CN205532611U - Shield tunnel's construction equipment - Google Patents

Shield tunnel's construction equipment Download PDF

Info

Publication number
CN205532611U
CN205532611U CN201620125495.5U CN201620125495U CN205532611U CN 205532611 U CN205532611 U CN 205532611U CN 201620125495 U CN201620125495 U CN 201620125495U CN 205532611 U CN205532611 U CN 205532611U
Authority
CN
China
Prior art keywords
steel bushing
shield
concrete pipe
steel sleeve
shield shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620125495.5U
Other languages
Chinese (zh)
Inventor
丁先立
史海欧
赵德刚
邓剑荣
于德涌
项宝
罗旭
周前
昝子卉
李恒
李恒一
张文奇
刘春杰
冯廷康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201620125495.5U priority Critical patent/CN205532611U/en
Application granted granted Critical
Publication of CN205532611U publication Critical patent/CN205532611U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a shield tunnel's construction equipment, construct the system including connecting crown plate, steel sleeve, setting concrete pipe and the shield in steel sleeve, it is pre -buried on foundation pit retaining structure to connect the crown plate, shield structure system includes the shield shell, the shield shell sets up steel sleeve with between the concrete pipe, steel sleeve's terminal surface with it connects fixedly to connect the crown plate, steel sleeve with between the shield shell and the shield shell with it has the gram mud effect that prevents soil erosion and water loss all to fill between the concrete pipe, steel sleeve is last to be provided with a plurality of being used for and to pour into into the injected hole that gram mud was imitated. The utility model discloses can effectively seal secret soil erosion and water loss, avoid arousing soil body disturbance owing to soil erosion and water loss to cause the shield and construct the accident of starting, construction convenience moreover, safe and reliable.

Description

A kind of constructing device of shield tunnel
Technical field
This utility model belongs to technical field of tunnel construction, is specifically related to the constructing device of a kind of shield tunnel.
Background technology
Application shield machine tunneling is a kind of method of Tunnel Design and construction, and the method is increasingly extensive in China's application.Shield Machine, typically from the foundation ditch in of open cut, enters stratum excavation driving and applies tunnel lining structure simultaneously, finally arriving tunnel another The open-cut foundation ditch of one end, forms through tunnel.Shield machine enters the soil body at open-cut foundation ditch internal cutting foundation pit enclosure structure and (calls in the following text " shield launching ") during, stratum exposes and disturbed, and subsoil water starts to run off, and easily causes cave in accident, and related Causing underground pipe network and surrounding building to damage, causing engineering accident, existing treatment measures is by shield launching end certain limit Stratum with cement grout reinforce improvement, improve stratum stability, stop subsoil water run off.
Existing stratum consolidation method is affected relatively big by underground pipe network and formation properties, and underground pipe network affects equipment construction, particularly When there is existing tunnel underground, stratum consolidation possibly cannot be implemented, and moves and changes pipe network and affect the duration and cost is the highest even can not realize; Groundwater Flow meeting dilution water mud, thus affect consolidation effect, and also after cement mortar improvement, the stability on stratum is difficult to differentiate, Some stratum is more closely knit before without disturbance, and cement mortar consolidation effect is inconspicuous, but the most easily disintegrate of the soil body of disturbance, this Time be difficult to the conservation of soil and water timely and effectively, this is also the main cause causing domestic many shield launching accidents.
Utility model content
When this utility model is in order to solve above-mentioned shield machine tunneling, easily causes soil erosion, disturbed soil, cause shield Originate the technical problem of accident, it is provided that a kind of simple and reliable for structure, the convenient constructing device operating reliable shield tunnel.
In order to solve the problems referred to above, this utility model is achieved by techniques below scheme:
The constructing device of shield tunnel described in the utility model, including connecting ring flat-plate, steel bushing, the coagulation that is arranged in steel bushing Soil section of jurisdiction and shield system, described connection ring flat-plate is embedded on foundation pit enclosure structure;Described shield system includes shield shell;Institute State shield shell to be arranged between described steel bushing and described concrete pipe sheet;
The end face of described steel bushing connects fixing with the described ring flat-plate that is connected;
All it is filled with between described steel bushing and described shield shell and between described shield shell and described concrete pipe sheet and prevents water and soil stream Gram mud effect lost;
Some injected holes for injecting described gram of mud effect it are provided with on described steel bushing.
Further, described steel bushing includes complementing each other to form columned upper steel bushing and lower steel bushing;Described steel bushing Bottom is provided with bracing frame;
The protruding support frame as described above having for supporting steel sleeve in bottom of described lower steel bushing, described upper steel bushing and lower steel bushing Cylinder is bolted fixing.
Further, the end face of described steel bushing is welded and fixed with the described ring flat-plate that is connected.
Further, described shield system also includes the jack promoting shield system to tunnel forward, and the end of described steel bushing sets It is equipped with the reaction frame that counter-force is provided for described jack.
The construction method of a kind of shield tunnel, comprises the following steps:
S1, when construction foundation pit building enclosure, pre-buried connection ring flat-plate;
S2, connecting steel bushing on ring flat-plate connecting, the end face of steel bushing is connected the fixing connection of ring flat-plate, on described steel bushing with described It is provided with some injected holes;
S3, shield system being arranged in steel bushing, described shield system includes shield shell;
S4, in shield shell, it is in the position assembly concrete pipe sheet at rear portion;
S5, by the injection orifice of steel bushing, note toward the space between steel bushing and shield shell and between steel bushing and concrete pipe sheet Enter gram mud effect prevented erosion.
Further, after S5, also include
S6, jack promote shield system to tunnel forward, and the end at steel bushing arranges the reaction frame providing counter-force to jack;
S7, advance along with shield system, increase concrete pipe sheet on the basis of concrete pipe sheet assembled in S4;
S8, utilize the slurry casting machine of shield system, inject a gram mud effect toward the space between concrete pipe sheet and the tunnel wall soil body.
Further, described steel bushing includes complementing each other to form columned upper steel bushing and lower steel bushing;
The bottom of described lower steel bushing is provided with bracing frame, described upper steel bushing and lower steel bushing and is bolted fixing.
Further, in described S2, the end face of steel bushing passes through to be welded and fixed with the described ring flat-plate that is connected.
Compared with prior art, the beneficial effects of the utility model are:
This utility model is by connection ring flat-plate pre-buried on even foundation pit enclosure structure, for the end face of stationary steel bushing cylinder, plays and props up Hold the effect of steel bushing, and by the injected hole of steel bushing, between steel bushing and shield shell and steel bushing and concrete pipe sheet Space inject gram mud effect, a gram mud effect is the paste that a kind of viscosity is the highest, is difficult to be diluted, and consolidation is fast, and intensity is low, energy Effectively closely descend soil erosion, it is to avoid cause soil disturbance due to soil erosion, thus cause shield launching accident, and And easy construction, safe and reliable.
In shield system tunneling process, the most assembled concrete pipe sheet, utilize the slurry casting machine of shield system, in section of jurisdiction and tunnel Inject a gram mud effect between the soil body, effectively control stratum deformation so that tunnel safety and reliability.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail, wherein:
Fig. 1 is the structural representation of shield tunnel construction device described in the utility model;
Fig. 2 is the structural representation of the lower steel bushing of shield tunnel construction device described in the utility model;
Fig. 3 be shield tunnel construction device described in the utility model tunneling process in supplement the schematic diagram of gram mud effect.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is illustrated, it will be appreciated that described herein be preferable to carry out Example is merely to illustrate and explains this utility model, is not used to limit this utility model.
As shown in FIG. 1 to 3, shield tunnel construction device described in the utility model, including connecting ring flat-plate 2, steel bushing 3, setting Putting the concrete pipe sheet 5 in steel bushing 3 and shield system 4, described connection ring flat-plate 2 is embedded on foundation pit enclosure structure 1; Described shield is 4 to include shield shell 41, jack 42 and slurry casting machine;Described shield system 4 is arranged in described steel bushing 3, Described concrete pipe sheet 5 is arranged on described shield shell 5 tail position;The end face of described steel bushing 3 connects with the described ring flat-plate 2 that is connected Fixing;Connection ring flat-plate 2 in the present embodiment passes through to be welded and fixed with the end face of described steel bushing 3, but this utility model does not limits to It is welded to connect fixing in employing, it is also possible to be by the connected mode such as bolt, rivet, steel bushing 3 is connected with being connected ring flat-plate 2 Fixing.
Described steel bushing 3 includes complementing each other to form columned upper steel bushing and lower steel bushing 31;Described lower steel bushing 31 Bottom is provided with bracing frame 34;Being provided with some bolts hole 33 on the joint face of described upper steel bushing and lower steel bushing, they lead to Cross bolt and connect fixing, or adjacent steel bushing 3 is fixing also by bolt hole 33 connection of bolt-through end face.Described steel bushing Some injected holes 32 it are additionally provided with on 3.
Between described steel bushing 3 and described shield shell 41, and all it is filled with between described shield shell 41 and described concrete pipe sheet 5 Gram mud effect 6 prevented erosion.Inject gram mud toward the space in steel bushing 3 from the outside by the injected hole 32 of steel bushing 3 to imitate 6.Gram mud effect 6 is the paste that a kind of viscosity is the highest, is difficult to be diluted, and consolidation is fast and intensity is low, when shield machine tunnels soil body mistake Cheng Zhong, steel bushing and a gram mud effect effectively closely descend soil erosion.
Also include the reaction frame 7 for providing counter-force to the jack 42 promoting shield system 4.Jack 42 promotes forward shield Construction system 4 moves, and when the distance that shield system 4 is advanced has exceeded the stroke of jack 42, needs to build into concrete pipe sheet 5, Jack 42 is provided that, and active force promotes shield system to advance.The infusion appliance of shield system 4 is to concrete pipe sheet 5 and tunnel A gram mud effect, the Strengthening Tunnel top layer soil body effectively are injected in gap 61 between the soil body.
Shield tunnel construction method described in the utility model, comprises the following steps:
S1, when construction foundation pit building enclosure 1, pre-buried connection ring flat-plate 2.
S2, connecting steel bushing 3 on ring flat-plate 2 connecting, the end face of steel bushing 3 passes through, with the described ring flat-plate 2 that is connected, the company of being welded and fixed Connect, described steel bushing 3 is provided with some injected holes 32.
S3, shield system 4 being arranged in steel bushing, described shield system includes shield shell;
S4, at the tail end assembly concrete pipe sheet of shield shell;
S5, by the injection orifice 32 of steel bushing 3, toward between steel bushing 3 and shield shell 41 and at steel bushing 3 and concrete pipe sheet 5 Between space inject gram mud effect prevented erosion.
S6, jack promote shield system to tunnel forward, and the end at steel bushing arranges the reaction frame providing counter-force to jack;
S7, advance along with shield system, increase concrete pipe sheet 5 on the basis of concrete pipe sheet assembled in S4;
S8, utilize the slurry casting machine of shield system 4, inject a gram mud effect 6 toward space 61 between concrete pipe sheet and the tunnel wall soil body.
Other structure of shield tunnel construction device described in the present embodiment sees prior art.
The above, be only preferred embodiment of the present utility model, and this utility model is not made any pro forma restriction, Therefore it is every without departing from technical solutions of the utility model content, according to appointing that above example is made by technical spirit of the present utility model What amendment, equivalent variations and modification, all still fall within the range of technical solutions of the utility model.

Claims (4)

1. the constructing device of a shield tunnel, it is characterised in that: include connecting ring flat-plate, steel bushing, concrete pipe sheet, shield System, described connection ring flat-plate is embedded on foundation pit enclosure structure;Described shield system includes shield shell;Described dark soil section of jurisdiction is arranged In described steel bushing, described shield shell is arranged between described steel bushing and described concrete pipe sheet;
The end face of described steel bushing connects fixing with the described ring flat-plate that is connected;
All it is filled with between described steel bushing and described shield shell and between described shield shell and described concrete pipe sheet and prevents water and soil stream Gram mud effect lost;
Some injected holes for injecting described gram of mud effect it are provided with on described steel bushing.
The most according to claim 1, the constructing device of shield tunnel, described steel bushing includes complementing each other to form on columned Steel bushing and lower steel bushing;The bottom of described steel bushing is provided with bracing frame;
The protruding support frame as described above having for supporting steel sleeve in bottom of described lower steel bushing, described upper steel bushing and lower steel bushing Cylinder is bolted fixing.
The most according to claim 1, the constructing device of shield tunnel, the end face of described steel bushing is connected ring flat-plate welding admittedly with described Fixed.
4., according to the constructing device of shield tunnel described in any one of claims 1 to 3, described shield system also includes promoting shield The jack that system is tunneled forward, the end of described steel bushing arranges promising described jack and provides the reaction frame of counter-force.
CN201620125495.5U 2016-02-17 2016-02-17 Shield tunnel's construction equipment Active CN205532611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620125495.5U CN205532611U (en) 2016-02-17 2016-02-17 Shield tunnel's construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620125495.5U CN205532611U (en) 2016-02-17 2016-02-17 Shield tunnel's construction equipment

Publications (1)

Publication Number Publication Date
CN205532611U true CN205532611U (en) 2016-08-31

Family

ID=56778567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620125495.5U Active CN205532611U (en) 2016-02-17 2016-02-17 Shield tunnel's construction equipment

Country Status (1)

Country Link
CN (1) CN205532611U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715277A (en) * 2016-02-17 2016-06-29 广州地铁设计研究院有限公司 Construction device and method for shield tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715277A (en) * 2016-02-17 2016-06-29 广州地铁设计研究院有限公司 Construction device and method for shield tunnel

Similar Documents

Publication Publication Date Title
CN105715277A (en) Construction device and method for shield tunnel
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN102121395A (en) Method for integrated comprehensive management of gas in low-permeability single coal bed
CN102979531B (en) Reinforce construction method and the structure of large-scale rock slope deep weak structural plane
CN104533452A (en) Sectional type grouting reinforcement method for underground coal mine fragmentized coal bodies
CN101173517A (en) Pile-pulling construction method
CN206592136U (en) A kind of plain wall closing water sealing consolidation structure of shield launching
CN106988753A (en) A kind of U-shaped plain concrete ground-connecting-wall adds steel bushing shield structure and its method of reseptance
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN113307560A (en) Grouting and filling material using coal gangue or construction waste to replace coal mine yellow mud
CN102797468B (en) Minimum over-burden originating method for shield tunnel
CN106014443A (en) Method for preventing roadway floor heaving and wall sliding of gob-side entry retaining
CN205532611U (en) Shield tunnel's construction equipment
CN104632228B (en) Main track entering construction method for cross aisle and cross aisle
CN204252119U (en) The special-shaped supporting pile structure of X
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN103132531A (en) Foundation pit supporting system construction method
CN101525875B (en) Reinforced concrete bifurcated pipe structure under action of high pressure water and construction method
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN203361147U (en) Recyclable anchor rod and bearing plate type anchor pile
CN105714832A (en) Deep-foundation-pit large-sized precast building envelope and construction method
CN205875150U (en) Stake of putting more energy into of stress dispersion type of recoverable dowel
CN104389609A (en) No-blasting mechanical digging method
CN204326061U (en) A kind of pile tube be drawn out easily

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Patentee before: Guangzhou Metro Design & Research Institute Co., Ltd.

CP01 Change in the name or title of a patent holder