CN205469668U - Landing stage is bank device even - Google Patents
Landing stage is bank device even Download PDFInfo
- Publication number
- CN205469668U CN205469668U CN201620233640.1U CN201620233640U CN205469668U CN 205469668 U CN205469668 U CN 205469668U CN 201620233640 U CN201620233640 U CN 201620233640U CN 205469668 U CN205469668 U CN 205469668U
- Authority
- CN
- China
- Prior art keywords
- stake
- landing stage
- connect
- draw
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model provides a landing stage is bank device even is including setting up two symmetric distribution draw -in grooves on bank base, and the connecting piece of setting on the landing stage, draw -in groove one end is equipped with protrudingly, the connecting piece include two symmetric distributions the connection stake, and connect two buffers of connecting the stake afterbodys, connect a stake front end and be equipped with the recess, connect the stake middle part through guide pile bearing and landing stage swing joint, connect stake and two draw -in groove joints for two. The utility model discloses the advantage lies in, adopts the mode lug connection of joint, and connection face is equipped with buffer structure, and it maintains fewly, safe and reliable.
Description
Technical field
This utility model relates to a kind of even bank device, particularly a kind of landing stage even bank device.
Background technology
Landing stage now serves not only as floating wharf and uses, and used also as business, amusement and floating school etc., the connection safety of landing stage and water bank and reliability are not only related to the life security more concerning related personnel service life on landing stage.The accident washed away by flood due to landing stage happens occasionally, therefore it is the most increasingly taken seriously at the fixing of bank.
It is the bollard on ship and bank stake hawser to be tethered that conventional landing stage connects bank mode, part boats and ships be aided with cast anchor fixing.This method of attachment is simple and practical, but hawser is many and easy-to-rust, and maintenance cost is higher, need to manually adjust cable length during SEA LEVEL VARIATION, and person works measures greatly, and impact resistance is poor, there is potential safety hazard.
Summary of the invention
Technical problem to be solved in the utility model is for above-mentioned maintenance cost height, operator's workload greatly, the shortcoming that impact resistance is poor, proposes a kind of landing stage and connects bank device, the mode using clamping is directly connected to, joint face is provided with buffer structure, and it safeguards few, safe and reliable.
For solving above-mentioned technical problem, this utility model be the technical scheme is that a kind of landing stage connects two symmetrical draw-in grooves that bank device includes being arranged on bank base, and the connector being arranged on landing stage;
Draw-in groove one end is conformed with;
Connector includes two symmetrical connecting stake and connect two buffers connecting stake afterbody, connects stake front end and is provided with groove, connects and be flexibly connected with landing stage by guide pile bearing in the middle part of stake;
Two described connection stakes and described two draw-in groove clampings.
Further, the inner surface connecting stake front end groove is provided with abrasionproof backing plate.
Further, even bank device also includes that fixture, described fixture include fixing bar and be located at the fixed frame of fixing bar two end, and fixed frame can be enclosed within connection stake afterbody.
This utility model compared with prior art has the advantage that this utility model uses fore clamping, connects reliable, and it is little to take water front space.This utility model can make by metal structure, and its cost of manufacture is low, safeguards simple.By setting buffer, connecting and post the structures such as wear-resistant gasket in stake, strong shock resistance, safety is high.Connect stake to move up and down on draw-in groove according to the rising of water level or drop, it is not necessary to often degree of tightness hawser, reduce manual operation.
Accompanying drawing explanation
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is that this utility model connects bank device schematic diagram.
Fig. 2 is that this utility model connects bank device A-A sectional view.
Fig. 3 is draw-in groove cross section structure schematic diagram.
Fig. 4 is anchor structure schematic diagram.
In figure: 1. bank base, 2. draw-in groove, 3. expansion bolt, 4. built-in fitting, 5. abrasionproof backing plate, 6. landing stage, 7. connect stake, 8. buffer, 9. guide pile bearing, 10. guide pile, 11. fixtures.
Detailed description of the invention
As shown in Figure 1, Figure 2, a kind of landing stage connects the built-in fitting 4 that bank device includes being fixed on bank base 1 by expansion bolt 3, and two symmetrical draw-in grooves 2 are welded on built-in fitting 4 (in Fig. 1, two draw-in grooves 2 form " π " type), and in Fig. 3, draw-in groove 2 one end is conformed with;The spacing that two guide piles 10 were welded on landing stage 6 and made its spacing and two symmetrical draw-in grooves 2 is consistent.Connect in the middle part of stake 7 equipped with guide pile bearing 9, and be arranged on guide pile 10 by guide pile bearing 9, connecting that stake 7 front end is fluted, it is relevant to the projection size of draw-in groove 2 to be provided with abrasionproof backing plate 5 and size in it, connecting stake 7 rear end its axle of buffer 8(can horizontally slip) connection makes connection stake symmetrical parallel and can left and right short distance swing.Two connect in stake 7(such as Fig. 1, and two connect stake 7 and form " U " type) and the clamping of two draw-in grooves 2, can move up and down according to the ups and downs of water level.
In Fig. 4, fixture 11 includes fixing bar and is located at the fixed frame of fixing bar two end, and fixed frame can be enclosed within connection stake afterbody, when maintenance, select the fixing bar being of convenient length, fixed frame is enclosed within the rear end of fixing bar, make two to connect stake 7 front end to be separated, to facilitate maintenance.Or when meeting wind and waves, select the fixing bar being of convenient length and area of section more than the fixed frame fixing rod rear end, fixed frame is enclosed within the rear end of fixing bar, two maximum spacings connected between stake 7 (two connect the U-shaped critical distance preventing two draw-in grooves 2 " π " type from departing from of stake 7) are carried out spacing, prevent two draw-in grooves 2 from departing from two and connect stake 7, make the clamping of the two lose efficacy.
The above embodiments are only optimal technical scheme of the present utility model; and it is not construed as restriction of the present utility model; the technical scheme that protection domain of the present utility model should be recorded with claim, is protection domain including the equivalents of technical characteristic in the technical scheme that claim is recorded.Equivalent the most in this range is improved, also within protection domain of the present utility model.
Claims (3)
1. a landing stage connects bank device, it is characterised in that: described even bank device includes two the symmetrical draw-in grooves being arranged on bank base, and the connector being arranged on landing stage;
Described draw-in groove one end is conformed with;
Described connector includes two symmetrical connecting stake and connect two buffers connecting stake afterbody,
Connect stake front end and be provided with groove, connect and be flexibly connected with landing stage by guide pile bearing in the middle part of stake;
Two described connection stakes and described two draw-in groove clampings.
A kind of landing stage the most according to claim 1 connects bank device, it is characterized in that: the inner surface of described connection stake front end groove is provided with abrasionproof backing plate.
A kind of landing stage the most according to claim 2 connects bank device, it is characterized in that: described even bank device also includes that fixture, described fixture include fixing bar and be located at the fixed frame of fixing bar two end, and fixed frame can be enclosed within connection stake afterbody.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620233640.1U CN205469668U (en) | 2016-03-24 | 2016-03-24 | Landing stage is bank device even |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620233640.1U CN205469668U (en) | 2016-03-24 | 2016-03-24 | Landing stage is bank device even |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205469668U true CN205469668U (en) | 2016-08-17 |
Family
ID=56652722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620233640.1U Expired - Fee Related CN205469668U (en) | 2016-03-24 | 2016-03-24 | Landing stage is bank device even |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205469668U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106542051A (en) * | 2017-01-12 | 2017-03-29 | 上海海事大学 | A kind of landing stage is tethered at composite structure equipment |
CN108842721A (en) * | 2018-05-03 | 2018-11-20 | 浙江省交通规划设计研究院有限公司 | A kind of deep water reservoir area floating navigational facility based on multidirectional limit bindiny mechanism |
WO2019061697A1 (en) * | 2017-09-26 | 2019-04-04 | 广船国际有限公司 | Steel fender |
-
2016
- 2016-03-24 CN CN201620233640.1U patent/CN205469668U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106542051A (en) * | 2017-01-12 | 2017-03-29 | 上海海事大学 | A kind of landing stage is tethered at composite structure equipment |
WO2019061697A1 (en) * | 2017-09-26 | 2019-04-04 | 广船国际有限公司 | Steel fender |
CN108842721A (en) * | 2018-05-03 | 2018-11-20 | 浙江省交通规划设计研究院有限公司 | A kind of deep water reservoir area floating navigational facility based on multidirectional limit bindiny mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205469668U (en) | Landing stage is bank device even | |
CN204197254U (en) | Waters grille guard | |
CN207141326U (en) | Mark time horizontal self formula boarding ladder | |
CN207244573U (en) | A kind of backed submersible berthing fender of band suitable for gravity harbour | |
CN105026253B (en) | Equipment for fixing floating body | |
CN209741861U (en) | Civil engineering foundation ditch prevention of seepage water side direction water proof curtain underground continuous wall | |
CN208605733U (en) | A kind of fire safe type antidetonation suspension and support | |
CN216786970U (en) | Effectual anticollision rail of buffering | |
CN215594477U (en) | Anticollision mechanism of building | |
CN209620053U (en) | A kind of High Slope Protection concreting steel form | |
CN211844823U (en) | Rope ladder anti-abrasion frame and ship | |
CN212336045U (en) | Earthwork strutting arrangement is used in civil engineering construction | |
CN209567051U (en) | A kind of double-wall steel cofferdam long range transportation by driving system | |
CN207375625U (en) | It is a kind of to be used to build or the bank crane windbreak anchoring device of old harbour | |
CN208949945U (en) | It is dumpable to mention pile frame | |
CN201224867Y (en) | Rail post provided on float bowl assembly body | |
CN206035339U (en) | Anti -flooding flashboard system | |
CN204739317U (en) | Pre -buried structure of pressure steel pipe | |
CN205382762U (en) | Hexagonal fence flexible connectors | |
CN212714596U (en) | Bridge reinforced structure for road and bridge engineering | |
CN211523274U (en) | Steel plate soil-piling temporary flood-proof structure of underwater tunnel | |
CN204875663U (en) | Be adapted to landing stage of oceanic tide | |
CN204851877U (en) | Rigid connection of marine flotation tank system connects | |
CN219467939U (en) | Ocean buoy scratch-proof protection mechanism | |
CN208251207U (en) | A kind of mortar pump installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171228 Address after: 18 No. 443007 Hubei city in Yichang province Xiao Ting Road Patentee after: Machinery & Ship Co., Ltd., China Gezhouba Group Address before: 18 No. 443007 Hubei city of Yichang province located in Xiaoting District Road Patentee before: Ge Zhou Ba mechanical industry Co., Ltd |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20210324 |