CN205576898U - Spout friction pile soon - Google Patents

Spout friction pile soon Download PDF

Info

Publication number
CN205576898U
CN205576898U CN201620350632.5U CN201620350632U CN205576898U CN 205576898 U CN205576898 U CN 205576898U CN 201620350632 U CN201620350632 U CN 201620350632U CN 205576898 U CN205576898 U CN 205576898U
Authority
CN
China
Prior art keywords
pile
stake
churning
soon
rotary churning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620350632.5U
Other languages
Chinese (zh)
Inventor
吴红刚
陈小云
冯文强
杨昊天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Research Institute Co Ltd of CREC
Original Assignee
Northwest Research Institute Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Research Institute Co Ltd of CREC filed Critical Northwest Research Institute Co Ltd of CREC
Priority to CN201620350632.5U priority Critical patent/CN205576898U/en
Application granted granted Critical
Publication of CN205576898U publication Critical patent/CN205576898U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a spout friction pile soon to it is poor to solve a native transmission performance who coordinates the deformation and do all can who has the existence of miniature pile group now, the anti -bending strength is poor, soil is easy between the stake during rainfall runs off, and perishable muscle material causes the problem of potential safety hazard. It is constituteed by spouting stake, muscle material, hood soon, spouts the stake soon for many, and the muscle material has been inserted at every center of spouting the stake soon, and every pile bolck that spouts the stake soon connects into a whole by the hood, overlaps and arranges in the stake part of spouting soon of the smooth direction of parallel owner, leaves the space between the stake adjacent the spouting soon of perpendicular main smooth direction. The utility model discloses a middle -size and small -size landslide (side slope) provides the miniature friction pile group structure that the flexibility is simple, construction cycle is short, be applicable to the great soil property of plasticity that is under construction.

Description

A kind of churning friction pile
Technical field
This utility model belongs to engineering field, is specifically related to the miniature pile group of no-dig technique churning of a kind of middle-size and small-size landslide (side slope) stable operation bigger for Plastic flow of soil.
Background technology
At present, using more ripe in (side slope) harnessing project of landslide is exactly common excavation type friction pile, the tension higher compared with high pressure resistance energy and armored concrete of concrete in bending deformation and shear behavior is it makes use of as heavy in section excavation type friction pile, skid resistance can be well provided when it arranges harnessing landslide with a determining deviation, limit development and the downslide on landslide.The advantage of common excavation type friction pile: (1) is applied widely;(2) anti-sliding support ability is strong;(3) construction is simple.Shortcoming has: (1) mechanized construction degree is poor;(2) hand excavation's danger is high;(3) market prospect of hand excavation is poor;(4) big to rock side slope undisturbed soil disturbance.
Also having a kind of retaining structure conventional in landslide antiskid is speedily carried out rescue work is the miniature pile group of type, utilizes mini pile to provide shear resistance to provide certain skid resistance, stops landslide to glide deformation.The advantage of miniature pile group: (1) speed of application is fast;(2) mechanization degree is high, it is to avoid excavated by manual work stake.Shortcoming: (1) is poor for applicability in incompact-deposit bodies landslide (side slope);(2) the transmission poor performance of stake soil compatible deformation and power;(3) anti-bending strength is poor;(4) during rainfall, inter-pile soil is easy to run off, perishable muscle material, causes potential safety hazard.
Utility model content
The purpose of this utility model is to provide a kind of churning friction pile, to solve stake soil compatible deformation and the transmission poor performance of power that existing miniature pile group exists;Anti-bending strength is poor;During rainfall, inter-pile soil is easy to run off, perishable muscle material, the problem causing potential safety hazard.
This utility model be the technical scheme is that a kind of churning friction pile, it is made up of rotary churning pile, muscle material, top cap, rotary churning pile is many, the center of every rotary churning pile is inserted with muscle material, the stake top of every rotary churning pile is connected into an entirety by top cap, rotary churning pile at parallel main sliding direction partly overlaps layout, leaves space between the adjacent rotary churning pile of vertical main sliding direction.
Preferably, rotary churning pile passes through gliding mass, sliding surface and stretches in slider bed.
Preferably, rotary churning pile stretch into that the length of slider bed is long not less than rotary churning pile stake 1/2.
Preferably, at the overlapped a length of 0.3m-0.4m of rotary churning pile of parallel main sliding direction.
Preferably, the spaced width of rotary churning pile at vertical main sliding direction is 0.3m-0.5m.
Preferably, a diameter of 0.6m-1.0m of rotary churning pile.
Preferably, top cap is reinforced concrete structure, and top cap is arranged at above-ground route top.
Preferably, the rotary churning pile outermost spacing that the length of top cap is arranged not less than parallel main sliding direction, the rotary churning pile outermost spacing that the width of top cap is arranged not less than vertical main sliding direction, the height of top cap is not less than 1m.
Preferably, muscle material stretches into the length of top cap not less than 0.3m.
This utility model is according to matrix arrangement by some rotary churning piles, and rotary churning pile leaves space between main sliding direction close arrangement, vertical main sliding direction stake, and muscle material is inserted at every rotary churning pile center, and stake top uses top cap to connect into an entirety, can preferably power be handed on.Hole between vertical main sliding direction stake can effectively draining, be beneficial to stablizing of slope body, stake top forms top cap with big thickness concrete again and is rigidly connected each mini pile, ultimately form fix with top cap, the stake soil miniature pile group of type integrally.The existence of big thickness concrete top cap makes each micro-pile combined effect, after inter-pile soil churning simultaneously, the raising of intensity makes mini pile and soil between pile deformation hight coordinate, the transmission of power is smooth and easy, there is while ensureing its energy shearing resistance the performance of stretch bending component, bending resistance increases, and is effectively improved its anti-slide performance.This utility model is that middle-size and small-size landslide (side slope) provides a kind of flexible simple, short construction period of constructing, is applicable to the Miniature anti-slide pile group structure of the bigger soil property of plasticity.
The beneficial effects of the utility model are: rotary spray technique is introduced in landslide (side slope) harnessing project by (1);(2) speed of application is fast;(3) it is prone to structural defence;(4) flexible arrangement is various.
Accompanying drawing explanation
Fig. 1 is the planar structure schematic diagram of a kind of churning friction pile;
Fig. 2 is the A-A view in Fig. 1;
Fig. 3 is the floor map that a kind of churning friction pile is arranged continuously;
Fig. 4 is the side schematic view that a kind of churning friction pile is arranged;
Fig. 5 is facade layout schematic diagram after a kind of churning friction pile stake.
Reference implication is as follows: 1. top cap, 2. rotary churning pile, 4. above-ground route, 5. gliding mass, 6. sliding surface, 7. slider bed, 8. muscle material, B. overlap length, C. interval width.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described further.
As it is shown in figure 1, Y-direction is main sliding direction in figure.
A kind of churning friction pile, it is made up of rotary churning pile 2, muscle material 8, top cap 1, and rotary churning pile 2 is many, shows 12 in Fig. 1.The center of every rotary churning pile 2 is inserted with muscle material 8, and the stake top of every rotary churning pile 2 is connected into an entirety by top cap 1, and the rotary churning pile 2 at parallel main sliding direction partly overlaps layout, leaves space between the adjacent rotary churning pile 2 of vertical main sliding direction.
Rotary churning pile 2 passes through gliding mass 5, sliding surface 6 and stretches in slider bed 7.
In present embodiment, rotary churning pile 2 stretches into the length of slider bed 7 not less than rotary churning pile 2 long 1/2.The overlapped length of rotary churning pile 2 (B) at parallel main sliding direction is 0.3m-0.4m.The spaced width of rotary churning pile 2 (C) at vertical main sliding direction is 0.3m-0.5m.A diameter of 0.6m-1.0m of rotary churning pile 2.Top cap 1 is reinforced concrete structure, and top cap 1 is arranged at above-ground route 4 top.
The rotary churning pile outermost spacing that the length of top cap 1 is arranged not less than parallel main sliding direction, the rotary churning pile outermost spacing that the width of top cap 1 is arranged not less than vertical main sliding direction, the height of top cap 1 is not less than 1m.Muscle material 8 stretches into the length of top cap 1 not less than 0.3m.
In present embodiment, muscle material (8) uses rail, shaped steel, steel pipe, tendon etc., and during muscle material (8) curtailment, joint uses welding, and muscle material (8) the joint quantity of same cross section is less than the 1/4 of muscle material (8) total number.
During use, according to on-the-spot actual, rotary churning pile is arranged, become antiskid pile group by some miniature rotary churning piles according to certain forms permutation and combination, and by adjusting quantity and the stake footpath size of stake, determine the scale of antiskid pile group, thus improve motility and the speed of application of construction, reduce difficulty of construction.

Claims (9)

1. a churning friction pile, it is characterized in that: it is made up of rotary churning pile (2), muscle material (8), top cap (1), rotary churning pile (2) is many, the center of every rotary churning pile (2) is inserted with muscle material (8), the stake top of every rotary churning pile (2) is connected into an entirety by top cap (1), rotary churning pile (2) at parallel main sliding direction partly overlaps layout, leaves space between the adjacent rotary churning pile (2) of vertical main sliding direction.
A kind of churning friction pile the most according to claim 1, it is characterised in that: rotary churning pile (2) passes through gliding mass (5), sliding surface (6) and stretches in slider bed (7).
A kind of churning friction pile the most according to claim 2, it is characterised in that: rotary churning pile (2) stretches into 1/2 that the length of slider bed (7) is long not less than rotary churning pile (2) stake.
4. according to a kind of churning friction pile described in Claims 2 or 3, it is characterised in that: at the overlapped a length of 0.3m-0.4m of rotary churning pile (2) of parallel main sliding direction.
A kind of churning friction pile the most according to claim 4, it is characterised in that: rotary churning pile (2) the spaced width at vertical main sliding direction is 0.3m-0.5m.
A kind of churning friction pile the most according to claim 5, it is characterised in that: a diameter of 0.6m-1.0m of rotary churning pile (2).
A kind of churning friction pile the most according to claim 6, it is characterised in that: top cap (1) is reinforced concrete structure, and top cap (1) is arranged at above-ground route (4) top.
A kind of churning friction pile the most according to claim 7, it is characterized in that: the rotary churning pile outermost spacing that the length of top cap (1) is arranged not less than parallel main sliding direction, the rotary churning pile outermost spacing that the width of top cap (1) is arranged not less than vertical main sliding direction, the height of top cap (1) is not less than 1m.
A kind of churning friction pile the most according to claim 8, it is characterised in that: muscle material (8) stretches into the length of top cap (1) not less than 0.3m.
CN201620350632.5U 2016-04-25 2016-04-25 Spout friction pile soon Expired - Fee Related CN205576898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620350632.5U CN205576898U (en) 2016-04-25 2016-04-25 Spout friction pile soon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620350632.5U CN205576898U (en) 2016-04-25 2016-04-25 Spout friction pile soon

Publications (1)

Publication Number Publication Date
CN205576898U true CN205576898U (en) 2016-09-14

Family

ID=56860712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620350632.5U Expired - Fee Related CN205576898U (en) 2016-04-25 2016-04-25 Spout friction pile soon

Country Status (1)

Country Link
CN (1) CN205576898U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816049A (en) * 2017-10-24 2018-03-20 大连理工大学 Accumulation type landslide Miniature anti-slide pile group's combining structure based on collaborative work principle
CN110055978A (en) * 2019-05-20 2019-07-26 中铁十二局集团有限公司 A kind of the foundation pit enclosure pilework and construction method of steel reinforced concrete drilling boundling stake

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816049A (en) * 2017-10-24 2018-03-20 大连理工大学 Accumulation type landslide Miniature anti-slide pile group's combining structure based on collaborative work principle
CN110055978A (en) * 2019-05-20 2019-07-26 中铁十二局集团有限公司 A kind of the foundation pit enclosure pilework and construction method of steel reinforced concrete drilling boundling stake

Similar Documents

Publication Publication Date Title
CN102767379A (en) Shallow-buried unsymmetrical pressure section tunnel drilling construction method
CN205576898U (en) Spout friction pile soon
CN106088110A (en) A kind of miniature pile group of churning and implementation
CN104196037B (en) A kind of environmental protection slope reinforcement structure
CN204343306U (en) Tunnel, landslide integration Reinforcement device
CN203238642U (en) Supporting retaining wall of foundation pit
CN104164884B (en) A kind of combined system bank protection dyke strengthening method
CN205688449U (en) A kind of miniature pile group of churning
CN205714282U (en) Waterproof/drainage structure at the bottom of a kind of soft stratum tunnel
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN207331709U (en) The netted retaining structure of deep welding with filler wire
CN106149631B (en) High mountain strid arch dam avalanche type Slope Treatment method
CN205188944U (en) Reinforcing concrete circular pile
CN205591133U (en) Swift current sand slope cutting reinforcement and protection structure
CN203904972U (en) Anti-soil leaking combined support pile
CN207130743U (en) A kind of landslide induced micro combination pile group arch ring ruggedized construction
CN209538198U (en) Abnormity draining friction pile
CN205591213U (en) Simple and easy device of construction branch stake
CN203925521U (en) A kind of shield tunnel bottom stratum consolidation channels configuration
CN207484200U (en) Ashlar brick
CN206298889U (en) Stake net mud-rock flow is blocked structure
CN208502764U (en) Anti-settling supporting construction
CN205779013U (en) The transverse drainage of tunnel crag
CN105672150B (en) Sand-sliding slope cutting reinforcement protection structure
CN103572778A (en) Rope fixture type shearing resisting, dip angle changing and mutual inlaying barricade block and rope fixing method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914

Termination date: 20200425