CN205532555U - Well pattern structure - Google Patents

Well pattern structure Download PDF

Info

Publication number
CN205532555U
CN205532555U CN201620243534.1U CN201620243534U CN205532555U CN 205532555 U CN205532555 U CN 205532555U CN 201620243534 U CN201620243534 U CN 201620243534U CN 205532555 U CN205532555 U CN 205532555U
Authority
CN
China
Prior art keywords
well
water injection
pattern structure
crack
interval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620243534.1U
Other languages
Chinese (zh)
Inventor
杨永亮
满安静
苏超
田淑芳
任雪
孟凡秋
庚琪
王恩辉
王尚慧
姜铄
王菲菲
王有慧
张安迪
贺程晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201620243534.1U priority Critical patent/CN205532555U/en
Application granted granted Critical
Publication of CN205532555U publication Critical patent/CN205532555U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the oil gas field of mineing, in particular to well pattern structure that can improve the oil reservoir ultimate recovery, this well pattern structure arranges in the fractured reservoir, and the fractured reservoir is concentrated including a plurality of cracks along the horizontal direction extends and is grown intervals, and the concentrated interval of growing in every crack all includes a plurality of cracks growth district, and wherein, well pattern structure includes: the water injection well passes at least one crack and concentrates the growth interval, many mouthfuls of perpendicular oil recovery wells, equipartition are around the water injection well, and every mouthful of perpendicular oil recovery well passes at least one crack growth district, the many mouthfuls of flat oil recovery wells of horizontal saliva are arranged around the well that recovers the oil perpendicularly. The utility model provides a well pattern structure has increased the scope that affects of injected water, and the water drive reserves who has improved the fractured reservoir employs the degree, has improved the ultimate recovery of fractured reservoir, has improved the development effect of fractured reservoir.

Description

A kind of well pattern structure
Technical field
This utility model belongs to oil-gas mining field, more particularly to a kind of well improving fractured reservoir ultimate recovery Web frame.
Background technology
Fractured reservoir refers to that oil is assembled and the oil reservoir that formed in Fractured trap.The important feature of fractured reservoir It is exactly that petroleum distribution is the most uneven, is positioned at the oil well output very different of same reservoir different parts.Cause this situation Reason, with the hole of the reservoir of fractured reservoir-Causes of Cracking is complicated and skewness is relevant.Fractured oil gas The original porosity height hiding reservoir differs, and permeability is the most extremely low, but the highest in the permeability of Fractured Zone, its Reservoir and flow space distribution pole heterogeneity, the different parts of same reservoir, storage and collection performance differs greatly.Developing this During the oil reservoir of type, it is most important that analyze and recognize the Fractured Zone regularity of distribution, because the growth of slit band divides Cloth situation, controls the enrichment degree of oilbearing stratum.
Meanwhile, on stream, along with the exhaustion of natural energy, for fractured reservoir, want to obtain higher Recovery ratio, it is necessary to supplement stratum energy by modes such as water fillings, the success or failure of reservoir waterflooding are played by crack therein Vital effect.On the one hand crack can make injection water quickly advance by leaps and bounds producing well, makes water breakthrough, from And make yield reduce.On the other hand the existence in crack increases the percolation ability on stratum.How to improve opening of this type of oil reservoir Send out effect, set up rational well-pattern system become it is nowadays accepted that a difficult problem.
Expert's fracture type reservoir well pattern has carried out numerous studies both at home and abroad.Within 2002, history becomes grace to pass through oil reservoir number Value analogy method research finds: rhombic inverted nini-spot well pattern and rectangular pattern adaptability are relatively strong, and development index is best.2003 Nian Zhouxi life, Mu Jiandong etc. by different well pattern forms and different injection mode are combined into multiple scheme and study, Find that the suitability of diamond shaped pattern fracture type reservoir is the strongest.2004 Nian Chen states profits, Liang Chunxiu et al. for crack and The obvious oil reservoir of sand body directivity, is optimized important parameters such as well spacing density, well array direction, injection-to-producing well ratios Research.Research shows: rhombic inverted nini-spot well pattern is stronger for crack and the obvious oil reservoir fitness of sand body directivity. 2006, LiLi, Bingyu Ji et al. by numerical reservoir simulation method compare 5 points, 4 points, anti-9: 4 The well pattern development effectiveness to oil reservoir, result of study finds: the water drive control of five-spot pattern is higher than other well pattern form 8-10%, moisture content and recovery percent of reserves are higher than other well pattern form.King ten thousand in 2009 is refined, Guo Xiao et al. analyzes well Row with fractuer direction at 45 °, 22.5 °, 0 ° time inverted nine-spot injection pattern development effectiveness, draw fracture development journey Spend the conclusion that different most suitable well pattern is the most different.
Theoretical research and mining site practice all show, whether well net deployment mates with extension direction, crack, and greatly impact is opened Send out effect.But in the research of current well pattern structure, about well pattern and reservoir heterogeneity, particularly with split The matching relationship of seam distribution, and the aspect research such as permeability anisotropy is weaker.
In the development process of fractured reservoir, often occur that directivity water breakthrough is fast, water logging is fast and reserves exploitation is unbalanced Etc. problem;And at fractured reservoir in development late stage, there is also injection water retaining in reservoir and decline, add up water-oil factor rising and consumption The problem that the water yield rises., also find in Development Practice meanwhile, utilize merely Vertical Christmas well development fractured reservoir, The water breakthrough of injected water cannot be suppressed, it is difficult to be effectively improved flood effectiveness.
Therefore, it is badly in need of setting up a kind of suitably well pattern structure, gives full play to the crack advantage to volume increase, improve further The development effectiveness of fractured reservoir.
Utility model content
The purpose of this utility model is to provide a kind of fractured reservoir well pattern structure, it is possible to increase reservoir water drive reserves exploitation Degree, improves the ultimate recovery of oil reservoir.
For reaching above-mentioned purpose, the utility model proposes a kind of well pattern structure, be deployed in fractured reservoir, described crack Property oil reservoir include multiple horizontally extending crack and concentrate and grow interval, each described crack is concentrated and is grown interval All including multiple fracture developing zone, wherein, described well pattern structure includes:
Water injection well, concentrates through crack at least one described and grows interval;
Many mouthfuls of Vertical Christmas wells, are distributed on around described water injection well, and every mouthful of described Vertical Christmas well is through at least one institute State fracture developing zone;
The many mouthfuls of flat producing wells of horizontal saliva, are arranged in around described Vertical Christmas well.
Well pattern structure as above, wherein, described water injection well is concentrated through plural described crack and is grown interval, Being additionally provided with more than one packer in described water injection well, described packer is arranged on the described crack that each two is adjacent Concentrate and grow between interval, described water injection well is insulated into plural water filling interval, in each described water filling interval All packings have a described crack to concentrate growth interval.
Well pattern structure as above, wherein, the aboveground oil recovery hole that is provided with of described Vertical Christmas, place, described oil recovery hole The fracture developing zone that described fracture developing zone passes with described water injection well is isolated.
Well pattern structure as above, wherein, described Vertical Christmas well is more than described in 3m at least across a thickness Fracture developing zone;Horizontally disposed in this thickness fracture developing zone more than 3m have two mouthfuls of described horizontal production Well.
Well pattern structure as above, wherein, the thickness at described fracture developing zone is more than under 15m state, at this Two mouthfuls of described horizontal production wells from top to bottom it are provided with in fracture developing zone.
Well pattern structure as above, wherein, described well pattern structure includes the water injection well of more than two mouthfuls, described water injection well Along the principal direction linear arrangement of described fractured reservoir, and germinal layer concentrated by described water injection well through all of described crack Section.
Well pattern structure as above, wherein, is disposed with four mouthfuls of described Vertical Christmas wells around water injection well described in every a bite, And described four mouthfuls of Vertical Christmas wells are separately positioned on foursquare four end points centered by this water injection well.
Well pattern structure as above, wherein, the well array of described Vertical Christmas well formation and the master of described fractured reservoir Angle between direction is 45 degree.
Well pattern structure as above, wherein, the horizontal segment of described horizontal production well and the main formula of described fractured reservoir To having 45 degree of angles.
Well pattern structure as above, wherein, the horizontal section length of described horizontal production well is 300m to 500m.
Well pattern structure as above, wherein, the well spacing between described water injection well and described Vertical Christmas well is 300m To 400m, the well spacing between the horizontal segment of described water injection well and described horizontal production well is 170m to 280m, phase Described in adjacent two, the well spacing between Vertical Christmas well is 400m to 500m.
Compared with prior art, this utility model has the characteristics that and advantage:
The well pattern structure that the utility model proposes has taken into full account the anisotropism of well pattern structure and fractured reservoir reservoir, Particularly with the matching relationship of fractue spacing, water injection well and producing well connection and reasonable arrangement, not only increase and inject involving of water Scope, substantially increases the water drive reserves development degree of fractured reservoir, also has preferably simultaneously for remaining oil between well Displacement effect, finally improves the ultimate recovery of fractured reservoir, improves the development effectiveness of fractured reservoir.This The well pattern structure that utility model proposes is particularly suited for special Fracture with low permeability oil reservoir, to high efficient rational development oil field, improves The ultimate recovery of oil reservoir is significant.
Accompanying drawing explanation
Accompanying drawing described here is only used for task of explanation, and is not intended to limit disclosed in this utility model by any way Scope.It addition, the shape of each parts in figure and proportional sizes etc. are only schematically, it is adapted to assist in this practicality newly The understanding of type, is not shape and the proportional sizes specifically limiting each parts of this utility model.Those skilled in the art Under teaching of the present utility model, various possible shape and proportional sizes can be selected as the case may be to implement this Utility model.
Fig. 1 is the planar configuration relation schematic diagram of this utility model well pattern structure;
Fig. 2 is section and the longitudinal divisions schematic diagram of well pattern structure of the present utility model;
Fig. 3 is the schematic diagram of Vertical Christmas well perforating site in this utility model;
Fig. 4 is the horizontal segment optimization length schematic diagram under Dikken optimization principles of the present utility model;
Fig. 5 is different well spacing Technological Economy relation curve schematic diagram of the present utility model.
Description of reference numerals:
110-crack is concentrated and is grown interval;
111-crack is concentrated and is grown interval;112-crack is concentrated and is grown interval;113-crack is concentrated and is grown interval;
120-fracture developing zone;
200-water injection well;210-packer;
300-Vertical Christmas well;310-oil recovery hole;
400-horizontal production well.
Detailed description of the invention
In conjunction with accompanying drawing and the description of this utility model detailed description of the invention, it is possible to clearly understand of the present utility model Details.But, detailed description of the invention of the present utility model described here, it is only used for explaining the purpose of this utility model, And can not be understood as by any way is to restriction of the present utility model.Under teaching of the present utility model, technical staff It is contemplated that based on the most possible deformation of the present utility model, these are regarded as belonging to model of the present utility model Enclose.
In order to solve fractured reservoir exploitation, difficulty is big, cost of winning is high, development effectiveness is poor, reserves exploitation is unbalanced Problem, this utility model applicant relies on experience and the practice being engaged in relevant industries for many years, with laboratory test and macroscopic view ore deposit Field Production development analysis is integrated as starting point, sets up microcosmic and contacts with macroscopical, sets up a set of effective crack Property oil reservoir skewed pattern structure, improve reservoir water drive reserves exploitation degree, and then finally gathering of oil reservoir can be improved Rate.
Refer to Fig. 1, Fig. 2, wherein, Fig. 1 is the planar configuration relation schematic diagram of this utility model well pattern structure; Fig. 2 is section and the longitudinal divisions schematic diagram of well pattern structure of the present utility model.As shown in Figure 1 and Figure 2, this practicality The well pattern structure of novel proposition, is deployed in fractured reservoir, and this fractured reservoir includes multiple horizontally extending Crack concentrate grow interval 110, each crack concentrate grow interval all include multiple fracture developing zone 120, crack Grow interval division, awareness based on fine geological study, have metastable interlayer each other, also It is exactly to be split by crack aplasia section.As shown in Figure 1 and Figure 2, well pattern structure include water injection well 200, many mouthfuls vertical Producing well 300 and the many mouthfuls of flat producing wells of horizontal saliva 400, wherein, germinal layer concentrated by water injection well 200 through at least one crack Section 110;Many mouthfuls of Vertical Christmas wells 300, are distributed on around water injection well 200, and every mouthful of Vertical Christmas well 300 is through extremely A few fracture developing zone 120;The many mouthfuls of flat producing wells of horizontal saliva 400, are arranged in Vertical Christmas well 300 around.
The well pattern structure that the utility model proposes, uses water injection well 200, Vertical Christmas well 300 and horizontal production well 400 Combined form, and take into full account when arranging water injection well 200, Vertical Christmas well 300 and horizontal production well 400 The anisotropism of fractured reservoir reservoir, particularly concentrates with crack and grows interval 110 and fracture developing zone 120 Matching relationship, increase and inject involving scope and substantially increasing the water drive reserves of fractured reservoir and employ journey of water Degree;The well pattern structure that simultaneously the utility model proposes also has preferable displacement effect for remaining oil between well, finally improves The ultimate recovery of fractured reservoir, improves the development effectiveness of fractured reservoir.
In one optional example of this utility model, well pattern structure also includes: water injection string, is arranged on water injection well In 200, flow string, it is arranged in Vertical Christmas well 300.Additionally, well pattern structure can also include: packer 210, it is arranged on water injection string.As in figure 2 it is shown, germinal layer concentrated by water injection well 200 through plural crack Section 110, in water injection well, 200 are additionally provided with more than one packer 210, and packer 210 is arranged on water injection string On, and packer 210 is arranged on the adjacent crack of each two and concentrates and grow between interval 110, by water injection well 200 Insulating into plural water filling interval 220, in each water filling interval 220, all packing has a crack to concentrate germinal layer Section 110.As in figure 2 it is shown, the crack being positioned at top layer and intermediate layer is concentrated grows interval 110 by injecting water addedly Layer energy, the fracture development interval 110 being positioned at bottom supplements stratum energy by bottom water.Wherein, packer can be adopted Use existing hydro-mechanical set packer.
In an optional example, as it is shown on figure 3, pass the position of fracture developing zone 120 at Vertical Christmas well 300 The place of putting is provided with oil recovery hole 310, and oil recovery hole 310 is arranged on flow string, connection flow string and fracture developing zone, And the fracture developing zone 120 that the fracture developing zone 120 at this place, oil recovery hole 310 and water injection well 200 are passed is separated by From, in other words, the fracture developing zone that fracture developing zone 120 and the water injection well 200 at this place, oil recovery hole 310 is passed 120 be the oil recovery hole 310 of two separate fracture developing zone, i.e. Vertical Christmas well 300 with water injection well office not Same fracture developing zone 120.The water injected by water injection well 200 is made to arrive adopting of Vertical Christmas well 300 along crack The time of oilhole increases, and expand injection water involves scope, improves the development effectiveness of fractured reservoir.Meanwhile, So can utilize bottom water energy more fully, and effectively extend the bottom water water logging time to Vertical Christmas well.Specifically , during as it is shown on figure 3, the oil recovery hole 310 of Vertical Christmas well 300 is positioned at crack concentration growth interval 112, hang down The crude oil that straight 300 wells that recover the oil are grown in interval 112 for exploiting crack to concentrate, and grow interval by concentrating in crack The horizontal production well 400 that the position of 113 is arranged is exploited crack and is concentrated the crude oil growing interval 113;Vertical Christmas well When the oil recovery hole 310 of 300 is positioned at crack concentration growth interval 111, utilizes and inject water energy, pass through Vertical Christmas Well 300 and horizontal production well 400 are jointly exploited crack and are concentrated growth interval 111 and crack concentration to grow in interval 112 Crude oil.
In one optional example of this utility model, as shown in Figure 1 and Figure 2, Vertical Christmas well 300 at least across One thickness is more than the fracture developing zone 120 of 3m;Along level in this thickness fracture developing zone 120 more than 3m Direction is provided with two mouthfuls of flat producing wells of horizontal saliva 400.As in figure 2 it is shown, two mouthfuls of flat producing wells of horizontal saliva 400 are arranged in Vertical Christmas The both sides of well 300.
In an optional example, the thickness at fracture developing zone 120 is more than under 15m state, sends out in this crack Two mouthfuls of flat producing wells of horizontal saliva 400 from top to bottom it are provided with in educating district 120.
In one optional example of this utility model, as in figure 2 it is shown, well pattern structure includes the water injection well of more than two mouthfuls 200, water injection well 200 is along the principal direction linear arrangement of fractured reservoir, and water injection well 200 is through all of crack collection Middle growth interval 110.
In one optional example of this utility model, as in figure 2 it is shown, be disposed with four around every a bite water injection well 200 Mouthful Vertical Christmas well 300, and these four mouthfuls of Vertical Christmas wells 300 are separately positioned on centered by this water injection well 200 On foursquare four end points.That is, inverted five spot shown the most greatly by water injection well 200 and four mouthfuls of Vertical Christmas wells 300 Method is distributed.Certainly, those skilled in the art can also adjust water injection well 200 with specific reference to actual reservoir geology situation It is adjusted with the distribution mode of Vertical Christmas well 300.
In an optional example, between well array and the principal direction of fractured reservoir that Vertical Christmas well 300 is formed Angle is 45 degree.The principal direction of the fractured reservoir i.e. bearing of trend of fractured reservoir major fracture, oozes in the direction Rate is maximum thoroughly, and perpendicular directional permeability is minimum.Results of numerical simulation shows along with Vertical Christmas well 300 The well array of formation first increases reduce afterwards with the increase of fractuer direction angle, cumulative production and recovery percent of reserves, and aqueous taking the lead in subtracts Increase after little.When the principal direction angle of the well array that Vertical Christmas well 300 is formed with fractured reservoir is 45 degree, tired Long-pending oil production and recovery percent of reserves are maximum, and moisture content is minimum, and development effectiveness is best.
In an optional example, horizontal production well 400 horizontal segment starting end is big to the vertical dimension of water injection well 200 In the vertical dimension of horizontal production well 400 horizontal segment end to water injection well, the horizontal segment of horizontal production well 400 and crack Property oil reservoir principal direction there are 45 degree of angles, macroscopic view ASP flooding test shows that 45 degree of angles can effectively prevent water breakthrough, exploitation Effect is preferable.
In one optional example of this utility model, the horizontal section length of horizontal production well 400 be 300m extremely 500m.Horizontal production well 400 can become the linear coning of bottom water and enter into banding step torr, thus extends bottom water water Flood the time of oil well, expand swept volume, improve oil recovery factor.
Wherein, calculate based on horizontal well production exponential formula and Dikken optimization principles determines that horizontal production well 400 is Excellent horizontal section length, such as accompanying drawing 4, computing formula is:
In formula:
Jh--horizontal well, straight well productivity index, m3/ (d MPa m);
Jv--horizontal well, straight well drainage radius, m;
Rev--straight well drainage radius, m;
Rwh--horizontal well wellbore radius, m;
Rwv--straight well wellbore radius, m;
L--horizontal section length, m;
H--effective thickness, m;
Sv、Sh--effective thickness, straight well, horizontal well skin factor, zero dimension;
β--Zero dimension;
Kh、Kv--horizontal direction, vertical permeability, μm2
Qo=Q (0)-Q (L) is 2.
In formula:
Qo--consider the horizontal well production of abrasion, m3/d;
Q (L)--horizontal segment end pit shaft flow;
Q (x)--pit shaft flow at the x of horizontal segment optional position, m3/d.
Qo`=JrLΔP ③
In formula:
QoHorizontal well production under the certain oil reservoir of `--, fluid condition, m3/d;
Jr--unit length horizontal well production index, m3/ (d MPa m);
L--horizontal section length, m;
Δ P--horizontal well producing pressure differential, MPa.
Qo/Qo`=0.8 is 4.
By above-mentioned model iterative, it is to work as friction loss according to Dikken optimization principles definition optimum horizontal interval length Reducing length during 20% production capacity, it is relatively reasonable that comprehensive study thinks that horizontal production well horizontal section length is set to 500m.
In one optional example of this utility model, the well spacing between water injection well 200 and Vertical Christmas well 300 is 300m to 400m, the well spacing between the horizontal segment of water injection well 200 and horizontal production well 400 is 170m to 280m, The adjacent well spacing between two Vertical Christmas wells 300 is 400m to 500m.
Concrete, according to study area reservoir physical parameter, use single well-controlled recoverable reserves method, determine that this oil reservoir is reasonable Well spacing, computing formula is:
N R O = m 1 + T · A B · E R ( T ) ( 1 + β )
In formula:
NRO--the average reasonable recoverable reserves of single well-controlled, 104t/ mouth;
m1--individual well gross investment, 104 yuan/mouthful;
T--main development period, year;
A--individual well average year producing cost, 104 yuan/(mouth. year);
B--crude oil price, unit/t;
ER(T)--the recovery ratio of recoverable reserves, % in T;
β--oil field base earnings ratio, 0.12.
Above formula is utilized to calculate the single well-controlled recoverable reserves under different oil price and the relation under different recovery ratio, such as Fig. 5 Shown in, for different oil prices and single well-controlled recoverable reserves, and recovery ratio, determine economic limit rational spacing between wells flexibly, When between two the most adjacent Vertical Christmas wells 300, well spacing is 400m to 500m, effect is best, Ji Nengbao Demonstrate,prove preferable exploitation effect, preferable economic benefit can be obtained again.
Relation statistical table under table 1 single well-controlled recoverable reserves and different recovery ratio
What the well pattern structure that layout the utility model proposes was used specifically comprises the following steps that
Step 1: according to study area FRACTURE CHARACTERISTICS, attribute volume is chased after by the parameters followed the trail of by arranging Formica fusca Track, and then produce Formica fusca attribute volume.Utilize the crack MBM of Petrel, on the basis of inputting parameter, in three-dimensional Specific region in grid, being determined by property sets up crack discrete networks model, and then fracture development belt scope Position.
Step 2: for Fractured Zone scope in step 1, introduces compressional wave orientation amplitude information, thus obtains in many ways Position Formica fusca amplitude body, utilizes in the range of Fractured Zone and carries out quantification based on amplitude with Orientation differences information fracture and retouch State, particularly as follows: utilize P-wave amplitude with azimuthal variation feature, calculated in many ways by R ü ger formula and simplified style thereof Azimuth data, follows the trail of result by the Formica fusca of the angles of azimuth data calculated and merges, more complete to realize fracture spread The description in face.
Wherein, R ü ger formula and simplified style thereof are most important theories based on amplitude anisotropy crack identification bases, its Approximate formula is:
R (i, φ)=A+Bisosin2i+Bani sin2icos2(φ-φsym) ①
In formula:
R (i, φ)--for the longitudinal wave reflection coefficient relevant with angle of incidence and azimuth;
G--is tangential modulus;
α--for velocity of longitudinal wave;
β--for shear wave velocity;
Δ--for the difference of upper and lower medium rock parameter;
δV、γV--for describing anisotropic Thomsen parameter;
φsym--for the azimuth of shot point to receiving station;
φ--for the azimuth of fracture strike;
I--is layered halfspace angle;
Biso--for amplitude with the rate of change of geophone offset;
Bani--for amplitude with azimuthal rate of change.
Step 3: set up fractured reservoir skewed pattern structure according to results of fracture prediction in step 2, as Fig. 1, Shown in Fig. 2, fractured reservoir includes the thickness more than one fracture developing zone 120 more than 3m, well pattern structure bag Include two mouthfuls of water injection wells 200 (water injection well 200 can be vertical water injection well), six mouthfuls of Vertical Christmas wells 300 and three mouthfuls of water Flat producing well 400.Grow direction and linearly arrange shape as it is shown in figure 1, two mouthfuls of vertical water injection wells 300 are positioned at major fracture and divide Cloth, and it is in the center that fracture spacing is bigger as far as possible, six mouthfuls of Vertical Christmas wells 300 are distributed in water injection well 200 Both sides, the most every four mouthfuls of Vertical Christmas wells 300 and a bite water injection well 200 show the most greatly the distribution of inverted five spot method, And the well array of Vertical Christmas well 300 and fractuer direction stagger certain angle, results of numerical simulation shows along with well array First increase with the increase of fractuer direction angle, cumulative oil production and recovery percent of reserves and reduce afterwards, increase after the aqueous reduction that takes the lead in. When the well array of Vertical Christmas well 300 is 45 ° with fractuer direction angle, cumulative oil production and recovery percent of reserves are maximum, Moisture content is minimum, and development effectiveness is best.
Step 4: for the fractured reservoir skewed pattern structure in step 3, according to actual reservoir development condition, Following the trail of result in conjunction with multi-faceted Formica fusca, arrange multiple packer 210 on water injection well 200, packer 210 can be adopted Use hydro-mechanical set packer of the prior art.As long as water injection well 200 concentrates growth interval 110 just to exist through crack Crack concentrates growth interval 110 to be respectively arranged at two ends with a packer 210, and each crack concentrates growth interval 110 equal Insulated in a water filling interval of water injection well 200 by packer 210.
Step 5: for the fractured reservoir skewed pattern structure in step 3, arranges horizontal production well 400, its In as shown in Figure 1 and Figure 2, three mouthfuls of flat producing wells of horizontal saliva 400 are arranged in Vertical Christmas well 200 both sides, horizontal production well 400 horizontal segment starting ends are more than horizontal production well 400 horizontal segment end to water injection well to the vertical dimension of water injection well 200 The vertical dimension of 200, follows the trail of result horizontal production well 400 horizontal segment and major fracture bearing of trend in conjunction with multi-faceted Formica fusca Keeping certain angle, macroscopic view ASP flooding test to show angle 45 °, can effectively prevent water breakthrough, exploitation effect is preferable.
Step 6: for the fractured reservoir skewed pattern structure in step 3, the aboveground perforating site of Vertical Christmas with Water injection well office difference fracture development section.
Step 7: for the fractured reservoir skewed pattern structure in step 3, horizontal production well horizontal section length is 300m to 500m, horizontal production well can become the linear coning of bottom water and enter into banding step torr, thus extend bottom water Water logging, to the time of oil well, expands swept volume, improves oil recovery factor.
Step 8: for the fractured reservoir skewed pattern structure in step 3, the geology characteristic in binding district, Consider technology and economic two factors, determine the rational spacing between wells of all kinds of well in study area.
Explaining in detail for the respective embodiments described above, its purpose is only that and explains this utility model, in order to Better understood when this utility model, but, these describe can not be to this utility model with any explanation one-tenth Restriction, particularly, each feature described in various embodiments can also mutual combination in any, thus group Becoming other embodiments, except there being the most contrary description, these features should be understood to be applied to any one In embodiment, and it is not limited merely to described embodiment.

Claims (11)

1. a well pattern structure, is deployed in fractured reservoir, described fractured reservoir include multiple in the horizontal direction The crack extended is concentrated and is grown interval, and each described crack concentrates growth interval all to include multiple fracture developing zone, and it is special Levying and be, described well pattern structure includes:
Water injection well, concentrates through crack at least one described and grows interval;
Many mouthfuls of Vertical Christmas wells, are distributed on around described water injection well, and every mouthful of described Vertical Christmas well is through at least one institute State fracture developing zone;
The many mouthfuls of flat producing wells of horizontal saliva, are arranged in around described Vertical Christmas well.
2. well pattern structure as claimed in claim 1, it is characterised in that described water injection well passes plural institute Stating crack and concentrate growth interval, be additionally provided with more than one packer in described water injection well, described packer is arranged on The described crack that each two is adjacent is concentrated and is grown between interval, and described water injection well insulates into plural water filling layer Section, in each described water filling interval, all packing has a described crack to concentrate growth interval.
3. well pattern structure as claimed in claim 2, it is characterised in that described Vertical Christmas is aboveground is provided with oil recovery hole, The fracture developing zone that the fracture developing zone at place, described oil recovery hole and described water injection well pass is isolated.
4. well pattern structure as claimed in claim 1, it is characterised in that described Vertical Christmas well is at least across The thickness described fracture developing zone more than 3m;This thickness more than 3m fracture developing zone in horizontally disposed There are two mouthfuls of described horizontal production wells.
5. well pattern structure as claimed in claim 4, it is characterised in that the thickness at described fracture developing zone is more than Under 15m state, in this fracture developing zone, from top to bottom it is provided with two mouthfuls of described horizontal production wells.
6. the well pattern structure as described in any one in claim 1 to 5, it is characterised in that described well pattern structure Including the described water injection well of more than two mouthfuls, described water injection well is along the principal direction linear arrangement of described fractured reservoir, and institute State water injection well and concentrate growth interval through all of described crack.
7. well pattern structure as claimed in claim 6, it is characterised in that be disposed with around water injection well described in every a bite Four mouthfuls of described Vertical Christmas wells, and described four mouthfuls of Vertical Christmas wells are separately positioned on the square centered by this water injection well Four end points on.
8. well pattern structure as claimed in claim 7, it is characterised in that the well array that described Vertical Christmas well is formed with Angle between the principal direction of described fractured reservoir is 45 degree.
9. well pattern structure as claimed in claim 7, it is characterised in that the horizontal segment of described horizontal production well and institute The principal direction stating fractured reservoir has 45 degree of angles.
10. well pattern structure as claimed in claim 1, it is characterised in that the horizontal section length of described horizontal production well For 300m to 500m.
11. well pattern structures as claimed in claim 1, it is characterised in that described water injection well and described Vertical Christmas well Between well spacing be 300m to 400m, the well spacing between the horizontal segment of described water injection well and described horizontal production well is 170m to 280m, the well spacing between Vertical Christmas well described in adjacent two is 400m to 500m.
CN201620243534.1U 2016-03-28 2016-03-28 Well pattern structure Active CN205532555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620243534.1U CN205532555U (en) 2016-03-28 2016-03-28 Well pattern structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620243534.1U CN205532555U (en) 2016-03-28 2016-03-28 Well pattern structure

Publications (1)

Publication Number Publication Date
CN205532555U true CN205532555U (en) 2016-08-31

Family

ID=56786056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620243534.1U Active CN205532555U (en) 2016-03-28 2016-03-28 Well pattern structure

Country Status (1)

Country Link
CN (1) CN205532555U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107766978A (en) * 2017-10-23 2018-03-06 南京特雷西能源科技有限公司 The intelligent optimization method of skewed pattern
CN114016979A (en) * 2021-11-05 2022-02-08 北京红蓝黑能源科技有限公司 Oil and gas exploitation method for injecting water into water layer of oil and gas reservoir
CN115434686A (en) * 2022-09-21 2022-12-06 常州大学 Method for inhibiting edge-bottom water coning of heterogeneous fault block heavy oil reservoir and application

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107766978A (en) * 2017-10-23 2018-03-06 南京特雷西能源科技有限公司 The intelligent optimization method of skewed pattern
CN107766978B (en) * 2017-10-23 2020-03-17 南京特雷西能源科技有限公司 Intelligent optimization method for irregular well pattern
CN114016979A (en) * 2021-11-05 2022-02-08 北京红蓝黑能源科技有限公司 Oil and gas exploitation method for injecting water into water layer of oil and gas reservoir
CN115434686A (en) * 2022-09-21 2022-12-06 常州大学 Method for inhibiting edge-bottom water coning of heterogeneous fault block heavy oil reservoir and application
CN115434686B (en) * 2022-09-21 2023-08-08 常州大学 Method for inhibiting side bottom water coning of heterogeneous broken block heavy oil reservoir and application

Similar Documents

Publication Publication Date Title
CN105888630B (en) A kind of method that densification oil pressure splits horizontal well huff and puff oil recovery raising recovery ratio
Fangzheng Practice and knowledge of volumetric development of deep fractured-vuggy carbonate reservoirs in Tarim Basin, NW China
CN105239990B (en) A kind of Oil in Super-low Permeability compact oil reservoir intends the lateral displacement horizontal well well-arranging procedure of this well
CN103046910B (en) Ultra-high water cut stage reservoir water drive development approach
CN104141481B (en) A kind of ultra-low penetration compact oil reservoir horizontal well well-arranging procedure
CN107435535B (en) A method of exploitation high dip angle heavy crude reservoir is driven using plane gravity
CN106437674B (en) Imitative water injection of horizontal well well pattern adaptation method
CN101818620B (en) Mining method for maximum reservoir contact well
CN100999992B (en) Method for transferring steam driven at thickened oil steam taking-in and sending-out later period post
CN102071922B (en) Low permeable oil deposit virtual horizontal well development method
CN106593400A (en) Volume fracturing directional well arranging method for ultra-low permeability dense reservoir
CN105822269B (en) Remaining oil distribution pattern and modification scenario method after stratified reservoir binary is driven
CN107630686A (en) Interlock between net horizontal section the fine and close oily energy supplement method of displacement and the imbibition displacement of reservoir oil
CN105822284B (en) Triangle horizontal well patterns well-arranging procedure
CN206309375U (en) The improvement well pattern structure of rhombic inverted nini-spot well pattern
CN205532555U (en) Well pattern structure
CN106761606A (en) The asynchronous note CO of different well of symmetrical expression cloth seam2Oil production method
CN201763308U (en) Fishbone well type structure
CN110259421A (en) A kind of broken up compact oil reservoir water filling supplement ENERGY METHOD
CN207093050U (en) A kind of gas drive well pattern structure of high water cut rate high inclination-angle LOW PERMEABILITY RESERVOIR
CN207315337U (en) Well pattern structure for the exploitation of stratiform LOW PERMEABILITY RESERVOIR
CN106869888A (en) The method for improving low-permeability oil deposit waterflooding effect
Zou et al. Principal characteristics of marine shale gas, and the theory and technology of its exploration and development in China
CN105332678A (en) Gas injection swallowing-spitting method
CN204252974U (en) A kind of horizontal well well structure for the block fractured reservoir exploitation of deep layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant