CN205475127U - Dykes and dams super -standard flood flood diversion siphon pipe racks - Google Patents

Dykes and dams super -standard flood flood diversion siphon pipe racks Download PDF

Info

Publication number
CN205475127U
CN205475127U CN201620144264.9U CN201620144264U CN205475127U CN 205475127 U CN205475127 U CN 205475127U CN 201620144264 U CN201620144264 U CN 201620144264U CN 205475127 U CN205475127 U CN 205475127U
Authority
CN
China
Prior art keywords
flood
siphon pipe
pipe shaft
downstream
dykes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620144264.9U
Other languages
Chinese (zh)
Inventor
叶兴
生化君
刘享东
郑喜财
胡兰东
孙宏儒
王晓岩
张晓东
叶坤
杨旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620144264.9U priority Critical patent/CN205475127U/en
Application granted granted Critical
Publication of CN205475127U publication Critical patent/CN205475127U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Dykes and dams super -standard flood flood diversion siphon pipe racks belongs to dykes and dams flood diversion hydraulic engineering technical field. The utility model discloses can let out super -standard flood to the controllable branch in farmland and protect dykes and dams, the novel energy dissipation of dynamic body export has concurrently and chooses class, the advantage of surface current, underflow, is suitable for any topography geological conditions. Simple structure, build swift, the cost is low. It includes: install in siphon pipe shaft (5) the import outside trash rack (2), water injection pipe valve (6) is connected in siphon pipe shaft (5), the terminal installation in siphon pipe shaft (5) low reaches is in the same direction as ending butterfly valve (8), siphon pipe shaft (5) low reaches end outside is connected with rigid body skeleton artificially synthesized material water conveying belt (9), rigid body skeleton artificially synthesized material's water conveying belt (9) link to each other with artificially synthesized material's water conveying belt (10), artificially synthesized material's water conveying belt (10) are terminal continuous with dynamic body export (11), the utility model is suitable for a dyke, the controllable very flood diversion of dam and flood -fighting.

Description

Dykes and dams super standard flood flood diversion siphon pipe racks
Technical field
The invention belongs to dykes and dams flood diversion hydraulic engineering technical field, be specifically related to dykes and dams super standard flood flood diversion siphon pipe racks.
Background technology
There is the super standard flood that manpower cannot be resisted in Heilungkiang in 2013, under existing water conservancy specification with technical conditions, realize " guaranteeing the safety of flood-fighting army " the biggest with the flood control case in advance difficulty of this target of embankment safety, if realizing this target by innovation theory, innovative approach, the most just solving dykes and dams super standard flood to overflow top and burst the global difficult problems of hurting people or smashing objects, following case and the difficult problem explanation present invention will produce huge economic results in society;Following case and the difficult problem explanation present invention are to ensureing that national economy has urgency.
Super standard flood dyke overflows top and bursts case: within 2015, Japanese JIUYUE inrushes on the 10th, and whole house, vehicle in a row are flushed away, and causes that many people injures and deaths are missing, fortune loss.Chinese super standard flood in 2014 causes damaging at dykes and dams 2.4 ten thousand.Heilungkiang dykes and dams in 2013 occur the loss of bursting of unrestrained dike serious, if the troop that will make to speedily carry out rescue work of blocking up by force owing to having inconvenient traffic falls into dangerous situation even impasse.Sha Lan river, Ningan City, Heilongjiang Province's in June, 2005 super standard flood overflow dike burst, cause the heavy casualties of dead 117 people.1998 dead 3004 people in the annual flood whole nation, direct economic loss reaches 166,600,000,000 yuan, and wherein Jiujiang embankment breaches a dyke, and heavy 9 ships and a large amount of relief materials of input, tens thousand of the army and the people 4 talentes control.
Dam overflows top and bursts case: within 2014, Chinese super standard flood causes 4 small reservoirs to break down, India Ma Qiu in 1979 overflows top 3000 people that break down and suffers from drowned, the reservoirs such as Henan slab bridge, stone overbanks in 1975 overflow top and break down, downstream close at hand speedily carry out rescue work troop none escape by luck, 2.6 ten thousand people suffer from drowned, and economic loss reaches 10,000,000,000 dollars.Many of Hebei province reservoir overflow top and broke down in August, 1963, and 1467 people suffer from drowned, the unrestrained top dam break 59 of nineteen fifty-one to 1986 year other National Flood of the world.
The difficult problem that super standard flood dykes and dams face: in the case of river dyke is the most up to standard, flood all converges in river course, increases downstream and the probability of flood occurs, and dykes and dams increase, and river course water-holding quantity increases, and once breaches a dyke, it is simply that extinction.Run into super standard flood guarantor's dykes and dams not burst, employing means only have three, " store, keep off, point ", " reservoir stores, dykes and dams keep off " is the most limited, once running into irresistible flood, three kinds of means reach capacity and flood diversion building can not now be built, and burst inevitable, this is the difficult problem that existing hydraulic engineering technology faces, and in these three option, only dykes and dams are protected in flood diversion is completely safe plan.Owing to small reservoir drainage area is little, amount big, the probability that rare storm centre concentrates in the drainage area of small reservoir is big, and small reservoir importance microassociation economic benefit is low, flood control standard is low, occur unrestrained dam breaking inevitable, in 14 years, state-owned 4 small reservoirs occur unrestrained dam breaking to be exactly illustration, and this is the difficult problem that small reservoir runs into that super standard flood faces.Flood diversion on sub-bottom changes (flood discharge) building form has flood-diversion sluice and the spillway of hafnium structure at present, cross water and soil dam, buried penstock under dam, shaft spillway, siphon spillways and flood diversion of artificially breaching a dyke, these flood diversion excessive flood building all now can not be built when occurring super standard flood to speedily carry out rescue work, shaft spillway, siphon spillways surpass the low emergency spillway being not suitable as earth and rockfill dam hinge of the ability of letting out, siphon spillways must reach certain water level condition just automatically starting, if the siphon spillways of reservoir need actively flood diversion, must possess upstream and downstream gate valve and water filling pipe valve and dissipation and scouring facility, these facility costs are high.Now from weir formula floodway of bursting, be equivalent to without lock hafnium structure spillway, its cost is the highest, and once start and face little water and produce uncontrollable big burst, now flood diversion building energy dissipation type surface current, bucket, choose stream, surface current, bucket need certain hydraulics, and underflow, surface current, Dissipation Energy in Solid Bucket must have hafnium structure protection-apron, and flip trajectory bucket must be chosen bank and form safety punching hole with head.Reservoir without energy-dissipating installation breaks the emergency spillway of auxiliary dam, once starts cost high and uncontrollable, and other emergency spillway not only cost height also needs to certain landform, geological conditions.
Super standard flood dike overflows the reason burst of top: the common feature of these damaged or destroyed by flood cases is exactly the major natural disasters running into super standard flood, economically developed country exists too, this is a global difficult problem, the dam designs theory that countries in the world are general, it is to be designed engineering according to the concrete standard of flood that quantifies of specification regulation, guarantee not occur engineering damaged or destroyed by flood in specification, the social and economic condition difference of various countries is only that its codes and standards are different, developed country's standard height generation super standard flood engineering damaged or destroyed by flood probability is low, and developing country's standard low generation super standard flood engineering damaged or destroyed by flood probability is high.The problem that can not solve unlimited super standard flood engineering damaged or destroyed by flood by the finite quantization standard of flood of specification in theory;The dykes and dams of rock structure cannot resist super standard flood.Currently also lack the auxiliary dam flood diversion of reservoir, the design theory of preventing and reducing natural disasters of the controlled flood diversion in emergency spillway.
Utilize the flood discharge beach damaged or destroyed by flood mechanism that leaf is emerging, build to farmland, the novel flood diversion of beach dispersion flood diversion is theoretical and measure, provides a kind of new construction for solving an above series of difficult problem.
Summary of the invention
Summary of the invention
The purpose of the present invention: for realizing the target of " guaranteeing the safety of flood-fighting army " and embankment safety, create novel dykes and dams flood diversion structure, flood diversion is protected dykes and dams and is avoided the generation dam that inrushes to surge and cause extinction, people and animals are allowed to have escape chance, reduce the property loss of engineering damaged or destroyed by flood, overflow for solution dyke super standard flood and push up the global problem burst, a kind of dykes and dams super standard flood flood diversion siphon pipe racks is provided, when running into super standard flood, controlled pre-can let out flood diversion and prevent the unrestrained top of dykes and dams to burst, a kind of technical feasibility is provided, the method of economical rationality, and simple in construction, interim construction of speedily carrying out rescue work is quick, use convenient management, cost is low, the most forever take up an area.
The present invention is applicable to dykes and dams and utilizes river course, ditch, the pool, low-lying land to disperse controlled point to farmland to let out dykes and dams super standard flood, it is applicable to reservoir emergency spillway, be suitable for use in reservoir meet super standard flood discharge capacity not in the case of flood diversion Bao Ba, be suitable for use in flash building in danger in the case of flood diversion protect flood releasing structure, it is applicable to original design auxiliary dam meet controlled flood diversion in the case of less super standard flood as the reservoir of emergency spillway and protect auxiliary dam not flood diversion, is further adapted for any needing flood-fighting, the place of controlled flood diversion.
Realize its technical scheme of object above as follows:
Dykes and dams super standard flood flood diversion siphon pipe racks, it is characterised in that it includes trash rack, flap valve, butterfly valve, siphon pipe shaft, water filling pipe valve, exports along only butterfly valve, the Flexible water pipe of rigid body skeleton synthetic material, the Flexible water pipe of synthetic material, dynamic float.nullTrash rack is arranged on outside upstream oblique section siphon pipe shaft import,Flap valve is arranged on outside upstream oblique section siphon pipe shaft import,Butterfly valve is installed inside upstream oblique section siphon pipe shaft import,Upstream oblique section siphon pipe shaft is outdoor to be arranged on dykes and dams up stream slope,Upstream oblique section siphon pipe shaft is connected with horizontal segment siphon pipe shaft in dam,Upstream oblique section siphon pipe shaft is fixed on the anchor block of upstream,In dam, horizontal segment siphon pipe shaft is connected with downstream tilting section siphon pipe shaft,In dam, horizontal segment siphon pipe shaft downstream is connected with water filling pipe valve,Downstream tilting section siphon pipe shaft is outdoor to be arranged on slope, dykes and dams downstream,Downstream tilting section siphon pipe shaft end is arranged on the anchor block of downstream,It is connected with the Flexible water pipe of rigid body skeleton synthetic material outside the tilting section siphon pipe shaft downstream end of downstream,Downstream tilting section siphon pipe shaft downstream end is installed along only butterfly valve,Along only butterfly valve by butterfly valve、Expansion ring forms,Butterfly valve downstream contact expansion ring,Expansion ring downstream is connected with the Flexible water pipe of rigid body skeleton synthetic material,The Flexible water pipe of rigid body skeleton synthetic material is connected with the Flexible water pipe of synthetic material,The Flexible water pipe end of synthetic material is connected with dynamic float outlet.
In order to realize object above further, described siphon pipe shaft lower exit elevation is less than upstream inlet elevation, and the discrepancy in elevation ensures to form siphon jet more than the loss of flood peak.
The invention has the beneficial effects as follows: the present invention utilizes ditch, bubble, the pool, low-lying land to disperse controlled point to let out the existing restriction concentrating flood diversion to detention basin of super standard flood breakthrough to farmland, people and animals are made to have escape chance, change existing design concept, fill up the blank of dyke very flood diversion design theory, solve and cannot solve unlimited super standard flood dyke by limited standard of flood and overflow the global problem that dike bursts, realizing not only having ensured speedily carry out rescue work troop safety but also ensure embankment safety, the concrete effect of the present invention is as follows with advantage:
1. the present invention can utilize siphon to carry out pre-letting out under conditions of not destroying dykes and dams, meet emergency and be possible not only to flood diversion guarantor's dykes and dams, can also be when there is dangerous situation in flood releasing structure, interim replacement flood releasing structure flood discharge is to protect flood releasing structure not damaged or destroyed by flood, and the siphon being originally not suitable as very flood diversion by structures a series of to siphon improvement but becomes advantageous very flood diversion building.
2. the present invention is for the dykes and dams without flood diversion, it is possible to achieve build the controlled point of flood diversion system letting out super standard flood, it is ensured that dykes and dams do not burst, it is to avoid generation dam break is surged and caused extinction, allows people and animals have escape chance, reduces the property loss of engineering damaged or destroyed by flood.The present invention can produce great social profit, saving construction investment, reduce the great economic loss that damaged or destroyed by flood causes.
3. the present invention compares with flood diversion design theory with existing dike, currently designed theory is the standard of flood design dykes and dams specified by specification, it is inevitable that super standard flood overflows that dike bursts, flood diversion must have suitable lake low-lying land, also to be put into forever to take up an area with engineering limited by flood-diversion sluice, embankment tremendous economic, and once flood must be burst beyond detention basin carrying capacity embankment.The present invention, on existing dike design theory, normative foundation, utilizes flood discharge beach damaged or destroyed by flood mechanism to increase and point lets out the dyke super standard flood of super standard flood to farmland dispersion and prevent and reduce natural disasters design, break through the existing restriction to detention basin concentration flood diversion.Also realize the most forever taking up an area, utilize the feature of flood improvement soil, it is achieved change flood and be flood, change Hong Weili.
4. the present invention compares with existing siphon, existing siphon must forever take up an area, concentrate flood diversion and cost is high, run into super standard flood to increase and build, the present invention can the controlled dispersion flood diversion to farmland, the most forever take up an area, use Pe, Pvc structure to face in flood season to build, can resist any rank super standard flood, dykes and dams are protected in flood diversion.Compare with existing siphon gate valve, existing siphon gate valve downstream needs valve or gate, if arranged, the big valve cost of caliber is high, flood-fighting installation is inconvenient, if arranging gate to be accomplished by a lock chamber, cost is high, flood-fighting can not now be built, and the present invention uses extremely simple and cheap suitable only butterfly valve to replace downstream gate valve with expansion ring;Compare with existing siphon pipe shaft, existing siphon pipe shaft uses hafnium, iron structure, part pipe shaft of the present invention uses the Flexible water pipe of rigid body skeleton synthetic material to replace hafnium pipe to deliver water to downstream, and being formed with baric flow increases the conveyance capacity of unit are, reduces dam crest pipe shaft quantities;Compare with existing siphon arrangement, siphon pipe shaft of the present invention is arranged in dykes and dams top, the length of siphon pipe shaft is short, increase is the Flexible water pipe of cheap rigid body skeleton synthetic material, not only cost is low but also construct easily, the Flexible water pipe quantity of increase siphon pipe shaft and synthetic material can solve to meet super standard flood siphon and surpass the shortcoming that the ability of letting out is low, also for using low water head without the flap valve of headstock gear, condition is provided along only butterfly valve, traffic is not affected in flood diversion pipe embedment dykes and dams, the dykes and dams having traffic requirement are greatly reduced cost, high-order layout avoids seepage flow hidden danger, freeze injury, the Flexible water pipe of trash rack warrantor's geosynthetics crosses water security;Open and close with existing siphon and compare, existing siphon can only close siphon jet, the water level pipe flow condition higher than the super standard flood of pipe shaft cannot be closed, flap valve of the present invention, water filling pipe valve, flood diversion is closed in double guarantee in time, upstream extremity flap valve arranges keying steel wire and can artificially close, owing to the depth of water of flap valve is little, break down and be easily processed, bulkhead gate and maintenance bridge can not be set, owing to the little manpower of hoisting capacity can be closed flap valve and the most just need not build service bridge without headstock gear with pull-up, greatly reduce construction costs;Compare with existing siphon dissipation and scouring, the Flexible water pipe of synthetic material, deliver water to away from embankment safety area, the rushing and cheat not crisis embankment safety without energy-dissipating installation outlet of the Flexible water pipe of warrantor's geosynthetics, the Flexible water pipe of synthetic material is drawn materials extensively, transport is set up convenient, cheap, dynamic float energy dissipation below spillway, the buoyancy aid of the Flexible water pipe dynamic float outlet of flexible synthetic material goes up with water level and upper shifting or adjustment Way out form surface current, stream is flooded at middle part, underflow punching hole dissipation and scouring, form a kind of novel dynamic float dissipation and scouring form rushing hole energy dissipating choosing stream without choosing bank, it is applicable to any level of tail water, geological conditions, the dissipation and scouring of head difference condition;Export downward-sloping by punching hole submerged bottom floor dissipation and scouring be applicable to the geological conditions that two sides impact resistance is low, outlet is away from bedding but the middle part submerged bottom floor dissipation and scouring flooded is applicable to that downstream water depth is big, ground impact resistance is low, and this stiling basin of structure without hafnium, the underflow energy dissipation anti-washing structure of stone-laying erosion control break through existing disspation through hydraudic jimp needs the hafnium structure stiling basin of high cost, the version of stone-laying erosion control;Export free discharge of flipping and form submerged bucket dissipator erosion control, being applicable to the high geological conditions of two sides impact resistance or the high condition of the level of tail water, this structure without hafnium chooses bank, submerged bucket dissipator without hafnium structure protection-apron, without stone-laying dissipation and scouring breaks through existing surface current, Dissipation Energy in Solid Bucket needs the condition of higher downstream water level to limit and version;This structure without hafnium is chosen bank and is formed the dissipation and scouring in safety punching hole, and stream punching hole energy dissipating is chosen in breakthrough needs certain head difference restrictive condition and the energy dissipation type choosing bank of hafnium structure;The Flexible water pipe dynamic float exit punching hole dissipation and scouring of flexible synthetic material, possess choose stream safety punching hole design principle but without current flip shot in the air, possess surface current, underflow, the waterpower feature of Dissipation Energy in Solid Bucket but without its hafnium structure and stone-laying structure, break through existing surface current, underflow, bucket, flip trajectory bucket form and structure, the advantage having surface current, underflow, bucket, flip trajectory bucket concurrently;The Flexible water pipe taking off synthetic material after the flood diversion phase recovers to plough, and the most forever occupies cultivated land.
5. the present invention compares with existing emergency spillway, it is achieved do not possess build emergency spillway (flood-diversion sluice), do not have emergency spillway (flood-diversion sluice) or auxiliary dam flood diversion dykes and dams can also controlled flood diversion protect dykes and dams target;The present invention both can substitute for the emergency spillway (flood-diversion sluice) infrequently enabled;The combination of materials of the present invention, structural arrangement form, dismounting and associativity the existing soil property dam of strategic structural on flood diversion form.
6. the present invention compares with existing flood-fighting, speedily carries out rescue work and can on-the-spot quickly assemble, and it is convenient, cheap that the Flexible water pipe of synthetic material and dynamic float outlet are drawn materials extensively, transport is set up, extremely beneficial to flood-fighting;Also the Flexible water pipe pressure flow solving flood diversion pipe shaft and synthetic material by increasing pipe racks quantity surpasses the shortcoming that the ability of letting out is low;Both can also be able to can also avoid starting the controlled flood diversion in auxiliary dam emergency spillway as reservoir super standard flood flood-fighting as reservoir emergency spillway, both interim flood diversion the most forever occupies cultivated land and also realizes the controlled flood diversion in any place and also realize disperseing flood diversion target to farmland to have realized river dyke, has both avoided concentrating flood diversion to bring extinction also to avoid flood fighting completely;The present invention is arranged by combination of materials, new structure, novel dissipation and scouring, forms novel flood diversion building dismantled and assembled, that can be combined and can also be used for flood-fighting flood diversion guarantor's dykes and dams;Flood diversion guarantor's dykes and dams need not " powerful and well-equipped army repaiies small dike completely ", it is only necessary to little personnel assemble and nurse, once runs into flood besieging advance and retreat and easily realizes with logistics support, and this just realizes the target of " guaranteeing the safety of flood-fighting army " and embankment safety.
7. the present invention compares with existing flood diversion building, is irradiated the most aging shortcoming by ultraviolet, but super standard flood starts, and probability is little can make up this shortcoming after enabling;There is the shortcoming that single tube flood diversion amount is few, but single tube cost is low can be made up with increasing flood diversion pipe number.
The applicable flow velocity of Flexible water pipe of the present invention is less than 17m/s, and high-velocity flow should prove cavitation and cavitation erosion specially.
Accompanying drawing illustrates:
Fig. 1 dykes and dams super standard flood flood diversion siphon pipe racks schematic longitudinal section;
Fig. 2 dykes and dams super standard flood flood diversion siphon pipe racks horizontal layout schematic diagram.
Detailed description of the invention:
Preferred forms to the present invention elaborates (seeing Fig. 1, Fig. 2) below in conjunction with the accompanying drawings.
nullEmbodiment 1: dykes and dams super standard flood flood diversion siphon pipe racks,It includes that trash rack 2 is arranged on outside upstream oblique section siphon pipe shaft 5-1 import,Prevent floating thing from damaging geosynthetics and blocking siphon,Flap valve 3 is arranged on outside upstream oblique section siphon pipe shaft 5-1 import,It is easy to close non-siphonic stream,Butterfly valve 4 is installed inside upstream oblique section siphon pipe shaft 5-1 import,Realize relatively low flood level by the pre-flood discharge of siphon,Upstream oblique section siphon pipe shaft 5-1 is outdoor to be arranged on dykes and dams 1 up stream slope,Upstream oblique section siphon pipe shaft 5-1 is connected with horizontal segment siphon pipe shaft 5-2 in dam,Upstream oblique section siphon pipe shaft 5-1 is fixed on the anchor block 7-1 of upstream,In dam, horizontal segment siphon pipe shaft 5-2 is connected with downstream tilting section siphon pipe shaft 5-3,In dam, horizontal segment siphon pipe shaft 5-2 downstream is connected with water filling pipe valve 6,Water filling forms siphon jet,Downstream tilting section siphon pipe shaft 5-3 is outdoor to be arranged on slope, dykes and dams 1 downstream,Downstream tilting section siphon pipe shaft 5-3 end is arranged on the anchor block 7-2 of downstream,It is connected with the Flexible water pipe 9 of rigid body skeleton synthetic material outside the tilting section siphon pipe shaft 5-3 downstream end of downstream,Save material and form siphon jet,Downstream tilting section siphon pipe shaft 5-3 downstream end is installed along only butterfly valve 8,Along only butterfly valve 8 by butterfly valve 8-1、Expansion ring 8-2 forms,The butterfly valve 8-1 expansion ring 8-2 closing Parallel to the flow direction withstands butterfly valve 8-1,Then expansion ring 8-2 is fixed,Realize closing valve and form syphonic water flow,Unclamp siphon earial drainage after expansion ring 8-2,Expansion ring 8-2 downstream is connected with the Flexible water pipe 9 of rigid body skeleton synthetic material,The Flexible water pipe 9 of rigid body skeleton synthetic material is connected with the Flexible water pipe 10 of synthetic material,Flexible water pipe 10 end of described synthetic material is connected with dynamic float outlet 11,The Flexible water pipe of synthetic material delivers water to the place of safety away from dykes and dams,Prevent from prolonging on punching hole jeopardizing dykes and dams,Dynamic float outlet raises Flexible water pipe outlet lifting the most therewith along with the level of tail water,Reduce scour hole depth.
Siphon pipe shaft 5 lower exit elevation is less than upstream inlet elevation, and the discrepancy in elevation ensures to form siphon jet more than this section of pipeline loss of flood peak, and little head is conducive to opening and closing along only butterfly valve 8.
Run and management: when flood crosses predetermined water level entrance flood control, trash rack 2, flap valve 3, butterfly valve 4 are first installed, when water level reaches corresponding warning line, installing rigid body skeleton described in the Flexible water pipe 9(along only butterfly valve 8, rigid body skeleton synthetic material is that reinforced rail silk screen, reinforcing bar netting or plastics wire gauze constitute Flexible water pipe tubular support skeleton, and described synthetic material is canvas line with rubber, waterproof cloth, thick plastic sheeting or composite geo-membrane), the Flexible water pipe 10 of synthetic material and dynamic float outlet 11.When water level reaches dykes and dams flood diversion prediction scheme water level or dyke downstream occurs that dangerous situation needs upstream flood diversion to reduce water level, telescoping tube 8-2 withstands butterfly valve 8-1, exports at siphon 5 with rope strapped telescoping tube 8-2, closes along only butterfly valve, to tube valve 6 water filling, upstream butterfly valve 4 automatic one-way is closed, and after filling water, closes water injection pipe valve 6, pull-up flap valve 3, opening strapped rope, butterfly valve 8-1 flicks telescoping tube 8-2, butterfly valve 8-1 unlatching and carries out flood diversion.Attended mode during flood diversion, runs into abnormal conditions and opens water injection pipe valve 6 in time and block siphon jet, stop flood diversion.When water level exceed siphon inner top non-siphonic stream need stop flood diversion time, flap valve 3 can be closed.Working as drawdown, flap valve aperture also reduces, and carrys out flow when reaching safe, opens water injection pipe valve 6 and destroy siphon jet, and butterfly gate 4 is automatically switched off flood diversion.Take off trash rack 2, butterfly valve 4 after flood season, export 11 along only butterfly valve 8, the Flexible water pipe 9 of rigid body skeleton synthetic material, the Flexible water pipe 10 of synthetic material and dynamic float, lock flap valve 3.Hydraulic reclamation is used to recover to plough as formed punching hole to farmland flood diversion.If flood diversion pipe shaft 5-2 uses Pe, Pvc or Pp chemical industry pipe, the import and export of flood diversion pipe shaft 5 should block and prevent flood diversion pipe shaft 5-2 from being irradiated aging by ultraviolet.
Embodiment 2: during the interim flood diversion of flood-fighting, use Pe, Pvc, Pp pipe as siphon pipe shaft 5, it is not necessary to anchor block 7, if wire gauze can be tied up at upstream oblique section siphon pipe shaft 5-1 entrance point as trash rack 2 without flap valve, using and close flood diversion at import anti-colour bar cloth pressure sandbag, other is ibid.
Certainly, described above is not limitation of the present invention, and the present invention is also not limited to the example above, change that those skilled in the art are made in the essential scope of the present invention, retrofits, adds or replaces, and also should belong to protection scope of the present invention.

Claims (2)

1. dykes and dams super standard flood flood diversion siphon pipe racks, it is characterised in that: include trash rack (2), flap valve (3), siphon pipe shaft (5), water filling pipe valve (6), export (11) along only butterfly valve (8), the Flexible water pipe (9) of rigid body skeleton synthetic material, the Flexible water pipe (10) of synthetic material, dynamic float;nullDescribed trash rack (2) is arranged on outside upstream oblique section siphon pipe shaft (5-1) import,Described flap valve (3) is arranged on outside upstream oblique section siphon pipe shaft (5-1) import,Butterfly valve 4 is installed inside upstream oblique section siphon pipe shaft (5-1) import,Described upstream oblique section siphon pipe shaft (5-1) is outdoor to be arranged on dykes and dams (1) up stream slope,Upstream oblique section siphon pipe shaft (5-1) is connected with horizontal segment siphon pipe shaft (5-2) in dam,Upstream oblique section siphon pipe shaft (5-1) is fixed on upstream anchor block (7-1),In described dam, horizontal segment siphon pipe shaft (5-2) is connected with downstream tilting section siphon pipe shaft (5-3),In dam, horizontal segment siphon pipe shaft (5-2) downstream is connected with water filling pipe valve (6),Described downstream tilting section siphon pipe shaft (5-3) is outdoor to be arranged on dykes and dams (1) slope, downstream,Downstream tilting section siphon pipe shaft (5-3) end is arranged on downstream anchor block (7-2),It is connected with the Flexible water pipe (9) of rigid body skeleton synthetic material outside tilting section siphon pipe shaft (5-3) downstream end of downstream,Downstream tilting section siphon pipe shaft (5-3) downstream end is installed along only butterfly valve (8),Described suitable only butterfly valve (8) is by butterfly valve (8-1)、Expansion ring (8-2) forms,Described butterfly valve (8-1) downstream contact expansion ring (8-2),Described expansion ring (8-2) downstream is connected with the Flexible water pipe (9) of rigid body skeleton synthetic material,The Flexible water pipe (9) of described rigid body skeleton synthetic material is connected with the Flexible water pipe (10) of synthetic material,Flexible water pipe (10) end of described synthetic material is connected with dynamic float outlet (11).
Dykes and dams super standard flood flood diversion siphon pipe racks the most according to claim 1, it is characterised in that: siphon pipe shaft (5) lower exit elevation is less than upstream inlet elevation, and the discrepancy in elevation is damaged more than this section of pipeline head, it is ensured that form siphon jet.
CN201620144264.9U 2016-02-26 2016-02-26 Dykes and dams super -standard flood flood diversion siphon pipe racks Withdrawn - After Issue CN205475127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620144264.9U CN205475127U (en) 2016-02-26 2016-02-26 Dykes and dams super -standard flood flood diversion siphon pipe racks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620144264.9U CN205475127U (en) 2016-02-26 2016-02-26 Dykes and dams super -standard flood flood diversion siphon pipe racks

Publications (1)

Publication Number Publication Date
CN205475127U true CN205475127U (en) 2016-08-17

Family

ID=56679097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620144264.9U Withdrawn - After Issue CN205475127U (en) 2016-02-26 2016-02-26 Dykes and dams super -standard flood flood diversion siphon pipe racks

Country Status (1)

Country Link
CN (1) CN205475127U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603942A (en) * 2016-02-26 2016-05-25 叶兴 Dam over-standard flood diversion siphon belt
CN109557832A (en) * 2019-01-15 2019-04-02 马荣立 A kind of diversion measure and control device
CN114059504A (en) * 2021-12-02 2022-02-18 国网甘肃省电力公司经济技术研究院 Prevention of seepage stagnant water structure among hydraulic and hydroelectric engineering

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603942A (en) * 2016-02-26 2016-05-25 叶兴 Dam over-standard flood diversion siphon belt
CN109557832A (en) * 2019-01-15 2019-04-02 马荣立 A kind of diversion measure and control device
CN109557832B (en) * 2019-01-15 2024-01-30 马荣立 Water diversion measurement and control device
CN114059504A (en) * 2021-12-02 2022-02-18 国网甘肃省电力公司经济技术研究院 Prevention of seepage stagnant water structure among hydraulic and hydroelectric engineering
CN114059504B (en) * 2021-12-02 2023-02-21 国网甘肃省电力公司经济技术研究院 Prevention of seepage stagnant water structure among hydraulic and hydroelectric engineering

Similar Documents

Publication Publication Date Title
CN105735208B (en) Dykes and dams super standard flood flood diversion siphon pipe band group
CA2777052C (en) Wave suppressor and sediment collection system
CN205475127U (en) Dykes and dams super -standard flood flood diversion siphon pipe racks
AU2018375503B2 (en) Express flood mitigation works using elevated and or at ground level with tunnel integrated large scale aqueduct with numerous functions, with main function to divert flood water or river water away from cities in order to fight or mitigate flood events and effect of global warming, with discharge invert levels to the sea higher than high tide levels
WO2023142032A1 (en) Method for improving waterlogging in existing coastal plain areas
CN105696514B (en) Multistage closed head-work of bursting certainly
CN109024476A (en) Base self collapsing levee dam geotechnique's woven fabric very floodway is washed in a pan in cross flow
CN109610405A (en) Half lunar crater shape water pond and its construction method
CN105603942B (en) Dykes and dams super standard flood flood diversion siphon pipe band
WO2020044355A1 (en) Integration of multipurpose box tunnels with empty lakes and mini dam for effective flood control
CN205475126U (en) Dykes and dams super -standard flood flood diversion siphon pipe racks crowd
RU144821U1 (en) OPERATIONAL WATER DISCHARGE (OPTIONS)
CN205475125U (en) It is multistage from geosynthetic material soil stone emergency spillway that bursts
CN105544455B (en) Dykes and dams super standard flood flood diversion pipe band
CN105603941B (en) Multistage geosynthetics soil stone emergency spillway of bursting certainly
CN205576835U (en) Multistage soil property flood diversion dykes and dams of bursting certainly of geosynthetic material protection
CN109235362A (en) Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway
CN105672189B (en) A kind of method of preventing and reducing natural disasters for preventing super standard flood dykes and dams damaged or destroyed by flood
CN205475064U (en) Dykes and dams super -standard flood flood diversion pipe racks
CN210887095U (en) Flood control dam for hydraulic engineering
CN108086264B (en) Intensive flooded channel
CN205530103U (en) Dykes and dams super -standard flood 's flood diversion pipe racks crowd
CN216141979U (en) Protective structure of water and electricity hydraulic engineering side slope
CN105568923A (en) Flood diversion pipe band group of dam for above standard flood
CN1185387C (en) Method for enlarging lake capacity for flood control

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160817

Effective date of abandoning: 20170825

AV01 Patent right actively abandoned