CN205530645U - Concatenation formula reservoir structure - Google Patents

Concatenation formula reservoir structure Download PDF

Info

Publication number
CN205530645U
CN205530645U CN201620059192.8U CN201620059192U CN205530645U CN 205530645 U CN205530645 U CN 205530645U CN 201620059192 U CN201620059192 U CN 201620059192U CN 205530645 U CN205530645 U CN 205530645U
Authority
CN
China
Prior art keywords
main splice
main
gripper shoe
plate
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620059192.8U
Other languages
Chinese (zh)
Inventor
李习洪
马佳
姜景升
刘肯林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Meihua Yushui Environment Co Ltd
Original Assignee
Wuhan Meihua Yushui Environment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Meihua Yushui Environment Co Ltd filed Critical Wuhan Meihua Yushui Environment Co Ltd
Priority to CN201620059192.8U priority Critical patent/CN205530645U/en
Application granted granted Critical
Publication of CN205530645U publication Critical patent/CN205530645U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a concatenation formula reservoir structure, it includes, and the middle part is the main member of rivers passageway, the fixed lower part component of cooperation bottom the main member to and with the main member around the laminating of both sides surface fixed, and the fixed headwall component of both sides cooperation around bottom and the lower part component, main member, lower part component and headwall component enclose into a confined reservoir body, the rear end bottom and the pump hole seat intercommunication that catchments of lower part component, and the water inlet of the pump that catchments hole seat and the rivers passageway intercommunication of main member, inlet tube and outlet pipe are connected respectively to the headwall component of both sides around the reservoir body, the top of main member is equipped with the inspection well casing. The prefabricated component of modular design and seriation can satisfy not co -content reservoir's demand, assemble the flexibility, but different whole shapes is assembled by the environment under the base area.

Description

A kind of spliced reservoir structure
Technical field
This utility model relates to reservoir technical field, in particular to a kind of spliced reservoir structure.
Background technology
Reservoir has wide range of applications, including the ground such as parking lot, street, community, park, even airport Lower place.Reservoir is collected and stored the rainwater through filtering, various reuse can be carried out, as gardens are green Change, road sprays, flushes the toilet etc., beneficially saving water resource, and existing reservoir structure is an entirety Pouring structure, work on the spot amount is big, affected by environment greatly, poor for applicability to varying environment.
Utility model content
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technology, it is provided that a kind of spliced Reservoir structure, reservoir is designed as a modular splicing construction by this structure, can meet varying environment and Reservoir under shape needs, and easy construction is practical.
For realizing this purpose, the spliced reservoir structure designed by this utility model, it includes that middle part is The main member of water stream channel with coordinate fixing lower member bottom main member, and with main member Both side surface laminating front and back is fixing, and bottom coordinates fixing headwall structure with both sides before and after lower member Part;Described main member, lower member and headwall component surround the reservoir body of a closing, described bottom Connect with water collecting pump hole seat bottom the rear end of component, the water inlet of described water collecting pump hole seat and main member Water stream channel connects, and before and after described reservoir body, the headwall component of both sides connects water inlet pipe and water outlet respectively Pipe;The top of described main member is provided with inspection well casing.
The arrangement of disconnection type water stream channel: described main member includes at least one water stream channel, Do not connect between described water stream channel;Described main member includes the first master that the laminating of multiple head and the tail is fixing Splice, described first main splice includes main splice top board, the left and right of described main splice top board Both sides end face connects vertical gripper shoe, the first main splice institute structure that the laminating of the plurality of head and the tail is fixing The central space becoming structure is single water stream channel;Described main splice top board is arch sheet or flat board.
The arrangement of communication type water stream channel: described main member includes a plurality of water stream channel, at least Article two, water stream channel is interconnected;Described main member includes the main splice that polylith head and the tail laminating is fixing, The central space of the constituted structure of main splice that the head and the tail laminating of described polylith is fixing is that single current lead to Road, described main splice includes that the main splice of even numbered blocks second, described second main splice include main spelling Fitting top board, the left and right sides end face of described main splice top board connects vertical gripper shoe, and described the The bottom center of the vertical gripper shoe of two main splice sides has current via, and each piece has current The vertical gripper shoe of via all has the vertical gripper shoe of current via and fits with another block;Described master Splice top board is arch sheet or flat board.
Further, described main splice also includes the 3rd main splice, described 3rd main splice bag Including main splice top board, the left and right sides end face of described main splice top board connects vertical gripper shoe, The bottom center of the vertical gripper shoe of described 3rd main splice both sides all has current via.
Further, described main splice also includes at least one piece of first main splice, described first Main splice includes main splice top board, and the left and right sides end face connection of described main splice top board has perpendicular Allotment fagging.
Described lower member for pouring base plate, described in pour the left and right sides of base plate and have and main member Vertically the first fixing groove, the width of described first groove is coordinated to prop up with single vertical bottom gripper shoe The width of fagging is corresponding, described in pour base plate before and after both sides have the splicing end plate with headwall component The second groove that bottom coordinates, the water inlet of described water collecting pump hole seat is opened in and pours on base plate.
Further, pour the middle part of base plate described in have and coordinate bottom two pieces of vertical gripper shoes 3rd groove, the width of described 3rd groove is corresponding with the twice of the width of single vertical gripper shoe.
The another kind of version of lower member: described lower member is the water storage base of a cuboid-type, Including base plate and around the fixing four pieces of base side plates of base plate peripheral surface, described base The bottom surface of side plate is concordant with the bottom surface of base plate, and the height of base side plate is more than the thickness of base plate Degree;The water inlet of described water collecting pump hole seat is opened on base plate, both sides before and after described water storage base The top of base side plate have the first draw-in groove that the splicing endplate root with headwall component coordinates, described The top of the base side plate of the water storage base left and right sides has that the vertical gripper shoe with main member coordinates Two draw-in grooves, the width of described second draw-in groove is corresponding with the width of single vertical gripper shoe.
Further, described base plate is provided with fixed block, the top of described fixed block along its length Portion has and the 3rd draw-in groove coordinated bottom two pieces of vertical gripper shoes, the width of described 3rd draw-in groove and list The twice of the width of individual vertical gripper shoe is corresponding.
Further, described base plate is provided with multiple fixed block, before and after described base plate Gap between two pieces of adjacent fixed blocks is corresponding with the current via bottom vertical gripper shoe.
The beneficial effects of the utility model are: 1, the prefabricated components of modular design and seriation can be expired The demand of the most isometric reservoir of foot;2, prefabricated components span is little, and the overall reservoir intensity of composition is high, Bearing capacity is strong;3, greatly reducing the workload at scene, shorten curing cycle, simple installation is high Effect;4, assembled flexibly, can be assembled into different whole according to underground environment (such as the non-disconnectable facility removed) Shape;5, prefabricated components can produce in locality, reduces cost of transportation;6, easily controllable module The quality of unit;7, construction is affected little by on-the-spot weather.
Accompanying drawing explanation
Fig. 1 is the explosive view of the reservoir in this utility model based on pouring base plate;
Fig. 2 is the left view of the reservoir in this utility model based on pouring base plate;
Fig. 3 is the top view pouring base plate in this utility model;
Fig. 4 is the sectional view of A A in Fig. 3;
Fig. 5 is that in this utility model, the main splice of arch coordinates fixing structure sectional view with pouring base plate;
Fig. 6 is that this utility model main splice of middle plateform type coordinates fixing structure section view with pouring base plate Figure;
Fig. 7 is the front view of the splicing end plate being connected with water inlet pipe in this utility model;
Fig. 8 is the left view splicing end plate in this utility model;
Fig. 9 is the front view of the splicing end plate being connected with outlet pipe in this utility model;
Figure 10 is the explosive view of the reservoir in this utility model based on water storage base;
Figure 11 is the left view of the reservoir in this utility model based on water storage base;
Figure 12 is the top view of water storage base in this utility model;
Figure 13 is the sectional view of B B in Figure 12;
Figure 14 is that in this utility model, the main splice of arch coordinates fixing structure section view with water storage base Figure;
Figure 15 is that this utility model main splice of middle plateform type coordinates fixing structure section view with water storage base Figure;
Figure 16 is the splicing construction one of the reservoir designed by this utility model;
Figure 17 is the splicing construction two of the reservoir designed by this utility model;
Figure 18 is the splicing construction three of the reservoir designed by this utility model;
Wherein, 1 main member, 1.1 first main splices, 1.2 second main splices, 1.3 Three main splices, 2 headwall components, 2.1 splicing end plates, 3 lower member, 3.1 pour base plate, 3.2 water storage bases, 4 water collecting pump hole seats, 5 water inlet pipes, 6 outlet pipes, 7 inspection well casings, 8 Main splice top board, 9 vertical gripper shoes, 10 current vias, 11 first grooves, 12 Two grooves, 13 the 3rd grooves, 14 base plates, 15 cat ladders, 16 base side plates, 17 First draw-in groove, 18 second draw-in grooves, 19 fixed blocks, 20 the 3rd draw-in grooves, 21 immersible pumps.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
This utility model devises the version of two kinds of lower member, a kind of for pouring base plate 3.1, with Reservoir based on this base plate, capacity is less, it is adaptable to rainwater recycle ring less demanding to moisture storage capacity Border, advantage is that processing is simple, and splicing is convenient, and labor workload is little, convenient construction.Another kind of for storage Water-bed seat 3.2, its moisture storage capacity of the reservoir based on this base is big, it is adaptable to having moisture storage capacity must The rainwater recycle environment asked.
Hereinafter two kinds of basic reservoir are illustrated respectively:
One, the reservoir structure (as shown in Fig. 1 9) based on pouring base plate 3.1:
Structure 1: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that at least one piece of first main splice 1.1, the first main splice 1.1 include main splice Top board 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, main splice top Plate 8 is arch sheet or flat board.Headwall component 2 includes that polylith splices end plate 2.1, reservoir rear body Splicing end plate 2.1 connects water inlet pipe 5, and anterior splicing end plate 2.1 connects outlet pipe 6;Lower member 3 For pouring base plate 3.1, the left and right sides pouring base plate 3.1 has the vertical gripper shoe 9 with main member 1 Bottom coordinates the first fixing groove 11, the width of the first groove 11 and the width of single vertical gripper shoe 9 Spend corresponding, pour both sides before and after base plate 3.1 have with the splicing end plate 2.1 of headwall component 2 bottom The second groove 12 coordinated, the water inlet of water collecting pump hole seat 4 is opened in and pours on base plate 3.1.Pour The middle part of base plate 3.1 is offered and the 3rd groove 13 coordinated bottom two pieces of vertical gripper shoes 9 as required, The width of the 3rd groove 13 is corresponding with the twice of the width of single vertical gripper shoe 9.
Structure 2: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that the main splice of even numbered blocks second 1.2, the second main splice 1.2 include main splice top Plate 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main splice The bottom center of the vertical gripper shoe 9 of 1.2 sides has current via 10, has current via 10 Vertically gripper shoe 9 fits;Main splice top board 8 is arch sheet or flat board.Headwall component 2 includes Polylith splicing end plate 2.1, the splicing end plate 2.1 of reservoir rear body connects water inlet pipe 5, anterior spelling Connect end plate 2.1 and connect outlet pipe 6;Lower member 3, for pouring base plate 3.1, pours the left and right of base plate 3.1 Both sides have and coordinate the first fixing groove 11, the first ditch bottom the vertical gripper shoe 9 of main member 1 The width of groove 11 is corresponding with the width of single vertical gripper shoe 9, pours both sides before and after base plate 3.1 The second groove 12 having and coordinate bottom the splicing end plate 2.1 of headwall component 2, water collecting pump hole seat 4 Water inlet be opened in and pour on base plate 3.1.The middle part pouring base plate 3.1 is offered and two pieces as required The 3rd groove 13 vertically coordinated bottom gripper shoe 9, the width of the 3rd groove 13 supports with single vertical The twice of the width of plate 9 is corresponding.
Structure 3: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that at least one piece of first main splice 1.1, described first main splice 1.1 include main spelling Fitting top board 8, the left and right sides end face of described main splice top board 8 connects vertical gripper shoe 9, institute State main member 1 and also include that the main splice of even numbered blocks second 1.2, the second main splice 1.2 include main splicing Part top board 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main spelling The bottom center of the vertical gripper shoe 9 of fitting 1.2 side has current via 10, has current via The vertical gripper shoe 9 of 10 fits;Main splice top board 8 is arch sheet or flat board.Headwall component 2 Splicing end plate 2.1 including polylith, the splicing end plate 2.1 of reservoir rear body connects water inlet pipe 5, anterior Splicing end plate 2.1 connect outlet pipe 6;Lower member 3, for pouring base plate 3.1, pours base plate 3.1 The left and right sides has and coordinates the first fixing groove 11 bottom the vertical gripper shoe 9 of main member 1, the The width of one groove 11 is corresponding with the width of single vertical gripper shoe 9, before and after pouring base plate 3.1 Both sides have and the second groove 12 coordinated bottom the splicing end plate 2.1 of headwall component 2, and water collecting pump is cheated The water inlet of seat 4 is opened in and pours on base plate 3.1.Pour the middle part of base plate 3.1 offer as required with The 3rd groove 13 coordinated bottom two pieces of vertical gripper shoes 9, the width of the 3rd groove 13 and single vertical The twice of the width of gripper shoe 9 is corresponding.
Structure 4: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that the main splice of even numbered blocks second 1.2, the second main splice 1.2 include main splice top Plate 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main splice The bottom center of the vertical gripper shoe 9 of 1.2 sides has current via 10;Main member 1 also includes the 3rd Main splice 1.3, the 3rd main splice 1.3 includes main splice top board 8, main splice top board 8 Left and right sides end face connects vertical gripper shoe 9, the vertical gripper shoe 9 of the 3rd main splice 1.3 both sides Bottom center all have current via 10;The each piece of vertical gripper shoe 9 with current via 10 is equal The vertical gripper shoe 9 with another block with current via 10 fits;Main splice top board 8 is arch Plate or flat board.Headwall component 2 includes that polylith splices end plate 2.1, the splicing end plate 2.1 of reservoir rear body Connecting water inlet pipe 5, anterior splicing end plate 2.1 connects outlet pipe 6;Lower member 3 is for pouring base plate 3.1, the left and right sides pouring base plate 3.1 has and coordinates bottom the vertical gripper shoe 9 of main member 1 admittedly The first fixed groove 11, the width of the first groove 11 is corresponding with the width of single vertical gripper shoe 9, Before and after pouring base plate 3.1, both sides have and second coordinated bottom the splicing end plate 2.1 of headwall component 2 Groove 12, the water inlet of water collecting pump hole seat 4 is opened in and pours on base plate 3.1.Pour in base plate 3.1 Portion offers and the 3rd groove 13 coordinated bottom two pieces of vertical gripper shoes 9, the 3rd groove 13 as required Width corresponding with the twice of the width of single vertical gripper shoe 9.
Structure 5: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes at least one piece of first main splice 1.1, the main splice of even numbered blocks second 1.2 and at least One piece of the 3rd main splice 1.3, the first main splice 1.1 includes main splice top board 8, main splice The left and right sides end face of top board 8 connects has vertical gripper shoe 9, the second main splice 1.2 to include main splicing Part top board 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main spelling The bottom center of the vertical gripper shoe 9 of fitting 1.2 side has current via 10;3rd main splice 1.3 include main splice top board 8, and the left and right sides end face of main splice top board 8 connects vertically support Plate 9, the bottom center of the vertical gripper shoe 9 of the 3rd main splice 1.3 both sides all has current via 10; The each piece of vertical gripper shoe 9 with current via 10 all has the perpendicular of current via 10 with another block Allotment fagging 9 fits;Main splice top board 8 is arch sheet or flat board.Headwall component 2 includes many Block splicing end plate 2.1, the splicing end plate 2.1 of reservoir rear body connects water inlet pipe 5, anterior splicing End plate 2.1 connects outlet pipe 6;Lower member 3, for pouring base plate 3.1, pours the left and right two of base plate 3.1 Side has and coordinates the first fixing groove 11, the first groove bottom the vertical gripper shoe 9 of main member 1 The width of 11 is corresponding with the width of single vertical gripper shoe 9, and before and after pouring base plate 3.1, both sides are opened The second groove 12 having and coordinate bottom the splicing end plate 2.1 of headwall component 2, water collecting pump hole seat 4 Water inlet is opened in and pours on base plate 3.1.The middle part pouring base plate 3.1 has perpendicular with two pieces as required The 3rd groove 13 coordinated bottom allotment fagging 9, the width of the 3rd groove 13 and single vertical gripper shoe The twice of the width of 9 is corresponding.
Two: the reservoir (as shown in Figure 10 15) by based on water storage base 3.2:
Structure 1: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that at least one piece of first main splice 1.1, the first main splice 1.1 include main splice Top board 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, main splice top Plate 8 is arch sheet or flat board.Headwall component 2 includes that polylith splices end plate 2.1, reservoir rear body Splicing end plate 2.1 connects water inlet pipe 5, and anterior splicing end plate 2.1 connects outlet pipe 6;Lower member 3 It is the water storage base 3.2 of a cuboid-type, including base plate 14 and around base plate 14 circumference Four pieces of base side plates 16 that surface is fixing, the bottom surface of base side plate 16 and the bottom surface of base plate 14 are put down Together, and the height of base side plate 16 is more than the thickness of base plate 14;Water collecting pump hole seat 4 enter water Mouth is opened on base plate 14, and before and after water storage base 3.2, the top of the base side plate 16 of both sides has The first draw-in groove 17 coordinated with bottom the splicing end plate 2.1 of headwall component 2, water storage base about 3.2 two The top of the base side plate 16 of side has the second draw-in groove 18 that the vertical gripper shoe 9 with main member 1 coordinates, The width of the second draw-in groove 18 is corresponding with the width of single vertical gripper shoe 9.Base plate 14 basis Needing to be provided with fixed block 19 along its length, the top of fixed block 19 has and two pieces of vertical gripper shoes The 3rd draw-in groove 20 coordinated bottom 9, the width of the 3rd draw-in groove 20 and the width of single vertical gripper shoe 9 Twice corresponding.
Structure 2: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that the main splice of even numbered blocks second 1.2, the second main splice 1.2 include main splice top Plate 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main splice The bottom center of the vertical gripper shoe 9 of 1.2 sides has current via 10, has current via 10 Vertically gripper shoe 9 fits;Main splice top board 8 is arch sheet or flat board.Headwall component 2 includes Polylith splicing end plate 2.1, the splicing end plate 2.1 of reservoir rear body connects water inlet pipe 5, anterior spelling Connect end plate 2.1 and connect outlet pipe 6;Lower member 3 is the water storage base 3.2 of a cuboid-type, including Base plate 14 and the four pieces of base side plates 16 fixed around base plate 14 peripheral surface, base The bottom surface of side plate 16 is concordant with the bottom surface of base plate 14, and the height of base side plate 16 is more than base The thickness of base plate 14;The water inlet of water collecting pump hole seat 4 is opened on base plate 14, water storage base Before and after 3.2, the top of the base side plate 16 of both sides has and joins bottom the splicing end plate 2.1 of headwall component 2 The first draw-in groove 17 closed, the top of the base side plate 16 of water storage base 3.2 left and right sides has and main structure The second draw-in groove 18 that the vertical gripper shoe 9 of part 1 coordinates, the width of the second draw-in groove 18 props up with single vertical The width of fagging 9 is corresponding.Base plate 14 is provided with fixed block 19 the most along its length, The top of fixed block 19 has and the 3rd draw-in groove 20 coordinated bottom two pieces of vertical gripper shoes 9, the 3rd card The width of groove 20 is corresponding with the twice of the width of single vertical gripper shoe 9.Base plate 14 basis Need to be provided with multiple fixed block 19, before and after base plate 14 between two pieces of adjacent fixed blocks 19 Gap is corresponding with the current via 10 bottom vertical gripper shoe 9.
Structure 3: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that at least one piece of first main splice 1.1, described first main splice 1.1 include main spelling Fitting top board 8, the left and right sides end face of described main splice top board 8 connects vertical gripper shoe 9, institute State main member 1 and also include that the main splice of even numbered blocks second 1.2, the second main splice 1.2 include main splicing Part top board 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main spelling The bottom center of the vertical gripper shoe 9 of fitting 1.2 side has current via 10, has current via The vertical gripper shoe 9 of 10 fits;Main splice top board 8 is arch sheet or flat board.Headwall component 2 Splicing end plate 2.1 including polylith, the splicing end plate 2.1 of reservoir rear body connects water inlet pipe 5, anterior Splicing end plate 2.1 connect outlet pipe 6;Lower member 3 is the water storage base 3.2 of a cuboid-type, Including base plate 14 and around the fixing four pieces of base side plates 16 of base plate 14 peripheral surface, The bottom surface of base side plate 16 is concordant with the bottom surface of base plate 14, and the height of base side plate 16 is more than The thickness of base plate 14;The water inlet of water collecting pump hole seat 4 is opened on base plate 14, water storage Before and after base 3.2, the top of the base side plate 16 of both sides has the splicing end plate 2.1 with headwall component 2 The first draw-in groove 17 that bottom coordinates, the top of the base side plate 16 of water storage base 3.2 left and right sides has The second draw-in groove 18 coordinated with the vertical gripper shoe 9 of main member 1, the width of the second draw-in groove 18 is with single Vertically the width of gripper shoe 9 is corresponding.Base plate 14 is provided with fixing the most along its length Block 19, the top of fixed block 19 has and the 3rd draw-in groove 20 coordinated bottom two pieces of vertical gripper shoes 9, The width of the 3rd draw-in groove 20 is corresponding with the twice of the width of single vertical gripper shoe 9.Base plate 14 Be provided with multiple fixed block 19 as required, before and after base plate 14 two pieces of adjacent fixed blocks 19 it Between gap corresponding with the current via 10 bottom vertical gripper shoe 9.
Structure 4: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes that the main splice of even numbered blocks second 1.2, the second main splice 1.2 include main splice top Plate 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main splice The bottom center of the vertical gripper shoe 9 of 1.2 sides has current via 10;Main member 1 also includes the 3rd Main splice 1.3, the 3rd main splice 1.3 includes main splice top board 8, main splice top board 8 Left and right sides end face connects vertical gripper shoe 9, the vertical gripper shoe 9 of the 3rd main splice 1.3 both sides Bottom center all have current via 10;The each piece of vertical gripper shoe 9 with current via 10 is equal The vertical gripper shoe 9 with another block with current via 10 fits;Main splice top board 8 is arch Plate or flat board.Headwall component 2 includes that polylith splices end plate 2.1, the splicing end plate 2.1 of reservoir rear body Connecting water inlet pipe 5, anterior splicing end plate 2.1 connects outlet pipe 6;Lower member 3 is a cuboid The water storage base 3.2 of type, including base plate 14 and fixing around base plate 14 peripheral surface Four pieces of base side plates 16, the bottom surface of base side plate 16 is concordant with the bottom surface of base plate 14, and base The height of side plate 16 is more than the thickness of base plate 14;The water inlet of water collecting pump hole seat 4 is opened in the end On seat bottom plate 14, before and after water storage base 3.2, the top of the base side plate 16 of both sides has and headwall component The first draw-in groove 17 coordinated bottom the splicing end plate 2.1 of 2, the base side of water storage base 3.2 left and right sides The top of plate 16 has the second draw-in groove 18 that the vertical gripper shoe 9 with main member 1 coordinates, the second draw-in groove The width of 18 is corresponding with the width of single vertical gripper shoe 9.Base plate 14 is long along it as required Degree direction is provided with fixed block 19, and the top of fixed block 19 has and coordinates bottom two pieces of vertical gripper shoes 9 The 3rd draw-in groove 20, the width of the 3rd draw-in groove 20 is relative with the twice of the width of single vertical gripper shoe 9 Should.Base plate 14 is provided with multiple fixed block 19 as required, two pieces of phases before and after base plate 14 The adjacent gap between fixed block 19 is corresponding with the current via 10 bottom vertical gripper shoe 9.
Structure 5: include middle part for water stream channel main member 1 with coordinates bottom main member 1 fix Lower member 3, and with main member 1 before and after both side surface laminating fixing, and bottom and lower member Before and after 3, both sides coordinate fixing headwall component 2;Main member 1, lower member 3 and headwall component 2 Surround the reservoir body of a closing, connect with water collecting pump hole seat 4 bottom the rear end of lower member 3, collection The water inlet of pump sump seat 4 connects with the water stream channel of main member 1, the end of both sides before and after reservoir body Wall member 2 connects water inlet pipe 5 and outlet pipe 6 respectively;The top of main member 1 is provided with inspection well casing 7. Main member 1 includes at least one piece of first main splice 1.1, the main splice of even numbered blocks second 1.2 and at least One piece of the 3rd main splice 1.3, the first main splice 1.1 includes main splice top board 8, main splice The left and right sides end face of top board 8 connects has vertical gripper shoe 9, the second main splice 1.2 to include main splicing Part top board 8, the left and right sides end face of main splice top board 8 connects vertical gripper shoe 9, the second main spelling The bottom center of the vertical gripper shoe 9 of fitting 1.2 side has current via 10;3rd main splice 1.3 include main splice top board 8, and the left and right sides end face of main splice top board 8 connects vertically support Plate 9, the bottom center of the vertical gripper shoe 9 of the 3rd main splice 1.3 both sides all has current via 10; The each piece of vertical gripper shoe 9 with current via 10 all has the perpendicular of current via 10 with another block Allotment fagging 9 fits;Main splice top board 8 is arch sheet or flat board.Headwall component 2 includes many Block splicing end plate 2.1, the splicing end plate 2.1 of reservoir rear body connects water inlet pipe 5, anterior splicing End plate 2.1 connects outlet pipe 6;Lower member 3 is the water storage base 3.2 of a cuboid-type, the end of including Seat bottom plate 14 and the four pieces of base side plates 16 fixed around base plate 14 peripheral surface, base side The bottom surface of plate 16 is concordant with the bottom surface of base plate 14, and the height of base side plate 16 is more than at the bottom of base The thickness of plate 14;The water inlet of water collecting pump hole seat 4 is opened on base plate 14, water storage base 3.2 Front and back the top of the base side plate 16 of both sides has and coordinates bottom the splicing end plate 2.1 of headwall component 2 The first draw-in groove 17, the top of the base side plate 16 of water storage base 3.2 left and right sides has and main member The second draw-in groove 18 that the vertical gripper shoe 9 of 1 coordinates, the width of the second draw-in groove 18 supports with single vertical The width of plate 9 is corresponding.Base plate 14 is provided with fixed block 19 the most along its length, Gu The top determining block 19 has and the 3rd draw-in groove 20 coordinated bottom two pieces of vertical gripper shoes 9, the 3rd draw-in groove The width of 20 is corresponding with the twice of the width of single vertical gripper shoe 9.Base plate 14 is as required It is provided with multiple fixed block 19, gap between two pieces of adjacent fixed blocks 19 before and after base plate 14 Corresponding with the current via 10 bottom vertical gripper shoe 9.
For convenience of the maintenance of inspection well casing 7 in this utility model, also it is provided with on splicing end plate 2.1 and climbs Ladder 15.During rainfall, the cleaning rainwater after filtration treatment is collected and is stored in reservoir.Work as needs Time, can by the cleaning rainwater in reservoir by immersible pump 21 extract out carry out various reuse, as afforestation, Road sprays, flushes the toilet etc..As shown in Figure 16 18, reservoir can be spliced into different knots according to environment Configuration formula, with satisfied construction needs.Water storage base 3.2 or pour base plate 3.1 and all can process at the scene Become, main splice and splicing end plate 2.1 are made as standard component and i.e. may be implemented under various varying environment Quick assembling.Main splice, splicing end plate 2.1 are precast concrete, water storage base 3.2 and watering Build base plate 3.1 for concrete cast in situs part.
When the inflow of rainwater exceedes the water-retention volume of reservoir, can be by high-order drain pipe by unnecessary Water yield overflow discharge, will not contaminant water environment to natural water or city planting ductwork.
The above, be only preferred embodiment of the present utility model, not to of the present utility model Structure does any pro forma restriction.Every according to technical spirit of the present utility model to above example Any simple modification, equivalent variations and the modification made, all still falls within the technical solution of the utility model In the range of.

Claims (10)

1. a spliced reservoir structure, it is characterised in that: it includes the middle part main structure for water stream channel Part (1) and main member (1) bottom coordinates the lower member (3) fixed, and with main member (1) Before and after both side surface laminating fixing, and bottom coordinates with both sides before and after lower member (3) and fixes Headwall component (2);Described main member (1), lower member (3) and headwall component (2) surround one The reservoir body closed, connects with water collecting pump hole seat (4) bottom the rear end of described lower member (3), The water inlet of described water collecting pump hole seat (4) connects with the water stream channel of main member (1), described reservoir Before and after body, the headwall component (2) of both sides connects water inlet pipe (5) and outlet pipe (6) respectively;Described The top of main member (1) is provided with inspection well casing (7).
Spliced reservoir structure the most as claimed in claim 1, it is characterised in that: described main member (1) Including at least one water stream channel, do not connect between described water stream channel;Described main member (1) wraps Include the first main splice (1.1) that the laminating of multiple head and the tail is fixing, described first main splice (1.1) bag Including main splice top board (8), the left and right sides end face of described main splice top board (8) connects to be had vertically Gripper shoe (9), the first main splice (1.1) constituted structure that the laminating of the plurality of head and the tail is fixing Central space is single water stream channel;Described main splice top board (8) is arch sheet or flat board.
Spliced reservoir structure the most as claimed in claim 1, it is characterised in that: described main member (1) Including a plurality of water stream channel, at least two water stream channels are interconnected;Described main member (1) includes The main splice that polylith head and the tail laminating is fixing, the described polylith main splice that laminating is fixing from beginning to end is constituted The central space of structure is single water stream channel, and described main splice includes the main splice of even numbered blocks second (1.2), described second main splice (1.2) includes main splice top board (8), described main splice The left and right sides end face of top board (8) connects vertical gripper shoe (9), described second main splice (1.2) The bottom center of the vertical gripper shoe (9) of side has current via (10), and each piece has current The vertical gripper shoe (9) of via (10) all has the vertical support of current via (10) with another block Plate (9) fits;Described main splice top board (8) is arch sheet or flat board.
Spliced reservoir structure the most as claimed in claim 3, it is characterised in that: described main splice Also include that the 3rd main splice (1.3), described 3rd main splice (1.3) include main splice top board (8), the left and right sides end face of described main splice top board (8) connects vertical gripper shoe (9), institute The bottom center of the vertical gripper shoe (9) stating the 3rd main splice (1.3) both sides all has current via (10)。
5. the spliced reservoir structure as described in claim 3 or 4, it is characterised in that: described main spelling Fitting also includes that at least one piece of first main splice (1.1), described first main splice (1.1) include Main splice top board (8), the left and right sides end face of described main splice top board (8) connects vertical Fagging (9).
Spliced reservoir structure the most as claimed in claim 1, it is characterised in that: described headwall component (2) including polylith splicing end plate (2.1), the splicing end plate (2.1) of described reservoir rear body connects Water inlet pipe (5), anterior splicing end plate (2.1) connects outlet pipe (6);
Described lower member (3) for pouring base plate (3.1), described in pour the left and right two of base plate (3.1) Vertical gripper shoe (9) bottom that side has with main member (1) coordinates fixing the first groove (11), The width of described first groove (11) is corresponding with the width of single vertical gripper shoe (9), described in water Build splicing end plate (2.1) bottom that both sides before and after base plate (3.1) have with headwall component (2) to join The second groove (12) closed, the water inlet of described water collecting pump hole seat (4) is opened in and pours base plate (3.1) On.
Spliced reservoir structure the most as claimed in claim 6, it is characterised in that pour base plate described in: (3.1) middle part has the 3rd groove (13) coordinated with two pieces of vertical gripper shoe (9) bottoms, institute The width stating the 3rd groove (13) is corresponding with the twice of the width of single vertical gripper shoe (9).
Spliced reservoir structure the most as claimed in claim 1, it is characterised in that: described headwall component (2) including polylith splicing end plate (2.1), the splicing end plate (2.1) of described reservoir rear body connects Water inlet pipe (5), anterior splicing end plate (2.1) connects outlet pipe (6);
Described lower member (3) is the water storage base (3.2) of a cuboid-type, including base plate (14) And around the fixing four pieces of base side plates (16) of base plate (14) peripheral surface, described base side The bottom surface of plate (16) is concordant with the bottom surface of base plate (14), and the height of base side plate (16) Thickness more than base plate (14);The water inlet of described water collecting pump hole seat (4) is opened at the bottom of base On plate (14), before and after described water storage base (3.2), the top of the base side plate (16) of both sides has The first draw-in groove (17) coordinated with splicing end plate (2.1) bottom of headwall component (2), described water storage The top of the base side plate (16) of base (3.2) left and right sides has vertical with main member (1) The second draw-in groove (18) that fagging (9) coordinates, the width of described second draw-in groove (18) and single vertical The width of gripper shoe (9) is corresponding.
Spliced reservoir structure the most as claimed in claim 8, it is characterised in that: described base plate (14) being provided with fixed block (19) along its length, the top of described fixed block (19) has and two The 3rd draw-in groove (20) that the vertical gripper shoe of block (9) bottom coordinates, the width of described 3rd draw-in groove (20) Spend corresponding with the twice of the width of single vertical gripper shoe (9).
Spliced reservoir structure the most as claimed in claim 9, it is characterised in that: at the bottom of described base Plate (14) is provided with multiple fixed block (19), before and after described base plate (14) two pieces adjacent Gap between fixed block (19) is corresponding with the current via (10) of vertical gripper shoe (9) bottom.
CN201620059192.8U 2016-01-21 2016-01-21 Concatenation formula reservoir structure Expired - Fee Related CN205530645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620059192.8U CN205530645U (en) 2016-01-21 2016-01-21 Concatenation formula reservoir structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620059192.8U CN205530645U (en) 2016-01-21 2016-01-21 Concatenation formula reservoir structure

Publications (1)

Publication Number Publication Date
CN205530645U true CN205530645U (en) 2016-08-31

Family

ID=56766411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620059192.8U Expired - Fee Related CN205530645U (en) 2016-01-21 2016-01-21 Concatenation formula reservoir structure

Country Status (1)

Country Link
CN (1) CN205530645U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696698A (en) * 2016-01-21 2016-06-22 武汉美华禹水环境有限公司 Spliced-type storage tank structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696698A (en) * 2016-01-21 2016-06-22 武汉美华禹水环境有限公司 Spliced-type storage tank structure

Similar Documents

Publication Publication Date Title
CN205502208U (en) Drainage well that hollow brick is piled up
CA2589582A1 (en) Pre-cast drive-down water separation pit system
CN108978455A (en) One kind builds a bridge discharge structure
CN205530645U (en) Concatenation formula reservoir structure
CN205369512U (en) Concatenation formula infiltration detention pond structure
CN105696698A (en) Spliced-type storage tank structure
CN205369513U (en) Non - infiltration detention pond structure of concatenation formula
CN211421240U (en) Siphon type rainwater collection and drainage tank applied to sponge city
CN204040103U (en) To catchment module
CN216641180U (en) Reinforced seepage and drainage collecting pipe
CN205475651U (en) Non - infiltration detention pond of rising to a height shape cast member
CN105064488A (en) Kerb drainage system and kerb drainage method for transformer substation
CN213295934U (en) Sponge city permeable roadbed capable of quickly discharging accumulated water
CN211571261U (en) Garden road structure
CN211312549U (en) Slope greening drainage structure
CN206902893U (en) A kind of inlet for stom water
CN217678439U (en) Waterproof pavement that permeates water of landscape
CN206599773U (en) A kind of grid prevented erosion
CN212103537U (en) Town road paves road surface structure that permeates water
CN206512827U (en) The permeable canal of combined type
CN205369392U (en) Rectangle frame cast member reservoir
RU2200786C1 (en) Surface storm-water channel member
CN214169392U (en) Cleanable filtering device
CN212742812U (en) Drainage tank for tunnel construction project
CN202610897U (en) Side drainage embedded part for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20220121