CN205555896U - Electric room of portal slewing crane - Google Patents
Electric room of portal slewing crane Download PDFInfo
- Publication number
- CN205555896U CN205555896U CN201620332006.3U CN201620332006U CN205555896U CN 205555896 U CN205555896 U CN 205555896U CN 201620332006 U CN201620332006 U CN 201620332006U CN 205555896 U CN205555896 U CN 205555896U
- Authority
- CN
- China
- Prior art keywords
- cabinet
- electrical
- maintenance area
- electrical house
- gantry crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides an electric room of portal slewing crane, includes electric room body (1), electric room door has been seted up on electric room body (1), electric room is equipped with rail and people's bank of china's ladder outdoors, electrical apparatus room (18) are arranged in portal slewing crane's last rotary column (8), be equipped with in electric room body (1) of the one side of electrical apparatus room (18) centralized lubrication system (11), be equipped with in electric room body (1) of electrical apparatus room opposite side maintenance area (12), be equipped with PLC cabinet (2), a change width of cloth cabinet (3), switching cabinet (4), support cabinet (5), rotatory cabinet (6) and power cabinet (7), cabinet air -conditioner (9) and/or ceiling type air conditioner (10) in electrical apparatus room (18), be equipped with a plurality of resistance cabinet (13) and work bench platform (14) in maintenance area (12).
Description
Technical field
The utility model relates to crane technical field, especially relates to a kind of gantry crane electrical house.
Background technology
High pedestal jib crane is as the lift implement that the development of harbour cause gets up.The engine house of high pedestal jib crane is arranged on rotating disk.It is typically provided the control panels such as electrical house, internal layout control flow, PLC, frequency converter.Electrical house is the part that it is important, installs fixing various bridge electrical equipments, additionally need to leave space for maintenance inside electrical house.At present, gantry crane electrical house is typically located in machine room, separates with machine room by composite plate.Such arrangement, occupies the space of too many machine room, result in machine room the hugest, thus it requires have bigger door machine rotating disk, not only increases complete machine cost, also causes inside machine room the narrowest and small for the space of maintenance.
Utility model content
In order to overcome the defect of prior art, the utility model solves the technical problem that and is: provide the high pedestal jib crane electrical house that a kind of space availability ratio is high.
In order to solve above-mentioned technical problem, on the one hand, the utility model provides a kind of gantry crane electrical house, including electrical house body;Offering electric chamber door on described electrical house body, described electric chamber is provided with fence and People's Bank of China's ladder outdoors, and electrical equipment room is arranged in the rotary column of gantry crane;Described electrical equipment room side electrical house this most internal be provided with centralized lubricating system;Described electrical equipment room opposite side electrical house this most internal be provided with maintenance area;It is provided with PLC rack, luffing cabinet, opening and closing cabinet in described electrical equipment room, supports cabinet, rotary wardrobe and power cabinet, cabinet air-conditioner and/or ceiling-mounted type air conditioner;Several resistor boxs and work bench platform it is provided with in described maintenance area.
As improving technical scheme further, the gantry crane electrical house that the utility model provides, it is additionally provided with data cabinet in described maintenance area.
As improving technical scheme further, the gantry crane electrical house that the utility model provides, it is additionally provided with desk in described maintenance area.
As improving technical scheme further, the gantry crane electrical house that the utility model provides, the electrical house in side, described maintenance area is the most internal to be provided with implement and drives motor.
In the case of not conflicting, above-mentioned improvement or optimal technical scheme can be implemented alone or in combination.
The technical scheme that the utility model provides, electrical equipment room is arranged in the rotary column of gantry crane, by PLC rack, luffing cabinet, opening and closing cabinet, support that the cabinet that cabinet, rotary wardrobe and these caloric values of power cabinet are big is arranged in electrical equipment room, the resistor box being arranged in prior art in rotary column is arranged in maintenance area, save the big quantity space of electrical house body, can obtain and carry out maintaining operation than the biggest space.In the case of ensureing service clearance, the size of electrical house body and rotating disk can be reduced, reduce cost.
Accompanying drawing explanation
Accompanying drawing is used for providing being further appreciated by of the present utility model, constitutes the part of the application, and schematic description and description of the present utility model is used for explaining the utility model, is not intended that improper restriction of the present utility model.In the accompanying drawings:
The arrangement schematic diagram of Fig. 1 embodiment gantry crane electrical house.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.
Gantry crane electrical house as shown in Figure 1, including electrical house body 1;nullElectric chamber door is offered on electrical house body 1,Electrically chamber is provided with fence and People's Bank of China's ladder outdoors,Electrical equipment room 18 is arranged in the rotary column 8 of gantry crane,It is provided with centralized lubricating system 11 in the electrical house body 1 of the side in electrical equipment room 18,It is provided with maintenance area 12 in the electrical house body 1 of electrical equipment room opposite side,In the electrical house body 1 of side, described maintenance area 12, it is provided with implement and drives motor 17,PLC rack 2 it is provided with in electrical equipment room 18、Luffing cabinet 3、Opening and closing cabinet 4、Support cabinet 5、Rotary wardrobe 6 and power cabinet 7、Cabinet air-conditioner 9 and ceiling-mounted type air conditioner 10,Support cabinet 5、Cabinet air-conditioner 9、Rotary wardrobe 6、Opening and closing cabinet 4、Power cabinet 7、Luffing cabinet 3、PLC rack 2 is sequentially arranged in electrical equipment room 18 along electrical equipment room 18 periphery,It is provided with ceiling-mounted type air conditioner 10 at the top in electrical equipment room 18;Work bench platform 14, several resistor boxs 13, data cabinet 15 and desk 16 it is provided with in described maintenance area 12.
Electrical equipment room 18 is arranged in the rotary column of gantry crane, by PLC rack 2, luffing cabinet 3, opening and closing cabinet 4, support that the cabinet that cabinet 5, rotary wardrobe 6 and these caloric values of power cabinet 7 are big is arranged in electrical equipment room 18, the multiple resistor boxs 13 being arranged in prior art in rotary column are arranged in maintenance area, save the big quantity space of electrical house body, can obtain and carry out maintaining operation than the biggest space.In the case of ensureing service clearance, the size of electrical house body 1 and rotating disk can be reduced, reduce cost.
Obviously, the utility model is not limited to above preferred embodiment, also can carry out conversion and the improvement of various ways in the spirit that the utility model claim and specification limit, can solve same technical problem, and obtain intended technique effect, therefore not repeat.Those of ordinary skill in the art can from the utility model disclosure directly or all schemes of associating, as long as within the spirit that claim limits, falling within protection domain of the present utility model.
Claims (4)
1. a gantry crane electrical house, including electrical house body (1);Offering electric chamber door on described electrical house body (1), described electric chamber is provided with fence and People's Bank of China's ladder outdoors, it is characterised in that electrical equipment room (18) are arranged in the rotary column (8) of gantry crane;It is provided with centralized lubricating system (11) in the electrical house body (1) of the side of described electrical equipment room (18);It is provided with maintenance area (12) in the electrical house body (1) of described electrical equipment room opposite side;It is provided with PLC rack (2), luffing cabinet (3), opening and closing cabinet (4) in described electrical equipment room (18), supports cabinet (5), rotary wardrobe (6) and power cabinet (7), cabinet air-conditioner (9) and/or ceiling-mounted type air conditioner (10);Several resistor boxs (13) and work bench platform (14) it is provided with in described maintenance area (12).
Gantry crane electrical house the most according to claim 1, it is characterised in that be additionally provided with data cabinet (15) in described maintenance area (12).
Gantry crane electrical house the most according to claim 1, it is characterised in that be additionally provided with desk (16) in described maintenance area (12).
Gantry crane electrical house the most according to claim 1, it is characterised in that the electrical house in described maintenance area (12) side is the most internal to be provided with implement and drives motor (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620332006.3U CN205555896U (en) | 2016-04-20 | 2016-04-20 | Electric room of portal slewing crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620332006.3U CN205555896U (en) | 2016-04-20 | 2016-04-20 | Electric room of portal slewing crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205555896U true CN205555896U (en) | 2016-09-07 |
Family
ID=56809671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620332006.3U Active CN205555896U (en) | 2016-04-20 | 2016-04-20 | Electric room of portal slewing crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205555896U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109626210A (en) * | 2019-01-08 | 2019-04-16 | 青岛海西重机有限责任公司 | A kind of gantry crane computer room component and method for arranging |
-
2016
- 2016-04-20 CN CN201620332006.3U patent/CN205555896U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109626210A (en) * | 2019-01-08 | 2019-04-16 | 青岛海西重机有限责任公司 | A kind of gantry crane computer room component and method for arranging |
CN109626210B (en) * | 2019-01-08 | 2020-02-14 | 青岛海西重机有限责任公司 | Portal crane machine room assembly and arrangement method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108512097A (en) | A kind of dust-proof damping type power distribution cabinet of self-cleaning | |
CN205049304U (en) | Many combined environment test system proof test case | |
CN205555896U (en) | Electric room of portal slewing crane | |
CN105107556A (en) | Automatically plate-replacing test box for multi-comprehensive-environment testing system | |
CN207234243U (en) | A kind of electric power cabinet of easy access | |
CN204288622U (en) | Maintenance electrician's work post vocational skills grade real training examination cabinet | |
CN207134629U (en) | A kind of electrical equipment easily arranges Moisture-proof switch cabinet | |
CN204230920U (en) | Close pull-out type intelligent low-pressure reactive compensation cabinet | |
CN203227575U (en) | Electric spray gun motor connecting mechanism | |
CN206878331U (en) | A kind of electromechanical equipment switch board | |
EP1217919B1 (en) | Workstation | |
CN203839860U (en) | Screen flip wiring duct | |
CN205653059U (en) | Hoisting apparatus of engine house and have device's high pedestal jib crane | |
CN207747892U (en) | A kind of railcar meeting vehicle intelligent conference table | |
CN107048709A (en) | A kind of study multi-function computer workstation | |
CN205265063U (en) | Novel power distribution cabinet | |
CN205472524U (en) | Turret device | |
CN205074017U (en) | Many combined environment test system proof test case trade board device | |
CN206757116U (en) | A kind of distribution cabinet with adjustable cabinet door | |
CN105170201A (en) | Multi-comprehensive-environment testing system capable of automatically replacing plates | |
CN205042490U (en) | Many combined environment test system proof test case that can move board certainly | |
CN205199869U (en) | Rack formula ultrasonator | |
CN203250994U (en) | Optimizing energy-saving cabinet of power plant fuel pump system | |
CN207239646U (en) | Shielding case fastened by screw equipment | |
CN203259282U (en) | Automatic torsion testing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Electric room of portal slewing crane Effective date of registration: 20180503 Granted publication date: 20160907 Pledgee: Xiangtan Jiuhua Economic Construction Investment Co., Ltd. Pledgor: Tidfore Engineering Co., Ltd.|Tidfore Heavy Industry Co., Ltd.|Ocean engineering equipment (Tianjin) Co., Ltd. Registration number: 2018430000029 |