stud The bolt hole of union piece is stretched out in upper end, and we install corresponding packing ring 5 and clamp nut 6 in the upper end of stud, i.e. Can realize between union piece with body element fixing is connected.
In order to realize the hi-Fix of union piece and body element, we can set on the connection polished rod of stud Putting positioning sleeve 4, the outer of positioning sleeve progressively reduces, namely near connection thread segment one end near fixing thread segment one end without leave Saying, the lower end of positioning sleeve has maximum outside diameter, and the external diameter of upper end progressively reduces generally conical shape, and positioning sleeve lower end is Big external diameter is suitable with the internal diameter of union piece bolt hole, and connects the upper end smooth transition that polished rod is less with positioning sleeve external diameter Connect.So, the connecting thread segment and connecting and can produce bigger between polished rod and the bolt hole of union piece of stud Gap, when union piece set is set on stud by we, connection thread segment that stud diameter is less and company Connect in the bolt hole that polished rod can conveniently enter union piece, thus greatly facilitate the assembling of union piece, it is to avoid because of even Connect too small the caused installation difficulty of the fit clearance between polished rod and bolt hole.When the bolt hole of union piece arrives double During positioning sleeve position on hook bolt, the small end of positioning sleeve can easily enter bolt hole under the guide effect connecting polished rod In, the tapered positioning sleeve of profile produces automatic centering effect to union piece.Owing to the maximum outside diameter of positioning sleeve leads to bolt The internal diameter in hole is suitable, therefore, can form interference fits between positioning sleeve and the bolt hole of union piece, thus in convenient peace Make to have between union piece and body element higher positioning precision on the premise of dress.
Additionally, we can be coaxially disposed the mounting head 34 of positive hexagon in the end connecting thread segment, when we need When being securely mounted to by stud in the threaded connection hole of body element, available spanner blocks mounting head, thus convenient turns Move and tighten stud.Particularly, when dismantling union piece, box spanner can be first enclosed within mounting head fixing double by we Hook bolt, unscrews the clamp nut connected on thread segment the most again, stud and fastening spiral shell during to avoid turning clamp nut Mother rotates together, so that stud directly gets loose from body element.
It addition, we also can be coaxially disposed the positioning head 35 of cylinder, correspondingly, main body in the end of fixing thread segment Part is coaxially disposed the hole, location 12 with positioning head interference fits in the bottom of threaded connection hole, and the length of positioning head is little The degree of depth in threaded connection hole.When stud is fixed in the threaded connection hole of body element by we, stud Positioning head is introduced in threaded connection hole, now rotates stud, can make the fixing thread segment screw thread of stud lower end It is connected on threaded connection hole.Along with the rotation of stud, fixing thread segment gradually gos deep into threaded connection hole, and positioning head is then Can clamp-on in hole, location, thus realize the hi-Fix between stud and body element.Certainly, we can be at positioning head End corresponding chamfering is set, in order to positioning head clamp-on location hole in, and can reduce as far as possible positioning head and location hole it Between maximum fit clearance, to improve the positioning precision between stud and body element.It is understood that we can fit The local length lengthening positioning head, thus increase the length of fit of stud and body element, be conducive to improving stud And the perpendicularity between body element, and then be conducive to the positioning precision improving union piece with body element.
Further, positioning sleeve of the present utility model can be made into Split type structure with being connected between polished rod.Specifically, as Fig. 2, Shown in Fig. 3, positioning sleeve is axially movably set on connection polished rod, and the two ends up and down of positioning sleeve are the most equally spaced arranges 6 Individual axially extended expansion groove 41, and the expansion groove at the upper and lower two ends of positioning sleeve is in the circumferencial direction layout ground layout that misplaces, the most just Being to say, between adjacent two expansion grooves, corresponding central angle is 30 degree.Adjacent two expansion grooves it are positioned on the medial wall of positioning sleeve Centre position be respectively provided with the guide groove 42 at the upper and lower two ends of the most through positioning sleeve, thus shape on the medial wall of positioning sleeve Becoming 12 guide grooves, the diameter of guide groove bottom surface connects thread segment one end progressively near fixing thread segment one end to close Reduce, say, that the bottom surface of guide groove is the taper seat that lower end is big, upper end is little.Correspondingly, we also need to connect polished rod Periphery on arrange 12 equally spacedly and axially extend and the guiding raised line 36 adaptive with guide groove, say, that The lateral surface guiding raised line is also the taper seat that lower end is big, upper end is little.When positioning sleeve moves down on stud, guide Raised line can promote positioning sleeve expanded radially, and the expansion well width of positioning sleeve becomes big, and the maximum outside diameter of positioning sleeve is increased up tightly Tight against the medial wall by bolt hole, thus realize the hi-Fix of union piece.In order to drive positioning sleeve to axially move, The bolt hole of union piece includes near the positioning section that body element side and diameter are adaptive with the maximum outside diameter of positioning sleeve 211 and away from the less conduction period 212 of body element side diameter, so that bolt hole forms shoulder hole.So, when When union piece set is set on stud by we, connection thread segment that stud diameter is less and connect polished rod successively Enter the positioning section of bolt hole, conduction period, when positioning sleeve enters positioning section and during against the cascaded surface of positioning section and conduction period, Positioning sleeve is i.e. prevented from, thus moves to lower end on polished rod connecting, and the maximum outside diameter of positioning sleeve is then stepped up.Work as connection Part is installed when putting in place, and the maximum outside diameter of positioning sleeve reaches maximum, thus formed with bolt hole and coordinate closely, it is achieved even Being accurately positioned of pipe fitting and body element.It is stepped up in installation process during due to the maximum outside diameter of positioning sleeve, therefore, We can easily install union piece, it is to avoid the installation difficulty caused because of the mistake tight fit between positioning sleeve and bolt hole.
Finally, we can arrange guiding chamfering at the positioning sleeve outer ledge near the upper surface connecting thread segment one end 43, in order to positioning sleeve enters in the positioning section of bolt hole, arranges the bullet that rubber is made on the upper surface of positioning sleeve simultaneously Property packing ring 44, so, positioning sleeve enters positioning section and during against the cascaded surface of positioning section and conduction period, positioning sleeve and cascaded surface it Between can form buffering.Therefore, when the outside distending of positioning sleeve is close to the positioning section medial wall of bolt hole, union piece still may be used There to be the movement of trace, until fitting with body element and installing and put in place, it is to avoid because scale error causes the installation of union piece Not in place.

Claims (5)

1. a location stud attachment structure, including being provided with the body element of threaded connection hole, being provided with the company of bolt hole Pipe fitting, connection body element and the stud of union piece, described stud includes the connection polished rod of centre, is arranged on Connect the fixing thread segment of polished rod one end, be arranged on the connection thread segment connecting the polished rod other end, it is characterized in that, in described connection Polished rod is provided with positioning sleeve, and the outer of described positioning sleeve connects thread segment one end progressively near fixing thread segment one end to close without leave Reducing, the maximum outside diameter of described positioning sleeve is suitable with the internal diameter of the bolt hole of described union piece.
A kind of location the most according to claim 1 stud attachment structure, is characterized in that, in the end connecting thread segment It is provided with the mounting head of positive hexagon coaxially.
A kind of location the most according to claim 1 stud attachment structure, is characterized in that, in the end of fixing thread segment Being provided with the positioning head of cylinder coaxially, described body element is provided with adaptive with positioning head coaxially in the bottom of threaded connection hole Hole, location.
4., according to a kind of location stud attachment structure described in claim 1 or 2 or 3, it is characterized in that, described bolt hole Including the conduction period that diameter is less with the positioning section of the maximum outside diameter of positioning sleeve adaptation and diameter, described positioning sleeve axially-displaceable Being set on connection polished rod, the two ends of described positioning sleeve are the most equally spaced is provided with some axially extended expansion grooves dynamicly, and And the expansion groove at the two ends of positioning sleeve is in the circumferencial direction layout ground layout that misplaces, and the medial wall of described positioning sleeve is positioned at adjacent two The centre position of individual expansion groove is equipped with axial guide groove, and the bottom surface of guide groove is that diameter is near fixing thread segment one End near connecting the taper seat that progressively reduces of thread segment one end, connect polished rod be provided with the most equally spacedly with guide logical The guiding raised line that groove is adaptive.
A kind of location the most according to claim 4 stud attachment structure, is characterized in that, described positioning sleeve is near connecting The end face of thread segment one end is provided with elastic washer, and the outer ledge of this end face is provided with guiding chamfering.
CN201620372636.3U 2016-04-27 2016-04-27 Location stud connection structure Active CN205592267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620372636.3U CN205592267U (en) 2016-04-27 2016-04-27 Location stud connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620372636.3U CN205592267U (en) 2016-04-27 2016-04-27 Location stud connection structure

Publications (1)

Publication Number Publication Date
CN205592267U true CN205592267U (en) 2016-09-21

Family

ID=56933326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620372636.3U Active CN205592267U (en) 2016-04-27 2016-04-27 Location stud connection structure

Country Status (1)

Country Link
CN (1) CN205592267U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106763514A (en) * 2016-12-29 2017-05-31 重庆腾增模具制造有限公司 vertical speed reducer
CN107030479A (en) * 2016-12-26 2017-08-11 北京金风科创风电设备有限公司 Dislocation adjusting device and flange dislocation adjusting method
CN107717845A (en) * 2017-11-21 2018-02-23 索格菲(苏州)汽车部件有限公司 A kind of predetermined set of the not de- bolt of pine
CN112373284A (en) * 2020-11-10 2021-02-19 奇瑞汽车股份有限公司 Power assembly suspension arrangement structure, assembly method thereof and vehicle

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107030479A (en) * 2016-12-26 2017-08-11 北京金风科创风电设备有限公司 Dislocation adjusting device and flange dislocation adjusting method
CN107030479B (en) * 2016-12-26 2019-05-24 北京金风科创风电设备有限公司 Dislocation adjusting device and flange dislocation adjusting method
CN106763514A (en) * 2016-12-29 2017-05-31 重庆腾增模具制造有限公司 vertical speed reducer
CN106763514B (en) * 2016-12-29 2023-05-09 重庆腾增模具制造有限公司 Vertical speed reducer
CN107717845A (en) * 2017-11-21 2018-02-23 索格菲(苏州)汽车部件有限公司 A kind of predetermined set of the not de- bolt of pine
CN112373284A (en) * 2020-11-10 2021-02-19 奇瑞汽车股份有限公司 Power assembly suspension arrangement structure, assembly method thereof and vehicle
CN112373284B (en) * 2020-11-10 2022-03-15 奇瑞汽车股份有限公司 Power assembly suspension arrangement structure, assembly method thereof and vehicle

Similar Documents

Publication Publication Date Title
CN205592267U (en) Location stud connection structure
CN204027829U (en) A kind of split type borescope plug
CN207014267U (en) The pneumatic Universal sleeve of high-performance
CN203051383U (en) Sealing bolt with mounting function
CN205280475U (en) Bolt tensile test fixes frock
CN102384141B (en) Connecting piece with fast disassembly and assembly
CN205503688U (en) But wrong bolt is pulled to double -end
CN209130017U (en) A kind of fastener that range of fit is wide
CN207071900U (en) Screw insert mounts and dismounts frock
CN203536166U (en) Positioning nail for oil tank of transformer
CN206190707U (en) Socket cap connecting screw
CN105643505A (en) Mounting clamping device
CN201606371U (en) Positioning pin
CN203614574U (en) Eccentric wheel
CN204944593U (en) Automobile air flow meter
CN203939836U (en) Bolt
CN203604405U (en) Connecting shaft with two ends being mounted
CN209180198U (en) A kind of splice type bolt
CN207291561U (en) A kind of automobile absorber mounting structure
CN204628209U (en) Fastening piece
CN209447052U (en) A kind of workshop temperature control system
CN210423533U (en) Bolt integral type shock attenuation cover for bumper shock absorber
CN219117884U (en) Asphalt nozzle assembly
CN202985490U (en) Bowl plug dismounting tool
CN205744793U (en) A kind of bolt assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 315602 Ninghai City, Ningbo Province, Li Yang Town, home Hill Road, No. 1

Patentee after: ZHIDOU ELECTRIC VEHICLE Co.,Ltd.

Address before: 315602 Ninghai City, Ningbo Province, Li Yang Town, home Hill Road, No. 1

Patentee before: ZHIDOU ELECTRIC VEHICLES SALES CO.,LTD.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Location stud connection structure

Effective date of registration: 20171211

Granted publication date: 20160921

Pledgee: Xingye Bank Limited by Share Ltd. Ningbo Ninghai branch

Pledgor: ZHIDOU ELECTRIC VEHICLE Co.,Ltd.

Registration number: 2017330000278

PE01 Entry into force of the registration of the contract for pledge of patent right
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20190412

Granted publication date: 20160921

PD01 Discharge of preservation of patent

Date of cancellation: 20210222

Granted publication date: 20160921

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20210222

Granted publication date: 20160921

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20240222

Granted publication date: 20160921

PD01 Discharge of preservation of patent