CN205557568U - Prestressing force divides and adds serial single storehouse drainage type underground pipe gallery - Google Patents

Prestressing force divides and adds serial single storehouse drainage type underground pipe gallery Download PDF

Info

Publication number
CN205557568U
CN205557568U CN201620182789.1U CN201620182789U CN205557568U CN 205557568 U CN205557568 U CN 205557568U CN 201620182789 U CN201620182789 U CN 201620182789U CN 205557568 U CN205557568 U CN 205557568U
Authority
CN
China
Prior art keywords
storehouse
prestressing force
piping lane
pipe
rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620182789.1U
Other languages
Chinese (zh)
Inventor
张楸长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620182789.1U priority Critical patent/CN205557568U/en
Application granted granted Critical
Publication of CN205557568U publication Critical patent/CN205557568U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a prestressing force divides and adds serial single storehouse drainage type underground pipe gallery, include the stress tube corridor body and outer skeleton and inner skeleton in advance, be provided with horizontal bobbin and vertical bobbin between the two -layer skeleton, wherein horizontal bobbin setting is in the roof and bottom plate that personally experienced sth. Part of the body in the stress tube corridor in advance, be provided with steel strand wires in the horizontal bobbin, the anchor is in the both sides of the stress tube corridor body in advance after stretch -draw produces prestressing force, the internal hole in stress tube corridor is provided with two piece at least compartment backup pads in advance, become at least three piping lane storehouse with piping lane hole separated, be provided with the transverse connection board between the two adjacent compartment backup pads in centre, the transverse connection board is down for arranging the rainwater storehouse. The utility model discloses new configuration mode has increaseed row's rainwater storehouse to the row of use rainwater storehouse is the main part, and rainwater import and rows of rain water pipes are connected to the mode that adopts the main part to distribute, has strengthened the ability of inspiration rainwater, utilizes lower row of rainwater case to send rows of rain water pipes's rainwater to row rainwater storehouse, has solved the technological problem who takes place the waterlogging because of the discharge capacity inadequately.

Description

Prestressing force divides and adds series single storehouse drainage type underground pipe gallery
Technical field
This utility model relates to a kind of prestressing force and divides and add series single storehouse drainage type underground pipe gallery.
Background technology
Since entering new century, global warming has become the new problem of meteorological field, and torrential rain or extra torrential rain occur frequently, has made a lot of city that waterlogging occurred, water environment pollution after the rain that the most different reasons cause in addition to this disaster, causes many cities to enjoy puzzlement.How to break away from the shade of urban waterlogging, how to set up rainwater circulating system, it has also become " aims of systems " of newly built city district the first level.
Socioeconomic fast development, has promoted the process of Urbanization Progress, quickly beyond original " town planning ", quickly extend inhabitation, commerce and trade, the scope of industry, define that people is many, Che Duoliao, street width, " city scape " of Lou Gaoliao.Along with the raising of standard, urban operating mechanism originally are built in metropolis, it is difficult to adapt to the development in city.
Construction theory in the sustainable draining of developed country, the most prevailing come, along with " rainwater blood circulation " impact on aspects such as resource, environment, ecologies, having made underground dedicated pipeline to the aspect development such as intensive, intelligent, the Necessity and feasibility of newly-built Urban Underground piping lane engineering has become undisputable fact.According to country about building a series of principles and policies of Urban Underground piping lane, carry out " structure innovation " and " function innovation ", construction meets the new city underground pipe gallery of " intensive, intelligent, green, low-carbon (LC) " standard-required, necessarily has a transitional stage from primary engineering to excellent project.Developing a kind of " reasonable in design, functional configuration are complete " for this, the underground pipe gallery of " construction costs low, length in service life " is the most in good time, is also the most valuable.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of prestressing force and divides and add series single storehouse drainage type underground pipe gallery, use novel frame mode, give full play to the function of compartment gripper shoe and cross connecting plate, reasonably optimize the useful space in hole in prestressing force piping lane body, it is provided with special row's rainwater storehouse, to arrange rainwater storehouse, define from rainwater import to purifying sump and solving " the especially big technical barrier " utilizing piping lane to set up " rainwater blood circulation " to " the rainwater blood circulation " regenerating water pipe, especially to often occurring the area of torrential rain to provide reliable technical support, popularization to underground pipe gallery can play facilitation.
Specifically, this utility model adopts the following technical scheme that
A kind of prestressing force divides and adds series single storehouse drainage type underground pipe gallery, the outer layer skeleton including prestressing force piping lane body and set within it and nexine skeleton, horizontal bobbin and longitudinal bobbin it is provided with inside outer layer skeleton, at least two pieces of compartment gripper shoes it are provided with in prestressing force piping lane body opening, it is provided with cross connecting plate between middle adjacent two pieces of compartment gripper shoes, the row of being formed rainwater storehouse between the bottom of described cross connecting plate and prestressing force piping lane body, the bottom of prestressing force piping lane body is provided with discharge casing, in the end of prestressing force piping lane body, connecting box is set, the middle part of prestressing force piping lane body is provided with construction joint, water-swellable adhesive tape it is provided with in construction joint.
Described outer layer skeleton is indulged muscle by outer layer horizontal bar and outer layer and is constituted, indulge between muscle intersects at outer layer horizontal bar and outer layer and be provided with U-shaped positioning bar, laterally bobbin is arranged in the U-shaped mouth of U-shaped positioning bar, longitudinal bobbin it is provided with between horizontal bobbin and nexine skeleton, nexine skeleton is made up of nexine horizontal bar and nexine horizontal bar, in horizontal bobbin and longitudinal bobbin, it is provided with the steel strand wires producing the anchoring of prestressing force anchorage through stretch-draw, is provided with in described cross connecting plate and produces, through stretch-draw, the transversely prestressed bars that prestressing force anchors at two ends anchorage.
Endoporus at prestressing force piping lane body is provided with two pieces of compartment gripper shoes, piping lane hole is separated into storehouse and storehouse, the right successively in storehouse, the left side, piping lane, arranges cross connecting plate between compartment gripper shoe,
Being provided with running water pipe, regeneration water pipe, thermal pipe, refuse conveying pipe, communication pipe and cable tube in described piping lane in storehouse, be provided with Gas Pipe, ventilation duct and sewage pipe in storehouse, the described left side, described the right is provided with power pipe in storehouse.
Described discharge casing is connected with storehouse, storehouse, the left side and storehouse, the right in piping lane respectively by osculum, be respectively arranged with drain pipe and special drain pipe in the both sides of discharge casing, regulation and control boiled water room and drain sump that described drain pipe is external with being arranged on prestressing force piping lane are connected.
Top arranged on left and right sides at prestressing force piping lane body is respectively provided with rain import, row's rain pipe and lower row's raintank, and lower row's raintank is connected with row's rain pipe by discharge casing, and row's rain pipe is connected with water flowing room, water storehouse and purification sump by discharge casing.
Series compartment demultiplexing formula underground pipe gallery is directly added according to claim or described a kind of prestressing force, it is characterized in that: the sidepiece at described connecting box is provided with passage, connecting box is connected with function room, repair and maintenance center, Surveillance center, ventilating house, special room, underground parking, ecommerce supermarket and the service centre of being connected respectively by passage.
Good effect of the present utility model is as follows:
This utility model arranges compartment gripper shoe in prestressing force piping lane body, between compartment gripper shoe, cross connecting plate is set, on the top of cross connecting plate, storehouse in piping lane is set, row rainwater storehouse is set in the bottom of cross connecting plate, belongs to the scope of structure innovation and function innovation, the design object of the reasonably optimizing piping lane useful space can be reached, the purpose reducing construction costs can be arrived, that can embody " worth, must to use up it and use " arranges idea, can play a positive role the popularization of underground pipe gallery.
This utility model is respectively provided with sewage pipe on the both sides, bottom of piping lane body, arranges sealing coat in the outside of sewage pipe, solve gas pipeline can only single storehouse " technical barrier " that arrange, can more reasonably utilize the useful space of piping lane endoporus.
The frame mode that this utility model is new increases row rainwater storehouse, and to arrange rainwater storehouse, the pattern using main body distribution is attached rainwater import and row's rain pipe, increase the ability of inspiration rainwater, utilize lower row's raintank that the rainwater of row's rain pipe is delivered to arrange rainwater storehouse, solve " technical barrier " that waterlogging occurs not because of discharge capacity.
Accompanying drawing explanation
Accompanying drawing 1 is this utility model agent structure schematic diagram;
Accompanying drawing 2 is this utility model section structure schematic diagram;
Accompanying drawing 3 is this utility model planar structure schematic diagram;
Accompanying drawing 4 is this utility model side elevation structural representation;
Accompanying drawing 5 is this utility model function room structural representation;
Accompanying drawing 6 is this utility model ventilating house structural representation;
Accompanying drawing 7 is this utility model water flowing room structural representation;
Accompanying drawing 8 is this utility model special self-control room structural representation.
nullIn the accompanying drawings: 1 prestressing force piping lane body、2 outer layer skeletons、3 nexine skeletons、4 outer layer horizontal bars、5 outer layers indulge muscle、6 U-shaped positioning bars、7 horizontal bobbins、8 longitudinal bobbins、9 nexine horizontal bars、10 nexines indulge muscle、11 steel strand wires、12 compartment gripper shoes、13 storehouse, the left sides、Storehouse on the right of in the of 14、15 cross connecting plates、Storehouse in 16 piping lanes、17 row's rainwater storehouses、18 rhones、19 bed courses、20 anchorages、21 transversely prestressed bars、22 osculums、23 discharge casings、24 drain pipies、25 bracing frames、26 running water pipes、27 regeneration water pipes、28 thermal pipes、29 refuse conveying pipes、30 communication pipes、31 cable tubes、32 light controlling devices、33 Gas Pipe、34 power pipes、35 ventilation ducts、36 sewage pipes、37 water-swellable adhesive tape、38 dilatation seams、39 connecting boxs、40 passages、41 function rooms、42 repair and maintenance centers、43 service centres、44 special drain pipies、45 regulation and control boiled water rooms、46 drain sumps、47 rainwater imports、48 row's rain pipes、49 times row's raintank、50 water flowing rooms、51 water storehouses、52 purify sump、53 Surveillance center、54 special connection rooms、55 ventilating houses、56 underground parkings、57 ecommerce supermarkets、58 construction joints、59 rubber fastening bands、60 road surface, cities、61 greenery patches planes、62 air-intake devices、63 air exhausting devices、64 water supply installations、65 self-con-tained units.
Detailed description of the invention
As shown in Figure 1, this utility model includes that cross section is rectangular prestressing force piping lane body 1 and the outer layer skeleton 2 set within it and nexine skeleton 3, described outer layer skeleton 2 is indulged muscle 5 by outer layer horizontal bar 4 and outer layer and is constituted, nexine skeleton 3 is made up of nexine horizontal bar 9 and nexine horizontal bar 10, horizontal bobbin 7 and longitudinal bobbin 8 it is provided with inside outer layer skeleton 2, the steel strand wires 11 producing prestressing force anchorage 20 anchoring through stretch-draw it are provided with in horizontal bobbin 7 and longitudinal bobbin 8, indulge between muscle 5 intersects at outer layer horizontal bar 4 and outer layer and be provided with U-shaped positioning bar 6, laterally bobbin 7 is arranged in the U-shaped mouth of U-shaped positioning bar 6.
As shown in Figure 2, laterally bobbin 7 is separately positioned in top board and the base plate of prestressing force piping lane body 1, the top board of prestressing force piping lane body 1 can be that plane can also be for arch, in horizontal bobbin 7, it is provided with the steel strand wires 11 being anchored at prestressing force piping lane body 1 both sides through stretch-draw generation prestressing force anchorage 20, in longitudinal bobbin 8, is provided with the steel strand wires 11 being anchored at prestressing force piping lane body 1 two ends through stretch-draw generation prestressing force anchorage 20.It is provided with two pieces of compartment gripper shoes 12 in prestressing force piping lane body 1 hole, piping lane endoporus is separated into successively storehouse 16 and storehouse, the right 14 in storehouse, the left side 13, piping lane, cross connecting plate 15 it is provided with between two pieces of compartment gripper shoes 12, the row of being formed rainwater storehouse 17 between itself and the base plate of prestressing force piping lane body 1, being provided with in cross connecting plate 15 and produce, through stretch-draw, the transversely prestressed bars 21 that prestressing force anchors at two ends anchorage 20, in row rainwater storehouse 17 and piping lane, the bottom in storehouse 16 is provided with rhone 18.The bottom of prestressing force piping lane body 1 is provided with discharge casing 23, and discharge casing 23 arranges one every a segment distance according to specific needs in the bottom of prestressing force piping lane body 1, does not has prestressing force piping lane body 1 bottom of discharge casing 23 to be provided with bed course 19.Running water pipe 26, regeneration water pipe 27, thermal pipe 28, refuse conveying pipe 29, communication pipe 30 and cable tube 31 it is provided with in storehouse 16 in described piping lane, it is provided with Gas Pipe 33, ventilation duct 35 and sewage pipe 36 in storehouse, the described left side 13, in storehouse, described the right 14, is provided with power pipe 34.
nullAs shown in Figure 3,In the end of prestressing force piping lane body 1, connecting box 39 is set,The junction of connecting box 39 and prestressing force piping lane body 1 is provided with dilatation seam 38,Connected by passage 40 in the both sides of connecting box 39 and have function room 41、Ventilating house 55 and Surveillance center 53,Two upper lateral parts at prestressing force piping lane body 1 are provided with rainwater import 47、Row's rain pipe 48 and lower row's raintank 49,Sidepiece at prestressing force piping lane body 1 is provided with water flowing room 50、Water storehouse 51、Purify sump 52、Service centre 43 and special drain pipe 44,Special drain pipe 44 is connected with storehouse, the left side 13,Sidepiece at prestressing force piping lane body 1 is additionally provided with regulation and control boiled water room 45、Drain sump 46、Special connection room 54、Underground parking 56 and ecommerce supermarket 57,Described drain sump 46 is connected with sewage pipe 36 by pressue device.
As shown in Figure 4, this utility model is provided with dilatation seam 38 between connecting box 39 and prestressing force piping lane body 1, it is provided with rubber fastening band 59 in described dilatation seam 38, described lower row's raintank 49 is in vertical, it is connected with discharge casing 23 by drain pipe, entering in drain pipe 24 by discharge casing 23 again, described drain pipe 24 arranges height gradient mode.The middle part of described prestressing force piping lane body 1 is provided with construction joint 58, in construction joint 58, is provided with water-swellable adhesive tape 37.
As shown in Figure 5, function room 41 described in the utility model is arranged on the upper and lower of greenery patches plane 61, described rainwater import 47 is arranged on the avris portion on road surface, city 60, described row's rain pipe 48 is connected with drain pipe 24 by discharge casing 23, function room 41 is connected with connecting box 39 by passage 40, and the osculum 22 between connecting box 39 and discharge casing 23 is provided around water-swellable adhesive tape 37.
As shown in Figure 6, ventilating house 55 described in the utility model is provided with air-intake device 62 and air exhausting device 63, is connected with ventilation duct 35 by passage 40, and the avris at passage is provided with lower row's raintank 49, is connected with row's rain pipe 48.
As shown in Figure 7, water flowing room 50 described in the utility model is arranged on the bottom of greenery patches plane 61, water supply installation 64 it is provided with in water flowing room 50, rainwater in drain pipe 24 is discharged to water flowing room 50 and water storehouse 51 by discharge casing 23, it is discharged to after precipitation purify sump 52, is returned in prestressing force piping lane body 1 by regeneration water pipe 27 again by purifying sump 52.
As shown in Figure 8, special connection room 54 described in the utility model is provided with self-con-tained unit 65, is arranged on the running water pipe 26 in prestressing force piping lane body 1, regeneration water pipe 27, thermal pipe 28, ventilation duct 35, cable tube 31, Gas Pipe 33, power pipe 34 and refuse conveying pipe 29 and is docked by the dedicated pipeline of special connection room 54 and community.
This utility model arranges water flowing room at the sidepiece of prestressing force piping lane body can be transported to water storehouse the rainwater in the row's of being gathered in rainwater storehouse, clear water after precipitation can also be transported to purify sump, also the water purifying sump can be transported to regenerate water pipe, thus reach rainwater circulation target is set, by regeneration water pipe can be additionally used in ecological, environmental protective, produce, the aspect such as life, create income can to underground pipe gallery engineering, can be that enforcement PPP pattern creates conditions, reach the target of " worth, must to be use up it and use ".
This utility model is adopted new technology, new technique, change the frame mode of underground pipe gallery, the target call of " transition and upgrade " can be reached, frame mode with 2-3 storehouse, the production technology of precast assembly can be selected, the piping lane section of long 2-3 rice can be produced, carry out assembly at the scene, production technology such as 5-10 rice cast in situs to be used, the overall pipeline section of long 30-80 rice can be produced, piping lane evolution from now on will necessarily be promoted widely, can be used for the pilot project at the underground pipe gallery built, it is also possible to for trunk project or branch line engineering.

Claims (7)

  1. null1. a prestressing force divides and adds series single storehouse drainage type underground pipe gallery,It is characterized in that: include prestressing force piping lane body (1) and the outer layer skeleton (2) set within it and nexine skeleton (3),Horizontal bobbin (7) and longitudinal bobbin (8) it is provided with in outer layer skeleton (2) inner side,At least two pieces of compartment gripper shoes (12) it are provided with in prestressing force piping lane body (1) hole,It is provided with cross connecting plate (15) between middle adjacent two pieces of compartment gripper shoes (12),The row of being formed rainwater storehouse (17) between the bottom of described cross connecting plate (15) and prestressing force piping lane body (1),The bottom of prestressing force piping lane body (1) is provided with discharge casing (23),In the end of prestressing force piping lane body (1), connecting box (39) is set,The middle part of prestressing force piping lane body (1) is provided with construction joint (58),Water-swellable adhesive tape (37) it is provided with in construction joint (58).
  2. nullThe most according to claim 1, a kind of prestressing force divides and adds series single storehouse drainage type underground pipe gallery,It is characterized in that: described outer layer skeleton (2) is indulged muscle (5) by outer layer horizontal bar (4) and outer layer and constituted,Indulge between muscle (5) intersects at outer layer horizontal bar (4) and outer layer and be provided with U-shaped positioning bar (6),Laterally bobbin (7) is arranged in the U-shaped mouth of U-shaped positioning bar (6),Longitudinal bobbin (8) it is provided with between horizontal bobbin (7) and nexine skeleton (3),Nexine skeleton (3) is made up of nexine horizontal bar (9) and nexine horizontal bar (10),It is provided with in horizontal bobbin (7) and longitudinal bobbin (8) and produces, through stretch-draw, the steel strand wires (11) that prestressing force anchorage (20) anchors,It is provided with in described cross connecting plate (15) and produces, through stretch-draw, the transversely prestressed bars (21) that prestressing force anchors at two ends anchorage (20).
  3. A kind of prestressing force the most according to claim 1 and 2 divides and adds series single storehouse drainage type underground pipe gallery, it is characterized in that: the endoporus at prestressing force piping lane body (1) is provided with two pieces of compartment gripper shoes (12), piping lane hole is separated into successively storehouse (16) and storehouse, the right (14) in storehouse, the left side (13), piping lane, cross connecting plate (15) is set between compartment gripper shoe (12), for row rainwater storehouse (17) under cross connecting plate (15).
  4. A kind of prestressing force the most according to claim 3 divides and adds series single storehouse drainage type underground pipe gallery, it is characterized in that: in described piping lane, in storehouse (16), be provided with running water pipe (26), regeneration water pipe (27), thermal pipe (28), refuse conveying pipe (29), communication pipe (30) and cable tube (31), it is provided with Gas Pipe (33), ventilation duct (35) and sewage pipe (36) in storehouse, the described left side (13), in storehouse, described the right (14), is provided with power pipe (34).
  5. A kind of prestressing force the most according to claim 3 divides and adds series single storehouse drainage type underground pipe gallery, it is characterized in that: described discharge casing (23) is connected with storehouse in piping lane (16), storehouse, the left side (13) and storehouse, the right (14) respectively by osculum (22), be respectively arranged with drain pipe (24) and special drain pipe (44) in the both sides of discharge casing (23), described drain pipe (24) be arranged on the outer regulation and control boiled water room (45) of prestressing force piping lane body (1) and drain sump (46) is connected.
  6. A kind of prestressing force the most according to claim 3 divides and adds series single storehouse drainage type underground pipe gallery, it is characterized in that: the top arranged on left and right sides at prestressing force piping lane body (1) is respectively provided with rain import (47), row's rain pipe (48) and lower row's raintank (49), lower row's raintank (49) is connected with row's rain pipe (48) by discharge casing (23), and row's rain pipe (48) is connected with water flowing room (50), water storehouse (51) and purification sump (52) by discharge casing (23).
  7. A kind of prestressing force the most according to claim 3 divides and adds series single storehouse drainage type underground pipe gallery, it is characterized in that: the sidepiece at described connecting box (39) is provided with passage (40), connecting box (39) is connected with function room (41), repair and maintenance center (42), Surveillance center (53), ventilating house (55), special room (54), underground parking (56), ecommerce supermarket (57) and the service centre (43) of being connected respectively by passage (40).
CN201620182789.1U 2016-03-10 2016-03-10 Prestressing force divides and adds serial single storehouse drainage type underground pipe gallery Expired - Fee Related CN205557568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620182789.1U CN205557568U (en) 2016-03-10 2016-03-10 Prestressing force divides and adds serial single storehouse drainage type underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620182789.1U CN205557568U (en) 2016-03-10 2016-03-10 Prestressing force divides and adds serial single storehouse drainage type underground pipe gallery

Publications (1)

Publication Number Publication Date
CN205557568U true CN205557568U (en) 2016-09-07

Family

ID=56816655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620182789.1U Expired - Fee Related CN205557568U (en) 2016-03-10 2016-03-10 Prestressing force divides and adds serial single storehouse drainage type underground pipe gallery

Country Status (1)

Country Link
CN (1) CN205557568U (en)

Similar Documents

Publication Publication Date Title
CN102995660B (en) Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof
CN106381885B (en) A kind of Underground Steel pipe gallery with skeleton
CN204401650U (en) Square longitudinally connection prestressed assembly formula underground pipe gallery
CN203256772U (en) Multifunctional arched combination pre-stress urban underground pipe gallery
CN202227749U (en) Underground automatic parking area for track traffic
CN204151825U (en) Super-section prestressing force Urban Underground pipe gallery
CN205557579U (en) Well controllable formula underground pipe gallery in storehouse is assembled to adding to prestressing force
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN205557568U (en) Prestressing force divides and adds serial single storehouse drainage type underground pipe gallery
CN203007978U (en) Multifunctional net-shaped combined prestressed underground pipe gallery
CN205557570U (en) Prestressing force divides and adds series pipe storehouse formula underground pipe gallery side by side
CN205557571U (en) Prestressing force divides and adds series side storehouse drainage type underground pipe gallery
CN205557574U (en) Underground pipe gallery with adjustable prestressing force divides to add assembles well storehouse
CN106677207A (en) Staggered type underground traffic pipe gallery car entrance and exit structure
CN205557563U (en) Prestressing force list adds series pipe storehouse and share formula underground pipe gallery
CN205557569U (en) Prestressing force divides and adds special formula underground pipe gallery in serial limit storehouse
CN109296006A (en) The double-deck assembly concrete pipe gallery
CN202252422U (en) Multifunctional pre-stress underground draining integrated pipeline of city
CN204080859U (en) High-strength resistance to compression centripetal-stress Urban Underground pipe gallery
CN204491663U (en) Prestressed structure function formula underground pipe gallery combined system
CN205742466U (en) Prestressing force is to adding series rain dirt shunting underground pipe gallery
CN205557572U (en) Prestressing force divides with storehouse passageway formula underground pipe gallery in series
CN205557764U (en) Prestressing force divides and adds serial distribution of rain and sewage formula underground pipe gallery
CN205077513U (en) Utility tunnel and underpass uncovered formula structure of building together
CN205557580U (en) Well storehouse cellular -type underground pipe gallery is assembled to adding to prestressing force

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20200310

CF01 Termination of patent right due to non-payment of annual fee