CN205583609U - A wind -force actuating mechanism for high -voltage line removes ice and snow - Google Patents
A wind -force actuating mechanism for high -voltage line removes ice and snow Download PDFInfo
- Publication number
- CN205583609U CN205583609U CN201620407745.4U CN201620407745U CN205583609U CN 205583609 U CN205583609 U CN 205583609U CN 201620407745 U CN201620407745 U CN 201620407745U CN 205583609 U CN205583609 U CN 205583609U
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- crossbeam
- snow
- parallel
- cross beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Wind Motors (AREA)
Abstract
The utility model discloses a wind -force actuating mechanism for high -voltage line removes ice and snow has sleeve pipe, first crossbeam and second crossbeam that the power supply line passed, the middle part of first crossbeam is fixed and is cup jointed the outer wall in sleeve pipe one end, and the middle part of second crossbeam is fixed and is cup jointed the outer wall at the sleeve pipe other end. The axis of first crossbeam and the axis of second crossbeam are parallel, and equal perpendicular to sheathed tube axis. The both ends of first crossbeam are provided with the installation arm parallel with the sleeve pipe respectively, and the both ends of second crossbeam also are provided with the installation arm parallel with the sleeve pipe respectively. It is all parallel with the sleeve pipe that each installs the arm, and each end of installing the arm all is provided with a fan wheel, and the fan wheel can rotate for connected installation arm. The utility model discloses simple structure, low in manufacturing cost, the practicality is strong, and it is efficient to remove ice and snow, clearance thoroughly clean.
Description
Technical field
This utility model relates to field of mechanical technique, is specifically related to a kind of wind drive mechanism for deicing of high-voltage wires snow.
Background technology
In recent years, the sleet extreme weather on a large scale of last longer often there is winter, run into sleet, rain and snow mixed and big
During the weather such as snow, because cold weather is difficult to dissolve, accumulated snow can be covered on the surface of high voltage transmission line and condense into ice slush.Ice is by line
What cable was thick wrap can cause short circuit, affects normal power transmission, and the deterioration of safety of power transmission is made to the life of broad masses of the people
Become great inconvenience.Especially in the Changjiang river areas to the south, original power delivery circuit design bearing capacity relatively low in the case of,
The outside icing of circuit can cause the increase at double of the weight of power transmission line, the phenomenon that power transmission line is broken and power transmission tower crushes occurs,
Directly result in power-off.
Most of areas, south are based on mountain region, in the case of occurring that power transmission line or power transmission tower are pressed down, by extreme weather and ground
The impact of reason position, rushes to repair extremely difficult.In the case of occurring that power transmission line meets with frost, taking most modes is manually to remove
Ice and snow, do so both wasted time and energy, and work efficiency is the lowest, meanwhile, there is also higher danger.At present, the most also go out
Having showed the device of more deicing snow removing, for example with heating the method making ice slush melt, the method is inefficient, and practicality
The strongest.Accordingly, it would be desirable to a kind of New Equipments being capable of quick deicing snow removing.
Utility model content
Being directed to the defect that above-mentioned prior art exists, the purpose of this utility model is to provide a kind of for deicing of high-voltage wires snow
Wind drive mechanism, works under the extreme weather that this mechanism can be the most severe, has the ability of quick deicing.
To achieve these goals, the technical solution of employing is this utility model:
A kind of wind drive mechanism for deicing of high-voltage wires snow, has sleeve pipe, first crossbeam and second cross beam that supply lines passes,
The fixedly sleeved outer wall in sleeve pipe one end in middle part of described first crossbeam, the middle part of second cross beam is fixedly sleeved at the sleeve pipe other end
Outer wall.The axis of described first crossbeam is parallel with the axis of second cross beam, and is each perpendicular to the axis of sleeve pipe.The two of first crossbeam
End is respectively arranged with the installation arm parallel with sleeve pipe, and the two ends of second cross beam are also respectively arranged with the installation arm parallel with sleeve pipe.Respectively
Installing arm all parallel with sleeve pipe, each end installing arm is provided with a fan wheel, and fan wheel can be relative to connected peace
Dress arm rotates.
Preferably, the outward flange of each fan wheel is evenly arranged the hammer handle of multiple rubber, and each hammer handle is away from one end of fan wheel
It is mounted on the spherical tup of metal.
Preferably, two the installation arms being connected with first crossbeam are for one is long and the other is short, and two the installation arms being connected with second cross beam are also
One is long and the other is short.
Preferably, the distance at the two ends of described first crossbeam to sleeve pipe is equal, and the distance at the two ends of second cross beam to sleeve pipe is the most equal.
By using technique scheme, Advantageous Effects of the present utility model is: this device is installed on high-voltage line, at wind
Under the effect of power, fan wheel can drive whole device constantly to advance along power transmission line, and it is multiple that the fan wheel in traveling drives outside it
Hammer handle rotates, and the spherical tup of metal can tap the ice slush covered on high voltage transmission line continuously, will fall on electric wire meanwhile
Accumulated snow is cleaned out the most in the lump.This utility model simple in construction, low cost of manufacture, practical, deicing efficiency is high, cleaning
Clean thoroughly.
Accompanying drawing explanation
Fig. 1 is the structural principle schematic diagram of a kind of wind drive mechanism for deicing of high-voltage wires snow in this utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in detail:
In conjunction with Fig. 1, a kind of wind drive mechanism for deicing of high-voltage wires snow, there is sleeve pipe 1, first crossbeam that supply lines passes
2 and second cross beam 3, the fixedly sleeved outer wall in sleeve pipe 1 one end in middle part of described first crossbeam 2, the middle part of second cross beam 3 is solid
Surely it is socketed in that the outer wall of sleeve pipe 1 other end, first crossbeam 2 and second cross beam 3 are all fixing with sleeve pipe 1 to be connected.Described first is horizontal
The axis of beam 2 is parallel with the axis of second cross beam 3, and they are each perpendicular to the axis of sleeve pipe 1, first crossbeam 2, second cross beam
I-shaped bracket is formed with sleeve pipe 1.Described first crossbeam and and the length of second cross beam 3 equal, the two ends of first crossbeam 2 are arrived
The distance of sleeve pipe 1 is equal, and the two ends of second cross beam 3 are the most equal to the distance of sleeve pipe 1.
The two ends of first crossbeam 2 are respectively arranged with the installation arm 4 parallel with sleeve pipe 1, and the two ends of second cross beam 3 are also respectively provided with
There is the installation arm 4 parallel with sleeve pipe 1.The length installing arm 4 being positioned at first crossbeam 2 left end is left more than being positioned at first crossbeam 2
The length installing arm 4 of end, is positioned at the length installing arm 4 of second cross beam 3 left end less than the peace being positioned at second cross beam 3 left end
The length of dress arm 4.Each installation arm 4 is all parallel with sleeve pipe 1, and the end of each installation arm 4 is provided with a fan wheel 5,
Fan wheel 5 can rotate relative to connected installation arm 5, and the disposed inboard of fan wheel 5 has multiple flabellum 51, all 5
The effect of wind-force is lower all to be rotated according to identical direction, and all produces pull strength in the same direction.The outward flange of each fan wheel 5 is equal
Even being disposed with multiple rubber hammer handle 6, each rubber hammer handle 6 is mounted on the spherical tup 7 of metal away from one end of fan wheel 5,
Fan wheel 5 is under rotary state, and spherical tup 7 can touch the axis of sleeve pipe 1.
Being passed from the inside of sleeve pipe 1 by high-voltage line, sleeve pipe 1 can slide along the axis direction of high-voltage line.At the shape that high-voltage line freezes
Under state, all fan wheel 5 meeting quick rotation under the action of the forces of the wind, multiple spherical tups 7 are under the effect of centripetal force, continuously
Constantly tapping and be wrapped in the ice and snow outside high-voltage line, ice and snow is broken after being tapped, and separates with power transmission line and falls.Fan wheel
5 under rotary state, can produce the pull strength along power transmission line direction, pull sleeve pipe 1 along high-voltage line axis direction advance or after
Moving back, meanwhile, the spherical tup 7 in all fan wheel 5 successively taps the ice and snow on high-voltage line.Two ends before and after sleeve pipe 1
Each two fan wheel 5, two fan wheel 5 of sleeve pipe 1 front end, after tapping, when power transmission line also has the ice slag of residual, are positioned at
Two fan wheel 5 of sleeve pipe 1 rear end can tap on one side again, is thoroughly cleaned out by the ice and snow on power transmission line.
Certainly, described above is not to restriction of the present utility model, and this utility model is also not limited to the example above, this skill
Change that the technical staff in art field is made in essential scope of the present utility model, retrofit, add or replace, also should belong to
Protection domain of the present utility model.
Claims (4)
1., for a wind drive mechanism for deicing of high-voltage wires snow, there is sleeve pipe, first crossbeam and the second horizontal stroke that supply lines passes
Beam, it is characterised in that the fixedly sleeved outer wall in sleeve pipe one end in middle part of described first crossbeam, the middle part fixed cover of second cross beam
It is connected on the outer wall of the sleeve pipe other end;The axis of described first crossbeam is parallel with the axis of second cross beam, and is each perpendicular to the axle of sleeve pipe
Line;The two ends of first crossbeam are respectively arranged with the installation arm parallel with sleeve pipe, and the two ends of second cross beam are also respectively arranged with and sleeve pipe
Parallel installation arm;Each installation arm is all parallel with sleeve pipe, and each end installing arm is provided with a fan wheel, and fan wheel can phase
Connected installation arm is rotated.
A kind of wind drive mechanism for deicing of high-voltage wires snow the most according to claim 1, it is characterised in that Mei Gefeng
The outward flange of impeller is evenly arranged the hammer handle of multiple rubber, and each hammer handle is mounted on the spherical of metal away from one end of fan wheel
Tup.
A kind of wind drive mechanism for deicing of high-voltage wires snow the most according to claim 1, it is characterised in that with first
Two installation arms that crossbeam connects are that one is long and the other is short, and two the installation arms being connected with second cross beam are also for one is long and the other is short.
A kind of wind drive mechanism for deicing of high-voltage wires snow the most according to claim 1, it is characterised in that described the
The two ends of one crossbeam are equal to the distance of sleeve pipe, and the distance at the two ends of second cross beam to sleeve pipe is the most equal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620407745.4U CN205583609U (en) | 2016-05-06 | 2016-05-06 | A wind -force actuating mechanism for high -voltage line removes ice and snow |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620407745.4U CN205583609U (en) | 2016-05-06 | 2016-05-06 | A wind -force actuating mechanism for high -voltage line removes ice and snow |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205583609U true CN205583609U (en) | 2016-09-14 |
Family
ID=56856421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620407745.4U Expired - Fee Related CN205583609U (en) | 2016-05-06 | 2016-05-06 | A wind -force actuating mechanism for high -voltage line removes ice and snow |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205583609U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107919642A (en) * | 2017-12-11 | 2018-04-17 | 黄文佳 | A kind of device for preventing cable accumulated snow |
CN107947088A (en) * | 2017-12-11 | 2018-04-20 | 黄文佳 | A kind of cable snow-removing device |
-
2016
- 2016-05-06 CN CN201620407745.4U patent/CN205583609U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107919642A (en) * | 2017-12-11 | 2018-04-17 | 黄文佳 | A kind of device for preventing cable accumulated snow |
CN107947088A (en) * | 2017-12-11 | 2018-04-20 | 黄文佳 | A kind of cable snow-removing device |
CN107919642B (en) * | 2017-12-11 | 2019-12-06 | 於岩明 | device for preventing cable snow |
CN107947088B (en) * | 2017-12-11 | 2019-12-13 | 黄文佳 | Cable snow removing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108767794B (en) | Cable defroster in winter | |
CN107230962B (en) | A kind of ice removal | |
CN205583609U (en) | A wind -force actuating mechanism for high -voltage line removes ice and snow | |
CN105680398B (en) | Electrical deicing pick and de-icing method | |
CN218124270U (en) | Deicing mechanism for power distribution network line | |
CN112952720A (en) | High-voltage line defroster based on electronic jar is strikeed | |
CN215580279U (en) | High-voltage line defroster | |
CN102227076A (en) | Robot used for automatically deicing high tension transmission line | |
CN204298782U (en) | A kind of mechanical heating power composite road deicing vehicle | |
CN104752997B (en) | The cleaning device of overhead transmission line | |
CN111705739B (en) | Integrated machine for removing ice and snow on railway | |
CN111002318B (en) | Ice-breaking emergency rescue robot | |
CN116073313B (en) | High-voltage line ice melting equipment, attachment cleaning equipment and ice melting method | |
CN205583615U (en) | A device for high -voltage line deicing snow removing | |
CN205681077U (en) | A kind of distribution network closed loop road deicing device | |
CN208923617U (en) | Substation equipment heating power charges device for expelling ice and snow | |
CN106911113A (en) | It is applied to the icing sweeping robot of overhead power transmission line | |
CN205583612U (en) | A manipulator for high -voltage line deicing | |
CN201994618U (en) | Tracked suspension type deicing device for high-voltage cable | |
CN205355751U (en) | Electric machine formula automatic control deicing equipment | |
CN202004410U (en) | Rotary deicing device for power transmission line wire | |
CN206323108U (en) | A kind of artificial deicing tool of transformer station | |
CN212875257U (en) | Device for preventing freezing on high-voltage line | |
CN209329649U (en) | A kind of deicer sending power transformation route | |
CN209913775U (en) | Crystalline silicon solar cell module with snow melting function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 Termination date: 20170506 |