CN205443816U - Assembled single shield sleeper for TBM - Google Patents

Assembled single shield sleeper for TBM Download PDF

Info

Publication number
CN205443816U
CN205443816U CN201521141012.2U CN201521141012U CN205443816U CN 205443816 U CN205443816 U CN 205443816U CN 201521141012 U CN201521141012 U CN 201521141012U CN 205443816 U CN205443816 U CN 205443816U
Authority
CN
China
Prior art keywords
sleeper
steel
tbm
channel
storage battery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521141012.2U
Other languages
Chinese (zh)
Inventor
葸振东
胡锡鹏
汪强宗
马思伟
樊德东
冷亚夫
刘拴锭
张历男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201521141012.2U priority Critical patent/CN205443816U/en
Application granted granted Critical
Publication of CN205443816U publication Critical patent/CN205443816U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model provides an assembled single shield sleeper for TBM involves single shield TBM when carrying out the subway construction, and the platform truck moves ahead and storage battery car transportation track. A serial communication port. Including bracket and storage battery car sleeper, the storage battery car sleeper includes steel buckle and channel -section steel base, two staggers at the every end of steel buckle are the width of a rail with interval between two steel buckles of one end, and 4 steel buckle both ends symmetrical arrangements are arranged in channel -section steel base top, the channel -section steel base is the quadrangular that the cross -section is isosceles trapezoid, two brackets of both ends symmetric connection, this assembled single shield sleeper for TBM bottom surface sets up two symmetrical arrangement's inclined plane. The utility model discloses very big sleeper quality, the more convenient manual operation of having alleviateed, more conventional sleeper has improved 50% installation rate, has reduced by 30% cost of manufacture, storage battery car derailment accident's emergence probability, assurance construction safety have greatly been reduced, the maintenance is convenient.

Description

A kind of assembled list shield TBM sleeper
Technical field
This utility model relates to chassis when single shield TBM carries out subway work and moves ahead and electromobile conveying track.
Background technology
In subway work, single shield TBM track installation is not in place will directly affect construction speed and construction safety.Conventional sleeper step when mounted is complicated, technology requires that height, cost input is big, librarian use efficiency is low.At present urban track traffic puts into big, and single shield TBM carries out subway work and extensively applied with its construction safety and the advantage such as quality controllable.For ensureing track installation quality, reducing construction cost, improve man-machine work efficiency, and invent the assembled list shield TBM sleeper being easy to construction.
Summary of the invention
There is the base growth of original sleeper, use and routine sleeper is disassembled into bracket and electromobile sleeper two parts.This utility model is complicated for the sleeper step when mounted solving routine, technology requires that high, cost puts into big, the inefficient problem of librarian use.
A kind of assembled list shield TBM sleeper, it is characterised in that;Including bracket and electromobile sleeper, electromobile sleeper includes steel buckle and channel-steel base, described steel buckle often hold two staggered, with being spaced apart the width of an one steel rail between two steel buckles of one end, 4 steel buckle two ends symmetric arrays are arranged in above channel-steel base.Channel-steel base cross section is isosceles trapezoid, and two ends symmetry connects two brackets;This assembled list shield TBM sleeper bottom surface arranges two inclined-planes being arranged symmetrically with.
Utilize sleeper of the present utility model, have the advantage that
One, sleeper quality is alleviated greatly, more convenient in manual operation;
Two, more conventional sleeper improves the installation rate of 50%;
Three, more conventional sleeper reduces the cost of manufacture of 30%;
Four, significantly reduce the probability of happening of electromobile derailment accident, ensure construction safety;
Five, maintenance is convenient.
Accompanying drawing explanation
Fig. 1 electromobile sleeper top view;Fig. 2 electromobile sleeper front view;Fig. 3 electromobile sleeper upward view;Fig. 4 bracket front view;Fig. 5 bracket side view;Fig. 6 bracket top view;Fig. 7-assembled list shield TBM sleeper, wherein 7-electromobile sleeper;8-bracket
A electromobile railway limit buckle;B trolley track limit fastener;C bottom surface pasting board.
Detailed description of the invention
1, electromobile sleeper is furnished with the spacing of every meter;2, transfer two electromobile tracks of 6 meters/product with double-rail beam lifting, snap in the card above sleeper and smash;3, docking orbit attachment rail connecting plate;4, bracket is assembled with electromobile track;5, on bracket, 3 meters/product trolley track and attachment rail connecting plate are laid;6, the electromobile sleeper after hauling out chassis is welded together with section of jurisdiction screw rod forms entirety, to increase its stability.
Illustrate below in conjunction with the accompanying drawings: this utility model is a kind of assembled list shield TBM sleeper, it bracket 8 including carrying TBM trolley track and the electromobile sleeper 7 of carrying electromobile track, this sleeper uses buckle to replace the bolt in conventional sleeper and the combination of pressing plate, on the basis of guaranteeing that gauge is in span of control, the form using assembling is fabricated to part form, it is different from the integral type sleeper of routine, greatly alleviate sleeper quality, improve the convenience of installation process, trolley track and the bracket of hauling out chassis part can directly dismantle and be assembled to chassis direction of advance, more conventional integral type sleeper greatly reduces cost, transit tunnel length is the longest, saving to cost is the most.Bracket uses shaped steel to process the effect acting primarily as carrying trolley track, and electromobile track uses channel-section steel to do sleeper base material, arranges inclined-plane in channel-section steel bottom surface, and what upper surface steel column was fabricated to spacing is welded in channel-section steel surface.
The single shield TBM sleeper being easy to construction of above this utility model, is implemented during three sections of running tunnel application, and is embodied its advantage, and range of application of the present utility model is not limited to this.

Claims (1)

1. an assembled list shield TBM sleeper, it is characterised in that;Including bracket and electromobile sleeper, electromobile sleeper includes steel buckle and channel-steel base, described steel buckle often hold two staggered, with being spaced apart the width of an one steel rail between two steel buckles of one end, 4 steel buckle two ends symmetric arrays are arranged in above channel-steel base;Channel-steel base cross section is isosceles trapezoid, and two ends symmetry connects two brackets;This assembled list shield TBM sleeper bottom surface arranges two inclined-planes being arranged symmetrically with.
CN201521141012.2U 2015-12-31 2015-12-31 Assembled single shield sleeper for TBM Expired - Fee Related CN205443816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521141012.2U CN205443816U (en) 2015-12-31 2015-12-31 Assembled single shield sleeper for TBM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521141012.2U CN205443816U (en) 2015-12-31 2015-12-31 Assembled single shield sleeper for TBM

Publications (1)

Publication Number Publication Date
CN205443816U true CN205443816U (en) 2016-08-10

Family

ID=56600336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521141012.2U Expired - Fee Related CN205443816U (en) 2015-12-31 2015-12-31 Assembled single shield sleeper for TBM

Country Status (1)

Country Link
CN (1) CN205443816U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968685A (en) * 2017-05-25 2017-07-21 淮南矿业(集团)有限责任公司 A kind of mining TBM chamber bottom plates method for curing
CN107489447A (en) * 2017-08-03 2017-12-19 中国电建集团铁路建设有限公司 Temporary track fixed system and its construction in a kind of tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968685A (en) * 2017-05-25 2017-07-21 淮南矿业(集团)有限责任公司 A kind of mining TBM chamber bottom plates method for curing
CN107489447A (en) * 2017-08-03 2017-12-19 中国电建集团铁路建设有限公司 Temporary track fixed system and its construction in a kind of tunnel
CN107489447B (en) * 2017-08-03 2024-05-10 中国电建集团铁路建设有限公司 Temporary track fixing system in tunnel and construction method thereof

Similar Documents

Publication Publication Date Title
CN203580948U (en) Low-gravity center container flat car
CN104562863A (en) Dual-purpose railway double track
CN202294848U (en) A railway track car bogie frame
CN205443816U (en) Assembled single shield sleeper for TBM
CN104527690A (en) Railway truck chassis
CN202966315U (en) Railway ore gondola car
CN206887784U (en) Sliding roof formula protecting canopy frame
CN202369259U (en) Improved crown block traveling track wheel set structure
CN201459610U (en) D-type construction temporary beam of improved railway
CN102602659B (en) Double-layer double-conveying belt type conveyer for mine
CN202413923U (en) Square-pipe welding type vehicle frame
CN203684010U (en) Reinforced gauge baffle assembly
CN204022299U (en) A kind of double-track trolley group operating unit of ultra-large type transfer crane
CN206556431U (en) Strand Sintering Machine Pallet sideslip deviation correcting device
CN204472598U (en) A kind of foot of ladder retractor device for electrification railway contact net tool car ladder
CN202705953U (en) Road oriented fan-shaped energy-absorption anti-collision pad
CN203567816U (en) Semitrailer chassis
CN204551143U (en) A kind of dual-purpose railway two-rail
CN202466322U (en) Movable cross rail connecting device
CN205417640U (en) Railway truck chassis
CN205740054U (en) A kind of interim backstop apparatus of travelling crane truck
CN107984148B (en) A kind of NA1 type railway transport vehicle central sill composition assembling device
CN202528976U (en) Coal mine multifunctional flat car
CN205737577U (en) Friction obstruction formula sky rail train stopper
CN204472597U (en) A kind of repairing car for overhead contact line equipment ladder with foot of ladder Telescopic

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20181231

CF01 Termination of patent right due to non-payment of annual fee