CN201224867Y - Rail post provided on float bowl assembly body - Google Patents

Rail post provided on float bowl assembly body Download PDF

Info

Publication number
CN201224867Y
CN201224867Y CNU2008200873703U CN200820087370U CN201224867Y CN 201224867 Y CN201224867 Y CN 201224867Y CN U2008200873703 U CNU2008200873703 U CN U2008200873703U CN 200820087370 U CN200820087370 U CN 200820087370U CN 201224867 Y CN201224867 Y CN 201224867Y
Authority
CN
China
Prior art keywords
baluster
floating drum
mounting rod
drum assembly
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200873703U
Other languages
Chinese (zh)
Inventor
林峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200873703U priority Critical patent/CN201224867Y/en
Application granted granted Critical
Publication of CN201224867Y publication Critical patent/CN201224867Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model discloses a baluster arranged on a floating drum combination, which comprises a baluster body, a hole for installing a transverse hand rail or a rail line is arranged on the baluster body, a connecting end is arranged at the lower end of the baluster body, a mounting rod is extended below the end surface of the connecting end, and a plurality of clipping lugs are arranged around the mounting rod. By adopting the baluster with the structure, the mounting rod of the baluster is installed on the mounting hole of the floating drum through the connecting end at the lower end of the baluster, the clipping lugs on the mounting rod can be limited and fixed on the floating drum combination by rotating for certain angle, a plurality of balusters can be installed on the floating drum combination as required, the installation is convenient, and the stability and the integrity between the assembled baluster and the floating drum combination are better.

Description

Be arranged on the baluster on the floating drum assembly
Technical field
The utility model relates to a kind of baluster, specifically is meant the baluster that is arranged on the floating drum combining structure.
Background technology
A plurality of monomer floating drum combination back formation piers can be used as harbour or pontoon bridge uses, and some peripheries of harbour and pontoon bridge need be provided with baluster.At present, normally used baluster and floating drum combining structure are to be made into cylinder with stainless steel to be inserted on the floating drum, connect with iron chains or hadron then, inconvenience is installed, and exists insufficient strength, and potential safety hazard is not enough greatly.
The utility model content
At the defective that exists in the above-mentioned prior art, the purpose of this utility model is to provide a kind of baluster that is arranged on the floating drum assembly, has the advantages that fitting operation is convenient, can be integrated with the floating drum combining structure.
For achieving the above object, be achieved by the following technical solution:
Be arranged on the baluster on the floating drum assembly, include cylinder, cylinder is provided with the hole that horizontal bar bar or horizontal bar line can be installed, and it is characterized in that: the lower end at cylinder is provided with link, extend a mounting rod under the link end face, be provided with a plurality of engaging projections around the mounting rod portion.
Have an installation interface between described link and the baluster, this installation interface can match with the floating drum assembly.
Described link middle part also is provided with the combination projection, and this combination projection can match with the floating drum assembly.
Adopt the baluster of said structure, can be by the link of baluster lower end, its mounting rod is installed on the installing hole of floating drum, by rotating to an angle, just can be fixed on the floating drum assembly the engaging projection on the mounting rod is spacing, the user can install a plurality of balusters as required on the floating drum assembly, easy for installation, steadiness, globality between baluster after the assembling and the floating drum assembly are relatively good.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model and floating drum, horizontal bar bar;
Fig. 3 is the structural representation of the adoptable horizontal bar line of the utility model.
The specific embodiment
As Fig. 1,2, shown in 3, be arranged on the baluster on the floating drum assembly, include cylinder 1, cylinder 1 is provided with the hole 11 that horizontal bar bar 8 or horizontal bar line 9 can be installed, be provided with link 2 in the lower end of cylinder 1, extend a mounting rod 3 under link 2 end faces, 3 ones of mounting rods are provided with a plurality of engaging projections 4 all around, can be by the link 2 of baluster lower end, its mounting rod 3 is installed on the installing hole 51 of floating drum 5, by rotation baluster certain angle, just can be with 4 spacing being fixed on floating drum 5 assemblys of the engaging projection on the mounting rod 3, the user can install a plurality of balusters as required on floating drum 5 assemblys.Have an installation interface 6 between link 2 and the cylinder 1, this installation interface 6 can match with floating drum 5 assemblys, makes at the assembly upper surface more smooth.And also be provided with a plurality of combination projections 7 at link 2 middle parts, the setting that cooperatively interacts of this combination projection 7 and floating drum 5, the user can install a plurality of balusters as required on the floating drum assembly, can interconnect and be integral, easy for installation, steadiness, globality between baluster after the assembling and the floating drum assembly are relatively good, and safety guarantee is provided.

Claims (3)

1, is arranged on baluster on the floating drum assembly, include cylinder, cylinder is provided with the hole that horizontal bar bar or horizontal bar line can be installed, and it is characterized in that: the lower end at cylinder is provided with link, extend a mounting rod under the link end face, be provided with a plurality of engaging projections around the mounting rod portion.
2, the baluster that is arranged on the floating drum assembly as claimed in claim 1 is characterized in that: have an installation interface between described link and the baluster, this installation interface can match with the floating drum assembly.
3, the baluster that is arranged on the floating drum assembly as claimed in claim 1 or 2 is characterized in that: described link middle part also is provided with the combination projection, and this combination projection can match with the floating drum assembly.
CNU2008200873703U 2008-05-19 2008-05-19 Rail post provided on float bowl assembly body Expired - Fee Related CN201224867Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200873703U CN201224867Y (en) 2008-05-19 2008-05-19 Rail post provided on float bowl assembly body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200873703U CN201224867Y (en) 2008-05-19 2008-05-19 Rail post provided on float bowl assembly body

Publications (1)

Publication Number Publication Date
CN201224867Y true CN201224867Y (en) 2009-04-22

Family

ID=40597752

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200873703U Expired - Fee Related CN201224867Y (en) 2008-05-19 2008-05-19 Rail post provided on float bowl assembly body

Country Status (1)

Country Link
CN (1) CN201224867Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103109022A (en) * 2009-07-06 2013-05-15 巡航冒险股份公司 Construction of a walkway
CN107859432A (en) * 2017-11-13 2018-03-30 林方杰 A kind of floatability enclosing for the water surface

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103109022A (en) * 2009-07-06 2013-05-15 巡航冒险股份公司 Construction of a walkway
CN103109022B (en) * 2009-07-06 2015-05-20 巡航冒险股份公司 Construction of a walkway
CN107859432A (en) * 2017-11-13 2018-03-30 林方杰 A kind of floatability enclosing for the water surface
CN107859432B (en) * 2017-11-13 2019-09-10 绍兴欣耀机电科技有限公司 A kind of floatability enclosing for the water surface

Similar Documents

Publication Publication Date Title
CN201224867Y (en) Rail post provided on float bowl assembly body
CN205469668U (en) Landing stage is bank device even
CN205141598U (en) Sea cable center location protection device
CN203531491U (en) Conical corrosion-resistant and waterproof protection cylinder
CN206437111U (en) A kind of motorcycle back elbow rest component
CN204662396U (en) A kind of tilting for high slope blocks dirty drift structure
CN205123201U (en) Sea cable center location protection device
CN209025340U (en) A kind of stair railing column
CN201310201Y (en) Reinforced structure on concrete floor crack
CN208168426U (en) A kind of basement ramp position inner support section steel beam reinforcement system
CN204418061U (en) The tiltable modular railing of a kind of transverse tube
CN207685684U (en) A kind of bridge supporting frame
CN202925678U (en) A column foot connecting structure of a modern bamboo structure
CN201459909U (en) Anti-fouling fence
CN208534082U (en) A kind of armored concrete anti-corrosion bracing means
CN204826476U (en) Wood system handrail mosaic structure
CN204570894U (en) A kind of fall arrest sewage conduct
CN204940115U (en) A kind of assembling Bridge guardrail
CN202360222U (en) Generator set
CN205242586U (en) Special water pipe of sewer with protruding ladle structure
CN209282793U (en) A kind of sea cable fixed structure
CN201411628Y (en) Handrails combined with pontoons
CN209619999U (en) A kind of civil engineering being easily installed building built pile
CN205875778U (en) Prestressing force carbon plate stretch -draw steel base
CN217949505U (en) Rapid Assembly type concrete prefabricated component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090422

Termination date: 20160519