CN205591529U - Attached lifting scaffold - Google Patents
Attached lifting scaffold Download PDFInfo
- Publication number
- CN205591529U CN205591529U CN201620386928.2U CN201620386928U CN205591529U CN 205591529 U CN205591529 U CN 205591529U CN 201620386928 U CN201620386928 U CN 201620386928U CN 205591529 U CN205591529 U CN 205591529U
- Authority
- CN
- China
- Prior art keywords
- fixed
- steel
- frame
- main frame
- attachment device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本实用新型公开了一种附着式升降脚手架,包括主框架、作业平台、附着装置、防坠装置、电动葫芦和密封板,主框架之间通过水平连接杆和人字撑固定连接,作业平台设于两个相邻的主框架之间,主框架包括轨道、提升钢梁和X型斜撑,轨道与附着装置之间通过导向架连接,轨道在导向架上滑动,防坠装置安装于导向架上,密封板铺设并固定于主框架外侧。本实用新型具有的优点和积极效果是:该附着式升降脚手架全部构配件实现了工厂化加工,从而保障了零部件及施工现场组装的质量,由于是标准化产品,使架体组装效率更高,降低了操作人员劳动强度;经济效益显著,具有多功能、适应性强、高安全性等特点,会为企业形成强大的市场竞争力。
The utility model discloses an attached lifting scaffold, which comprises a main frame, an operation platform, an attachment device, an anti-falling device, an electric hoist and a sealing plate. Between two adjacent main frames, the main frame includes rails, lifting steel beams and X-shaped diagonal braces, the rails and attachment devices are connected by guide frames, the rails slide on the guide frames, and the anti-falling devices are installed on the guide frames , the sealing plate is laid and fixed on the outside of the main frame. The advantages and positive effects of the utility model are: all components of the attached lifting scaffold have realized factory processing, thereby ensuring the quality of components and assembly at the construction site, and because it is a standardized product, the assembly efficiency of the frame is higher. The labor intensity of operators is reduced; the economic benefits are remarkable, and it has the characteristics of multi-function, strong adaptability and high safety, which will form a strong market competitiveness for enterprises.
Description
技术领域technical field
本实用新型属于脚手架领域,尤其是涉及一种附着式升降脚手架。The utility model belongs to the field of scaffolding, in particular to an attached lifting scaffolding.
背景技术Background technique
随着建筑市场中高层、超高层、高端建筑日益增多,建筑辅助机具也随之日趋完善。目前高层、超高层建筑施工外围护主要使用挑架和附着式升降脚手架进行施工,但从安全、操作成本和施工速度的角度上分析,附着式升降脚手架优于挑架,故目前大多数施工单位已开始大规模的使用。With the increasing number of high-rise, super high-rise and high-end buildings in the construction market, construction auxiliary equipment is also becoming more and more perfect. At present, the external protection of high-rise and super high-rise buildings is mainly constructed by pick-up frames and attached lifting scaffolds. Units have begun to be used on a large scale.
传统的附着式升降脚手架技术趋近成熟,其灵活安全的施工工艺得到了广大施工单位的广泛认可,但是由于传统的附着式升降脚手架,其架设材料均由施工单位提供,占用施工单位部分资源,且材料性能无法得到保证,极易造成安全隐患。此外,如何提高附着式升降脚手架产品安全性能,成为各个厂家技术研究的焦点。而架体结构构架主要由立杆、斜杆及架体间相关的连接杆件构成,是构成附着式升降脚手架的关键部分。The traditional attached lifting scaffolding technology is approaching maturity, and its flexible and safe construction technology has been widely recognized by the majority of construction units. However, due to the traditional attached lifting scaffolding, its erection materials are provided by the construction unit, which occupies part of the resources of the construction unit. Moreover, the performance of the material cannot be guaranteed, which can easily cause potential safety hazards. In addition, how to improve the safety performance of attached lifting scaffold products has become the focus of technical research by various manufacturers. The frame structure frame is mainly composed of vertical rods, inclined rods and related connecting rods between the frame bodies, which is a key part of the attached lifting scaffold.
发明内容Contents of the invention
本实用新型要解决的问题是提供一种附着式升降脚手架,能够解决上述问题。The problem to be solved by the utility model is to provide an attached lifting scaffold, which can solve the above problems.
为解决上述技术问题,本实用新型采用的技术方案是:一种附着式升降脚手架,包括主框架、作业平台、附着装置、防坠装置和密封板,均设有若干组,所述主框架之间通过水平连接杆和人字撑固定连接,作业平台设于两个相邻的主框架之间,附着装置固定于建筑结构,主框架包括轨道、中节提升钢梁、底座提升钢梁、横杆和X型斜撑,轨道固定于主框架上朝建筑结构一侧,轨道与附着装置之间通过导向架连接,轨道在导向架上滑动,防坠装置安装于导向架上,并设于附着装置以下,中节提升钢梁上安装有电动葫芦,底座提升钢梁上安装有导向轮,电动葫芦的起吊绳的两端分别连接附着装置和吊钩,并穿过导向轮,导向架上轴连接有调节顶撑,调节顶撑的顶端为与轨道的圆钢相配合的凹槽,当轨道停止运行时,凹槽支撑圆钢,所述密封板铺设并固定于主框架外侧。In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: an attached lifting scaffold, including a main frame, a working platform, an attachment device, an anti-falling device and a sealing plate, each of which is provided with several groups. The work platform is fixed between two adjacent main frames, and the attachment device is fixed to the building structure. The main frame includes rails, middle section lifting steel beams, base lifting steel beams, horizontal Rods and X-shaped braces, the track is fixed on the side of the main frame facing the building structure, the track and the attachment device are connected by a guide frame, the track slides on the guide frame, the anti-falling device is installed on the guide frame, and is located on the attachment Below the device, an electric hoist is installed on the lifting steel beam of the middle section, and a guide wheel is installed on the lifting steel beam of the base. It is connected with an adjustable top brace, and the top of the adjustable top brace is a groove matching the round steel of the track. When the track stops running, the groove supports the round steel, and the sealing plate is laid and fixed on the outside of the main frame.
进一步,所述调节顶撑包括第一方钢管、第二方钢管和调节螺栓,调节螺栓设于第一方钢管和第二方钢管之间,第一方钢管的顶端为半圆形凹槽,第二方钢管的底端与导向架通过穿销连接。主框架通过调节顶撑和穿销将荷载传递给附着装置。Further, the adjustable top support includes a first square steel pipe, a second square steel pipe and an adjustment bolt, the adjustment bolt is arranged between the first square steel pipe and the second square steel pipe, the top of the first square steel pipe is a semicircular groove, The bottom end of the second square steel pipe is connected with the guide frame through pins. The main frame transmits the load to the attachment device by adjusting the top brace and the pin.
进一步,所述导向架包括滑道、滑轮和固定架,固定架固设于滑道上朝向附着装置的一侧,并设于防坠装置的上端,附着装置固定在固定架上,固定架上端设有耳座,调节顶撑轴连接于耳座,滑轮设于滑道内侧。Further, the guide frame includes a slideway, a pulley and a fixed frame, the fixed frame is fixed on the side of the slideway facing the attachment device, and is arranged on the upper end of the anti-falling device, the attachment device is fixed on the fixed frame, and the upper end of the fixed frame is set There are lug seats, the adjustable top support shaft is connected to the lug seats, and the pulley is arranged on the inner side of the slideway.
进一步,所述主框架与水平连接杆、人字撑通过立杆连接件固定连接,所述立杆连接件呈π状,包括相互固定的长钢板和两个相互平行的短钢板,短钢板垂直于长钢板,两个短钢板之间固定主框架,水平连接杆的一端与人字撑的一端固定连接于长钢板上。该立杆连接件可固定连接两组水平连接杆和人字撑。Further, the main frame is fixedly connected with the horizontal connecting rod and the gable brace through the vertical rod connecting piece, and the vertical rod connecting piece is in the shape of π, including long steel plates fixed to each other and two short steel plates parallel to each other, and the short steel plates are perpendicular to each other. The main frame is fixed between two short steel plates on the long steel plate, and one end of the horizontal connecting rod and one end of the gable are fixedly connected to the long steel plate. The vertical rod connecting piece can be fixedly connected with two sets of horizontal connecting rods and a gable.
进一步,所述作业平台包括花纹板和钢网片,施工作业面铺设花纹板,其他和楼层平齐的作业面铺设钢网片。操作层为花纹板和钢网片相结合,可以有效的降低平台总重量。Further, the working platform includes checkered plates and steel mesh sheets, checkered plates are laid on the construction work surface, and steel mesh sheets are laid on other work surfaces that are level with the floors. The operation layer is a combination of checkered plate and steel mesh, which can effectively reduce the total weight of the platform.
相对于现有技术,本实用新型所述的附着式升降脚手架的安装结构具有以下优势:Compared with the prior art, the installation structure of the attached lifting scaffold described in the utility model has the following advantages:
1.该附着式升降脚手架全部构配件实现了工厂化加工,从而保障了零部件及施工现场组装的质量,由于是标准化产品,使架体组装效率更高,降低了操作人员劳动强度;1. All components of the attached lifting scaffold have realized factory processing, thus ensuring the quality of parts and construction site assembly. Because it is a standardized product, the frame assembly efficiency is higher and the labor intensity of operators is reduced;
2.采用该附着式升降脚手架,能够加强架体的整体强度、刚度及稳定性,从而保证施工的安全性;2. The use of the attached lifting scaffold can strengthen the overall strength, rigidity and stability of the frame, thereby ensuring the safety of construction;
3.经济效益显著,一般的施工企业均能接受,现场管理投入也相对减少,机具综合投入费明显降低;另外,由于此类装备具有多功能、适应性强、高安全性等特点,加上较高的技术支撑,会为企业形成强大的市场竞争力,预期经济效益显著;3. Significant economic benefits, acceptable to general construction enterprises, relatively reduced on-site management investment, and significantly reduced comprehensive input costs for machinery and tools; in addition, due to the multi-functional, adaptable, high-safety characteristics of this type of equipment, plus High technical support will form a strong market competitiveness for the enterprise, and the expected economic benefits will be significant;
4.该附着式升降脚手架可以反复周转使用,占用钢材资源少,低碳环保,从国家产业政策分析,该产品推广前景广阔。4. The attached lifting scaffold can be used repeatedly, occupies less steel resources, and is low-carbon and environmentally friendly. From the analysis of national industrial policies, this product has broad prospects for promotion.
附图说明Description of drawings
构成本实用新型的一部分的附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings constituting a part of the utility model are used to provide a further understanding of the utility model, and the schematic embodiments of the utility model and their descriptions are used to explain the utility model, and do not constitute improper limitations to the utility model. In the attached picture:
图1是本实用新型的应用示意图;Fig. 1 is the application schematic diagram of the present utility model;
图2是图1的左视图;Fig. 2 is the left view of Fig. 1;
图3是图2中A部分的放大示意图;Fig. 3 is an enlarged schematic view of part A in Fig. 2;
图4是所述调节顶撑和固定架之间的安装过程示意图;Fig. 4 is a schematic diagram of the installation process between the adjustable top support and the fixed frame;
图5是所述调节顶撑和固定架之间安装后的示意图;Fig. 5 is a schematic diagram after installation between the adjustable top support and the fixed frame;
图6是所述立杆连接件的安装示意图;Figure 6 is a schematic diagram of the installation of the pole connector;
图7是图6中立杆连接件的结构示意图;Fig. 7 is a schematic structural view of the vertical rod connector in Fig. 6;
图8是所述花纹板的结构示意图;Fig. 8 is a structural schematic diagram of the checkered plate;
图9是所述钢网片的结构示意图;Fig. 9 is a structural representation of the steel mesh sheet;
附图标记说明:Explanation of reference signs:
1-建筑结构;2-人字撑;3-附着装置;4-轨道;5-电动葫芦;6-防坠装置;7-底座提升钢梁;8-横杆;9-花纹板;10-X型斜撑;11-钢网片;12-中节提升钢梁;13-密封板;14-第一方钢管;15-凹槽;16-调节螺栓;17-第二方钢管;18-穿销;19-圆钢;20-滑道;21-耳座;22-固定架;23-短钢板;24-长钢板;25-水平连接杆。1-building structure; 2-herringbone; 3-attachment device; 4-track; 5-electric hoist; 6-anti-drop device; 7-base lifting steel beam; X-shaped diagonal brace; 11-steel mesh; 12-middle section lifting steel beam; 13-sealing plate; 14-first square steel pipe; 15-groove; 16-adjusting bolt; 17-second square steel pipe; 18- Wear pin; 19-round steel; 20-slide; 21-ear seat; 22-fixed frame; 23-short steel plate; 24-long steel plate;
具体实施方式detailed description
需要说明的是,在不冲突的情况下,本实用新型中的实施例及实施例中的特征可以相互组合。It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上。In describing the present utility model, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationships shown in the drawings, and are only for the convenience of describing the present invention. Novel and simplified descriptions do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the utility model. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, a feature defined as "first", "second", etc. may expressly or implicitly include one or more of that feature. In the description of the present utility model, unless otherwise specified, "plurality" means two or more.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a flexible connection. Detachable connection, or integral connection; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention through specific situations.
下面将参考附图并结合实施例来详细说明本实用新型。The utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
如图1~9所示,一种附着式升降脚手架,包括主框架、作业平台、附着装置3、防坠装置6和密封板13,均设有若干组,所述主框架之间通过水平连接杆25和人字撑2固定连接,作业平台设于两个相邻的主框架之间,附着装置3固定于建筑结构1,主框架包括轨道4、中节提升钢梁12、底座提升钢梁7、横杆8和X型斜撑10,轨道4固定于主框架上朝建筑结构1一侧,轨道4与附着装置3之间通过导向架连接,轨道4在导向架上滑动,防坠装置6安装于导向架上,并设于附着装置3以下,中节提升钢梁12上安装有电动葫芦5,底座提升钢梁7上安装有导向轮,电动葫芦5的起吊绳的两端分别连接附着装置3和吊钩,并穿过导向轮,导向架上轴连接有调节顶撑,调节顶撑的顶端为与轨道4的圆钢19相配合的凹槽15,当轨道4停止运行时,凹槽15支撑圆钢19,所述密封板13铺设并固定于主框架外侧。As shown in Figures 1 to 9, an attached lifting scaffold includes a main frame, a working platform, an attachment device 3, an anti-fall device 6 and a sealing plate 13, each of which is provided with several groups, and the main frames are connected horizontally The rod 25 is fixedly connected to the gable brace 2, the working platform is set between two adjacent main frames, the attachment device 3 is fixed to the building structure 1, and the main frame includes the track 4, the middle section lifting steel beam 12, and the base lifting steel beam 7. Cross bar 8 and X-shaped diagonal brace 10. The track 4 is fixed on the main frame towards the side of the building structure 1. The track 4 and the attachment device 3 are connected by a guide frame. The track 4 slides on the guide frame. The anti-falling device 6 is installed on the guide frame and located below the attachment device 3, the electric hoist 5 is installed on the lifting steel beam 12 of the middle section, the guide wheel is installed on the lifting steel beam 7 of the base, and the two ends of the lifting rope of the electric hoist 5 are respectively connected The attachment device 3 and the suspension hook pass through the guide wheel. The upper shaft of the guide frame is connected with an adjustable top brace. The top of the adjustable top brace is a groove 15 matched with the round steel 19 of the track 4. When the track 4 stops running, The groove 15 supports the round steel 19, and the sealing plate 13 is laid and fixed on the outside of the main frame.
所述调节顶撑包括第一方钢管14、第二方钢管17和调节螺栓16,调节螺栓16设于第一方钢管14和第二方钢管17之间,第一方钢管14的顶端为半圆形的凹槽15,第二方钢管17的底端与导向架通过穿销18连接。The adjustable top support includes a first square steel pipe 14, a second square steel pipe 17 and an adjusting bolt 16. The adjusting bolt 16 is located between the first square steel pipe 14 and the second square steel pipe 17, and the top of the first square steel pipe 14 is half The circular groove 15, the bottom end of the second square steel pipe 17 is connected with the guide frame by a pin 18.
所述导向架包括滑道20、圆钢19和固定架22,固定架22固设于滑道20上朝向附着装置3的一侧,并设于防坠装置6的上端,附着装置3固定在固定架22上,固定架22上端设有耳座21,调节顶撑轴连接于耳座21,圆钢19设于滑道20内侧。Described guide frame comprises slideway 20, round steel 19 and fixed frame 22, and fixed frame 22 is fixed on the side of slideway 20 towards attachment device 3, and is located at the upper end of anti-falling device 6, and attachment device 3 is fixed on On the fixed mount 22 , the upper end of the fixed mount 22 is provided with an ear seat 21 , the adjusting top support shaft is connected to the ear seat 21 , and the round steel 19 is arranged on the inside of the slideway 20 .
所述主框架与水平连接杆25、人字撑2通过立杆连接件固定连接,所述立杆连接件呈π状,包括相互固定的长钢板24和两个相互平行的短钢板23,短钢板23垂直于长钢板24,两个短钢板23之间固定主框架,水平连接杆25的一端与人字撑2的一端固定连接于长钢板24上。The main frame is fixedly connected with the horizontal connecting rods 25 and the gables 2 through the vertical rod connectors. The vertical rod connectors are π-shaped and include long steel plates 24 fixed to each other and two short steel plates 23 parallel to each other. The steel plate 23 is perpendicular to the long steel plate 24, the main frame is fixed between the two short steel plates 23, and one end of the horizontal connecting rod 25 and one end of the gable 2 are fixedly connected to the long steel plate 24.
所述作业平台包括花纹板9和钢网片11,施工作业面铺设花纹板9,其他和楼层平齐的作业面铺设钢网片11。The work platform includes checkered plates 9 and steel mesh sheets 11. Checkered plates 9 are laid on the construction work surface, and steel mesh sheets 11 are laid on other work surfaces that are flush with floors.
主框架提升时,提升钢丝绳两端分别连接电动葫芦5的吊钩和提升支座,通过导向轮将提升钢丝绳转向180°,电动葫芦5挂在安装在主框架的中节提升钢梁12上,进行提升。该提升方式无需周转电动葫芦5,降低了工人的劳动强度,提高了操作安全,并且电动葫芦5为正挂,大大方便了电动葫芦5的维护和保养。When the main frame is lifted, the two ends of the hoisting wire rope are respectively connected to the hook of the electric hoist 5 and the lifting support, and the hoisting wire rope is turned 180° through the guide wheel, and the electric hoist 5 is hung on the middle section hoisting steel beam 12 installed on the main frame. for promotion. This lifting method does not need to turn around the electric hoist 5, which reduces the labor intensity of workers and improves the operation safety, and the electric hoist 5 is hung upright, which greatly facilitates the maintenance and maintenance of the electric hoist 5.
以上对本实用新型的实施例进行了详细说明,但所述内容仅为本实用新型的较佳实施例,不能被认为用于限定本实用新型的实施范围。凡依本实用新型申请范围所作的均等变化与改进等,均应仍归属于本实用新型的专利涵盖范围之内。The embodiments of the present utility model have been described in detail above, but the content described is only a preferred embodiment of the present utility model, and cannot be considered as limiting the implementation scope of the present utility model. All equal changes and improvements made according to the application scope of the utility model should still belong to the scope covered by the patent of the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620386928.2U CN205591529U (en) | 2016-04-28 | 2016-04-28 | Attached lifting scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620386928.2U CN205591529U (en) | 2016-04-28 | 2016-04-28 | Attached lifting scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205591529U true CN205591529U (en) | 2016-09-21 |
Family
ID=56933648
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620386928.2U Expired - Fee Related CN205591529U (en) | 2016-04-28 | 2016-04-28 | Attached lifting scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205591529U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106522533A (en) * | 2016-12-26 | 2017-03-22 | 广东运达科技股份有限公司 | Large-span modulus-free attached type lifting scaffold |
| CN107419894A (en) * | 2017-06-21 | 2017-12-01 | 河北盛卓建筑设备制造有限公司 | Adhesion type lifting type aluminium alloy scaffold |
| CN114923618A (en) * | 2022-07-22 | 2022-08-19 | 中建六局华南建设有限公司 | Video measuring system for measuring the adhesion of attached lifting scaffolding |
-
2016
- 2016-04-28 CN CN201620386928.2U patent/CN205591529U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106522533A (en) * | 2016-12-26 | 2017-03-22 | 广东运达科技股份有限公司 | Large-span modulus-free attached type lifting scaffold |
| CN107419894A (en) * | 2017-06-21 | 2017-12-01 | 河北盛卓建筑设备制造有限公司 | Adhesion type lifting type aluminium alloy scaffold |
| CN107419894B (en) * | 2017-06-21 | 2019-11-08 | 河北盛卓建筑设备制造有限公司 | Adhesion type lifting type aluminium alloy scaffold |
| CN114923618A (en) * | 2022-07-22 | 2022-08-19 | 中建六局华南建设有限公司 | Video measuring system for measuring the adhesion of attached lifting scaffolding |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204040435U (en) | High-altitude steel structure welding Hanging Basket | |
| CN205591529U (en) | Attached lifting scaffold | |
| WO2021135775A1 (en) | Connecting structure for upright pole and climbing frame protective net frames | |
| CN204873379U (en) | Repeatedly usable's construction elevator guard gate | |
| CN205617772U (en) | Gallows structure under lifting foot hand rack special use | |
| CN202298485U (en) | Bridge tower surrounding type lifting platform | |
| CN206873898U (en) | A kind of climbing frame seat in the plane guide rail bottom and aisle board connecting structure | |
| CN202788002U (en) | Assembled overhanging-type feed-receiving platform | |
| CN205976394U (en) | Convenient low layer construction scaffolding | |
| CN111232852A (en) | Novel rotary crane | |
| CN205116854U (en) | Coal scuttle is portable platform for aggregate erection | |
| CN213329975U (en) | Steel pull rod hanging and pulling overhanging bearing steel beam structure | |
| CN204357138U (en) | Simple steel structure hoisting frame | |
| CN103899078B (en) | Attachment automatic lifting protecting screen mounting method | |
| CN206487128U (en) | A kind of Guiding Support Elevating Scaffold | |
| CN210340110U (en) | Two T board hoisting structure of large-span assembled | |
| CN210067397U (en) | Intelligent integrated all-steel attached lifting scaffold | |
| CN205591526U (en) | A structure framework for inserted lift scaffold | |
| CN207863502U (en) | A kind of Construction of Steel Structure life line bracket | |
| CN219429514U (en) | Climbing frame dismantling support | |
| CN106149568A (en) | A kind of device for the outside construction of box beam chamber and construction method | |
| CN215829977U (en) | A suspended door formula support for high altitude tower building vestibule fitment | |
| CN207110403U (en) | A kind of outdoor construction support frame | |
| CN205932875U (en) | Telescopic landing stage is used to steel construction integration elevator | |
| CN216893597U (en) | Elevartor shaft instrument formula protection frame convenient to dismouting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160921 Termination date: 20180428 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |