CN205476472U - Building template - Google Patents

Building template Download PDF

Info

Publication number
CN205476472U
CN205476472U CN201620039947.8U CN201620039947U CN205476472U CN 205476472 U CN205476472 U CN 205476472U CN 201620039947 U CN201620039947 U CN 201620039947U CN 205476472 U CN205476472 U CN 205476472U
Authority
CN
China
Prior art keywords
channel
pull bar
section steel
base plate
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620039947.8U
Other languages
Chinese (zh)
Inventor
陈臻颖
严兆滔
汤少斌
余伟健
胡景文
陈煜文
李建勇
陈裕钧
林凡
聂秀娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Di-Er Construction & Engineering Co Ltd
Original Assignee
Guangzhou Di-Er Construction & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Di-Er Construction & Engineering Co Ltd filed Critical Guangzhou Di-Er Construction & Engineering Co Ltd
Priority to CN201620039947.8U priority Critical patent/CN205476472U/en
Application granted granted Critical
Publication of CN205476472U publication Critical patent/CN205476472U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a building template, including prefabricated pouring template and at least a pair of channel -section steel, prefabricated pouring template includes the bottom plate and sets up at least one pull rod on the bottom plate, bottom plate and pull rod mutually perpendicular, whenever, set up back -to -back the channel -section steel, every to the channel -section steel with all reserve the interval between concrete slab's the bottom plate, the pull rod passes between the channel -section steel that sets up back -to -back. The utility model provides a building template conveniently carries out narrow space reservation hole template and sets up the construction to can guarantee the concrete quality behind the construction operation, effectively solve the workman and carry out the template set up produced problem in the high narrow space less than a meter.

Description

A kind of building form
Technical field
This utility model relates to a kind of building form.
Background technology
In construction, some holes are needed to carry out vertical transport goods, if being no longer necessary to vertical transport goods, then need to reclose these holes, for some holes, need to use form bracing system to construct, to be supported at hole, common templates support system can be implemented to be to need certain working space, and want that template can remain material effectively and carry out reclaiming cleaning.For the height hole less than 1 meter, operating personnel cannot carry out template and set up in entering, then need to use a kind of novel pre-cast building template to set up system and carry out setting up casting concrete.
Utility model content
Based on above not enough, the technical problems to be solved in the utility model is to provide a kind of building form, conveniently carry out narrow space hole to be provided template erection construction, and can guarantee that the concrete quality after construction operation, effectively solve workman and in the height narrow space less than a meter, carry out template set up produced problem.
In order to solve above technical problem, this utility model have employed techniques below scheme:
A kind of building form, including prefabricated cast template and at least one pair of channel-section steel, described prefabricated cast template includes base plate and at least one pull bar being arranged on described base plate, described base plate and pull bar are mutually perpendicular to, the described back-to-back setting of every pair of channel-section steel, all reserving spacing between described every pair of channel-section steel and the base plate of described concrete slab, described pull bar is through the channel-section steel of described back-to-back setting.
Described base plate includes double layer bar and steel plate, and described Plate Welding is on the end muscle of described double layer bar, and described pull bar is welded on described steel plate.
Concrete is poured into a mould between the double layer bar of described base plate.
Described base plate is steel plate, described steel plate is offered porose, and described pull bar is through described hole and stretches out, and the part of the both sides that described pull bar is positioned at described steel plate is locked by nut;Or described base plate is steel plate, described steel plate is offered porose, described pull bar one end fixed installation plate, the other end stretches out from channel-section steel through the hole on steel plate, and pull bar is stretched out the part of channel-section steel and locked by nut.
Using above technical scheme, this utility model achieves techniques below effect:
(1) building form that this utility model provides, targetedly narrow mezzanine space can be carried out template to set up, convenient construction operation, and can guarantee that the concrete quality after construction operation, effectively solve workman and in the height narrow space less than a meter, carry out template set up produced problem.
Accompanying drawing explanation
Fig. 1 is the mounting structure figure of this utility model building form;
Fig. 2 is the structure chart of this utility model building form, and cast template is reinforced concrete structure;
Fig. 3 is the structure chart of this utility model building form, and cast template is steel construction;
Detailed description of the invention
This utility model provides a kind of building form erection method, for reserved opening carries out sealing construction.As shown in Figure 1-Figure 3, and as a example by 150mm thickness floor, when carrying out building form and setting up, comprise the following steps:
(1) prefabricated long 1900mm, wide 550mm, the cast template 1 of thick 50mm, described prefabricated cast template is embedded with pull bar 12;
(2) by channel-section steel 2 back-to-back across at reserved opening;
(3) by the pull bar 12 of prefabricated cast template through the back-to-back channel-section steel 2 set up, form a whole after fastening;Specifically, passed in the middle of two channel-section steels 2 by the pull bar on prefabricated cast template, regulate prefabricated cast template to the distance of channel-section steel until concrete floor to be poured reaches preset thickness, with nut 3, pull bar is locked with channel-section steel;
(4) on prefabricated cast template, casting concrete, to floor slab tops absolute altitude, makes concrete strength meet design form removal requirement;
(5) pull bar exposing floor is excised, remove channel-section steel.
Wherein, cast template can be reinforced concrete structure, it is also possible to for steel plate structure, see Fig. 2, and the making of the cast template of reinforced concrete structure specifically includes following steps:
(11) making bar-mat reinforcement 111, bar-mat reinforcement is double layer bar;
(12) steel plate 112 is welded on the face of end muscle of bar-mat reinforcement 111;
(13) being vertically welded in by pull bar 12 on described steel plate 112, for long 1900mm, wide 550mm, the armoured concrete slab of thick 50mm, need to preset 4 pull bars, pull bar is uniformly distributed;
(14) template is set around bar-mat reinforcement, casting concrete in template, form the prefabricated cast template of 50mm thickness.
Seeing Fig. 3, the making of the cast template of steel plate structure comprises the following steps:
(11) hole on steel plate 11;
(12) by pull bar 12 through described hole, with nut, the part that pull bar 12 is positioned at below steel plate 11 is tightened, then with nut, pull bar is positioned at the part above floor and tightens;Plate can also be fixedly mounted in pull bar 12 one end, then by pull bar 12 other end through the hole on steel plate, then with nut, pull bar is positioned at the part above channel-section steel and tighten.
As shown in Figure 1-Figure 3, this utility model additionally provides a kind of building form, it includes prefabricated cast template 1 and at least one pair of channel-section steel 2, prefabricated cast template 1 includes base plate 11 and at least one pull bar 12 being arranged on base plate 11, base plate 11 and pull bar 12 are mutually perpendicular to, every pair of channel-section steel 2 is arranged back-to-back, reserved spacing between every pair of channel-section steel 2 and the base plate 11 of prefabricated cast template 1, and pull bar 12 is through the channel-section steel of setting back-to-back.
Base plate 11 includes double layer bar 111 and steel plate 112, and steel plate 112 is welded on the end muscle of double layer bar 111, and pull bar 12 is welded on described steel plate 112.Concrete is poured into a mould between the double layer bar 111 of base plate 11.Seeing Fig. 3, base plate 11 can also be steel plate, described steel plate is offered porose, and described pull bar is through described hole and stretches out, and the part of the both sides that described pull bar is positioned at described steel plate is locked by nut;Can also fixedly mount plate in pull bar one end, the pull bar other end stretches out through the hole on steel plate, and pull bar is stretched out the part of channel-section steel and locked by nut.
Last it is noted that these are only preferred embodiment of the present utility model; it is not limited to this utility model; although this utility model being described in detail with reference to embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent; but it is all within spirit of the present utility model and principle; the any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (4)

1. a building form, it is characterized in that: include prefabricated cast template and at least one pair of channel-section steel, described prefabricated cast template includes base plate and at least one pull bar being arranged on described base plate, described base plate and pull bar are mutually perpendicular to, the described back-to-back setting of every pair of channel-section steel, all reserving spacing between the base plate of described every pair of channel-section steel and described prefabricated cast template, described pull bar is through the channel-section steel of described back-to-back setting.
Building form the most according to claim 1, it is characterised in that: described base plate includes double layer bar and steel plate, and described Plate Welding is on the end muscle of described double layer bar, and described pull bar is welded on described steel plate.
Building form the most according to claim 2, it is characterised in that: pour into a mould concrete between the double layer bar of described base plate.
Building form the most according to claim 1, it is characterised in that: described base plate is steel plate, described steel plate is offered porose, and described pull bar is through described hole and stretches out, and the part of the both sides that described pull bar is positioned at described steel plate is locked by nut;Or described base plate is steel plate, described steel plate is offered porose, described pull bar one end fixed installation plate, the other end stretches out from channel-section steel through the hole on steel plate, and pull bar is stretched out the part of channel-section steel and locked by nut.
CN201620039947.8U 2016-01-15 2016-01-15 Building template Withdrawn - After Issue CN205476472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620039947.8U CN205476472U (en) 2016-01-15 2016-01-15 Building template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620039947.8U CN205476472U (en) 2016-01-15 2016-01-15 Building template

Publications (1)

Publication Number Publication Date
CN205476472U true CN205476472U (en) 2016-08-17

Family

ID=56669408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620039947.8U Withdrawn - After Issue CN205476472U (en) 2016-01-15 2016-01-15 Building template

Country Status (1)

Country Link
CN (1) CN205476472U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672653A (en) * 2016-01-15 2016-06-15 广州市第二建筑工程有限公司 Method for erecting building formwork and building formwork

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672653A (en) * 2016-01-15 2016-06-15 广州市第二建筑工程有限公司 Method for erecting building formwork and building formwork

Similar Documents

Publication Publication Date Title
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN107268348B (en) Subway column check pit construction method
CN106049289B (en) Bailey beam make-shift bridge transform the construction method of steel reinforced concrete combination permanent bridge as
CN107053440B (en) A kind of precast plate girder pedestal production method
CN108729353A (en) A kind of General reinforced cage binding moulding bed
CN108818919A (en) Precast T-Beam reinforcing bar is bound in advance and the construction method of integral installation
CN106948598A (en) A kind of aluminum alloy formwork system and its construction method for variable cross-section rectangular column
CN212957628U (en) Template reinforced structure of concrete frame post
CN105649213B (en) A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting
CN109914783A (en) A kind of expansion joint shear wall formwork
CN102251481B (en) Railway pier layered construction method and construction device
CN205476472U (en) Building template
CN108086674A (en) A kind of roof boarding hangs the construction method of mould and roof boarding
CN105672653A (en) Method for erecting building formwork and building formwork
CN110424601B (en) Concrete pouring anti-floating device for composite floor slab with fabricated structure and implementation method
CN102767378B (en) Method for constructing distyle tunnel portal by framed bent
CN205557349U (en) Device is changed to jib
CN209976016U (en) Combined steel formwork keel support with steel bar protection layer support
CN111663668A (en) Construction method for supporting buried waterproof steel plate in post-cast strip
CN109736202A (en) Great cantilever bent cap Bracket method for construction method
CN207296399U (en) Continuous placing is molded overall assembled stair template system
CN215052265U (en) Reinforced concrete thin wall body reinforced structure
CN210738580U (en) Mould hanging device for hoisting hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160817

Effective date of abandoning: 20180112

AV01 Patent right actively abandoned