CN205561691U - Blasting engineering air space device - Google Patents

Blasting engineering air space device Download PDF

Info

Publication number
CN205561691U
CN205561691U CN201620297221.4U CN201620297221U CN205561691U CN 205561691 U CN205561691 U CN 205561691U CN 201620297221 U CN201620297221 U CN 201620297221U CN 205561691 U CN205561691 U CN 205561691U
Authority
CN
China
Prior art keywords
container
preformed hole
top board
spacer
blasting engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620297221.4U
Other languages
Chinese (zh)
Inventor
钟权
龙军飞
王峰
周德彦
王勇胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201620297221.4U priority Critical patent/CN205561691U/en
Application granted granted Critical
Publication of CN205561691U publication Critical patent/CN205561691U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a blasting engineering air space device. The utility model discloses a container of airtight structure, the container middle part is provided with the baffle, make the container separate for the upper strata, two spaces of lower floor, the baffle is provided with the preformed hole in its one side, container upper strata space has the top cover labyrinth of the material that is used for packing into, container lower floor space has the lower seal lid of the material that is used for packing into, the top cover labyrinth is close to preformed hole one side or locates the container lateral wall and be close to preformed hole one side on locating the container roof, the lower seal lid is close to preformed hole one side or locates the container lateral wall and be close to preformed hole one side on locating the container bottom plate, container lateral wall part at least is the elastic expansion material, the container lateral wall has hoist and mount the time can make the container setting of lying on one's side, and the preformed hole lies in a connection structure of container top, the container lateral wall can make the container just found the 2nd connection structure who sets up when having hoist and mount.

Description

Blasting engineering air-spacer
Technical field
This utility model relates to a kind of blasting engineering air-spacer.
Background technology
Drillhole blasting is the common technology of rock excavation, is widely used in the fields such as water conservancy and hydropower, mine, traffic.Traditional company Continuous column charge exists that unit consumption is big, detonation first pressing is too high, the overground shortcoming of rock so that the effective utility of laser power of explosive Low, and it is easily generated bulk and foundation, bring the problems such as blasting vibration harm.Air-decking technique can reduce explosive Initial peak pressure to big gun hole surrounding rock, in making hole, blast pressure obtains evenly along big gun hole axial distribution, thus reduces or keep away Exempt from the over grind of near region, big gun hole country rock, expanded rupture zone scope, improved the effective rate of utilization of explosive blasting energy, thus drop Low blasting cost, controled blasting harm.Airspace device is i.e. arranged between air column and explosive, air column and stemming Spacer to bear the weight of explosive and stemming.The most conventional air-spacer is air bag, and its unit price is high, it is numerous to operate Trivial, reduce loading rate, add blasting cost.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of with low cost, easy to operate blasting engineering airspace Device, to improve loading rate, to reduce blasting cost.
Blasting engineering air-spacer is the technical scheme is that, including airtight by solving above-mentioned technical problem this utility model The container of structure, is provided with dividing plate in the middle part of container so that container is divided into upper strata, two spaces of lower floor, and dividing plate sets in its side Being equipped with preformed hole, on container, sheaf space has the top cover labyrinth for loading material, and container lower layer space has for loading material Lower sealing cover, top cover labyrinth is located on container top board near preformed hole side or is located at container side wall near preformed hole side, under Sealing is covered on container floor near preformed hole side or is located at container side wall near preformed hole side, and container side wall is at least part of For elastic flexible material, container can be made when container outside wall has lifting to lie on one's side setting and preformed hole is positioned at the above container One attachment structure, can make the second attachment structure of container upright setting when container outside wall has lifting.
Further: on container, the sidewall of sheaf space is elastic flexible material, passes through reinforcement between container top board and dividing plate Plate connects, and the sidewall of container lower layer space, container top board, container floor, dividing plate, reinforcement gusset are rigid material.
Further: strengthening gusset is spaced a plurality of reinforcing plate structure.
Further: strengthening gusset is the net-like spacer structure that container is divided into two spaces, left and right.
Further: be cylindrical when container is upright, dividing plate is parallel to container 1 top board and arranges.
Further: be cylindrical when container is upright, dividing plate is parallel to container top board and arranges, and strengthens gusset and is perpendicular to container top board Arrange.
Further: top cover labyrinth is located on container top board near preformed hole side.
Further: the first attachment structure includes being located on container top board the first hanger of close preformed hole side, being located at container Second hanger of close preformed hole side on base plate;Second attachment structure includes being located on container top board the near preformed hole side One hanger, to be located at container top board upper in the 3rd hanger of the first hanger opposite side.
This utility model implements step:
A, container is lain on one's side setting and preformed hole is positioned at above container;On container, sheaf space loads material M, lower layer space Gas can be produced after loading material N, material M and material N mixing;By top cover labyrinth, lower sealing cover by container closure;
B, the first attachment structure, the second attachment structure are all connected with hoisting rope;The appearance will lain on one's side by the hoisting rope of the first attachment structure Blast-hole design position sent into by device;Then by the hoisting rope of the second attachment structure, container is overturn, the upright setting of container;Material M and material N mixing, produces gas, and the elastic flexible material portion of container side wall expands so that container is stuck in big gun hole;
C, load explosive or stemming at upper vessel portion;
D, repetition step A, B, C, until powder charge completes.
The beneficial effects of the utility model are: utilize material M and material N mixing to produce gas, so that device dilatancy Principle, device card is in big gun hole the most at last, in order to complete underground borehole blasting.This utility model is with low cost, easy to operate.
Accompanying drawing explanation
Fig. 1 is the structural representation under the upright state of container;
Fig. 2 is structural representation during this utility model enforcement;
Fig. 3 is this utility model structural representation time big gun hole put into by container when implementing;
Fig. 4 is this utility model structural representation time container is stuck in big gun hole when implementing;
Labelling in figure: 1-container, 2-dividing plate, 3-preformed hole, 4-strengthen gusset, 5-top cover labyrinth, 6-lower sealing cover, 7-the One hanger, 8-the second hanger, 9-the 3rd hanger, 10-big gun hole, 11-powder charge section, 12-air section.
Detailed description of the invention
For ease of understanding and implementing this utility model, select preferred embodiment of the present utility model to combine accompanying drawing and be described further.
As it is shown in figure 1, blasting engineering air-spacer, including the container 1 of closed structure, in the middle part of container 1, it is provided with dividing plate 2, Making container 1 be divided into upper strata, two spaces of lower floor, dividing plate 2 is provided with preformed hole 3, sheaf space on container 1 in its side Having the top cover labyrinth 5 for loading material, container 1 lower layer space has the lower sealing cover 6 for loading material, seals on 5 It is covered on container 1 top board near preformed hole 3 side or is located at container 1 sidewall and sets near preformed hole 3 side, lower sealing cover 6 Near preformed hole 3 side or be located at container 1 sidewall near preformed hole 3 side on container 1 base plate, container 1 sidewall at least portion Be divided into elastic flexible material, container 1 lateral wall can make when there is lifting container 1 lie on one's side setting and preformed hole 3 be positioned at container The first attachment structure above in the of 1, container 1 lateral wall can make the second attachment structure of container 1 upright setting when having lifting. Preformed hole 3 can be bar hole, it is also possible to for spaced loose structure;Preformed hole 3 may be alternatively provided as multiple rows of structure simultaneously.
For ensureing that apparatus structure is stable, container 1 finally can be stuck in big gun hole 10 reliably, and preferred implementation is: on container 1 The sidewall of sheaf space is elastic flexible material, is connected by reinforcement gusset 4, container 1 time between container 1 top board and dividing plate 2 The sidewall of sheaf space, container 1 top board, container 1 base plate, dividing plate 2, reinforcement gusset 4 are rigid material.Wherein, for entering One step improves apparatus structure stability, for strengthening gusset 4, also provides for two kinds of preferred implementations: strengthen gusset 4 for interval The a plurality of reinforcing plate structure arranged;Or strengthening gusset 4 is the net-like spacer structure that container 1 is divided into two spaces, left and right.Separately Outward, strengthen gusset 4 and may also be configured to spaced multiple rows of structure.Seal lid and attachment structure is preferably disposed on rigid material portion Position, when using said structure, the preferred implementation sealing lid is: top cover labyrinth 5 is located on container 1 top board near preformed hole 3 sides;The preferred implementation of attachment structure is: the first attachment structure includes being located on container 1 top board near preformed hole 3 one First hanger 7 of side, it is located on container 1 base plate the second hanger 8 near preformed hole 3 side;Second attachment structure includes being located at The first hanger 7 near preformed hole 3 side on container 1 top board, it is located on container 1 top board and is positioned at the first hanger opposite side 3rd hanger 9.
For ensureing that apparatus structure is stable, container 1 finally can be stuck in big gun hole 10 reliably, and preferred implementation is: container 1 is just Being cylindrical, dividing plate 2 is parallel to container 1 top board and arranges immediately.When using the structure with reinforcement gusset 4, strengthen gusset 4 are perpendicular to container 1 top board is arranged.
As shown in Figure 2 to 4, this utility model enforcement step is:
A, container 1 is lain on one's side setting and preformed hole 3 is positioned at above container 1;On container 1 sheaf space load material M, Lower layer space can produce gas after loading material N, material M and material N mixing;To be held by top cover labyrinth 5, lower sealing cover 6 Device 1 is airtight;Wherein, material M and material N can be any one in following combination: water and dry ice, hydrochloric acid and calcium carbonate, Aluminum sulfate and sodium bicarbonate, hydrogen peroxide and manganese dioxide, material M, material N can also be the mixture of many kinds of substance, as long as Physical-chemical reaction can be occurred to produce a large amount of gas, and the preferred implementation that this utility model uses is: empty on container 1 upper strata Between load water, lower layer space loads dry ice, is considered as the match ratio of water and dry ice simultaneously, determines therefrom that sheaf space, lower floor are empty Between both height;Container 1 specification is adaptive with big gun hole 10;
B, the first attachment structure, the second attachment structure are all connected with hoisting rope;The appearance will lain on one's side by the hoisting rope of the first attachment structure Big gun hole 10 design attitude sent into by device 1;Then by the hoisting rope of the second attachment structure, container 1 being overturn, container 1 just erects Put;Material M and material N mixing, produces gas, and the elastic flexible material portion of container 1 sidewall expands so that container 1 is stuck in In big gun hole 10;
C, load explosive or stemming on container 1 top;Hoisting rope can be single use, direct and attachment structure colligation, Stay in big gun hole after loading explosive;Hoisting rope can also use hook structure, in order to reuses, and now hanger preferably employs ring Shape structure;Using the former to implement conveniently, the convenient container 1 that controls smoothly lifts, and uses the latter's then implementation cost lower;
D, repetition step A, B, C, until powder charge completes.

Claims (8)

  1. null1. blasting engineering air-spacer,It is characterized in that: include the container (1) of closed structure,Container (1) middle part is provided with dividing plate (2),Container (1) is made to be divided into upper strata、Two spaces of lower floor,Dividing plate (2) is provided with preformed hole (3) in its side,The upper sheaf space of container (1) has the top cover labyrinth (5) for loading material,Container (1) lower layer space has the lower sealing cover (6) for loading material,Top cover labyrinth (5) is located on container (1) top board near preformed hole (3) side or is located at container (1) sidewall near preformed hole (3) side,Lower sealing cover (6) is located on container (1) base plate near preformed hole (3) side or is located at container (1) sidewall near preformed hole (3) side,Container (1) sidewall at least partially elastic flexible material,Container (1) lateral wall can make container (1) lie on one's side setting when having lifting、And preformed hole (3) is positioned at the first attachment structure of container (1) top,Container (1) lateral wall can make the second attachment structure of container (1) upright setting when having lifting.
  2. 2. blasting engineering air-spacer as claimed in claim 1, it is characterized in that: the sidewall of the upper sheaf space of container (1) is elastic flexible material, by strengthening gusset (4) connection between container (1) top board and dividing plate (2), the sidewall of container (1) lower layer space, container (1) top board, container (1) base plate, dividing plate (2), reinforcement gusset (4) are rigid material.
  3. 3. blasting engineering air-spacer as claimed in claim 2, it is characterised in that: strengthening gusset (4) is spaced a plurality of reinforcing plate structure.
  4. 4. blasting engineering air-spacer as claimed in claim 2, it is characterised in that: strengthening gusset (4) is the net-like spacer structure that container (1) is divided into two spaces, left and right.
  5. 5. blasting engineering air-spacer as claimed in claim 1, it is characterised in that: container (1) is cylindrical time upright, and dividing plate (2) is parallel to container (1) top board and arranges.
  6. 6. blasting engineering air-spacer as claimed in claim 2, it is characterized in that: for cylinder when container (1) is upright, dividing plate (2) is parallel to container (1) top board and arranges, and strengthens gusset (4) and is perpendicular to the setting of container (1) top board.
  7. 7. blasting engineering air-spacer as claimed in claim 2, it is characterised in that: top cover labyrinth (5) is located on container (1) top board near preformed hole (3) side.
  8. 8. blasting engineering air-spacer as claimed in claim 2, it is characterised in that: the first attachment structure includes being located on container (1) top board first hanger (7) of close preformed hole (3) side, being located on container (1) base plate the second hanger (8) near preformed hole (3) side;Second attachment structure includes being located on container (1) top board first hanger (7) of close preformed hole (3) side, being located on container (1) top board the 3rd hanger (9) being positioned at the first hanger opposite side.
CN201620297221.4U 2016-04-11 2016-04-11 Blasting engineering air space device Withdrawn - After Issue CN205561691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620297221.4U CN205561691U (en) 2016-04-11 2016-04-11 Blasting engineering air space device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620297221.4U CN205561691U (en) 2016-04-11 2016-04-11 Blasting engineering air space device

Publications (1)

Publication Number Publication Date
CN205561691U true CN205561691U (en) 2016-09-07

Family

ID=56811652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620297221.4U Withdrawn - After Issue CN205561691U (en) 2016-04-11 2016-04-11 Blasting engineering air space device

Country Status (1)

Country Link
CN (1) CN205561691U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105674822A (en) * 2016-04-11 2016-06-15 中国电建集团成都勘测设计研究院有限公司 Blasting engineering air spacer and spaced loading method
CN107664466A (en) * 2017-11-06 2018-02-06 宿州云宏建设安装有限公司 A kind of spherical blasthole spacer delivery device
CN108662956A (en) * 2018-05-15 2018-10-16 中国葛洲坝集团易普力股份有限公司 A kind of non-inflatable air-spacer
CN111322918A (en) * 2020-03-20 2020-06-23 威海埃姆提爱矿山设备有限公司 Gas of gas spacer

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105674822A (en) * 2016-04-11 2016-06-15 中国电建集团成都勘测设计研究院有限公司 Blasting engineering air spacer and spaced loading method
CN107664466A (en) * 2017-11-06 2018-02-06 宿州云宏建设安装有限公司 A kind of spherical blasthole spacer delivery device
CN107664466B (en) * 2017-11-06 2019-08-20 绍兴市寅川软件开发有限公司 A kind of spherical shape blasthole spacer delivery device
CN108662956A (en) * 2018-05-15 2018-10-16 中国葛洲坝集团易普力股份有限公司 A kind of non-inflatable air-spacer
CN108662956B (en) * 2018-05-15 2019-12-03 中国葛洲坝集团易普力股份有限公司 A kind of non-inflatable air-spacer
CN111322918A (en) * 2020-03-20 2020-06-23 威海埃姆提爱矿山设备有限公司 Gas of gas spacer

Similar Documents

Publication Publication Date Title
CN205561691U (en) Blasting engineering air space device
CN201934141U (en) Mining assembly-type laneway plugging airbag
CN105674822B (en) Blasting engineering air-spacer and spaced loading method
CN104564137B (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN106152887A (en) Inflation expanding perforation plugging device certainly for tunnel deep hole blasting
CN107024157A (en) A kind of blast charging structure and application method
CN202101611U (en) Inflatable blasthole protective cover
CN206554020U (en) A kind of combined type disaster relief dam and interim pontoon bridge
CN206146317U (en) A aerify expanding perforation plugging device certainly for tunnel deep hole blasting
CN103485818B (en) Stope roof falling space stowage unit and connect top method
CN109186390A (en) Hole Blasting In Open-pit Mines water spacer-coupling charging blasting method and dedicated water column bag
CN211120885U (en) Energy-conserving efficient explosive loads structure in blasting construction
CN209310653U (en) Deep hole blasting powder charge airspace device
CN201442938U (en) Low-priced multifunctional methane pool
CN201666769U (en) Mini-sized explosive storage tank
CN208040445U (en) A kind of underground mine use paste body filling bag
CN109506533A (en) Airspace device for deep hole blasting powder charge
CN205537376U (en) Deep hole blasting charging means
CN203345502U (en) Storage tank for compound fertilizer raw material
CN208441021U (en) Combined type Anti-collision barrel
CN201795730U (en) Shaft excavation blocking bursting handling device
CN209310652U (en) Airspace device for deep hole blasting powder charge
CN109341452B (en) Deep hole blasting charge air spacer
CN209512670U (en) A kind of Novel underground mine blasting ammonium nitrate-fuel oil mixture explosive loader
CN203531911U (en) Stope roof caving space filling equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160907

Effective date of abandoning: 20170405

AV01 Patent right actively abandoned