CN205475305U - Assembled board cable basis - Google Patents
Assembled board cable basis Download PDFInfo
- Publication number
- CN205475305U CN205475305U CN201620048942.1U CN201620048942U CN205475305U CN 205475305 U CN205475305 U CN 205475305U CN 201620048942 U CN201620048942 U CN 201620048942U CN 205475305 U CN205475305 U CN 205475305U
- Authority
- CN
- China
- Prior art keywords
- basis
- plate
- anchor
- upper plate
- force
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses an assembled board cable basis, including basic upper plate and basic hypoplastron, the underground is buryyed to the basis hypoplastron, the basis upper plate is fixed on the earth's surface, be connected with the anchor rope between basis upper plate and the basic hypoplastron, the upper end of basis upper plate is equipped with bears the billet, the lower extreme of basis hypoplastron is equipped with down and bears the billet, the one end of anchor rope is passed basic upper plate and is born the billet on with and be connected, and the other end passes basic hypoplastron and bears the billet under with and be connected, on bear the steel sheet and pass through the crab -bolt with basic upper plate and be connected, under bear the steel sheet and pass through the crab -bolt with basic hypoplastron and be connected. The utility model discloses an assembled board cable basis, through the setting of basic upper plate and basic hypoplastron and anchor rope, just can be effectual through basic upper plate and the basic hypoplastron mating reaction with the anchor rope, with electric power tower having fixed firmly.
Description
Technical field
This utility model relates to a kind of power tower base, a kind of assembled plate rope basis.
Background technology
nullDuring electric force pole tower is constructed,It is frequently necessary to first to construct the basis of shaft tower,During construction pole and tower foundation,The ground surface environment being accomplished by the area for construction is constructed,In the area that cover layer is thicker," heavy excavation "、" draw and dig base expanding and base expanding "、Foundation classs such as " explosion expanded pilings " is the main transmission line foundation used,And the mode of " heavy excavation " be by building essential bearing stratum more than the earthwork all scoop away,This mode is accomplished by substantial amounts of carrying out digging,So will cause the increase of quantities,Add cost,The mode of same " draw and dig base expanding and base expanding ",Owing to process is complicated,So certain cost also can be increased,And existing basis is all by pouring out soleplate in the part dug after digging,Then electric force pole tower is installed on soleplate,By soleplate, electric force pole tower is fixed,And generally,It is in the consideration of cost,Substantially one piece tabular of the structure of soleplate,Thus bury is not the deepest,So during electric force pole tower tilts,The bed knife of soleplate the most just seems it is not the most sufficient,So it is high that the structure on existing basis has cost,The problem that bed knife is the strongest.
Utility model content
The deficiency existed for prior art, the purpose of this utility model is the assembled plate rope basis providing a kind of low cost, bed knife the strongest.
For achieving the above object, this utility model provides following technical scheme: a kind of assembled plate rope is basic, including basis upper plate and basis lower plate, lower plate embedment underground, described basis, described basis upper plate is fixed on earth's surface, it is connected between described basis upper plate and basis lower plate and has anchor cable, the upper end of described basis upper plate is provided with carrying billet, the lower end of described basis lower plate is provided with lower carrying billet, one end of described anchor cable is connected through basis upper plate with upper carrying billet, the other end is connected through basis lower plate with lower carrying billet, described upper carrying billet passes through anchor bolts with basis upper plate, described lower carrying billet passes through anchor bolts with basis lower plate, it is equipped with anchor on described basis upper plate and basis lower plate, described basis upper plate and basis lower plate are all connected by anchor with anchor cable.
nullAs further improvement of the utility model,Described anchor includes being embedded respectively the fixed plate on the upper plate of basis and the force-bearing base being embedded on plate under the foundation,The upper end of described fixed plate offers fixing screwed hole,Threaded on described fixing screwed hole have fixed disk,One end of described anchor cable is fixedly connected with fixed disk after fixed plate,Described fixed plate is rectangular-shaped,Described fixed disk is arranged on the position at fixed plate center,Described fixed plate is hollow structure,Sheet material it is filled with in it,Described sheet material is that four prisms are spliced,End face is arranged the most upward,The fixing bolt fixed with electric force pole tower it is fixedly connected with on the corner of described fixed plate,The bottom of described force-bearing base is embedded with cable wire anchor plate,Described anchor cable penetrates from the top of force-bearing base,And be fixedly attached on cable wire anchor plate,The passage running through its top and bottom is offered in described force-bearing base,The diameter of described channel bottom is less than the diameter of cable wire anchor plate,The top of described force-bearing base is provided with silica gel sealing ring,Described silica gel sealing ring is enclosed within anchor cable,The top of described force-bearing base is additionally provided with fiberglass sealed lid,Described fiberglass sealed lid is connected by bolt and force-bearing base top are fixing,Described silica gel sealing ring is arranged between fiberglass sealed lid and the top of force-bearing base,Offer, in described fiberglass sealed lid, the through hole running through fiberglass sealed lid,The top of described fiberglass sealed lid is coaxially fixed with glass reinforced plastic pipe protection pipe,Described anchor cable is through glass reinforced plastic pipe protection pipe、Through hole、Fix with cable wire anchor plate after passage and be connected,It is embedded with silica gel sealing ring on the inwall of described glass reinforced plastic pipe protection pipe,Described silica gel sealing ring set is on anchor cable,Described glass reinforced plastic pipe protection pipe one end is wholely set with fiberglass sealed lid,The other end extends upwardly to basis upper plate from the position of fiberglass sealed lid,It is filled with foaming fluid sealant between described glass reinforced plastic pipe protection pipe and anchor cable.
This utility model has the advantages that, by basis upper plate, basis lower plate and the setting of anchor cable, when plate rope basis is acted on by downforce, basis upper plate bears most of even all of downforce.When plate rope basis is acted on by uplift force, uplift force is delivered to basis lower plate by upper plate and anchor cable, and upper plate and anchor cable have primarily served the effect of transmission uplift force, and be primarily subjected to uplift force is basic lower plate.When plate rope basis is by horizontal force action, owing to horizontal force cannot be delivered to lower plate by anchor cable, therefore horizontal force almost all is born by upper plate, so basis upper plate is primarily subjected to downforce and horizontal force, and basis lower plate is primarily subjected to uplift force, thus just can be by basis upper plate and the mating reaction of basis lower plate, it is achieved electric force pole tower is more firmly fixed.
Accompanying drawing explanation
Fig. 1 is the illustraton of model on assembled plate rope of the present utility model basis;
Fig. 2 is the overall structure figure on assembled plate rope of the present utility model basis;
Fig. 3 is the overall structure figure of basis upper plate in Fig. 2;
Fig. 4 is the overall structure figure of basis lower plate in Fig. 2.
Detailed description of the invention
nullReferring to figs. 1 through shown in 4,A kind of assembled plate rope basis of the present embodiment,Including basis upper plate 1 and basis lower plate 2,Described basis lower plate 1 imbeds underground,Described basis upper plate 1 is fixed on earth's surface,It is connected between described basis upper plate 1 and basis lower plate 2 and has anchor cable 3,The upper end of described basis upper plate 1 is provided with carrying billet 11,The lower end of described basis lower plate 2 is provided with lower carrying billet 21,One end of described anchor cable 3 is connected through basis upper plate 1 with upper carrying billet 11,The other end is connected through basis lower plate 2 with lower carrying billet 21,Described upper carrying billet 11 passes through anchor bolts with basis upper plate 1,Described lower carrying billet 21 passes through anchor bolts with basis lower plate 2,It is equipped with anchor 4 on described basis upper plate 1 and basis lower plate 2,Described basis upper plate 1 and basis lower plate 2 are all connected by anchor 4 with anchor cable 3,After on the basis of electric force pole tower is installed to,Electric force pole tower will apply downforce to basis,So soil body between basis upper plate 1 and basis lower plate 2 will bear this downforce together with the upper plate 1 of basis,When electric force pole tower is wanted to tilt when,Apply a horizontal force will to basis upper plate 1,Apply a uplift force to the most again basis lower plate 2,And the soil body resists this uplift force together with the lower plate 2 of basis between basis upper plate 1 and basis lower plate 2,No matter it is so downforce or uplift force,The soil body between basis upper plate 1 and basis lower plate 2 has participation,And owing to the distance between basis upper plate 1 and basis lower plate 2 is bigger,Thus this soil body can be thicker,It is possible to bear bigger strength,The most just can be good at increasing the fastness of electric force pole tower,And operation is simple,With low cost,And anchor cable 3 is mainly applied with pull out force to basis lower plate 2,Just can effectively basis upper plate 1 be connected together with basis lower plate 2 with the setting of lower carrying billet 21 and anchor 4 by upper carrying billet 11.
nullAs a kind of detailed description of the invention improved,Described anchor 4 includes being embedded respectively the fixed plate 111 on the upper plate 1 of basis and the force-bearing base 211 being embedded on plate 2 under the foundation,The upper end of described fixed plate 111 offers fixing screwed hole,Threaded on described fixing screwed hole have fixed disk 1111,One end of described anchor cable 3 is fixedly connected with fixed disk 1111 after fixed plate 111,Described fixed plate 111 is rectangular-shaped,Described fixed disk 1111 is arranged on the position at fixed plate 111 center,Described fixed plate 111 is in hollow structure,Sheet material it is filled with in it,Described sheet material is that four prisms are spliced,End face is arranged the most upward,The fixing bolt fixed with electric force pole tower it is fixedly connected with on the corner of described fixed plate 111,The bottom of described force-bearing base 211 is embedded with cable wire anchor plate 2111,Described anchor cable 3 penetrates from the top of force-bearing base 211,And be fixedly attached on cable wire anchor plate 2111,Offer, in described force-bearing base 211, the passage running through its top and bottom,The diameter of described channel bottom is less than the diameter of cable wire anchor plate 2111,The top of described force-bearing base 211 is provided with silica gel sealing ring 2112,Described silica gel sealing ring 2112 is enclosed within anchor cable 3,The top of described force-bearing base 211 is additionally provided with fiberglass sealed lid 2113,Described fiberglass sealed lid 2113 is connected by bolt and force-bearing base 211 top are fixing,Described silica gel sealing ring 2112 is arranged between the top of fiberglass sealed lid 2113 and force-bearing base 211,Offer, in described fiberglass sealed lid 2113, the through hole running through fiberglass sealed lid 2113,The top of described fiberglass sealed lid 2113 is coaxially fixed with glass reinforced plastic pipe protection pipe 2114,Described anchor cable 3 protects pipe 2114 through glass reinforced plastic pipe、Through hole、Fix with cable wire anchor plate 2111 after passage and be connected,It is embedded with silica gel sealing ring 2115 on the inwall of described glass reinforced plastic pipe protection pipe 2114,Described silica gel sealing ring 2115 is enclosed within anchor cable 3,Described glass reinforced plastic pipe protection pipe 2114 one end is wholely set with fiberglass sealed lid 2113,The other end extends upwardly to basis upper plate 1 from the position of fiberglass sealed lid 2113,It is filled with foaming fluid sealant between described glass reinforced plastic pipe protection pipe 2114 and anchor cable 3,Connecting basis upper plate 1、The when of basis lower plate 2 and anchor cable 3,First fixed plate 111 is embedded in the upper plate 1 of basis,So fixed plate 111 will fix with basis upper plate 1,Force-bearing base 211 is embedded in the lower plate 2 of basis simultaneously,And imbed underground,Then the two ends of anchor cable 3 are connected with fixed plate 111 and force-bearing base 211 respectively,So just complete the construction on basis,And by fixed plate 111 is arranged to hollow structure,And fill the mode of sheet material,One use that can effectively save material,Two intensity that can also ensure fixed plate 111,And by silica gel sealing ring 2112、Fiberglass sealed lid 2113、Glass reinforced plastic pipe protection pipe 2114 and the setting of silica gel sealing ring 2115,Just can effectively anchor cable 3 be separated with soil,Avoid the problem that anchor cable 3 gets rusty,Well ensure that the structural stability that anchor cable 3 uses for a long time,So just can be good at being connected together with basis lower plate 2 by basis upper plate 1 by anchor cable 3,Add the bed knife on basis.
In sum, assembled plate rope of the present utility model basis, by basis upper plate 1, basis lower plate 2 and the setting of anchor cable 3, it is possible to effective utilization basis upper plate 1 bears horizontal force and downforce, utilize basis lower plate 2 to bear uplift force, greatly add the bed knife on basis.
The above is only preferred implementation of the present utility model, and protection domain of the present utility model is not limited merely to above-described embodiment, and all technical schemes belonged under this utility model thinking belong to protection domain of the present utility model.It should be pointed out that, for those skilled in the art, without departing from the some improvements and modifications under this utility model principle premise, these improvements and modifications also should be regarded as protection domain of the present utility model.
Claims (2)
- null1. an assembled plate rope basis,It is characterized in that: include basis upper plate (1) and basis lower plate (2),Described basis lower plate (2) embedment underground,Described basis upper plate (1) is fixed on earth's surface,It is connected between described basis upper plate (1) and basis lower plate (2) and has anchor cable (3),The upper end of described basis upper plate (1) is provided with carrying billet (11),The lower end of described basis lower plate (2) is provided with lower carrying billet (21),One end of described anchor cable (3) is connected through basis upper plate (1) with upper carrying billet (11),The other end is connected through basis lower plate (2) with lower carrying billet (21),Described upper carrying billet (11) passes through anchor bolts with basis upper plate (1),Described lower carrying billet (21) passes through anchor bolts with basis lower plate (2),It is equipped with anchor (4) on described basis upper plate (1) and basis lower plate (2),Described basis upper plate (1) and basis lower plate (2) are all connected by anchor (4) with anchor cable (3).
- nullAssembled plate rope the most according to claim 1 basis,It is characterized in that: described anchor (4) includes being embedded respectively the fixed plate (111) on basis upper plate (1) and the force-bearing base (211) being embedded on plate (2) under the foundation,The upper end of described fixed plate (111) offers fixing screwed hole,Threaded on described fixing screwed hole have fixed disk (1111),One end of described anchor cable (3) is fixedly connected with fixed disk (1111) afterwards through fixed plate (111),Described fixed plate (111) is rectangular-shaped,Described fixed disk (1111) is arranged on the position at fixed plate (111) center,Described fixed plate (111) is in hollow structure,Sheet material it is filled with in it,Described sheet material is that four prisms are spliced,End face is arranged the most upward,The fixing bolt fixed with electric force pole tower it is fixedly connected with on the corner of described fixed plate (111),The bottom of described force-bearing base (211) is embedded with cable wire anchor plate (2111),Described anchor cable (3) penetrates from the top of force-bearing base (211),And be fixedly attached on cable wire anchor plate (2111),Described force-bearing base offers, in (211), the passage running through its top and bottom,The diameter of described channel bottom is less than the diameter of cable wire anchor plate (2111),The top of described force-bearing base (211) is provided with silica gel sealing ring (2112),Described silica gel sealing ring (2112) is enclosed within anchor cable (3),The top of described force-bearing base (211) is additionally provided with fiberglass sealed lid (2113),Described fiberglass sealed lid (2113) is connected by bolt and force-bearing base (211) top are fixing,Described silica gel sealing ring (2112) is arranged between the top of fiberglass sealed lid (2113) and force-bearing base (211),Offer, in described fiberglass sealed lid (2113), the through hole running through fiberglass sealed lid (2113),The top of described fiberglass sealed lid (2113) is coaxially fixed with glass reinforced plastic pipe protection pipe (2114),Described anchor cable (3) is through glass reinforced plastic pipe protection pipe (2114)、Through hole、Fix with cable wire anchor plate (2111) after passage and be connected,It is embedded with silica gel sealing ring (2115) on the inwall of described glass reinforced plastic pipe protection pipe (2114),Described silica gel sealing ring (2115) is enclosed within anchor cable (3),Described glass reinforced plastic pipe protection pipe (2114) one end is wholely set with fiberglass sealed lid (2113),The other end extends upwardly to basis upper plate (1) from the position of fiberglass sealed lid (2113),It is filled with foaming fluid sealant between described glass reinforced plastic pipe protection pipe (2114) and anchor cable (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620048942.1U CN205475305U (en) | 2016-01-19 | 2016-01-19 | Assembled board cable basis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620048942.1U CN205475305U (en) | 2016-01-19 | 2016-01-19 | Assembled board cable basis |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205475305U true CN205475305U (en) | 2016-08-17 |
Family
ID=56670261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620048942.1U Withdrawn - After Issue CN205475305U (en) | 2016-01-19 | 2016-01-19 | Assembled board cable basis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205475305U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442627A (en) * | 2016-01-19 | 2016-03-30 | 温州电力设计有限公司 | Assembly type plate-cable foundation |
CN112177029A (en) * | 2020-09-15 | 2021-01-05 | 重庆首页工程设计咨询有限责任公司 | Electric power tower foundation |
CN115030212A (en) * | 2022-01-16 | 2022-09-09 | 辛振科 | Plate anchor uplift resistance foundation |
-
2016
- 2016-01-19 CN CN201620048942.1U patent/CN205475305U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442627A (en) * | 2016-01-19 | 2016-03-30 | 温州电力设计有限公司 | Assembly type plate-cable foundation |
CN112177029A (en) * | 2020-09-15 | 2021-01-05 | 重庆首页工程设计咨询有限责任公司 | Electric power tower foundation |
CN115030212A (en) * | 2022-01-16 | 2022-09-09 | 辛振科 | Plate anchor uplift resistance foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10253473B2 (en) | Rock anchor foundation structure suitable for mountain photovoltaic module and construction method of rock anchor foundation structure | |
CN205475305U (en) | Assembled board cable basis | |
CN102776899B (en) | Anti-floating structure of shallow-buried shield tunnel | |
CN208899463U (en) | A kind of uplift pile with hangnail | |
CN203654309U (en) | Pile-caisson hydraulic structure | |
CN103572770B (en) | A kind of stake case hydraulic structures and construction method thereof | |
CN208441092U (en) | A kind of Rock And Soil locking type reinforcing anchor pole | |
CN204753621U (en) | Power transmission sequence iron tower is with compound basis | |
CN105257315A (en) | Anti-floating structure for underground tunnel | |
CN103938641A (en) | Foundation construction technology of large-scale photovoltaic power station in desert | |
CN203257442U (en) | Anchor rod/anchor rope with leakproof plug of rubber for anchoring | |
CN105442627B (en) | A kind of assembled plate rope basis | |
CN203977421U (en) | Line of power dish | |
CN204000856U (en) | The anti-side changeable ridigity pile of inner support grouting formula level base | |
CN201502065U (en) | Anchor rod joint excavation compound basis | |
CN103790156A (en) | Square buckle plate mechanical pile splicing method for precast square piles | |
CN216156600U (en) | Automatic dewatering device for pipe well | |
CN209854711U (en) | Tubular pile shoe suitable for deep loose aeolian sand geology | |
CN108301409A (en) | A kind of interior casing mounting process | |
CN211080252U (en) | Prefabricated formula deep basal pit supporting construction | |
CN204356795U (en) | A kind of transformer station's pile tube with long vertical grounding electrode | |
CN104420479A (en) | Anchor rod base structure with concrete block of photovoltaic module bracket and setting method | |
CN204023569U (en) | A kind of bellows enlarged footing anchor bolt support | |
CN203145025U (en) | Soft soil deep foundation pit supporting cat anchor structure | |
CN203569565U (en) | Anti-vibration foundation spiral ground pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160817 Effective date of abandoning: 20180914 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20160817 Effective date of abandoning: 20180914 |