CN109235362A - Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway - Google Patents

Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway Download PDF

Info

Publication number
CN109235362A
CN109235362A CN201810944194.9A CN201810944194A CN109235362A CN 109235362 A CN109235362 A CN 109235362A CN 201810944194 A CN201810944194 A CN 201810944194A CN 109235362 A CN109235362 A CN 109235362A
Authority
CN
China
Prior art keywords
dams
dam
dykes
levee
self collapsing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810944194.9A
Other languages
Chinese (zh)
Inventor
叶兴
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810944194.9A priority Critical patent/CN109235362A/en
Publication of CN109235362A publication Critical patent/CN109235362A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Abstract

Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway, the national defence that the hydraulic engineering and dykes and dams reply water for belonging to emergency spillway engineering are attacked.The present invention it specifically include that Quantitative design cross flow confluence draws and rushes self collapsing levee dam;Cross flow confluence draw rush self collapsing levee dam (1) include kerbstone cross flow confluence draw rush self collapsing levee dam (1-a), upstream small dike's kerbstone cross flow confluence draw rush self collapsing levee dam (1-b), pipe band and kerbstone cross flow converge to draw and rush self collapsing levee dam (1-c);The geotechnological plate mask of geotechnological plate very floodway (2) it be made of multiple fish scale shape units, fish scale shape unit encrypts arrangement in the high region of flow velocity, is divided into geotechnological plate seamless connection (II-I), transverse joint fish scale shape connection (II-II) according to fish scale shape unit linked vector graph.The present invention be suitable for reservoir auxiliary dam, key dam, higher dyke, the very flood diversion of higher ditch head dam across a river controllable automatic flood diversion, structure it is simple it is easy to implement, cheap, do not take up an area permanently.

Description

Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway
Technical field
The invention belongs to dykes and dams very flood diversion hydraulic engineering technical fields, also belong to the defense technology field that reply water is attacked, More particularly to the design method on self collapsing levee dam, geotechnological plate very floodway.
Background technique
Japanese 75 western Japan heavy rains in 2018, Cangfu city very breach a dyke for one river of raised path between farm fields, and flood destroys by rush of water about three/ One house forces thousands of people to climb onto the roof emergency, only very for raised path between farm fields, is resulting at least 28 people wrecked, Japanese authorities the force of rain most When serious, went out evacuation command to 5,000,000 human hairs, but these order many common people not take seriously, not due to flood Certainty, the uncertainty to inrush, theoretical under technical conditions in existing flood control, " wolf is coming " is global social concern. Japan's No. 10 typhoon " Lion Rock " heavy rain in 2016 causes Hokkaido, Japans and the Northeast more people of waterflooding of breaching a dyke wrecked.Japan On September 11 days 10,2015 successive two this generation of river floods overflow dike and burst, and cause the more people of 7 personnel deaths missing and injury, Fortune is caused to lose, 20 centimetres of dykes and dams that 10 years one 4 meters high for meeting standard of flood are crossed after eagre inrush, people The Japan mouthful more, national territorial area is small, economically developed inrushes disaster by super standard flood year after year, once the people that inrushes of happening suddenly has little time Escape, this is global problem.According to Chinese floods and droughts bulletin: 12 years to 14 years water conservancy projects damaged or destroyed by flood years lost 46,800,000,000 yuan extremely 44600000000 yuan, national water engineering facility damaged or destroyed by flood in 16 years is at totally 17.57 ten thousand, and 697.7 hundred million yuan of water conservancy projects direct losses, wherein greatly Medium-sized reservoir 111, small reservoir 2337, at dyke 66950, dyke 90250,14256, sluice, irrigating facility At 233879.A large amount of frequent damaged or destroyed by flood reservation or revocation of the low mini engineering of standard of flood are problems, because mini engineering, which has, meets national conditions Particular advantages, built just to have its existent value by taking small reservoir as an example, in plato and hill, they are decentralized, access on the spot Water floods that the small, effect on environment in arable land is small to require that low, damaged or destroyed by flood consequence is small without land occupation water supply project over long distances, management, it meets Chinese people is ploughed few national conditions more, this problem is all not present in US and Russia Europe;Medium and small reservoirs by water attack threaten it is small, if central water supply Large reservoir encounter war water and attack threat, not water storage grain security is compromised, and it is to threaten that water storage water, which attacks dam break, because of west state Family, which attacks water, is classified as war important option, and water attacks dam break and destroys lower reservoir dam, chain destruction dyke, flood-diversion sluice, head works work Journey leads to river diversion, and there are more than 80,000 reservoirs and numerous high dykes, flood-diversion sluice, head-work in China, and it is difficult for how coping with water and attacking Topic is also blank spot.In addition, Rapid-Urbanization, remote water project management shortage of staff is problem, national boundary river trans-boundary water point Flood, do not have build detention basin medium or smallsized river how flood diversion, divide sluice management and maintenance maintenance, the single flood releasing structure of reservoir Contingency is problem;The plastic garbages such as medical treatment, old chemical fibre clothes recycling are problems.
If being to solve numerous low water head water conservancy projects using emerging et al. the self collapsing levee dam geosynthetics very floodway of leaf A kind of feasible scheme of economic technology of building damaged or destroyed by flood.Due to there is no self collapsing levee dam design theory, become the barrier of popularization and application Hinder.Self collapsing levee dam is ancient in China and has it, and ancient times Dujiang weir just uses blown sand weir, just bursts as Japanese dyke overflows 20 centimetres of water Case can be found everywhere, this illustrates that self collapsing levee dam has feasibility, but also having self collapsing levee dam not burst in time causes key dam to overflow dam Case, furnish a huge amount of money for since the fifties to carry out the self collapsing levee dam design reason that experimental study is not built consensus both at home and abroad By it becomes 60 years pendent worldwide theoretical puzzles.Self bursting dam is introduced into Design of Reservoirs in modern American people, Nineteen fifty-nine E.RoyTinney introduces prototype and model investigation, opens self bursting dam system in " performance of flushing from weir of bursting " text Journal of Sex Research of uniting draws immediately because self bursting dam super standard flood enabling probability is small, low cost, automatic opening, advantage convenient for management Countries in the world are played to furnish a huge amount of money for carry out follow-up research.The F Sai Tuerke of Turkey in 1978 is in " a kind of novel spillway " Point out " hard surface anti-impact makes self bursting dam be difficult to the problem of bursting, and solves using jet-bedding is drawn ".Zhang Kejian is in " Zhejiang reservoir spillway Building overview and related knowledge question of water conservancy " in point out that " after 75.8 flood of Henan China, planning and design institute of Ministry of Water Resources and Power Industry organizes river South, Liaoning, Zhejiang, Anhui etc. save the experimental study that self bursting dam is carried out in relation to design R&D institution, live prototype or large scale Not only model test cost is very big, and the dam body that testing data also can only explain under this kind of dam type and this kind of experimental condition washes away Situation, can not design to provide for self bursting dam generally can provide the analysis calculation method of application and just once occur in small-sized hilly pond reservoir Cross and do not cause inundating the dam by flood because the temporary adhesive low bank of earth between fields is not destroyed by rush of water in time ", the emphasis of China's research is also to draw jet-bedding and draw washing pipe, The disadvantage is that testing expenses are high and draw jet-bedding scale, the design of spacing needs test determination, can not be protected in face of uncertain flood Card draws routed in time, and drawing jet-bedding maintenance management is also problem." Hydroplus-one kind is novel recommending Swedish patent by Guo Jun Flood control water blocking formula from burst weir " in quote inventor " the long-term consolidation of self bursting dam is allowed to be difficult in flood period by the problem of destroying by rush of water ", Consolidated clay is solved the problems, such as using the concrete cut to topple automatically, because can precisely quantify the condition of bursting, more than ten of state Family uses.But its dissipation and scouring requires height, cost high and topples to will cause disaster of surging greatly very much from bursting.Pang Min " is bursting certainly The design of formula emergency spillway " point out " geomembrane self collapsing levee dam breaking is fast ", it can protect to stay without reference to geomembrane and swim dam body resistance Stagnant the problem of washing away." Chinese rivers flood control book series-Haihe River volume " Haihe River uses self collapsing levee dam, exists because self collapsing levee is anti-and is unable to control The shortcomings that, using human-generated explosives as alternative.There is presently no the design theories that self collapsing levee is prevented, generally general is human-generated explosives Flood diversion method, advantage can overcome consolidated clay, hard surface uncertain, the management of disadvantage flood season and explosive management require it is high, Once explosion flood diversion is out of control.Dykes and dams burst very generally, without the feasible self collapsing levee dam design theory with common recognition, just without complete skill Art, the reason of be that present self bursting dam design theory is to quantify to reach standard of flood as defined in specification, i.e. self bursting dam starts to open Move that reservoir level rises to the time of normal water level and self bursting dam time of bursting coincide, and various dams are from bursting phenomenon mechanism all very Complexity can be solved without mathematical model at present;At present by research technique, only draw jet-bedding self bursting dam it is big have than ruler bulk testing it is similar Property, the statically indeterminate structure for drawing three face consolidated clays of jet-bedding complicates the issue, while test can't resolve the uncertain of flood Property, unlimitedness and consolidated clay and hard surface cause from the uncertain problem burst, it is all at present by experimental design Self bursting dam must be rare singularity lanthanon, be hardly obtained the verifying of practice;It is limited by economic technology condition a large amount of middle-size and small-size Dam, head-work, dyke, canal structure, cofferdam, specification allows super standard flood damaged or destroyed by flood, although the damaged or destroyed by flood of magnanimity, specification People are allowed to be accustomed to.
Super standard flood of the invention further includes flood caused by attacking more than administrative standard and war water, flood diversion of the invention Road includes reservoir spillway, emergency spillway, head works floodway and dyke floodway, and dykes and dams include reservoir dam and river and lake dike Anti-, geosynthetics adds colour bar cloth including geotechnological plate, composite geo-membrane, waterproof geotechnological woven fabric, colour bar cloth, non-woven fabrics, soil Work plate includes conventional geotechnological plate, bamboo wound composite plate, and geotechnological plate film cloth is knitted including geotechnological plate, geomembrane, waterproof geotechnique Cloth.
In conclusion establish self collapsing levee dam design theory and complete set technology to be related to Homeland Security in the urgent need to address Theoretical and technical problem;It is Hydraulic Engineering Design under the conditions of urbanization, mechanization, management theory and technology in the urgent need to address Problem;It is boundary river between country, the flood diversion of across footpath river theory and technical problem in the urgent need to address.
Utilize the method and Zhe Sheng in 1978 of leaf emerging et al. rock-fill dams damaged or destroyed by flood mathematical model and the evolution of origin cause of formation Dynamic Coupling Water conservancy and hydropower Science Institute etc. " report of South Mountain reservoir self bursting dam experimental stage " data establishes dykes and dams and bursts mechanism, recycles The dykes and dams of Ye Xing are prevented and reduced natural disasters the method for design theory, are established self collapsing levee dam and are prevented and reduced natural disasters design theory and complete set technology, for solution Certainly pendent global problem provides a kind of method.
Summary of the invention
The purpose of the present invention: according to " the blown sands mechanism " on blown sands weir, self collapsing levee dam is constructed using self collapsing levee dam damaged or destroyed by flood mechanism It prevents and reduces natural disasters design theory, is suitable for the complete self collapsing levee dam structure of any head by the invention of self collapsing levee dam design theory, leads to It crosses dykes and dams to prevent and reduce natural disasters the complete geotechnological plate of design theory building very floodway, using the emerging geotechnique's synthesis material of geotechnological plate extension leaf It is included in the specification with intellectual property and provided fundamental basis and technical support, for solution by the organization plan of the unusual floodway of material It breaches a dyke anti-, the Yellow River silt arrester, small dyke, canal structure damaged or destroyed by flood problem, to solve water project management problem, medium or smallsized river Flood diversion problem, war water are attacked, the single flood releasing structure contingency problem of reservoir, difficult to solve trans-boundary water and boundary river flood diversion Topic provides a kind of new method to solve the problems, such as that plastic garbage utilizes, and realizes the target for ensuring Homeland Security.
Cross flow of the present invention confluence, which is drawn, rushes self collapsing levee dam and geotechnological plate very floodway is independent of each other, and cross flow converges and draws punching Self collapsing levee dam applies also for geotechnological woven fabric, non-woven fabrics, geomembrane, composite geo-membrane, colour bar cloth, stone masonry, concrete structure very Floodway, geotechnological plate very floodway apply also for geotechnological plate, geotechnological woven fabric self collapsing levee dam, geomembrane self collapsing levee dam, non-woven fabrics Self collapsing levee dam, the naughty base of cross flow, which draw, rushes self collapsing levee dam, and cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway suitable for any Rivers, lake, canal system, dyke are from flood diversion of bursting, the emergency spillway suitable for large, medium and small reservoir low water head.
In order to achieve the above object, core technology of the present invention is that set of cross flow confluence draws and rushes self collapsing levee dam and geotechnological plate very Two mutual independent structures of floodway and a key theory, key theory be include that self collapsing levee dam takes precautions against natural calamities and subtracts, critical washes away Destroy weir headwater depth, unrestrained water dykes and dams burst be broken to because coupling destroy the self collapsing levee dam that dynamical evolution is constituted and prevent and reduce natural disasters design Theory, theory are the targets of structure, and structural support is theoretical.
Above-mentioned purpose is realized by following technical scheme: cross flow confluence, which is drawn, rushes the very flood diversion of self collapsing levee dam geotechnique's plate Road draws according to cross flow confluence and rushes self collapsing levee dam design theory design cross flow confluence of preventing and reducing natural disasters and draw and rush self collapsing levee dam, according to exceeded Quasi- flood dykes and dams are prevented and reduced natural disasters Theoretical Design geotechnique plate very floodway, and cross flow confluence, which is drawn, rushes self collapsing levee dam bottom and connect geotechnological plate Very floodway, geotechnological plate very floodway two sides connect dykes and dams bank;Super standard flood dykes and dams are prevented and reduced natural disasters theory, it be according to Flood discharge beach water in field ruins mechanism and the structure type and scale of the determining geotechnological plate of target of preventing and reducing natural disasters very floodway, with dispersion point The theory of preventing and reducing natural disasters that flood, decentralized storage of water are attacked as reply war water, cross flow confluence, which is drawn, rushes the very flood diversion of self collapsing levee dam geotechnique's plate Road by cross flow confluence draw rush self collapsing levee dam cross flow elevation be divided into single-stage cross flow confluence draw rush self collapsing levee dam geotechnique's plate very floodway, Multistage cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway, and multistage cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate and divide very much Big vast road is the floodway on the self collapsing levee dam with more than two elevations, for 3 grades, 1 grade of self collapsing levee dam and 2 grades of self collapsing levee dams Height difference is 1 grade of differential d1, 2 grades of self collapsing levee dams and 3 grades of self collapsing levee height of dam differences are 2 grades of differential d2, 3 grades of self collapsing levee dams and dykes and dams height difference For 3 grades of differential d3, it is divided into following form;Self collapsing levee dam very floodway is expanded in multistage staggered floor side, and for 3 grades, it is successively wrapped Include 1 grade of self collapsing levee dam, 2 grades of self collapsing levee dams, 3 grades of self collapsing levee dams, 1 grade of expansion of geosynthetics side slope protection, 2 grades of geosynthetics Slope protection, horizontal geosynthetics anchoring body are expanded in side;Multistage staggered floor lamination self collapsing levee dam very floodway, for 3 grades, it according to Secondary includes 1 grade of self collapsing levee dam, 2 grades of self collapsing levee dams, 3 grades of self collapsing levee heights of dam, 1 grade of trapezoidal geosynthetics lamination mask, 2 grades Trapezoidal geosynthetics lamination mask, L shape geosynthetics anchoring body, geotechnological plate river bottom protection, geotechnological plate slope protection, horizontal geotechnique Curtain is pierced in synthetic material anchoring body, geomembrane cloth antiseepage;Multistage staggered floor separation levee self collapsing levee dam very floodway, it is the separation levee of staggered floor Separate the self collapsing levee dam of staggered floor;Multistage slope separation levee self collapsing levee dam very floodway, it is that slope separation levee separates slope self collapsing levee Dam.
In order to further realize the above object, cross flow confluence, which is drawn, rushes self collapsing levee dam and prevents and reduces natural disasters design theory, it be by Draw with target design cross flow confluence of preventing and reducing natural disasters according to dykes and dams mechanism of bursting and rush the structure type on self collapsing levee dam, Quantitative design cross flow converges Stream draw rush self collapsing levee dam is differential, cross flow confluence draw rush self collapsing levee dam zoning, Quantitative design kerbstone cross flow confluence draw blurt out it is scarce Mouthful depth, unrestrained water dykes and dams burst mechanism, it is that unrestrained water dykes and dams cross flow rate is more than that soil body anti-impact flow velocity dykes and dams will wash away It destroys, unrestrained water dykes and dams cross flow erosion damage causes unrestrained water dykes and dams geometry to change, and unrestrained water dykes and dams geometry change causes to overflow The change of water dykes and dams flow-shape, it is further exacerbated by erosion damage, and the change of unrestrained water dykes and dams flow-shape necessarily passes various Fixed critical erosion damage weir headwater depth, unrestrained water dykes and dams geometry change cause seepage through soil mass and stress changes, seepage through soil mass Various unrestrained water dykes and dams will be caused to burst more than the permissive permeability gradient of the soil body, shearing strength, tensile strength with stress to be broken to The coupling of cause destroys dynamical evolution, forms unrestrained water dykes and dams erosion damage and bursts to dykes and dams, then the differentiation stable to dykes and dams crevasse;Face Boundary's dykes and dams headcut scour destroys weir headwater depth HdIf wider dykes and dams top is channel flow using formula (1), formula (2) simultaneous solution Hd, If dykes and dams top is weir flow using formula (2), formula (3) simultaneous solution Hd, critical dykes and dams top incision erosion damage weir headwater depth Hu, adopt With (4), (5) simultaneous solution Hu, critical not erosion damage weir headwater depth Hn, using (6), (7) simultaneous solution Hn, differential diUsing Formula (8), cross flow confluence, which is drawn, rushes self collapsing levee dam zoning using formula (9), (10), (11), if dykes and dams are shorter using non- Uniform flow inquires into slope foot flow velocity, and kerbstone cross flow confluence draws notch depth of blurting out and uses formula (12),
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
In formula: hi、vi、hi+1、vi+1- respectively represent the dykes and dams top stream upstream and downstream section depth of water (m) of section, flow velocity (m/s), in it is initial hi+1Using critical depth of water hk; △l,il- respectively represent dykes and dams top stream segment length (m), dykes and dams top Parallel to the flow direction longitudinal slope;J— Represent the average hydraulic gradient on dykes and dams top;Vd- represent slope surface initial velocity in downstream at the dykes and dams level of tail water;N, R, i-generation respectively Table dykes and dams downstream slope surface roughness, hydraulic radius (m), longitudinal slope;Q, ε, m, σ, B-respectively represent dykes and dams top flow (m3/ s), side receive Contracting coefficient, discharge coefficient, to flood coefficient, cross flow wide (m);G-represents acceleration of gravity (m/s2);α-represents velocity flow profile system Number;v0- represent velocity of approach (m/s); Vu- represent dykes and dams top parting hard surface, sandstone dam body, dykes and dams clay cut-off wall Dynamic flow velocity (m/s);Vn- represent dykes and dams clay cut-off wall or sandstone dam body non-scouring velocity (m/s); di- i-stage is differential, m; Hd- critical dykes and dams headcut scour destroys weir headwater depth, m;Ai- water level rise rate and dykes and dams burst speed and engineering order because The self collapsing levee dams or self collapsing levee dam at different levels of element and dike dam heightening;He- represent and draw punching pin dykes and dams height, m;Hu- represent critical dykes and dams Push up incision erosion damage weir headwater depth, m;As- represent sub- dam heightening, m;β-mother's sandstone dyke (dam) and the easy sand surfing of female non-sticky The inclination angle in stone earth embankment dam area upstream and downstream line of demarcation,;The easy sand surfing stone earth embankment dam internal friction angle of φ-mother's non-sticky,;T-mother's sandstone Dyke (dam) and the easy sand surfing stone earth embankment dam area horizontal dividing lines of female non-sticky female sandstone dyke (dam) scour hole depth below, m;K-punching Cheat coefficient;The critical dykes and dams headcut scour of q-destroys discharge per unit width, m3/s.m;Z-water levels of upstream and downstream is poor, m;ht- downstream water depth, m;hg- represent the notch depth with notch kerbstone, m;Hg- critical dykes and dams foot headcut scour destruction weir headwater depth is represented, m;Ag- represent notch depth and increase, m;
Unrestrained water dykes and dams burst be broken to because coupling destroy dynamical evolution, be typical case, cross flow dykes and dams downstream with unrestrained water Clay Microstructure It is open channel uniform flow erosion damage that erosion damage, which takes place, in slope, is that unrestrained water dykes and dams downstream sandy soil slope headcut scour destroys at this time Stage beginning, corresponding weir headwater depth are that critical dykes and dams headcut scour destroys weir headwater depth Hd;Washing away makes dam base dam slope steepening, Open channel nonuniform flow precipitation fluidised form level erosion damage step by step is formed, the higher level of tracing to the source of dykes and dams washes away faster, unrestrained water dykes and dams bottom After portion's gradient is greater than sandy soil internal friction angle, it is broken that sand earth embankment dam body generates the straight line landslide that inclination angle is sandy soil internal friction angle Bad, dykes and dams slope surface is transferred, and turning point is occurred in dykes and dams slope surface and is developed into down stream erosion damage, and the higher down stream of dykes and dams is traced to the source punching It brushes faster;When slope straight line landslide in unrestrained water dykes and dams downstream extends under the road surface of dykes and dams top, hard surface forms cantilever down stream, in dam abutment Place forms road surface down stream erosion damage, and the cantilever road surface on scour hard surface basis, Clay Microstructure downstream is used in self weight, water recast Lower generation moment of flexure stress rupture and local shedding develop as Clay Microstructure cantilever down stream, lose sandy soil after dykes and dams Clay Microstructure Dyke (dam) support, the Circular Slip peeled off layer by layer is generated under osmotic pressure, Gravitative Loads and is destroyed, and washing away, landslide coupling is broken Under bad, cross flow dykes and dams Clay Microstructure is thinning and seepage erosion occurs, and empties roadbed, and hard surface is washed away in self weight, water weight, dynamic water Effect is lower to occur fall damage, is unrestrained water dykes and dams crevasse initial phase at this time;When unrestrained water dykes and dams Clay Microstructure top loses hardening road When the scour protection of face, overflows water dykes and dams Clay Microstructure and incision erosion damage occurs, under unsaturation consolidated clay anti-impact flow velocity in top is big It cuts slowly, seepage flow saturation consolidated clay anti-impact flow velocity in bottom is small and the big incision of flow velocity is fast, and Clay Microstructure is in self weight, water pressure, soil pressure The stress rupture that unrestrained water dykes and dams Clay Microstructure cantilever occurs fracture or topples under power effect, the cohesion of top unsaturation consolidated clay Power, internal friction angle are big, and tension stress is big, and generation stress rupture is slow, and bottom unsaturation consolidated clay cohesiveness, internal friction angle are small, Tension stress is small, and generation stress rupture is fast, and the crevasse depth of water increases, the quick incision erosion damage of crevasse Clay Microstructure, is just formed unrestrained Water dykes and dams burst the stage, under the conditions of critical dykes and dams headcut scour destroys weir headwater depth, overflow water dykes and dams crevasse initial phase evolution It is a slow process, it is more lower slower overflows water dykes and dams;In dykes and dams weir headwater depth on critical dykes and dams top incision erosion damage weir Depth of water HuUnder the conditions of, dykes and dams top downstream road surface occur to destroy first and on prolong, unrestrained water dykes and dams Clay Microstructure loses scour protection hair It gives birth to and cuts erosion damage, unrestrained water dykes and dams crevasse initial phase is formed, while downstream slope occurs headcut scour and destroys, with regard to quick evolution Burst the stage for unrestrained water dykes and dams;When dykes and dams weir, headwater depth reaches critical not erosion damage weir headwater depth Hn, dykes and dams crevasse lateral incision is slow Slowly, the unrestrained water dykes and dams crevasse stabilization sub stage is formed;The relatively narrow jet-bedding formula self collapsing levee dam that draws is the affixed statically indeterminate structure in three faces, and top is non- Cohesiveness, the internal friction angle for being saturated consolidated clay are larger, fracture, the stress rupture that topples it is slow, bottom saturation consolidated clay Cohesiveness, internal friction angle it is smaller, fracture, the stress rupture that topples it is fast.
Unrestrained water dykes and dams burst be broken to because coupling destroy dynamical evolution, be typical case, cross flow dykes and dams with unrestrained water Clay Microstructure It is open channel uniform flow erosion damage that erosion damage, which takes place, in downstream slope, is that unrestrained water dykes and dams downstream sandy soil slope headcut scour is broken at this time Bad initial phase, corresponding weir headwater depth are that critical dykes and dams headcut scour destroys weir headwater depth Hd;Washing away makes dam base dam slope Steepening, forming open channel nonuniform flow, precipitation fluidised form level erosion damage, the higher level of tracing to the source of dykes and dams wash away faster, Man Shuidi step by step After dam bottom slope is greater than sandy soil internal friction angle, sand earth embankment dam body generates the straight line that inclination angle is sandy soil internal friction angle and comes down It destroys, dykes and dams slope surface transfers, turning point occurs in dykes and dams slope surface and develop into down stream erosion damage, the higher down stream of dykes and dams is traced to the source It washes away faster;When slope straight line landslide in unrestrained water dykes and dams downstream extends under the road surface of dykes and dams top, hard surface forms cantilever down stream, on dam Down stream erosion damage in road surface is formed at shoulder, scour hard surface basis, the cantilever road surface in Clay Microstructure downstream is in self weight, water recast The local shedding with lower generation moment of flexure stress rupture develops as Clay Microstructure cantilever down stream, loses sand after dykes and dams Clay Microstructure The support of earth embankment dam body generates the Circular Slip peeled off layer by layer under osmotic pressure, Gravitative Loads and destroys, and is washing away landslide coupling Under destruction, cross flow dykes and dams Clay Microstructure is thinning and seepage erosion occurs, and empties roadbed, hard surface is in self weight, water weight, dynamic water punching Brush effect is lower to occur fall damage, is unrestrained water dykes and dams crevasse initial phase at this time;When unrestrained water dykes and dams Clay Microstructure top loses hardening When the scour protection of road surface, overflows water dykes and dams Clay Microstructure and incision erosion damage occurs, unsaturation consolidated clay anti-impact flow velocity in top is big Incision is slow, and seepage flow saturation consolidated clay anti-impact flow velocity in bottom is small and the big incision of flow velocity is fast, and Clay Microstructure is in self weight, water pressure, soil The stress rupture that unrestrained water dykes and dams Clay Microstructure cantilever occurs fracture or topples under pressure effect, the cohesion of top unsaturation consolidated clay Power, internal friction angle are big, and tension stress is big, and generation stress rupture is slow, and bottom unsaturation consolidated clay cohesiveness, internal friction angle are small, Tension stress is small, and generation stress rupture is fast, and the crevasse depth of water increases, the quick incision erosion damage of crevasse Clay Microstructure, is just formed unrestrained Water dykes and dams burst the stage, under the conditions of critical dykes and dams headcut scour destroys weir headwater depth, overflow water dykes and dams crevasse initial phase evolution It is a slow process, it is more lower slower overflows water dykes and dams;In dykes and dams weir headwater depth on critical dykes and dams top incision erosion damage weir Depth of water HuUnder the conditions of, dykes and dams top downstream road surface occur to destroy first and on prolong, unrestrained water dykes and dams Clay Microstructure loses scour protection hair It gives birth to and cuts erosion damage, unrestrained water dykes and dams crevasse initial phase is formed, while downstream slope occurs headcut scour and destroys, with regard to quick evolution Burst the stage for unrestrained water dykes and dams;When dykes and dams weir, headwater depth reaches critical not erosion damage weir headwater depth Hn, dykes and dams crevasse lateral incision is slow Slowly, the unrestrained water dykes and dams crevasse stabilization sub stage is formed;The relatively narrow jet-bedding formula self collapsing levee dam that draws is the affixed statically indeterminate structure in three faces, and top is non- Cohesiveness, the internal friction angle for being saturated consolidated clay are larger, fracture, the stress rupture that topples it is slow, bottom saturation consolidated clay Cohesiveness, internal friction angle it is smaller, fracture, the stress rupture that topples it is fast;The cross flow confluence of cantilever design, which is drawn, rushes self collapsing levee Dam obtains A using top local section model testi、Az
In order to further realize the above object, cross flow confluence, which is drawn, rushes self collapsing levee dam, high, female non-using punching pin dykes and dams are drawn Sticky easily sand surfing stone earth embankment dam area internal friction angle, female sandstone dyke (dam) scour hole depth divide self collapsing levee dam subregion, it includes as follows Form: kerbstone cross flow confluence, which is drawn, rushes self collapsing levee dam, and by taking kerbstone cross flow confluence draws and rushes Clay Microstructure self collapsing levee dam as an example, it is wrapped It includes and draws geotechnological plate film cloth antiseepage curtain body drawing for Clay Microstructure of connection of blurting out and blurt out, draw geotechnological plate film cloth antiseepage curtain body upstream and downstream of blurting out The easy sand surfing stone earth embankment dam of sub- non-sticky of blurting out is drawn in connection, and Clay Microstructure draws periphery connection geomembrane cloth contact antiseepage curtain of blurting out, Draw the easy sand surfing stone earth embankment dam downstream dam abutment connection kerbstone cross flow confluence of sub- non-sticky of blurting out and draw the indentation, there blurted out, draws son of blurting out The easy sand surfing stone earth embankment dam crest portion of non-sticky connects parting hard surface, and the female easy upstream sand surfing stone earth embankment Ba Qu connection of non-sticky is female husky Stone earth embankment dam body, kerbstone cross flow confluence draw bottom of blurting out and connect the easy downstream the sand surfing stone earth embankment Ba Qu dam abutment of female non-sticky, curb Stone cross flow confluence draws the tubaeform confluence of notch downstream connection of blurting out and draws sluicing slot, and transverse joint, female non-sticky is arranged in kerbstone indentation, there The easy sand surfing stone upstream earth embankment Ba Qu connects female sandstone dykes and dams;Small dike's kerbstone cross flow confluence in upstream, which is drawn, rushes self collapsing levee dam, with upstream Small dike's kerbstone cross flow confluence, which is drawn, rushes for clay core wall self collapsing levee dam, it successively includes drawing geotechnological plate film cloth antiseepage curtain of blurting out The easy sand surfing stone earth embankment dam of sub- non-sticky of blurting out, clay core wall, female sandstone dyke (dam), the easy sand surfing stone soil of female non-sticky are drawn in body, upstream Dykes and dams area, kerbstone cross flow confluence draw blurt out, it is tubaeform confluence draw sluicing slot, through parting hard surface kerbstone transverse joint, point Stitch hard surface, geomembrane cloth contacts antiseepage curtain;Pipe band and kerbstone cross flow confluence, which are drawn, rushes self collapsing levee dam, with pipe band and kerbstone Cross flow confluence, which is drawn, rushes for clay core wall self collapsing levee dam, it successively includes drawing geotechnological plate film cloth antiseepage curtain body of blurting out, drawing son of blurting out The easy sand surfing stone earth embankment dam of non-sticky, clay core wall, female sandstone dyke (dam), the easy sand surfing stone earth embankment Ba Qu of female non-sticky, kerbstone are unrestrained Stream confluence draw blurt out, it is tubaeform confluence draw sluicing slot, transverse joint, pipe band, parting hard surface, geomembrane cloth contact antiseepage curtain.
In order to further realize the above object, geotechnological plate very floodway, it included water and soil dykes and dams top surface connection soil Work plate mask, geotechnological plate mask top surface connect soil body protective layer, it includes geotechnological plate river bottom protection, geotechnological plate slope protection with geotechnological plate mask, It is made of geotechnological plate mask multiple fish scale shape units, and fish scale shape unit encrypts arrangement in the high region of flow velocity, according to fish scale shape Unit linked vector graph is divided into geotechnological plate seamless connection, the connection of transverse joint fish scale shape, by taking two neighboring fish scale shape unit as an example, geotechnological plate Seamless connection, it includes that geotechnological sole scale and shell upstream end bottom surface connects upstream fish scale shape unit, geotechnological sole scale and shell downstream bottom Face connects downstream fish scale shape unit, and the connection of transverse joint fish scale shape, stream rides on the fish scale shape unit of downstream upstream fish scale shape unit downstream You Duan, upstream fish scale shape unit downstream connecting rod line, bar line bottom end connect downstream fish scale shape unit;Fish scale shape unit it include Following form: geotextiles threading geotechnique's sole scale and shell shape unit, it includes the body that bankets in trapezoidal geotextiles threading, trapezoidal geotextiles Threading top connects geotechnological sole scale and shell;Trapezoidal geotextiles close threading geotechnique sole scale and shell shape unit, it includes trapezoidal geotechnique Cloth closes threading upstream end and connects upstream connecting rod line, and trapezoidal geotextiles closing threading downstream connects downstream connection bar line, ladder Banket body in shape geotextiles closing threading, and upstream connecting rod line, downstream connection bar line top connect geotechnological sole scale and shell piece upstream End;Geotechnological plate threading geotechnique sole scale and shell shape unit, it successively includes geotechnological plate threading, geotechnological plate scale, the soil body;Concrete frame Frame geotextiles threading geotechnique's sole scale and shell shape unit, it includes the body that bankets in closing geotextiles threading, is closed in geotextiles threading It is placed in concrete frame, concrete frame top connects geotechnological plate scale upstream end;Reinforced concrete pile beam geotechnique's sole squama First shape unit, it successively includes reinforced beam, geotechnological plate scale, soil matrix, bar line, reinforced concrete pile, armored concrete Soil matrix is squeezed into stake;L shape geotechnique's plate threading geotechnique's sole scale and shell shape unit, it includes the body that bankets in open type L shape geotechnique's plate threading, The shape geotechnique plate threading top open type L connects geotechnological plate scale upstream end.
Beneficial effects of the present invention: the national defence value that 1. reply war water of the invention are attacked, the soil including the present invention Self collapsing levee dam, the emergency spillway of geosynthetics can meet an urgent need now build, be inexpensive, feature easy to implement, it may be used for Reply war water is attacked;Reply upper pond water attacks dam break and surges disaster, now built at the auxiliary dam, bank weir of reservoir its prevent or Dam break disaster is reduced, now building on head-work two sides dyke or barrage, which prevents dam break from surging, destroys head-work;In rivers Flood-diversion sluice upstream, which now builds it and prevents dam break from surging, to be destroyed flood-diversion sluice and changes its course;Dyke dispersion in rivers two sides builds it more, prevents Dam break, which is surged, to destroy dyke and leads to river diversion and the disaster of surging that inrushes, and wartime dispersion for the entire people is now built with of the invention small-sized Dyke, medium and small reservoirs water storage, agricultural supplies water on the spot, reduces water and attacks high dam dam break risk, reduces and flood arable land, reduce waterman Journey and land occupation reduce agriculture excessive exploitation of groundwater and threaten cities and towns safe drinking water, and large reservoir water is avoided to attack high dam dam break disaster and right The influence of ecological environment, Ensuring Food Safety.2. cross flow confluence of the invention draws and rushes self collapsing levee dam and prevent and reduce natural disasters design theory Learning value, the present invention quantify ancient Chinese " blown sands weir " and have well solved the world certainly using novel " geosynthetics " Inrush sciences problems and technical bottleneck of the dam length up to 60 years, the Theory comparison of it and existing individual experimental design self bursting dam, at all Difference be burst using dykes and dams mechanism Quantitative design multistage cross flow confluence draw rush self collapsing levee dam, Quantitative design cross flow confluence draw punching from Inrush dam subregion, it solves the problems, such as that the existing critical condition for obtaining the self bursting dam of individual that can only test with from the time of bursting, that is, solves It has determined and has furnished a huge amount of money for fill up the blank of self collapsing levee dam design theory without the worldwide theoretical puzzle of solution both at home and abroad, to formulate Self collapsing levee dam specification is provided fundamental basis to promote and apply self collapsing levee dam;It is answered remotely to control, being controlled automatically in hydraulic engineering With safety theory and technical guarantee is provided, the difficulty that the global remote middle-size and small-size hydraulic engineering of urbanization lacks management duty personnel is solved Topic.Quantitative design multistage cross flow confluence, which is drawn, rushes the differential of self collapsing levee dam, and it is theoretical indeterminable overproof that it solves existing design Flood uncertainty, the problem of unlimitedness;By overflow water dykes and dams burst be broken to because coupling destroy dynamical evolution, invent it is complete Partition type cross flow confluence draw and rush self collapsing levee dam, change the structure on existing self collapsing levee dam, utilize the easy sand surfing of standardized non-sticky The gradation of stone soil, median particle diameter Quantitative design self collapsing levee dam subregion thereby determine that it is solved from critical condition of bursting, from the time of bursting Probabilistic problem that the theoretical indeterminable consolidated clay of existing design, hard surface, coarse grain diameter sandstone dyke (dam) are burst certainly, Partition type cross flow confluence, which is drawn, rushes self collapsing levee dam structure and cross flow confluence draws and rushes self collapsing levee dam Quantitative design and mutually support, realization cross flow Confluence draw rush self collapsing levee dam it is reliable, predictable, controllable from bursting.It establishes cross flow confluence to draw and rush self collapsing levee dam design theory, into one The emerging dykes and dams of step support leaf are prevented and reduced natural disasters design theory, and are expanded to compared with high water head, according to high bank dam breaking it is fast, generate disaster Greatly, the prevent and reduce natural disasters theory emerging by leaf increases the differential height prevented and reduced natural disasters, in flood-fighting in design at maximum dykes and dams When, increase the differential height prevented and reduced natural disasters at maximum dykes and dams, prevents from bursting at maximum dykes and dams, break through one line of existing dykes and dams and set Meter is theoretical, provides theoretical foundation to modify existing dam designs specification;Using critical erosion damage weir headwater depth as self collapsing levee dam It is differential, draw the basis for quantitative design of punching pin dykes and dams height, then be aided with Ai、AsIncrease coefficient solve different dykes and dams uncertain flood, Uncertain routed problem certainly;High dykes and dams, the easy sand surfing stone internal friction angle of cohesiveless soil and scour hole depth are rushed using drawing, quantifies self collapsing levee Dam subregion, it avoids consolidated clay, hard surface, coarse grain diameter sandstone dyke (dam) in flow-shape change procedure and various unrestrained water dikes Dam breaking be broken to because coupling destroy the extremely complex process of dynamical evolution, by standardized Quantitative design self collapsing levee dam point Area forms fixed critical condition of bursting certainly, from the time of bursting, simplifies with operability;Unrestrained water dykes and dams burst be broken to because Coupling destroy dynamical evolution, self collapsing levee dam it is extremely complex burst presentation neutralizing be dynamical evolution mechanism, it is complete to establish Self collapsing levee dam structure is provided fundamental basis, and has theory that can introduce undergraduate course classroom, design, construction, management it is each Link is linked together, and is overflow water dykes and dams downstream sandstone slight slope headcut scour and is destroyed, it is to be multistage from burst differential design and self collapsing levee Dam zoning design is provided fundamental basis, and it is that can be used as the non-water that rises suddenly and sharply that it, which discloses sufficiently high existing clay core body self collapsing levee dam, The self collapsing levee dam of position is the certainly routed reliability in the built short self collapsing levee dam of discriminatory analysis, is that selection creates short self collapsing levee dam type formula There is provided foundation, it can be used for disclose self bursting dam do not burst in time and cause key dam burst case the reason of;Unrestrained water dykes and dams are burst Mouthful initial phase, it for determine draw punching pin embankment structure, the design of self collapsing levee dam distributed area is provided fundamental basis, and then solve to have hard Change the self collapsing levee dam design theory problem on road surface, consolidated clay, coarse grain diameter sandstone dyke (dam), the dykes and dams crevasse stabilization sub stage can be sentenced Determine the residual and flood diversion ability on self collapsing levee dam;Self collapsing levee dam crest end consolidated clay is that low flow velocity impact resilience is big, low water head tension is answered Power is big, this, which also discloses some self collapsing levee dams, to be to crack consolidated clay from probabilistic key of bursting in time from routed reason, Draw punching pin dykes and dams for invention and theoretical foundation is provided;It is existing to draw jet-bedding formula self collapsing levee dam Clay Microstructure, it is that three faces consolidate indeterminate knot Structure discloses the key that present self bursting dam test can not be general, converges certainly for the cross flow self collapsing levee dam of invention cantilever design and cross flow Dam configuration of bursting provides theoretical foundation;The target of the anti-design theory of self collapsing levee is to prevent and reduce natural disasters, and is not only using self collapsing levee dam certainly It bursts fast but also slow from bursting using self collapsing levee dam, because anti-slow burst of the self collapsing levee of short duration flood is also mitigation.Of the invention is unrestrained Water dykes and dams are burst the scientific research value of mechanism, as long as after subregion cross flow confluence draws and rushes that self collapsing levee dam small dike dam is fast and reliable and burst, at this time Self collapsing levee dam has the super ability of letting out and slows down the rate of climb of dykes and dams water level, while obtaining enough heads that washes away and accelerating from bursting, certainly It bursts and is getting faster, so burst certainly by female dykes and dams top surface part that prototype cross-section model studies cross flow self collapsing levee dam, instead of Whole self collapsing levee dam be it is relatively safe, may determine that accordingly from routed reliability, can satisfy design requirement, without comparing ruler greatly Test or bulk testing, test simply have operability, and theory of the invention can be tested with cantilever design by section Verifying, and similar projects can adopt test result, carry out scientific experiment research to formulate self collapsing levee dam standard, be specific work Journey experimental study provides test theory foundation, it is also the key for cracking top global problem.It is obtained using undisturbed soil test It is negated saturation and saturation consolidated clay impervious body cantilever design critical condition, using section prototype obtain clay allowable tensile stress, Initial velocity can find out identical clay accordingly and roll state in concretion state and now from routed pass property;It is started by the soil body Flow velocity can obtain critical dykes and dams headcut scour and destroy weir headwater depth, critical dykes and dams incision erosion damage weir headwater depth, critical Not erosion damage weir headwater depth;The research easy sand surfing stone soil of non-sticky can establish standardized self collapsing levee dam subregion from the time of bursting and set Meter, passes through section experimental study coarse grain diameter sandstone body initial velocity and the incision rate of various flow velocitys, so that it may determine Ai、AsMark Quasi- value.3. public welfare value of the invention and the value that brings the Yellow River under control, the invention is simple and feasible, it is inexpensive can be towards the small of small dyke Micro- peasant household, which provides commonweal technology guidance, has operability, fills up the blank of private small micro- Hydraulic Engineering Design management, is water Sharp social transformation provides technical support, private self-built naturally profitable, and magnanimity little Wei peasant household totality economic results in society are high, simultaneously Avoid great economic loss and environmental disruption caused by magnanimity dyke damaged or destroyed by flood.The present invention can solve silt arrester and uniformly burst difficulty Topic improves China and brings the Yellow River under control the design of unique silt arrester, avoids jeopardizing the Yellow River safety.4. the value of flood prevention management of the present invention: Flood diversion is dispersed to the equilibrium of beach field using the present invention, substandard flood flood diversion uses fixed cycle rotation system, water level is arranged at flood diversion Automatic forecasting system, its solution never have the cross-border small watershed river flood diversion problem for the condition for building detention basin, and flood-diversion sluice is built in solution High, the separate village of cost collects the problem of management, solves existing concentration and floods unfairness at one, the flood-diversion sluice addressing problem opposed.By In low cost of the present invention, unattended, automatic controllable flood diversion economical, technically feasible;Because have determining flood diversion place, really Fixed flood diversion water level is aided with automatic forecasting system again, and resident, peasant understand autonomous organizations prevention, withdraw automatically, government organization flood control, It withdraws and is also easy, it solves the global social problem of " wolf is coming ".5. cross flow confluence of the invention, which is drawn, rushes self collapsing levee dam: with The fundamental difference on existing self collapsing levee dam is that (1) changes existing clay core body self collapsing levee dam according to self collapsing levee dam breaking mechanism Structure, construct set of cheap, structure it is simple, it is super let out it is super it is routed subtract the cross flow confluence surged and draw rush self collapsing levee dam, according to certainly Inrush dam breaking mechanism, to it is set of it is super let out it is super it is routed subtract the cross flow confluence surged and draw rush that self collapsing levee dam carries out subregion and quantization is set Meter, probabilistic, unlimited super standard flood problem and uncontrollable disaster of surging can not be solved by solving existing self collapsing levee dam Problem, solve the insurmountable consolidated clay in existing self collapsing levee dam, hard surface, coarse grain diameter sandstone dam body from burst uncertainty Problem, solve the problems, such as that the design of existing self bursting dam can not be general using individual test;(2) cross flow confluence, which is drawn, rushes self collapsing levee Dam subregion effect is prolonged on female easy sand surfing stone earth embankment dam body area headcut scour of non-sticky destroys and straight line comes down, and causes parting hard Change road surface quickly collapses, impervious body loses dyke (dam) support and overturning, and then causes the easy sand surfing stone earth embankment dam of sub- non-sticky Seepage erosion;The sub- easy sand surfing stone earth embankment dam of non-sticky, seepage flow further causes hard surface collapsing, in low water head, low flow velocity item Seepage flow quickly bursts with washing away under coupling under part, and self collapsing levee dam obtains enough flow velocity realizations and draws punching, coarse grain diameter or containing gluing Property soil dyke (dam), also slow down dam break using slow burst while reducing cost using natural material and surge disaster;Consolidated clay is anti- Body is seeped, guarantees that safety under conditions of bursting, is burst slowly using consolidated clay and slows down dam break and surge in incision flow velocity;(3) draw soil of blurting out Work plate film cloth antiseepage curtain body replaces drawing the problem of clay cut-off wall of blurting out avoids consolidated clay cut-pff wall, easily rushes in sub- non-sticky The destruction of sandstone earth embankment dam headcut scour, which is toppled, to fall off, and then the destruction of small dike dam, hard surface collapsing is caused to burst and draw punching, it is solution The key for the problem for certainly having the low cross flow head of hard surface, short self collapsing levee dam breaking slow;(4) confluence draws punching with lesser cross flow Head acquisition is biggish to wash away discharge per unit width, and cross flow, which has to surpass, lets out ability, and cross flow head bursts more greatly faster, has super routed energy Power, it solves the problems, such as to solve super standard flood uncertainty, unlimitedness;On the one hand, self collapsing levee dam draws subregion of blurting out, and is converging Scour causes to prolong on the easy sand surfing stone earth embankment dam area straight line landslide of female non-sticky, and naughty sky draws the curb stone foundation blurted out, and causes curb Stone collapses, and further increases and washes away head, and kerbstone, which plays, laterally concentrates guide functions, after so that the road surface for having transverse joint is collapsed upwards Trip extension;On the other hand, wider to draw after easily routed geotechnological plate film cloth antiseepage curtain body of blurting out draws and blurt out and quickly burst, it is risen in kerbstone To guide functions, basis under lateral scour road surface are laterally concentrated, road bed collapses in the case where coupling is washed in a pan in downstream Hui Tao, side, The clay cantilever core-wall structure for losing the support of sandstone dyke (dam), loses the affixed effect of cantilever, makees in water pressure, soil pressure, seepage flow Overturning occurs with lower clay core body, solve three face consolidation statically indeterminate structure of top unsaturation consolidated clay low flow velocity, Anti-impact, tension are burst probabilistic problem under low head condition, and it is uncertain to solve hard surface, coarse grain diameter sandstone dam bursting The problem of property.Non-sticky easy sand surfing stone soil area is lacked for locality, subregion can be improved from routed speed and reduce project cost, Consolidated clay, coarse grain diameter sandstone dam body slow abatement of the bursting dam that inrushes surge.Using drawing the easy sand surfing stone of high, the female non-sticky of punching pin dykes and dams Earth embankment dam area internal friction angle, female sandstone dyke (dam) scour hole depth divide self collapsing levee dam subregion, Quantitative design self collapsing levee dam subregion.Road Kerb cross flow confluence, which is drawn, rushes self collapsing levee dam, and advantage is that project amount saves, the disadvantage is that parting hard surface slows down from speed of bursting;Upper alien Dike kerbstone cross flow confluence, which is drawn, rushes self collapsing levee dam, and advantage is that the small dike dam higher flow velocity that bursts of acquisition easily to burst washes away female dykes and dams Parting hard surface reduces influence of the mother stock seam hard surface to bursting, convenient for management, the disadvantage is that project amount is big compared with the former;Pipe Band draws with kerbstone cross flow confluence rushes self collapsing levee dam, and advantage is to work as to draw the washing pipe connection small flood of woven fabric band by pipe band flood diversion, no Start self collapsing levee dam, is directly unfolded into and draws washing pipe and draw punching, if there is accident in main body flood diversion building, active when can meet an urgent need Draw punching from flood diversion of bursting, great flood draws washing pipe and kerbstone cross flow confluence draws punching jointly, and disadvantage management requires high.The present invention with it is existing Cross flow self bursting dam compares, now only reservoir self bursting dam, the present invention cover reservoir dam and the various heads of river and lake canal dyke at Self collapsing levee dam structure is covered, it is not influenced by consolidated clay, hard surface;Compared with existing geomembrane self collapsing levee dam, present invention soil Work plate film cloth antiseepage curtain body prevents its retardance from routed problem, and its selection is extensively not limited to geomembrane;With automatically topple Concrete cut compares, low cost of the present invention, can gradual control surge, avoid disastrous toppling from surging;With human-generated explosives Flood diversion is compared, and the present invention is unattended, automatic controllable flood diversion, convenient for management;There is lock to draw jet-bedding with existing, draw washing pipe self collapsing levee dam Compare, wider cross flow confluence draws the easy cantilever design burst blurted out, the simple low cost of structure, and spacing pair of blurting out is drawn in encryption Cost influence is little, it solves the existing solid clay cut-off wall self collapsing levee dam in three faces for having lock to draw jet-bedding, drawing washing pipe and tries by individual The problem of Data Design is tested, it controls automatic flood diversion without gate.6. cross flow confluence of the invention, which is drawn, rushes self collapsing levee dam geotechnique's plate Unusual floodway: being with existing self collapsing levee dam floodway fundamental difference, according to self collapsing levee dam breaking mechanism, utilizes reason of preventing and reducing natural disasters By, carry out the height difference of self collapsing levee dam and non-overflow dykes and dams, multistage self collapsing levee dam it is differential be versatility Quantitative design, small water is small Routed, great flood is burst greatly, and realization is prevented and reduced natural disasters, it solves the unlimitedness, probabilistic problem of super standard flood, is solved a at present The problem of body experimental design multistage self bursting dam;Design theory of foundation very floodway super standard flood preventing and reducing natural disasters designs geotechnological plate Very floodway solves the problems, such as numerous small hydraulic project damaged or destroyed by floods and towards the flood diversion of beach field.The emerging multistage self collapsing levee dam with leaf Emergency spillway is compared, and Ye Xing only limits to low water head flood diversion towards beach field in pervious multistage self collapsing levee dam, and the present invention is on material It is widely applicable to expand to geotechnological plate, increases separation levee, slope connection in structure;Staggered floor advantage of the invention is structure and hydraulics Feature is simple, and disadvantage is not suitable for vehicle pass-through, is suitable for small dike's self collapsing levee dam, separation levee advantage is can temporarily to set up Simple bridge just In traffic and block diffluence pass, shunt elevation of weir crest can with flexible arrangement, by flood diversion elevation of weir crest can timely flood diversion, It flushes to have to surpass with ground and lets out ability and take into account water drainage, the disadvantage is that project amount is big, require height or control in time to divide suitable for traffic The dyke and reservoir of flood can quickly face especially in war and build suspension bridge and resume traffic with functions of national defense;Slope advantage is vehicle P Passable, the disadvantage is that complicated from routed hydraulic characteristic, from bursting, water level is difficult to accurate grading control, and it is demanding certainly to be suitable for traffic Inrush dam;It is that the shared small structure of dissipation and scouring section project amount is simple that advantage is expanded in side, the disadvantage is that flood diversion water level is single and higher The super ability of letting out in weir is small, once flood diversion blocks traffic, the dyke and small reservoir that have drainage gate of less demanding suitable for traffic;It is more Grade lamination advantage is that project amount is small, and flood diversion weir height is variable, and great flood divides greatly, small point of small flood, and structure is complicated and it is folded to require for disadvantage Layer height is larger, and suitable for higher self collapsing levee dam, traffic is of less demanding, dykes and dams of flood diversion limited width.With no emergency spillway Design of Reservoirs project plan comparison, the present invention can be to avoid the unexpected thing of the single earth and rockfill dam dam abutment spillway for having lock to control big aperture Therefore jeopardize the problem of earth dam safety, it avoids cost high and enables the extremely low steel construction of probability at full capacity and corrode to need to furnish a huge amount of money for conserve The problem of maintenance, avoid outdoor concrete by aging, freeze thawing, frost heave, sedimentation, seepage erosion problem;Compared with flood-diversion sluice, this There is no gate corrosion, outdoor concrete aging, freeze thawing, frost heave and routine servicing maintenance and problem of management, automatic flood diversion for invention Administrative vulnerability, burst war water is avoided to attack problem;Compared with single flood-diversion sluice, the automatic flood diversion of Ji Zikuidiba is washed in a pan equipped with cross flow, It can use long-range control and automatically control numerous remote gates under the conditions of flood-diversion sluice solves the problems, such as urbanization and lack administrative staff; Compared with dykes and dams are without lock floodway, concrete needs higher without the inevitable higher weir head of lock floodway if large discharge per unit Non-overflow dykes and dams, reservoir inundation is big, can not be directly to the flood diversion of beach field, and low cost of the present invention controls smaller weir using wide floodway Upper head reduces non-overflow dykes and dams height, directly can need longer overfall dam, work to the flood diversion of beach field if small discharge per unit width Journey cost is high, and the present invention is flooded small, and project cost is low;It is existing compared with existing multistage self collapsing levee dam concrete emergency spillway Concrete dividing pier form cost is high, and cost of the present invention is extremely low, and it is small routed big to wash in a pan the small water of base self collapsing levee dam floodway by multistage cross flow Water is burst greatly, and flood uncertainty problem is solved, and is realized purpose of preventing and reducing natural disasters, is solved the uncertain problem of super standard flood;With No flood diversion building compares, and geotechnological plate very floodway cost of the invention is extremely low, it allows hydraulic engineering super now to change The design theory of standard flood damaged or destroyed by flood provides technical support to establish dykes and dams super standard flood theory of preventing and reducing natural disasters.Using this hair It is bright can solve existing standard of flood it is low, without the very silt arrester of flood diversion measure, the largely River Embankment without flood-diversion sluice, canal system The problem of building, cofferdam damaged or destroyed by flood;It advantageously accounts for the problem of trans-boundary water boundary river flood diversion between country;Reduce flood-diversion sluice aging The maintenance problem of corrosion;And a kind of new way is provided for plastic garbage recycling.7. geotechnological plate very floodway of the invention: with The geosynthetics of Ye Xing very floodway compares, and increases the structure of geotechnological sole scale and shell in structure, is suitable for more Gao Shui Head higher flow rate and smaller floating material, compare, the geotechnological plate advantage that the present invention uses is can to meet an urgent need now to build, and is encountered on material War can take over civilian industry plate for use and replace geotechnological plate;Structure is simply easy to implement;Trapezoidal and closing threading is suitable for sandy land Base, the fish scale shape overlap joint of geotechnological sole squama shape mask plays drainage pressure-reducing dispersing water flow shearing force, prevents in uplift pressure, part It throws under the effect of damaged flowing pressure geotechnological sole squama shape mask, disadvantage overlaps excessive project amount and increases;Geotechnological plate seamless connection, The simple project amount of advantage structure saves, the very floodway suitable for small flow velocity;Geotextiles threading geotechnique's sole scale and shell shape unit, The fixed geotechnological sole scale and shell of trapezoidal geotextiles threading, geotechnological sole scale and shell can resist floating material, be suitable for low flow velocity;Trapezoidal soil Work cloth closes threading geotechnique sole scale and shell shape unit, locally destroys, and trapezoidal geotextiles closing threading retardance, which is washed away, prolongs; Geotechnological plate threading geotechnique sole scale and shell shape unit, is locally destroyed, and geotechnological plate threading retardance, which is washed away, prolongs, the disadvantage is that vertically Geotechnological plate is easily toppled by scour by unidirectional soil pressure, the self collapsing levee dam suitable for the shallow threading of low flow velocity;Concrete frame geotextiles Threading geotechnique's sole scale and shell shape unit, it resists high flow velocities, prevents geotechnological sole scale and shell destruction from washing away and prolongs, is suitable for Gao Shui The slope foot on head self collapsing levee dam and energy dissipation measure end;Reinforced concrete pile beam geotechnique's sole scale and shell shape unit, be suitable for it is existing compared with Low dykes and dams reconstruction is very floodway;L shape geotechnique's plate threading geotechnique's sole scale and shell shape unit is suitable for trapezoidal geotechnique's synthesis Material laminate mask.
Detailed description of the invention:
Fig. 1 cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway schematic longitudinal section;
Fig. 2 multistage cross flow confluence, which is drawn, rushes the vertical view schematic diagram of self collapsing levee dam geotechnique's plate very floodway pattern;
Fig. 3 cross flow confluence, which is drawn, rushes self collapsing levee dam type formula vertical section and vertical view schematic diagram;
Fig. 4 fish scale shape unit pattern thin portion schematic diagram.
Specific embodiment: it with reference to the accompanying drawing elaborates preferred forms of the invention (referring to Fig. 1, figure 2, Fig. 3, Fig. 4)
Embodiment 1: basin flood diversion system, certain basin dyke is drawn using cross flow confluence rushes self collapsing levee dam geotechnique's plate very floodway, Draw according to cross flow confluence and rush self collapsing levee dam design theory design cross flow confluence of preventing and reducing natural disasters and draw and rush self collapsing levee dam 1, according to overproof Flood dykes and dams are prevented and reduced natural disasters Theoretical Design geotechnique plate very floodway 2, and cross flow confluence, which is drawn, rushes 1 bottom of self collapsing levee dam and connect geotechnological plate Very floodway 2, geotechnological plate very 2 two sides of floodway connect dykes and dams bank 3;Super standard flood dykes and dams are prevented and reduced natural disasters theory, it is Mechanism is ruined according to flood discharge beach water in field and the structure type and scale of the determining geotechnological plate of target of preventing and reducing natural disasters very floodway, with dispersion As the theory of preventing and reducing natural disasters attacked of reply war water, cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate and divides very much for flood diversion, decentralized storage of water Draw to rush 1 cross flow elevation of self collapsing levee dam and be divided into single-stage cross flow confluence by cross flow confluence and draw and rush the very flood diversion of self collapsing levee dam geotechnique's plate in big vast road Road, multistage cross flow confluence, which are drawn, rushes self collapsing levee dam geotechnique's plate very floodway, and multistage cross flow confluence draws that rush self collapsing levee dam geotechnique's plate non- Normal floodway is that have two or more depth displacements for differential diSelf collapsing levee dam floodway, it is multistage from small water of bursting it is small burst, flood Big to burst, geotechnological plate very floodway 2 is divided into following form by self collapsing levee dam crest shape and linked vector graph;Multistage staggered floor side is expanded certainly 1. dam very floodway II-inrush, by taking self collapsing levee dam very floodway is expanded in 3 grades of staggered floor sides as an example, it successively includes 1 grade of self collapsing levee I -1- of dam 1., 2 grades of I -2- of self collapsing levee dam 1., 3 grades of I -3- of self collapsing levee dam 1., dykes and dams bank 3 is successively with 1 grade of differential d1, 2 grades of differential d2、 3 grades of differential d3Staggered floor symmetrically connects, and Quantitative design is differential, and the small routed, great flood of small flood is burst greatly, and 1 grade of geosynthetics side is expanded Slope protection A-1- 1., 2 grades of geosynthetics sides expand slope protection A-2- 1. successively separate 1 grade of I -1- of self collapsing levee dam 1., 2 grades of self collapsing levee dams I -2- 1., 3 grades of I -3- of self collapsing levee dam 1., when 1 grade of self collapsing levee dam overflow water burst flood diversion when, the expansion of 1 grade of geosynthetics side Slope protection plays erosion control, when 2 grades of self collapsing levee dams overflow water burst flood diversion when, 1 grade of geosynthetics side expansion slope protection is flushed away, Other at different levels and so on, slope protection horizontal joint bottom is expanded in the connection geosynthetics side horizontal geosynthetics anchoring body A1; Multistage staggered floor lamination self collapsing levee dam very floodway II -2., by taking 3 grades of staggered floor lamination self collapsing levee dams very floodway as an example, with 3 grades For staggered floor lamination self collapsing levee dam very floodway, it include 1 grade of I -1- of self collapsing levee dam 2., 2 grades of I -2- of self collapsing levee dam 2., 3 grades I -3- of self collapsing levee dam is 2., dykes and dams bank 3 is successively with 1 grade of differential d1, 2 grades of differential d2, 3 grades of differential d3Staggered floor symmetrically connects, and 1 grade trapezoidal Geosynthetics lamination mask A-1- 2., 2 grades of trapezoidal geosynthetics lamination mask A-2- 2. successively separate 1 grade of self collapsing levee I -1- of dam 2., 2 grades of I -2- of self collapsing levee dam 2., 3 grades of I -3- of self collapsing levee dam 2., horizontal geosynthetics anchoring body A1, geomembrane Curtain A2 is pierced in cloth antiseepage, and the shape geosynthetics top anchoring body A0 L connects at trapezoidal geosynthetics lamination mask longitudinal joint, when 1 grade of self collapsing levee dam overflow water burst flood diversion when, 1 grade of trapezoidal geosynthetics lamination mask plays erosion control, oneself is routed when 2 grades Dykes and dams overflow water burst flood diversion when, 1 grade of trapezoidal geosynthetics lamination mask rises and destroys at the top of slope protection first, and L shape is geotechnological Synthetic material anchoring body, which is emptied, loses anchorage effect, and last base foundation is emptied, 1 grade of trapezoidal geosynthetics lamination shield Face is flushed away, other at different levels from routed and so on;Multistage staggered floor separation levee self collapsing levee dam very floodway, it is the separation levee point of staggered floor Every the self collapsing levee dam of staggered floor, advantage is that flood diversion water level is flexible, and disadvantage project amount is big, is not suitable for vehicle pass-through;Multistage slope Separation levee self collapsing levee dam very floodway, it is that slope separation levee separates slope self collapsing levee dam, and advantage is that flood diversion water level is flexible, is lacked Point project amount is big, is applicable in vehicle pass-through.
Cross flow confluence, which is drawn, rushes self collapsing levee dam and prevents and reduces natural disasters design theory, it is burst according to dykes and dams mechanism and mesh of preventing and reducing natural disasters Mark design cross flow confluence draws the structure type for rushing self collapsing levee dam, and Quantitative design cross flow confluence, which is drawn, rushes that self collapsing levee dam is differential, cross flow converges Stream draw rush self collapsing levee dam zoning, Quantitative design kerbstone cross flow confluence draws notch depth of blurting out, unrestrained water dykes and dams burst mechanism, it It is to overflow water dykes and dams cross flow rate erosion damage will occur more than soil body anti-impact flow velocity dykes and dams, unrestrained water dykes and dams cross flow erosion damage draws It plays unrestrained water dykes and dams geometry to change, unrestrained water dykes and dams geometry changes the change for causing unrestrained water dykes and dams flow-shape, it is into one Step aggravation erosion damage, the change of unrestrained water dykes and dams flow-shape necessarily pass the critical erosion damage weir headwater depth of various fixations, overflow The change of water dykes and dams geometry causes seepage through soil mass and stress changes, and seepage through soil mass and stress allow to permeate slope more than the soil body Drop, shearing strength, tensile strength will cause various unrestrained water dykes and dams burst be broken to because coupling destroy dynamical evolution, formed unrestrained Water dykes and dams erosion damage bursts to dykes and dams, then the differentiation stable to dykes and dams crevasse;Critical dykes and dams headcut scour destroys weir headwater depth HdIf wider dykes and dams top is channel flow using formula (1), formula (2) simultaneous solution HdIf dykes and dams top be weir flow using formula (2), Formula (3) simultaneous solution Hd, critical dykes and dams top incision erosion damage weir headwater depth Hu, using (4), (5) simultaneous solution Hu, it is critical not Erosion damage weir headwater depth Hn, using (6), (7) simultaneous solution Hn, differential diUsing formula (8), cross flow confluence, which is drawn, rushes self collapsing levee Dam zoning uses formula (9), (10), (11), if dykes and dams are shorter to inquire into slope foot flow velocity using non-uniform flow, kerbstone is unrestrained Stream confluence draws notch depth of blurting out and uses formula (12),
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
In formula: hi、vi、hi+1、vi+1- respectively represent the dykes and dams top stream upstream and downstream section depth of water (m) of section, flow velocity (m/s), in it is initial hi+1Using critical depth of water hk; △l,il- respectively represent dykes and dams top stream segment length (m), dykes and dams top Parallel to the flow direction longitudinal slope;J— Represent the average hydraulic gradient on dykes and dams top;Vd- represent slope surface initial velocity in downstream at the dykes and dams level of tail water;N, R, i-generation respectively Table dykes and dams downstream slope surface roughness, hydraulic radius (m), longitudinal slope;Q, ε, m, σ, B-respectively represent dykes and dams top flow (m3/ s), side receive Contracting coefficient, discharge coefficient, to flood coefficient, cross flow wide (m);G-represents acceleration of gravity (m/s2);α-represents velocity flow profile system Number;v0- represent velocity of approach (m/s); Vu- represent dykes and dams top parting hard surface, sandstone dam body, dykes and dams clay cut-off wall Dynamic flow velocity (m/s);Vn- represent dykes and dams clay cut-off wall or sandstone dam body non-scouring velocity (m/s); di- i-stage is differential, m; Hd- critical dykes and dams headcut scour destroys weir headwater depth, m;Ai- water level rise rate and dykes and dams burst speed and engineering order because The self collapsing levee dams or self collapsing levee dam at different levels of element and dike dam heightening;He- represent and draw punching pin dykes and dams height, m;Hu- represent critical dykes and dams Push up incision erosion damage weir headwater depth, m;As- represent sub- dam heightening, m;β-mother's sandstone dyke (dam) and the easy sand surfing of female non-sticky The inclination angle in stone earth embankment dam area upstream and downstream line of demarcation,;The easy sand surfing stone earth embankment dam internal friction angle of φ-mother's non-sticky,;T-mother's sandstone Dyke (dam) and the easy sand surfing stone earth embankment dam area horizontal dividing lines of female non-sticky female sandstone dyke (dam) scour hole depth below, m;K-punching Cheat coefficient;The critical dykes and dams headcut scour of q-destroys discharge per unit width, m3/s.m;Z-water levels of upstream and downstream is poor, m;ht- downstream water depth, m;hg- represent the notch depth with notch kerbstone, m;Hg- critical dykes and dams foot headcut scour destruction weir headwater depth is represented, m;Ag- represent notch depth and increase, m;
Unrestrained water dykes and dams burst be broken to because coupling destroy dynamical evolution, be the extremely complex presentation abbreviation that bursts in self collapsing levee dam Extremely simple mechanism draws to establish complete cross flow confluence and rushes self collapsing levee dam structure and provide fundamental basis, fills up self collapsing levee dam and set Theoretical blank is counted, is typical case with unrestrained water Clay Microstructure, when cross flow dykes and dams open the beginning with smaller depth of water spreading cross flow, dykes and dams top Road surface and downstream slope have certain impact resilience, do not break through bad, and cross flow dykes and dams downstream slope flow-shape is open channel uniform flow, When the cross flow dykes and dams top depth of water increases, open channel uniform flow erosion damage takes place in cross flow dykes and dams downstream slope, is unrestrained water dykes and dams at this time Downstream sandy soil slope headcut scour destroys initial phase, to be multistage from bursting differential design and cross flow confluence draws and rushes the design of self collapsing levee dam and mention For theoretical basis, corresponding weir headwater depth is that critical dykes and dams foot headcut scour destroys weir headwater depth Hd, mentioned for differential Quantitative design For theoretical basis;If erosion damage, dam base dam slope steepening occurs in dam base, dam slope steepening is passed to top step by step It leads, forms open channel nonuniform flow precipitation fluidised form level erosion damage step by step, constitute the fast unrestrained water dykes and dams of undermining and trace to the source level Erosion damage feature, dykes and dams are higher, and headcut scour is faster, after the unrestrained water dam base gradient is greater than sandy soil angle of repose, sand earth embankment Dam body generates the straight line landslide that inclination angle is sandy soil internal friction angle and destroys, and dykes and dams slope surface is transferred, turned in dykes and dams slope surface At folding occur Embankment Slope down stream erosion damage, the higher down stream of dykes and dams wash away hole it is bigger, incision speed is faster, cause it is subsequent directly Line landslide is faster, and quick incision is continued in bottom, and Embankment Slope down stream headcut scour is faster;When unrestrained water dykes and dams downstream slope straight line comes down It extends under the road surface of dykes and dams top, hard surface forms cantilever down stream, and road surface down stream erosion damage, scour hardening are formed at dam abutment Road bed, the cantilever road surface in Clay Microstructure downstream occur moment of flexure stress rupture in the case where self weight, water recast are used and local shedding, lead It causes Clay Microstructure to form cantilever down stream, the support of sandy soil dyke (dam) is lost after dykes and dams Clay Microstructure, in osmotic pressure, Gravitative Loads Lower generation Circular Slip destroys, and shows that dykes and dams Clay Microstructure downstream is peeled off layer by layer, is unrestrained water dykes and dams crevasse starting rank at this time Section is provided fundamental basis to determine that cross flow confluence draws to rush the design of self collapsing levee dam structure and draw the design of punching pin embankment structure;When unrestrained water dike When Ba Niantuxieqiangding loses hard surface scour protection, overflows water dykes and dams Clay Microstructure and incision erosion damage occurs, top is non-full Slow with consolidated clay incision, it is fast that bottom seepage flow is saturated consolidated clay incision, while unrestrained water dykes and dams Clay Microstructure cantilever increases, clay Sloping core overflows water dykes and dams Clay Microstructure cantilever under self weight, water pressure, soil pressure effect and stress rupture occurs and is broken, or occurs Overturning, unsaturation consolidated clay stress rupture in top is slow, and seepage flow saturation consolidated clay stress rupture in bottom is fast, the crevasse depth of water Increase, the quick incision erosion damage of crevasse Clay Microstructure, just forms unrestrained water dykes and dams and burst the stage, and then solve the reason of Clay Consolidation Topic is argued, under the conditions of critical dykes and dams foot headcut scour destroys weir headwater depth, is broken by unrestrained water dykes and dams downstream sandy soil slope headcut scour It is badly a slow process to unrestrained water dykes and dams crevasse initial phase evolution, the lower unrestrained water dykes and dams the slower, lower unrestrained water dykes and dams Evolving to unrestrained water dykes and dams stage of bursting by unrestrained water dykes and dams crevasse initial phase is also slow process;When dykes and dams weir, headwater depth quickly reaches To critical dykes and dams top incision erosion damage weir headwater depth Hu, when the critical flow flow velocity of dykes and dams weir crest is greater than road surface initial velocity, dike Dam crest downstream road surface is destroyed first, then on prolong erosion damage, unrestrained water dykes and dams Clay Microstructure loses scour protection, dykes and dams weir The critical flow flow velocity on top is greater than dykes and dams clay cut-off wall initial velocity, and incision erosion damage occurs for dykes and dams Clay Microstructure top layer, directly It connects and quickly forms unrestrained water dykes and dams crevasse initial phase, while downstream slope occurs headcut scour and destroys, and is just quickly evolved to Man Shuidi Dam breaking stage, the evolution of bursting of the unrestrained more high unrestrained water dykes and dams of water dykes and dams are faster;When dykes and dams weir, headwater depth reaches critical not erosion damage Weir headwater depth Hn, upstream water level landing downstream water depth increases after bursting due to unrestrained water dykes and dams, and dykes and dams crevasse flow velocity reduces, and works as crevasse The flow velocity of critical flow is lower than Clay Microstructure non-scouring velocity, and dykes and dams crevasse incision is slow, forms the unrestrained water dykes and dams crevasse stabilization sub stage, can To determine the residual and flood diversion ability on self collapsing levee dam.The relatively narrow jet-bedding formula self collapsing levee dam that draws is the affixed statically indeterminate structure in three faces, top Cohesiveness, the internal friction angle of portion's unsaturation consolidated clay are larger, fracture, the stress rupture that topples it is slow, bottom saturation consolidation Cohesiveness, the internal friction angle of clay are smaller, fracture, the stress rupture that topples it is fast.
Cross flow confluence, which is drawn, rushes self collapsing levee dam 1, is rubbed using drawing in the easy sand surfing stone earth embankment dam area of high, the female non-sticky of punching pin dykes and dams Angle, female sandstone dyke (dam) scour hole depth divide self collapsing levee dam subregion, it includes following form: kerbstone cross flow confluence draws punching and bursts certainly Dykes and dams 1-a, by taking kerbstone cross flow confluence draws and rushes Clay Microstructure self collapsing levee dam as an example, it includes drawing geotechnological plate film cloth antiseepage curtain of blurting out Drawing for body 1-1-a connection Clay Microstructure 1-3-a is blurted out, and avoiding consolidated clay influences low flow velocity self collapsing levee dam, draws the geotechnique that blurts out Sub- non-sticky of blurting out easy sand surfing stone earth embankment dam 1-2-a, Clay Microstructure 1-3-a are drawn in the connection of plate film cloth antiseepage curtain body 1-1-a upstream and downstream Draw blurt out periphery connection geomembrane cloth contact antiseepage curtain 1-9-a, geomembrane cloth contact antiseepage curtain extend seepage paths, draw blurt out son it is non- The sticky easily sand surfing stone earth embankment dam downstream 1-2-a dam abutment connection kerbstone cross flow confluence draws the indentation, there for the 1-5-a that blurts out, and draws son of blurting out Parting hard surface 1-8-a is connected at the top of the easy sand surfing stone earth embankment dam 1-2-a of non-sticky, kerbstone cross flow confluence draws the bottom company that blurts out Connect the easy sand surfing stone earth embankment dam area downstream the 1-4-A dam abutment of female non-sticky, the female easy sand surfing stone earth embankment dam area upstream 1-4-A connection of non-sticky Female sandstone earth embankment dam body 1-4-a, kerbstone cross flow confluence draw the tubaeform confluence of 1-5-a notch downstream connection of blurting out and draw sluicing slot 1- 6-a obtains biggish erosive velocity with lesser cross flow head, and it is horizontal that kerbstone cross flow confluence draws 1-5-a indentation, there setting of blurting out 1-7-a is stitched, basis is collapsed in time by scour, further obtains higher confluence head, female easy sand surfing stone earth embankment dam area 1- of non-sticky The upstream 4-A connects female sandstone dykes and dams 1-4-a, and female easy sand surfing stone earth embankment dam area fast flush of non-sticky causes straight line landslide to cause Parting hard surface quickly collapses, and quicklys increase Clay Microstructure cantilever height, and then fracture strength occurs and destroys, and obtains punching enough Brush head washes away the female viscous sloping core soil of consolidation and coarse grain diameter sandstone dyke (dam);Small dike's kerbstone cross flow confluence in upstream, which is drawn, rushes self collapsing levee dam 1-b, upstream small dike, which draws to blurt out to draw with downstream cross flow confluence, rushes collective effect, and the formation blurted out is drawn in quickening, and dam crest lateral current is washed in a pan Brush dykes and dams and female dykes and dams basis accelerate small dike dam and burst with female dykes and dams, and above alien's dike kerbstone cross flow confluence, which is drawn, rushes clay For core-wall self collapsing levee dam, it include draw the geotechnological plate film cloth antiseepage curtain body 1-1-b that blurts out, the easy sand surfing of sub- non-sticky of blurting out is drawn in upstream Stone earth embankment dam 1-2-b, clay core wall 1-3-b, female sandstone dyke (dam) 1-4-b, the easy sand surfing stone earth embankment dam area 1-4-B of female non-sticky, Kerbstone cross flow confluence draws the 1-5-b that blurts out, tubaeform confluence draws sluicing slot 1-6-b, through parting hard surface kerbstone transverse joint 1-7-b, parting hard surface 1-8-b, geomembrane cloth contact antiseepage curtain 1-9-b;Pipe band and kerbstone cross flow confluence draw punching and burst certainly Dykes and dams 1-c, when flood diversion, connect woven fabric band, small moisture flood Bao Zikuidiba, and punching is drawn in the direct flood diversion of flood, draw washing pipe quickening and draw shape of blurting out At by taking pipe band and kerbstone cross flow confluence draw and rush clay core wall self collapsing levee dam as an example, it successively includes drawing geotechnological plate film cloth of blurting out Antiseepage curtain body 1-1-c, draw easy sand surfing stone earth embankment dam 1-2- c of sub- non-sticky of blurting out, clay core wall 1-3-c, female sandstone dyke (dam) 1- 4-c, the easy sand surfing stone earth embankment dam area 1-4-C of female non-sticky, kerbstone cross flow confluence draw 1-5- c that blurts out, tubaeform confluence draws sluicing Slot 1-6- c, transverse joint 1-7- c, pipe band 1-8-c, parting hard surface 1-9-c, geomembrane cloth contact antiseepage curtain 1-10-c.
Geotechnological plate very floodway 2, it includes geotechnological plate very floodway 2, it included the connection of the water and soil top surface dykes and dams 2-1 Geotechnological plate mask, geotechnological plate mask top surface connect soil body protective layer 2-4, geotechnological plate mask it include geotechnological plate river bottom protection 2-2, geotechnique Plate slope protection 2-3, it is made of geotechnological plate mask multiple fish scale shape units, and fish scale shape unit encrypts arrangement in the high region of flow velocity, Prolong on retardance erosion damage, is divided into geotechnological plate seamless connection II-I according to fish scale shape unit linked vector graph, transverse joint fish scale shape connects II-II, by taking two neighboring fish scale shape unit as an example, geotechnological plate seamless connection II-I, advantage project amount is saved, disadvantage is suitable for low stream Speed, it includes that geotechnological II -2 upstream end bottom surface of sole scale and shell connects upstream fish scale shape unit II-A- I, geotechnological sole scale and shell II -2 Downstream bottom surface connects downstream fish scale shape unit II-B- I, and transverse joint fish scale shape connection II-II, drainage pressure-reducing, erosion control, it includes upper Stream rides over II upstream end downstream fish scale shape unit II-B-, upstream fish scale shape unit II-A- to swimming fish squama shape unit II-A- II downstream II downstream connecting rod line, II-C, II bottom end-C of bar line connect downstream fish scale shape unit II-B- II;Fish scale shape unit it include such as Lower form: geotextiles threading geotechnique sole scale and shell shape unit II-a, it includes the body II-that bankets in trapezoidal II -1-a of geotextiles threading 3-a, trapezoidal II top -1-a of geotextiles threading connect geotechnological II -2-a of sole scale and shell, the fixed geotechnological sole of trapezoidal geotextiles threading Scale and shell, geotechnological sole scale and shell erosion control, the impact of anti-floating material;Trapezoidal geotextiles close threading geotechnique sole scale and shell shape unit II-b, It includes trapezoidal geotextiles closing II upstream end -1-b of threading connection, II-C-1 of upstream connecting rod line, once geotechnological sole scale and shell hair Raw to destroy, geotextiles closing threading, which can be resisted to wash away, prolongs, the permeable connection of bar line, and fixed geotechnique's sole scale and shell simultaneously drains, ladder Shape geotextiles close II downstream -1-b of threading and connect II-C-2 of downstream connection bar line, and trapezoidal geotextiles are closed in II -1-b of threading Banket II -3-b of body, and II-C-1 of upstream connecting rod line, II top-C-2 of downstream connection bar line connect geotechnological II -2- of sole scale and shell piece The upstream end b;Geotechnological plate threading geotechnique sole scale and shell shape unit II-c, threading, which can be resisted to wash away, prolongs, it successively includes geotechnique II -1-c of plate threading, geotechnological II -2-c of plate scale, II -3-c of the soil body, the self collapsing levee dam suitable for the shallow threading of low flow velocity;Concrete Frame geotextiles threading geotechnique sole scale and shell shape unit II-d, it includes the body (II-that bankets in closing geotextiles threading (II -1-d) 3-d), closing geotextiles threading (II -1-d) is built in concrete frame (II -4-d), the top concrete frame (II -4-d) Geotechnological upstream end plate scale (II -2-d) is connected, globality is strong.Threading, which can be resisted to wash away, prolongs, and is suitable for dykes and dams foot, energy dissipating The mask of end and high flow rate;Reinforced concrete pile beam geotechnique sole scale and shell shape unit II-e, it successively includes armored concrete II -1-e of beam, geotechnological II -2-e of plate scale, II -3-e of soil matrix, II -4-e of bar line, II -5-e of reinforced concrete pile, reinforced concrete Native II -5-e of stake squeezes into II -3-e of soil matrix, and being suitable for existing lower dykes and dams reconstruction is very floodway;L shape geotechnique's plate threading soil Work sole scale and shell shape unit II-f, it includes the II -3-f of body that bankets in II -1-f of open type L shape geotechnique's plate threading, open type L shape The fixed geotechnological plate scale of geotechnological plate threading, basis lose fixed function by scour, are suitable for trapezoidal geosynthetics lamination and protect Face, II top -1-f of open type L shape geotechnique's plate threading connect geotechnological II upstream end -2-f of plate scale.
The very floodway type selection of high 3 meters of weir or more and 1 meter of weir head or more of geotechnological plate should carry out hydraulic model Verification experimental verification.
Embodiment 2, war water attack very flood diversion, national boundary river span diameter river very flood diversion: 1) water that prevents war is attacked, and is adopted With dispersion flood diversion, decentralized storage of water method, can be met an urgent need using the self collapsing levee dam of geosynthetics, emergency spillway now build, Feature inexpensive, easy to implement, reply war water are attacked;Reply upper pond water attacks dam break and surges disaster, auxiliary dam, bank in reservoir It is now built at the weir of side prevents or reduces dam break disaster;Existing its, which is built, on head-work two sides dyke or barrage prevents dam break from gushing Wave destroys head-work;It now builds it in rivers flood-diversion sluice upstream and prevents dam break from surging and destroy flood-diversion sluice and change its course;In rivers two sides Dyke dispersion build it and prevent dam break from surging destroy dyke and lead to river diversion and the disaster of surging that inrushes.Prevent water from attacking cutting big Type reservoir water source threatens grain security, safe drinking water, dam break disaster, and wartime, dispersion for the entire people was now built with the small-sized pool of the invention Dam, medium and small reservoirs water storage, agricultural supplies water on the spot, reduces water and attacks high dam dam break risk, reduces and flood arable land, reduce water supply project And land occupation, the agriculture excessive exploitation of groundwater of reduction threaten cities and towns safe drinking water, and large reservoir water is avoided to attack dam break disaster and to ecological ring The influence in border, Ensuring Food Safety.2) upstream state of national boundary river span diameter river very flood diversion, trans-boundary water uses this hair The bright automatic flood diversion of self collapsing levee dam floodway, it advantageously accounts for furnishing a huge amount of money for build problem of the flood-diversion sluice to which country flood diversion, it has Conducive to solving the problems, such as that unlimited super standard flood can not be resisted by furnishing a huge amount of money for build excessively high dyke, it advantageously accounts for inrushing and lead River diversion, uncontrollable flood damage, high bank is caused to burst and cause the problem of extinction, it advantageously accounts for backward in economy National numerous the problem of the threatening grain security of inrushing of provincial standard low frequency.Boundary river two sides country uses self collapsing levee dam flood diversion of the invention Dyke is protected in the automatic flood diversion of the automatic flood diversion in road, controls the disaster that inrushes, it, which advantageously accounts for two neighbouring countries, can not furnish a huge amount of money for build flood-diversion sluice The problem of oneself country is flooded, it, which advantageously accounts for the two states dyke increased of all furnishing a huge amount of money for, can not resist unlimited super standard flood Problem, it advantageously accounts for inrushing and causes river diversion, uncontrollable flood damage, high bank to burst to cause the difficulty of extinction Topic, it advantageously accounts for numerous inrush of two countries' dyke standard low frequency backward in economy and threatens the problem of grain security and lives and properties.
Dykes and dams embodiment is protected in embodiment 3, flood diversion: certain cross-border small watershed river does not have the condition for building detention basin, builds flood diversion It is also problem that not only cost is high for lock, management is collected far from village, and not building detention basin flood-diversion sluice addressing is exactly problem, and concentration is flooded unjust at one It is flat to be opposed.For this situation, flood diversion is dispersed to the equilibrium of beach field using the present invention, substandard flood flood diversion is taken turns using the fixed cycle Automatic forecasting system is arranged at flood diversion for the system of changing.Since low cost of the present invention, unattended, automatic controllable flood diversion are in economy, technology It is upper feasible;Because of its fair flood diversion, resident, peasant can receive the solution problem of detention basin flood diversion guarantor dykes and dams addressing, management hardly possible by no means Topic;Because having determining flood diversion place, automatic flood diversion water level, resident, peasant can withdraw automatically, and government organization flood control is withdrawn It is easy, solves the global social problem of " wolf is coming ".
Certainly, the above description is not a limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the technical staff in domain is made within the essential scope of the present invention also should belong to of the invention Protection scope.

Claims (4)

1. cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway, it is characterised in that it includes drawing punching according to cross flow confluence Self collapsing levee dam design theory design cross flow confluence of preventing and reducing natural disasters is drawn and is rushed self collapsing levee dam (1), takes precautions against natural calamities and subtracts according to super standard flood dykes and dams Calamity Theoretical Design geotechnique plate very floodway (2), cross flow confluence are drawn to rush self collapsing levee dam (1) bottom and connect geotechnological plate and be divided very much Big vast road (2), geotechnique's plate very floodway (2) two sides connection dykes and dams bank (3);The super standard flood dykes and dams are prevented and reduced natural disasters reason By it is to ruin mechanism and the determining geotechnological plate of target of preventing and reducing natural disasters the very structure type of floodway and rule according to flood discharge beach water in field Mould, using the theory of preventing and reducing natural disasters for dispersing flood diversion, decentralized storage of water is attacked as reply war water, cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique Plate very floodway by cross flow confluence draw rush self collapsing levee dam (1) cross flow elevation be divided into single-stage cross flow confluence draw rush self collapsing levee dam geotechnique Plate very floodway, multistage cross flow confluence, which are drawn, rushes self collapsing levee dam geotechnique's plate very floodway, and the multistage cross flow confluence draws punching certainly Dam geotechnique's plate very floodway that inrushes is that have two or more depth displacements for differential diSelf collapsing levee dam floodway, geotechnological plate is non- Normal floodway (2) is divided into following form by the structure on multistage self collapsing levee dam: self collapsing levee dam very floodway is expanded in multistage staggered floor side (II -1.), by taking self collapsing levee dam very floodway is expanded in 3 grades of staggered floor sides as an example, it bursts certainly including 1 grade of self collapsing levee dam (I -1- is 1.), 2 grades Dykes and dams (I -2- is 1.), 3 grades of self collapsing levee dams (I -3- is 1.), dykes and dams banks (3) are successively with 1 grade of differential d1, 2 grades of differential d2, 3 grades of differential d3 Staggered floor symmetrically connects, and slope protection (A-1- is 1.) is expanded in 1 grade of geosynthetics side, slope protection is expanded in 2 grades of geosynthetics sides (A-2- is 1.) Successively separate 1 grade of self collapsing levee dam (I -1- is 1.), 2 grades of self collapsing levee dams (I -2- is 1.), 3 grades of self collapsing levee dams (I -3- is 1.), horizontal geotechnique Synthetic material anchoring body (A1), geomembrane cloth antiseepage thorn curtain (A2), horizontal geosynthetics anchoring body (A1) the connection soil Slope protection horizontal joint bottom is expanded in geosynthetics side;Multistage staggered floor lamination self collapsing levee dam very floodway (II -2.), with 3 grades of staggered floors For lamination self collapsing levee dam very floodway, it includes 1 grade of self collapsing levee dam (I -1- is 2.), 2 grades of self collapsing levee dams (I -2- is 2.), 3 grades Self collapsing levee dam (I -3- is 2.), dykes and dams bank (3) are successively with 1 grade of differential d1, 2 grades of differential d2, 3 grades of differential d3Staggered floor symmetrically connects, and 1 grade Trapezoidal geosynthetics lamination mask (A-1- is 2.), 2 grades of trapezoidal geosynthetics lamination masks (A-2- is 2.) successively separate 1 Grade self collapsing levee dam (I -1- is 2.), 2 grades of self collapsing levee dams (I -2- is 2.), 3 grades of self collapsing levee dams (I -3- is 2.), horizontal geosynthetics anchors Solid (A1), the shape geosynthetics anchoring body top (A0) L connect at trapezoidal geosynthetics lamination mask longitudinal joint;It is multistage Staggered floor separation levee self collapsing levee dam very floodway, it is that the separation levee of staggered floor separates the self collapsing levee dam of staggered floor;Multistage slope separation levee is burst certainly Dykes and dams very floodway, it is that slope separation levee separates slope self collapsing levee dam.
2. cross flow confluence, which is drawn, according to claim 1 rushes self collapsing levee dam geotechnique's plate very floodway, it is characterised in that: described unrestrained Stream confluence, which is drawn, rushes self collapsing levee dam and prevents and reduces natural disasters design theory, it is burst according to dykes and dams mechanism and target design cross flow of preventing and reducing natural disasters Confluence draws the structure type for rushing self collapsing levee dam, and Quantitative design cross flow confluence, which is drawn, rushes that self collapsing levee dam is differential, cross flow confluence draws punching from bursting Dyke (dam) subregion, Quantitative design kerbstone cross flow confluence draw notch depth of blurting out, and the unrestrained water dykes and dams burst mechanism, it is unrestrained water Dykes and dams cross flow rate is more than that erosion damage will occur for soil body anti-impact flow velocity dykes and dams, and unrestrained water dykes and dams cross flow erosion damage causes unrestrained water Dykes and dams geometry changes, and unrestrained water dykes and dams geometry changes the change for causing unrestrained water dykes and dams flow-shape, it is further exacerbated by The change of erosion damage, unrestrained water dykes and dams flow-shape necessarily passes the critical erosion damage weir headwater depth of various fixations, overflows water dykes and dams Geometry change causes seepage through soil mass and stress changes, and seepage through soil mass and stress are more than the permissive permeability gradient of the soil body, shearing resistance Intensity, tensile strength will cause various unrestrained water dykes and dams burst be broken to because coupling destroy dynamical evolution, form unrestrained water dykes and dams Erosion damage bursts to dykes and dams, then the differentiation stable to dykes and dams crevasse;The critical erosion damage weir headwater depth includes critical dike Dam headcut scour destroys weir headwater depth Hd, critical dykes and dams top incision erosion damage weir headwater depth Hu, water on critical not erosion damage weir Deep Hn, cross flow confluence draws that it is differential to rush self collapsing levee dam is between self collapsing levee heights of dam differences at different levels and highest self collapsing levee dam and dykes and dams The referred to as differential d of height differencei, the cross flow confluence, which is drawn, rushes self collapsing levee dam zoning, it is to be contained by " blown sands mechanism " with control cohesive soil The easy sand surfing stone soil of the non-sticky of amount divides self collapsing levee dam subregion, primary and secondary dykes and dams subregion is divided using punching pin dykes and dams height is drawn, with non-stick Property easy sand surfing stone soil internal friction angle be that the oblique line upstream and downstream at inclination angle divides female sandstone dyke (dam) and the easy sand surfing stone earth embankment of female non-sticky Ba Qu utilizes dyke (dam) scour hole depth horizontal bar denominator sandstone dyke (dam) and the easy sand surfing stone earth embankment dam differentiation area of female non-sticky, knot It closes self collapsing levee dam type formula and determines self collapsing levee dam zoning, described " blown sands mechanism ", it is that flow rate of water flow is more than sandstone start velocity, Sandstone will be flown away by punching;The critical dykes and dams headcut scour destroys weir headwater depth HdIf wider dykes and dams top is that channel flow is adopted With formula (1), formula (2) simultaneous solution HdIf dykes and dams top is weir flow using formula (2), formula (3) simultaneous solution Hd, the critical dykes and dams Push up incision erosion damage weir headwater depth Hu, using (4), (5) simultaneous solution Hu, the critical not erosion damage weir headwater depth Hn, adopt With (6), (7) simultaneous solution Hn, differential diUsing formula (8), cross flow confluence draw rush self collapsing levee dam zoning using formula (9), (10), (11), if dykes and dams are shorter to inquire into slope foot flow velocity using non-uniform flow, kerbstone cross flow confluence draws notch depth of blurting out Using formula (12),
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
In formula: hi、vi、hi+1、vi+1- the dykes and dams top stream upstream and downstream section depth of water (m) of section, flow velocity (m/s) are respectively represented, wherein just Beginning hi+1Using critical depth of water hk;△l,il- respectively represent dykes and dams top stream segment length (m), dykes and dams top Parallel to the flow direction longitudinal slope; J-represents the average hydraulic gradient on dykes and dams top;Vd- represent slope surface initial velocity in downstream at the dykes and dams level of tail water;N, R, i-point Dykes and dams downstream slope surface roughness, hydraulic radius (m), longitudinal slope are not represented;Q, ε, m, σ, B-respectively represent dykes and dams top flow (m3/ s), Side constriction coefficient, discharge coefficient, to flood coefficient, cross flow wide (m);G-represents acceleration of gravity (m/s2);α-represents flow velocity point Cloth coefficient;v0- represent velocity of approach (m/s); Vu- represent dykes and dams top parting hard surface, sandstone dam body, dykes and dams clay core Wall initial velocity (m/s);Vn- represent dykes and dams clay cut-off wall or sandstone dam body non-scouring velocity (m/s); di- i-stage is differential, m;Hd- critical dykes and dams headcut scour destroys weir headwater depth, m;Ai- water level rise rate and dykes and dams burst speed and engineering order The self collapsing levee dams or self collapsing levee dam at different levels of factor and dike dam heightening;Hy- represent and draw punching pin dykes and dams height, m;Hu- represent critical dike Dam crest incision erosion damage weir headwater depth, m;Az- represent sub- dam heightening, m;β-mother's sandstone dyke (dam) is easily rushed with female non-sticky The inclination angle in sandstone earth embankment dam area upstream and downstream line of demarcation,;The easy sand surfing stone earth embankment dam internal friction angle of φ-mother's non-sticky,;T-mother's sand Bank of stone dam body and the easy sand surfing stone earth embankment dam area horizontal dividing lines of female non-sticky female sandstone dyke (dam) scour hole depth below, m;K— Punching hole coefficient;The critical dykes and dams headcut scour of q-destroys discharge per unit width, m3/s.m;Z-water levels of upstream and downstream is poor, m;ht- downstream water It is deep, m;h1- represent the notch depth with notch kerbstone, m;Hd- represent tubaeform confluence and draw the critical dykes and dams foot of sluicing slot and trace to the source Erosion damage weir headwater depth, m;Ak- represent notch depth and increase, m;
The unrestrained water dykes and dams burst be broken to because coupling destroy dynamical evolution, be typical case, cross flow dykes and dams with unrestrained water Clay Microstructure It is open channel uniform flow erosion damage that erosion damage, which takes place, in downstream slope, is that unrestrained water dykes and dams downstream sandy soil slope headcut scour is broken at this time Bad initial phase, corresponding weir headwater depth are that critical dykes and dams headcut scour destroys weir headwater depth Hd;Washing away makes dam base dam slope Steepening, forming open channel nonuniform flow, precipitation fluidised form level erosion damage, the higher level of tracing to the source of dykes and dams wash away faster, Man Shuidi step by step After dam bottom slope is greater than sandy soil internal friction angle, sand earth embankment dam body generates the straight line that inclination angle is sandy soil internal friction angle and comes down It destroys, dykes and dams slope surface transfers, turning point occurs in dykes and dams slope surface and develop into down stream erosion damage, the higher down stream of dykes and dams is traced to the source It washes away faster;When slope straight line landslide in unrestrained water dykes and dams downstream extends under the road surface of dykes and dams top, parting hard surface forms cantilever down stream, Down stream erosion damage in road surface is formed at dam abutment, scour hard surface basis, the cantilever road surface in Clay Microstructure downstream is in self weight, water Recast local shedding with lower generation moment of flexure stress rupture develops as Clay Microstructure cantilever down stream, loses after dykes and dams Clay Microstructure It goes sandy soil dyke (dam) to support, the Circular Slip peeled off layer by layer is generated under osmotic pressure, Gravitative Loads and is destroyed, landslide is being washed away Under coupling destroys, cross flow dykes and dams Clay Microstructure is thinning and seepage erosion occurs, and empties roadbed, and hard surface is heavy, dynamic in self weight, water Fall damage occurs under water souring, is unrestrained water dykes and dams crevasse initial phase at this time;When unrestrained water dykes and dams Clay Microstructure top loses When hard surface scour protection, overflows water dykes and dams Clay Microstructure and incision erosion damage, top unsaturation consolidated clay anti-impact stream occurs Fast big incision is slow, and seepage flow saturation consolidated clay anti-impact flow velocity in bottom is small and the big incision of flow velocity is fast, and Clay Microstructure is in self weight, hydraulic pressure The stress rupture that unrestrained water dykes and dams Clay Microstructure cantilever occurs fracture or topples under power, soil pressure effect, top unsaturation consolidation are viscous Native cohesiveness, internal friction angle are big, and tension stress is big, and generation stress rupture is slow, bottom unsaturation consolidated clay cohesiveness, interior friction Angle is small, and tension stress is small, and generation stress rupture is fast, and the crevasse depth of water increases, the quick incision erosion damage of crevasse Clay Microstructure, with regard to shape Cheng Manshui dykes and dams burst the stage, under the conditions of critical dykes and dams headcut scour destroys weir headwater depth, overflow water dykes and dams crevasse initial phase Evolution is a slow process, and it is more lower slower to overflow water dykes and dams;In dykes and dams weir headwater depth in critical dykes and dams top incision erosion damage Weir headwater depth HuUnder the conditions of, dykes and dams top downstream road surface occur to destroy first and on prolong, unrestrained water dykes and dams Clay Microstructure loses erosion control guarantor Hair care, which is given birth to, cuts erosion damage, forms unrestrained water dykes and dams crevasse initial phase, while downstream slope occurs headcut scour and destroys, just quickly Unrestrained water dykes and dams are evolved to burst the stage;When dykes and dams weir, headwater depth reaches critical not erosion damage weir headwater depth Hn, dykes and dams crevasse side It cuts slowly, forms the unrestrained water dykes and dams crevasse stabilization sub stage;The relatively narrow jet-bedding formula self collapsing levee dam that draws is the affixed statically indeterminate structure in three faces, top Cohesiveness, the internal friction angle of portion's unsaturation consolidated clay are larger, fracture, the stress rupture that topples it is slow, bottom saturation consolidation Cohesiveness, the internal friction angle of clay are smaller, fracture, the stress rupture that topples it is fast;The cross flow confluence of cantilever design draws punching certainly Dam inrush using top local section model test acquisition Ai、Az
3. cross flow confluence, which is drawn, according to claim 1 rushes self collapsing levee dam geotechnique's plate very floodway, it is characterised in that: cross flow converges Stream, which draws, rushes self collapsing levee dam (1), it includes following form: kerbstone cross flow confluence, which is drawn, rushes self collapsing levee dam (1-a), with kerbstone cross flow Confluence, which is drawn, rushes for Clay Microstructure self collapsing levee dam, it is oblique including drawing geotechnological plate film cloth antiseepage curtain body (1-1-a) connection clay of blurting out Drawing for wall (1-3-a) is blurted out, and is drawn geotechnological plate film cloth antiseepage curtain body (1-1-a) upstream and downstream connection of blurting out and is drawn sub- non-sticky of blurting out and easily rushes Sandstone earth embankment dam (1-2-a), the Clay Microstructure (1-3-a) draw the periphery connection geomembrane cloth contact antiseepage curtain (1-9- that blurts out A), easy sand surfing stone earth embankment dam (1-2-a) the downstream dam abutment connection kerbstone cross flow confluence of sub- non-sticky of blurting out of drawing draws (the 1- that blurts out Indentation, there 5-a) draws and connects parting hard surface (1-8-a) at the top of the easy sand surfing stone earth embankment dam (1-2-a) of sub- non-sticky of blurting out, The kerbstone cross flow confluence draws the bottom (1-5-a) of blurting out and connects easy sand surfing stone earth embankment Ba Qu (1-4-A) the downstream dam of female non-sticky Shoulder, the easy upstream (1-4-A) sand surfing stone earth embankment Ba Qu of mother's non-sticky connect female sandstone earth embankment dam body (1-4-a), and kerbstone is unrestrained Stream confluence is drawn the tubaeform confluence of (1-5-a) notch downstream connection of blurting out and is drawn sluicing slot (1-6-a), and kerbstone cross flow confluence, which is drawn, blurts out Transverse joint (1-7-a) is arranged in (1-5-a) indentation, there;Small dike's kerbstone cross flow confluence in upstream, which is drawn, rushes self collapsing levee dam (1-b), the above alien Dike kerbstone cross flow confluence, which is drawn, rushes for clay core wall self collapsing levee dam, it successively includes drawing geotechnological plate film cloth antiseepage curtain body of blurting out The easy sand surfing stone earth embankment dam (1-2-b) of sub- non-sticky of blurting out, clay core wall (1-3-b), female sandstone dyke (dam) are drawn in (1-1-b), upstream (1-4-b), the easy sand surfing stone earth embankment Ba Qu (1-4-B) of female non-sticky, kerbstone cross flow confluence draw blurt out (1-5-b), tubaeform remittance Stream draws sluicing slot (1-6-b), through parting hard surface kerbstone transverse joint (1-7-b), parting hard surface (1-8-b), geotechnique Film cloth contacts antiseepage curtain (1-9-b);Pipe band and kerbstone cross flow confluence, which are drawn, rushes self collapsing levee dam (1-c), unrestrained with pipe band and kerbstone Stream confluence, which is drawn, rushes for clay core wall self collapsing levee dam, it successively includes drawing geotechnological plate film cloth antiseepage curtain body (1-1-c) of blurting out, drawing punching The easy sand surfing stone earth embankment dam (1-2- c) of openning non-sticky, clay core wall (1-3-c), female sandstone dyke (dam) (1-4-c), female non-sticky Easy sand surfing stone earth embankment Ba Qu (1-4-C), kerbstone cross flow confluence draw blurt out (1-5- c), tubaeform confluence draws sluicing slot (1-6- C), transverse joint (1-7- c), pipe band (1-8- c), parting hard surface (1-9-c), geomembrane cloth contact antiseepage curtain (1-10-c).
4. cross flow confluence, which is drawn, according to claim 1 rushes self collapsing levee dam geotechnique's plate very floodway, it is characterised in that: the soil Work plate very floodway (2), it included that the water and soil dykes and dams top surface (2-1) connects geotechnological plate mask, geotechnique's plate mask top surface Connect soil body protective layer (2-4), geotechnological plate mask it include geotechnological plate river bottom protection (2-2), geotechnological plate slope protection (2-3), the geotechnique It is made of plate mask multiple fish scale shape units, and fish scale shape unit encrypts arrangement in the high region of flow velocity, according to fish scale shape unit Linked vector graph is divided into geotechnological plate seamless connection (II-I), transverse joint fish scale shape connection (II-II), is with two neighboring fish scale shape unit Example, geotechnique's plate seamless connection (II-I), it includes that geotechnological sole scale and shell (II -2) upstream end bottom surface connects upstream fish scale shape Unit (II-A- I), geotechnological sole scale and shell (II -2) downstream bottom surface connect downstream fish scale shape unit (II-B- I), the transverse joint Fish scale shape connects (II-II), and stream rides on downstream fish scale shape unit (II-B- II) upstream fish scale shape unit (II-A- II) downstream You Duan, upstream fish scale shape unit (II-A- II) downstream connecting rod line (II-C), the bar line bottom end (II-C) connect downstream fish scale shape Unit (II-B- II);The fish scale shape unit it include following form: geotextiles threading geotechnique's sole scale and shell shape unit (II- A), it includes banketing body (II -3-a) in trapezoidal geotextiles threading (II -1-a), and the trapezoidal geotextiles threading top (II -1-a) connects Meet geotechnological sole scale and shell (II -2-a);Trapezoidal geotextiles close threading geotechnique sole scale and shell shape unit (II-b), it includes trapezoidal Geotextiles close the threading upstream end (II -1-b) connection upstream connecting rod line (II-C-1), and trapezoidal geotextiles close threading (II -1- B) downstream connection downstream connection bar line (II-C-2), trapezoidal geotextiles closing threading (II -1-b) is interior to banket body (II -3-b), Upstream connecting rod line (II-C-1), the downstream connection bar line top (II-C-2) connect geotechnological upstream sole scale and shell piece (II -2-b) End;Geotechnological plate threading geotechnique sole scale and shell shape unit (II-c), it successively includes geotechnological plate threading (II -1-c), geotechnological plate scale (II -2-c), the soil body (II -3-c);Concrete frame geotextiles threading geotechnique's sole scale and shell shape unit (II-d), it includes closing It bankets body (II -3-d) in geotextiles threading (II -1-d), closing geotextiles threading (II -1-d) is built in concrete frame (II - In 4-d), the concrete frame top (II -4-d) connects geotechnological upstream end plate scale (II -2-d);Reinforced concrete pile beam Geotechnological sole scale and shell shape unit (II-e), it successively include reinforced beam (II -1-e), geotechnological plate scale (II -2-e), Soil matrix (II -3-e), bar line (II -4-e), reinforced concrete pile (II -5-e), the reinforced concrete pile (II -5-e) squeeze into soil Base (II -3-e);L shape geotechnique's plate threading geotechnique's sole scale and shell shape unit (II-f), it includes open type L shape geotechnique's plate threading It bankets body (II -3-f) in (II -1-f), the shape geotechnique's plate threading top (II -1-f) open type L connects geotechnological plate scale (II -2- F) upstream end.
CN201810944194.9A 2018-08-18 2018-08-18 Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway Pending CN109235362A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810944194.9A CN109235362A (en) 2018-08-18 2018-08-18 Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810944194.9A CN109235362A (en) 2018-08-18 2018-08-18 Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway

Publications (1)

Publication Number Publication Date
CN109235362A true CN109235362A (en) 2019-01-18

Family

ID=65070034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810944194.9A Pending CN109235362A (en) 2018-08-18 2018-08-18 Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway

Country Status (1)

Country Link
CN (1) CN109235362A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855709A (en) * 2021-07-08 2022-08-05 张征骥 Combined dam and relieving pressure method
CN116522435A (en) * 2023-03-21 2023-08-01 浙江省水利河口研究院(浙江省海洋规划设计研究院) Water-spreading dike arrangement method based on hierarchical fortification

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014177854A (en) * 2012-06-01 2014-09-25 Nippon Steel & Sumitomo Metal Reinforcement structure of dike
CN105603941A (en) * 2016-02-26 2016-05-25 叶兴 Multi-stage self-bursting geosynthetic material earth-rockfill emergency spillway

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014177854A (en) * 2012-06-01 2014-09-25 Nippon Steel & Sumitomo Metal Reinforcement structure of dike
CN105603941A (en) * 2016-02-26 2016-05-25 叶兴 Multi-stage self-bursting geosynthetic material earth-rockfill emergency spillway

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
4C779509F7: "溢洪道基础知识", 《豆丁网》 *
范同斌等: "水库自溃坝及其应用初探", 《黑龙江水专学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855709A (en) * 2021-07-08 2022-08-05 张征骥 Combined dam and relieving pressure method
CN116522435A (en) * 2023-03-21 2023-08-01 浙江省水利河口研究院(浙江省海洋规划设计研究院) Water-spreading dike arrangement method based on hierarchical fortification
CN116522435B (en) * 2023-03-21 2024-03-26 浙江省水利河口研究院(浙江省海洋规划设计研究院) Water-spreading dike arrangement method based on hierarchical fortification

Similar Documents

Publication Publication Date Title
Fischetti Drowning new orleans
Mishra The Bihar flood story
Olson et al. The effects of 2011 Ohio and Mississippi river valley flooding on Cairo, Illinois, area
CN109024476A (en) Base self collapsing levee dam geotechnique's woven fabric very floodway is washed in a pan in cross flow
Pilarczyk et al. Experience and practices on flood control in Vietnam
CN109235362A (en) Cross flow confluence, which is drawn, rushes self collapsing levee dam geotechnique's plate very floodway
CN110889151A (en) Design method of flood diversion channel of self-breaking dam
Bharti et al. Study on the dam & reservoir, and analysis of dam failures: a data base approach
CN207260063U (en) Multifunctional ecological sea wall structure system
CN109024475A (en) Forbidden lamella geomembrane cloth antiseepage curtain self collapsing levee dam floodway
Li Mountain hazards in China
Ulate et al. Mud floods related to the Irazu volcano eruptions
CN107119625A (en) Multifunctional ecological sea wall structure system
CN109024474A (en) Geotechnological plate cut-pff wall self collapsing levee dam flood diversion gate
Dobrowolski et al. Floods in Poland from 1946 to 2001: origin, territorial extent and frequency
CN105544455B (en) Dykes and dams super standard flood flood diversion pipe band
Al-Zaidy The impact of the eighth largest dam-under construction-in Iraq on the Tigris River: Makhool Dam as a review paper
Yu Flooding and EcoBuild-strategies for the future: dykes, dams, SUDS and floating homes
Costa et al. History of coastal engineering in Portugal
Phienwej et al. Subsidence and flooding in Bangkok
Schweitzer Strategy or disaster: New-style river regulation as an issue of national security
Ji-yu et al. Marine hazards in coastal areas and human action against them—A case study of the Changjiang River estuaries and Qiantang River
UWAREMWE Design of a sustainable hydraulic structure for flood control in Rubyiro catchment with focus on Katabuvuga sub catchment
Li et al. Yangtze dyke and its strengthening
Tanvir Hossain Experimental study on the volumetric sustainability of sand filled geo-bags placed in flowing water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190118