CN205527318U - Hanger tooling - Google Patents
Hanger tooling Download PDFInfo
- Publication number
- CN205527318U CN205527318U CN201620135123.0U CN201620135123U CN205527318U CN 205527318 U CN205527318 U CN 205527318U CN 201620135123 U CN201620135123 U CN 201620135123U CN 205527318 U CN205527318 U CN 205527318U
- Authority
- CN
- China
- Prior art keywords
- suspension hook
- lifting
- suspension
- hook
- gib head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000725 suspension Substances 0.000 claims description 142
- 238000000034 method Methods 0.000 description 3
- 239000004677 Nylon Substances 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a hanger tooling, including the gallows, articulated being equipped with along two at least lifting hooks of horizontal circumference direction equipartition on the gallows, each lifting hook has respectively and is used for the hook to treat the gib head of hoist and mount, the articulated the central axis of each lifting hook with radial perpendicular so that each lifting hook of horizontal circumference all can be followed horizontal circumference radial swinging, each lifting hook have on respective swing stroke to be made corresponding gib head and treats hoist and mount a hook complex hoist and mount station and a dismantlement station that makes corresponding gib head with treat that the hoist and mount piece breaks away from, hanger tooling still will correspond on being used for corresponding lifting hook swing orientation when each lifting hook is in the hoist and mount station lifting hook with gallows relatively fixed assembly removable location structure together. Through making the lifting hook swing of articulated assembly on the gallows be in the hoist and mount station and dismantle the station, realize hanger tooling and treat installing and removing of hoist and mount, easy operation is convenient, and the dismouting is efficient.
Description
Technical field
This utility model relates to a kind of lifting tooling.
Background technology
Chopper is built-in timing in workshop, mostly it is that suspension ring are installed on-board the circuit breaker, then by rope, suspension ring are suspended on suspension hook, or tie up overlap joint after being directly wound around a few circle on-board the circuit breaker with nylon lifting rope to hang over and lift on suspension hook, two kinds of lifting modes the most easily make chopper run-off the straight, rock, assembling becomes difficulty, the most dangerous.
Authorization Notice No. be CN201390592Y Chinese utility model patent in disclose a kind of Special lifting tool for circuit breaker, it includes link, the position of link two ends correspondence chopper one pole disconnect switch patch panel installing hole offers connection open-work, in connecting open-work, it is coated with the bolt for connecting chopper one pole disconnect switch, link is additionally provided with suspension ring.During use, by being installed on together with the patch panel of link with chopper disconnect switch is securely fitted in by the bolt connected in open-work, then lift by crane with loop wheel machine, in lifting transport process, one pole disconnect switch is in plumbness all the time, and amplitude of fluctuation is little, is difficult to thread off.
But this suspender there is also problem when specifically used, on the one hand bolt is utilized to be linked together by the patch panel that link and single-pole circuit breaker switch, in hoisting process, patch panel stress, easily cause patch panel damage, on the other hand, when using bolt to realize link with single-pole circuit breaker switch, installation and removal process is the most relatively complicated, and transhipment lifting work is inefficient.
Summary of the invention
This utility model provides a kind of lifting tooling, to solve to use bolt to realize the technical problem that the link of suspender is relatively complicated with mounting or dismounting during the fixing assembling of the patch panel of chopper single-pole switch in prior art.
The technical scheme of lifting tooling provided by the utility model is: a kind of lifting tooling, including suspension bracket, on suspension bracket, hinge mounted has along the uniform at least two suspension hook of horizontal circle circumferential direction, each suspension hook is respectively provided with the gib head treating lifting part for hook, the hinged central axis of each suspension hook is the most vertical so that each suspension hook all can radially wobble along described horizontal circumference with described horizontal circumference, each suspension hook has on respective oscillating stroke to be made corresponding gib head and treats lifting station that lifting part hook coordinates and make corresponding gib head and the dismounting station treated lifting part and depart from, lifting tooling also includes for corresponding suspension hook being relatively fixed the removable location structure being assembled together with described suspension bracket when each suspension hook is in lifting station on corresponding suspension hook swaying direction.
The first pin-and-hole of the hinged central axis side being offset to corresponding suspension hook along the vertical direction it is respectively equipped with on described each suspension hook, being provided with on suspension bracket and the first corresponding the second through pin-and-hole of pin-and-hole, described removable location structure is to be relatively fixed the alignment pin of assembling realizing suspension hook and suspension bracket in corresponding second pin-and-hole of removable the first pin-and-hole being assemblied in each suspension hook and suspension bracket.
The centrage of described the first pin-and-hole on each suspension hook is parallel with the hinged central axis of corresponding suspension hook.
On described suspension bracket, corresponding each suspension hook is respectively equipped with two arms downwardly extended parallel, each suspension hook lays respectively between two arms of correspondence, each suspension hook, respectively by being installed on the jointed shaft hinge mounted on corresponding two arms on suspension bracket, each suspension hook and two corresponding arms is respectively equipped with the hinge hole of correspondence.
The described jointed shaft on each suspension hook is respectively provided with the changeover portion outside the hinge hole being exposed at corresponding suspension hook and corresponding two arms, corresponding two arms of jointed shaft on each suspension hook are respectively provided with a described changeover portion, being respectively installed with positioning sleeve outside two changeover portions, the top of the two ends of each positioning sleeve correspondence respectively is pressed on the arm of suspension hook and respective side.
Described suspension bracket includes horizontally extending crossbeam, and at two arms being respectively arranged at the two ends with a described suspension hook and correspondence of crossbeam, each arm is fixedly connected with crossbeam respective end.
The gib head of described each suspension hook is respectively provided with the pressing face, top coordinated for top corresponding to the corresponding site treating lifting part press-fit with the hook realizing corresponding gib head with treat lifting part.
Be respectively provided with on the pressing face, top of the gib head of described each suspension hook dodge treat on lifting part with had on the corresponding site of top pressing face corresponding top press-fit protruding dodge groove.
The center position of described suspension bracket is installed with suspension ring.
The beneficial effects of the utility model are: lifting tooling provided by the utility model is in use, when suspension hook is rocked to lifting station, suspension hook with treat that lifting part hook coordinates, and by removable location structure suspension hook is relatively fixed with suspension bracket and to be assembled together, avoid the occurrence of unexpected automatically-unhooked problem, and when suspension hook is rocked to dismantle station, suspension hook departs from band lifting part.In lifting tooling provided by the utility model, being in lifting station and dismounting station by making hinge mounted suspension hook on suspension bracket swing, it is achieved lifting tooling and the mounting or dismounting treating lifting part, simple to operation, dismounting efficiency is high.
Further, removable location structure uses alignment pin, so, it is rocked to lifting station with when coordinating until lifting part hook, to be inserted by alignment pin in the first pin-and-hole of suspension hook and the second pin-and-hole of suspension bracket, it is achieved suspension hook is relatively fixed assembling with suspension bracket at suspension hook, simple in construction, is convenient to mount and dismount.
Further, each suspension hook lays respectively between two arms of suspension bracket, it is simple to arrange that jointed shaft is to realize the hinge mounted of suspension hook and suspension bracket.
Further, positioning sleeve is set to realize the axial location to suspension hook on jointed shaft is axial.
Further, the gib head of each suspension hook is respectively provided with pressing face, top, in order to top corresponding to the corresponding site treating lifting part press-fit coordinates with the hook realizing corresponding gib head with treat lifting part in use, and hook is the most steady.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of lifting tooling provided by the utility model;
Fig. 2 is the left side schematic diagram of lifting tooling shown in Fig. 1;
Fig. 3 is the structural representation when gib head is in lifting station of the lifting tooling shown in Fig. 1;
Fig. 4 is the structural representation when gib head is in dismounting station of the lifting tooling shown in Fig. 1;
Fig. 5 is the structural representation of breaker body to be lifted.
Detailed description of the invention
As shown in Figures 1 to 4, a kind of embodiment of lifting tooling, lifting tooling in this embodiment includes suspension bracket 1, the center position of suspension bracket is installed with suspension ring 6, suspension bracket 1 herein includes horizontally extending crossbeam, the two ends of crossbeam are respectively articulated with and are equipped with a suspension hook 2, the hinged central axis of each suspension hook 2 is the most vertical so that each suspension hook 2 all can radially wobble along horizontal circumference with horizontal circumference, each suspension hook 2 has on respective oscillating stroke to be made corresponding gib head 20 and treats lifting station that lifting part hook coordinates and make corresponding gib head 20 and the dismounting station treating that lifting part departs from, in the present embodiment, lifting tooling also includes for corresponding suspension hook being relatively fixed the removable location structure being assembled together with described suspension bracket when each suspension hook is in lifting station on corresponding suspension hook swaying direction.
In the present embodiment, two suspension hooks 2 are uniform in horizontal circle circumferential direction, the most specifically the two ends at crossbeam are respectively welded a boom arm sections 5, each boom arm sections all includes that two downwardly extend and two arms spaced apart parallel, between two arms being arranged in a boom arm sections 5 of each suspension hook 2 correspondence, each suspension hook respectively by jointed shaft 4 hinge mounted that is installed on corresponding two arms on suspension bracket 1, each suspension hook 2 and two corresponding arms are respectively equipped with the hinge hole of correspondence.
And, jointed shaft 4 on each suspension hook 2 is respectively provided with the changeover portion outside the hinge hole being exposed at corresponding suspension hook 2 and corresponding two arms, corresponding two arms of jointed shaft 4 on each suspension hook 2 are respectively provided with a changeover portion, being respectively installed with positioning sleeve 3 outside two changeover portions, the top of the two ends of each positioning sleeve 3 correspondence respectively is pressed on the arm of suspension hook 2 and respective side.
Specifically, each suspension hook 2 being respectively equipped with the first pin-and-hole 22 of the hinged central axis side being offset to corresponding suspension hook along the vertical direction, the centrage of the first pin-and-hole on each suspension hook is parallel with the hinged central axis of corresponding suspension hook.Suspension bracket 1 is provided with and the first corresponding the second through pin-and-hole 50 of pin-and-hole, second pin-and-hole 50 is specifically located on corresponding two arms, and above-mentioned removable location structure is particularly for the alignment pin 7 in corresponding second pin-and-hole of removable the first pin-and-hole being assemblied in each suspension hook and suspension bracket.
In the present embodiment, the gib head 20 of each suspension hook 2 is respectively provided with for top corresponding to the corresponding site treating lifting part press-fit to realize the pressing face, top 21 that corresponding gib head 20 coordinates with the hook treating lifting part.
The pressing face 21, top of the gib head of each suspension hook is respectively provided with dodge treat on lifting part with had on the corresponding site of top pressing face corresponding top press-fit protruding dodge groove 23.As shown in Figure 5, owing to breaker body to be lifted is provided with flange attachment bolt, on suspension hook gib head dodge groove 23 on gib head top the top press-fit corresponding with the flanged plate on breaker body of pressing face time dodge on breaker body flange attachment bolt.
As a example by the present embodiment lifting breaker body as shown in Figure 5, breaker body includes main body 300, at the flanged plate 100 of main body 300, Flange joint has patch panel 200, use lifting tooling lifting breaker body as shown in Figure 3, time specifically used, making the suspension hook 2 of lifting tooling be rocked to lifting station, the pressing face 21, top of the gib head 20 of suspension hook 2 coordinates with flanged plate 100 hook on breaker body, use alignment pin 7 that suspension hook 2 locking is fixed on lifting station, it is ensured that normally to lift.And when lifting puts in place, alignment pin is pulled down, and suspension hook 2 is rocked to dismantle station, make gib head and flanged plate be separated, thus realize fast assembling-disassembling.
In the present embodiment, suspension bracket includes crossbeam, and so, the only two ends at crossbeam are respectively articulated with suspension hook.In other embodiments, suspension bracket can also be annular suspension bracket, and now, suspension hook can be evenly equipped with more than three along horizontal circle circumferential direction.
In the present embodiment, removable location structure uses the alignment pin of plug, in other embodiments, the U-shaped keeper of plug can also be used, during use, when arm is positioned at lifting station, U-shaped keeper can be inserted into arm and suspension hook from side, thus arm and suspension hook be positioned and is assembled together.Removable location structure may be used without screw or bolt fastening structure, at this time, it may be necessary to arrange corresponding screw mounting hole on suspension hook and arm.
In the present embodiment, on suspension bracket, additionally welding is fixed with arm, certainly, in other embodiments, it is also possible to be fixed on suspension bracket by arm by the way of other fixing connected modes are such as bolt-connection.In other embodiments, arm can also be for the suspention section integrally downwardly extended on suspension bracket.
In the present embodiment, lifting tooling is used for lifting breaker body, and in other embodiments, lifting tooling can be used for lifting other parts.
Claims (9)
1. a lifting tooling, including suspension bracket, it is characterized in that: on suspension bracket, hinge mounted has along the uniform at least two suspension hook of horizontal circle circumferential direction, each suspension hook is respectively provided with the gib head treating lifting part for hook, the hinged central axis of each suspension hook is the most vertical so that each suspension hook all can radially wobble along described horizontal circumference with described horizontal circumference, each suspension hook has on respective oscillating stroke to be made corresponding gib head and treats lifting station that lifting part hook coordinates and make corresponding gib head and the dismounting station treated lifting part and depart from, lifting tooling also includes for corresponding suspension hook being relatively fixed the removable location structure being assembled together with described suspension bracket when each suspension hook is in lifting station on corresponding suspension hook swaying direction.
Lifting tooling the most according to claim 1, it is characterized in that: on described each suspension hook, be respectively equipped with the first pin-and-hole of the hinged central axis side being offset to corresponding suspension hook along the vertical direction, being provided with on suspension bracket and the first corresponding the second through pin-and-hole of pin-and-hole, described removable location structure is to be relatively fixed the alignment pin of assembling realizing suspension hook and suspension bracket in corresponding second pin-and-hole of removable the first pin-and-hole being assemblied in each suspension hook and suspension bracket.
Lifting tooling the most according to claim 2, it is characterised in that: the centrage of described the first pin-and-hole on each suspension hook is parallel with the hinged central axis of corresponding suspension hook.
4. according to the lifting tooling described in claim 1 or 2 or 3, it is characterized in that: on described suspension bracket, corresponding each suspension hook is respectively equipped with two arms downwardly extended parallel, each suspension hook lays respectively between two arms of correspondence, each suspension hook, respectively by being installed on the jointed shaft hinge mounted on corresponding two arms on suspension bracket, each suspension hook and two corresponding arms is respectively equipped with the hinge hole of correspondence.
Lifting tooling the most according to claim 4, it is characterized in that: the described jointed shaft on each suspension hook is respectively provided with the changeover portion outside the hinge hole being exposed at corresponding suspension hook and corresponding two arms, corresponding two arms of jointed shaft on each suspension hook are respectively provided with a described changeover portion, being respectively installed with positioning sleeve outside two changeover portions, the top of the two ends of each positioning sleeve correspondence respectively is pressed on the arm of suspension hook and respective side.
Lifting tooling the most according to claim 4, it is characterised in that: described suspension bracket includes horizontally extending crossbeam, and at two arms being respectively arranged at the two ends with a described suspension hook and correspondence of crossbeam, each arm is fixedly connected with crossbeam respective end.
7. according to the lifting tooling described in claim 1 or 2 or 3, it is characterised in that: the gib head of described each suspension hook is respectively provided with the pressing face, top coordinated for top corresponding to the corresponding site treating lifting part press-fit with the hook realizing corresponding gib head with treat lifting part.
Lifting tooling the most according to claim 7, it is characterised in that: be respectively provided with on the pressing face, top of the gib head of described each suspension hook dodge treat on lifting part with had on the corresponding site of top pressing face corresponding top press-fit protruding dodge groove.
9. according to the lifting tooling described in claim 1 or 2 or 3, it is characterised in that: the center position of described suspension bracket is installed with suspension ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620135123.0U CN205527318U (en) | 2016-02-23 | 2016-02-23 | Hanger tooling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620135123.0U CN205527318U (en) | 2016-02-23 | 2016-02-23 | Hanger tooling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205527318U true CN205527318U (en) | 2016-08-31 |
Family
ID=56778943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620135123.0U Active CN205527318U (en) | 2016-02-23 | 2016-02-23 | Hanger tooling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205527318U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106586817A (en) * | 2017-02-14 | 2017-04-26 | 北京新能正源环境科技有限公司 | Lifting clamp used for arch frame, grip mechanism and arch frame trolley |
CN107585713A (en) * | 2017-07-26 | 2018-01-16 | 葫芦岛天力工业有限公司 | Suspension hook deflecting suspender |
CN107804789A (en) * | 2017-10-23 | 2018-03-16 | 齐齐哈尔雷昂重工机械制造有限责任公司 | Hoisting gripping member frock |
CN108439189A (en) * | 2018-04-28 | 2018-08-24 | 安徽安凯汽车股份有限公司 | A kind of tooling for the lifting of integral new-energy passenger high-tension battery |
CN108516455A (en) * | 2018-04-26 | 2018-09-11 | 张家港凯斯机械有限公司 | A kind of safety hook for Steel plate hoisting implement |
CN110202500A (en) * | 2019-05-31 | 2019-09-06 | 苏州江南嘉捷电梯有限公司 | The fast-positioning device that escalator side plate closes up |
CN113562618A (en) * | 2020-04-28 | 2021-10-29 | 中国航发商用航空发动机有限责任公司 | Turbine disc leveling lifting appliance, lifting appliance switching section thereof and turbine disc leveling method |
-
2016
- 2016-02-23 CN CN201620135123.0U patent/CN205527318U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106586817A (en) * | 2017-02-14 | 2017-04-26 | 北京新能正源环境科技有限公司 | Lifting clamp used for arch frame, grip mechanism and arch frame trolley |
CN107585713A (en) * | 2017-07-26 | 2018-01-16 | 葫芦岛天力工业有限公司 | Suspension hook deflecting suspender |
CN107804789A (en) * | 2017-10-23 | 2018-03-16 | 齐齐哈尔雷昂重工机械制造有限责任公司 | Hoisting gripping member frock |
CN108516455A (en) * | 2018-04-26 | 2018-09-11 | 张家港凯斯机械有限公司 | A kind of safety hook for Steel plate hoisting implement |
CN108439189A (en) * | 2018-04-28 | 2018-08-24 | 安徽安凯汽车股份有限公司 | A kind of tooling for the lifting of integral new-energy passenger high-tension battery |
CN110202500A (en) * | 2019-05-31 | 2019-09-06 | 苏州江南嘉捷电梯有限公司 | The fast-positioning device that escalator side plate closes up |
CN113562618A (en) * | 2020-04-28 | 2021-10-29 | 中国航发商用航空发动机有限责任公司 | Turbine disc leveling lifting appliance, lifting appliance switching section thereof and turbine disc leveling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205527318U (en) | Hanger tooling | |
CN204529100U (en) | A kind of skeleton symbol three-jaw lifting machine arm frock | |
CN204917666U (en) | Engine test -run a machine connection pad hoist | |
CN204179605U (en) | A kind of cable clip | |
CN116216493A (en) | Negative ring pipe piece hoisting and dismantling assembly and dismantling method | |
CN210065018U (en) | Rotatory davit device of synthetic insulator chain hangs in pair L type | |
CN209635714U (en) | A kind of suspender clamping axial workpiece | |
CN212127273U (en) | Hoisting accessory of large-scale cylindric spare part | |
CN203428743U (en) | Hoisting device of non-road driving engineering machine | |
CN211393541U (en) | Universal adjustable lifting appliance | |
CN219009751U (en) | Large cylinder head turnover device of diesel engine | |
CN205855778U (en) | A kind of suspender of Diesel engine machinery injection pump | |
CN210944609U (en) | Quick installation device of platform | |
CN220351564U (en) | Novel pulling plate dismounting structure | |
CN215666557U (en) | Device for replacing hanging cable of lifting appliance | |
CN213231328U (en) | Portable portable high altitude construction accessory hoisting machine constructs | |
CN217076738U (en) | Hoisting device capable of assisting in centering of hoisting piece | |
CN204416912U (en) | Two claw suspenders of component location guide cylindricality laminated spare parts | |
CN210286486U (en) | Novel horizontal lifting appliance for H-shaped steel | |
CN215854594U (en) | Hoisting device and hoisting system | |
CN210944589U (en) | Self-detaching attachment mechanism | |
CN215645831U (en) | Gas tank hoisting accessory | |
CN204022254U (en) | During crawler crane transferring other spots, caterpillar block carries hang device | |
CN215946493U (en) | Lifting appliance for lifting pipe of crown block | |
CN220769428U (en) | Pulley device for connecting rod sleeve ring of pumping unit and pumping unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |