CN205419580U - A hoist and mount system for dismantling tower crane overlength pull rod - Google Patents

A hoist and mount system for dismantling tower crane overlength pull rod Download PDF

Info

Publication number
CN205419580U
CN205419580U CN201620296115.4U CN201620296115U CN205419580U CN 205419580 U CN205419580 U CN 205419580U CN 201620296115 U CN201620296115 U CN 201620296115U CN 205419580 U CN205419580 U CN 205419580U
Authority
CN
China
Prior art keywords
tower crane
steel wire
hoist
building
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620296115.4U
Other languages
Chinese (zh)
Inventor
颜毓
杨继兵
周志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pangyuan Machinery Construction Co Ltd
Original Assignee
Shanghai Pangyuan Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pangyuan Machinery Construction Co Ltd filed Critical Shanghai Pangyuan Machinery Construction Co Ltd
Priority to CN201620296115.4U priority Critical patent/CN205419580U/en
Application granted granted Critical
Publication of CN205419580U publication Critical patent/CN205419580U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a hoist and mount system for dismantling tower crane overlength pull rod, tower crane one side subaerial is equipped with a hoist engine, tower crane's balance arm lateral part hoist and mount have a pulley, the subaerial building that is of tower crane opposite side, it attaches the wall pole to be equipped with between tower crane standard festival and the building, be equipped with running gear on the davit, main one end of hoisting the steel wire is connected with unwinding device on the running gear, the main other end that hoists the steel wire through the hook with attach wall pole one end and be connected, the one end and the windlass connected of vice hoist and mount steel wire, the other end of vice hoist and mount steel wire after through above -mentioned pulley with attach the wall pole other end and be connected. When dismantling the construction, destroying simultaneously and attaching wall pole both ends draw bar pin axle, the hoist engine is bottom hook to safe position (being difficult for running into the building position promptly) slowly, hangs out the pull rod with tower machine lifting hook. If the tower crane mounting height is not high and hoister wire rope is enough long, can fall pull rod two while bottom hook to ground.

Description

A kind of Lift-on/Lift-off System for dismantling derrick crane overlength pull bar
Technical field
This utility model relates to the technical field of construction, and a kind of Lift-on/Lift-off System for dismantling derrick crane overlength pull bar, particularly to its system attachment structure.
Background technology
Derrick crane can run into various operating mode in engineering construction, and at a small space, attached wall pull bar is long, during derrick crane dismounting attachment device, remove generally by tower crane self, extremely difficult and be absolutely unsafe when removing outermost pull bar, it is easy to again encounter building simultaneously.If building exterior decoration is the most complete, can be more to cause unnecessary loss.
Summary of the invention
The purpose of this utility model is to provide a kind of Lift-on/Lift-off System for dismantling derrick crane overlength pull bar, efficiently solves the lifting problem of construction later stage small space dismounting attached wall pull bar.
nullTo achieve these goals: the technical solution of the utility model is: a kind of Lift-on/Lift-off System for dismantling derrick crane overlength pull bar,Including derrick crane,This derrick crane is by being perpendicular to the standard knot that ground is arranged,And the rotating mechanism being positioned at standard knot top is constituted,Rotating mechanism top is respectively equipped with arm and counter-jib,The ground of described derrick crane side is provided with a hoist engine,The counter-jib sidepiece of derrick crane is lifted with a pulley,It it is building on the ground of derrick crane opposite side,Wall attaching rod it is provided with between column crane mast section and building,Arm is provided with walking mechanism,Main one end of lifting steel wire is connected with the unwinding device in walking mechanism,The other end of main lifting steel wire is connected with wall attaching rod one end by hook,One end of secondary lifting steel wire is connected with hoist engine,The other end of secondary lifting steel wire is connected with the wall attaching rod other end by after above-mentioned pulley.
The utility model discloses a kind of Lift-on/Lift-off System for dismantling derrick crane overlength pull bar, it placed a hoist engine on ground, the secondary lifting steel wire of hoist engine extend out to counter-jib side, wall attaching rod one end is hung after the pulley on maintenance gin pole, the hook of tower crane hangs the wall attaching rod other end, during dismounting construction, destroys wall attaching rod two ends pull bar bearing pin simultaneously, hoist engine slowly descends hook to home (being i.e. difficult to encounter building position), is hung out by pull bar with tower crane suspension hook.If tower crane setting height(from bottom) is the highest and steel wire rope of windlass is the longest, pull bar two can be dropped down onto ground with hook at present, thus avoid when slinging pull bar one end, the accident that the other end collides with other buildings or structures, too increase the safety coefficient of operative employee.A whole set of Lift-on/Lift-off System highly versatile, easy and simple to handle, decrease the grazing of neighboring buildings, not only ensure safety but also improve efficiency.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Wherein:
1, standard knot;
2, rotating mechanism;
3, arm;
4, counter-jib;
5, hoist engine;
6, pulley;
7, building;
8, wall attaching rod;
9, walking mechanism;
10, main lifting steel wire;
11, secondary lifting steel wire.
Detailed description of the invention
With reference to the accompanying drawings, this utility model is further described below.
nullThe utility model discloses a kind of Lift-on/Lift-off System for dismantling derrick crane overlength pull bar,Including derrick crane,This derrick crane is by being perpendicular to the standard knot 1 that ground is arranged,And the rotating mechanism 2 being positioned at standard knot 1 top is constituted,Rotating mechanism top is respectively equipped with arm 3 and counter-jib 4,It is different from prior art and is: the ground of described derrick crane side is provided with a hoist engine 5,Counter-jib 4 sidepiece of derrick crane is repaiied the lower section of gin pole and is lifted with a pulley 6,It it is building 7 on the ground of derrick crane opposite side,Wall attaching rod 8 it is provided with between column crane mast section 1 and building 7,Arm 3 is provided with walking mechanism 9,One end of main lifting steel wire 10 is connected with the unwinding device in walking mechanism 9,The other end of main lifting steel wire 10 is connected with wall attaching rod 8 one end by hook,One end of secondary lifting steel wire 11 is connected with hoist engine 5,The other end of secondary lifting steel wire 11 is connected with wall attaching rod 8 other end by after above-mentioned pulley 6.
Above content is to combine concrete preferred implementation further detailed description of the utility model, it is impossible to assert that this utility model is embodied as being confined to these explanations above-mentioned.For this utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, it is also possible to make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.

Claims (1)

  1. null1. the Lift-on/Lift-off System being used for dismantling derrick crane overlength pull bar,Including derrick crane,This derrick crane is by being perpendicular to the standard knot (1) that ground is arranged,And the rotating mechanism (2) being positioned at standard knot (1) top is constituted,Rotating mechanism top is respectively equipped with arm (3) and counter-jib (4),It is characterized in that: the ground of described derrick crane side is provided with a hoist engine (5),Counter-jib (4) sidepiece of derrick crane is lifted with a pulley (6),It it is building (7) on the ground of derrick crane opposite side,Wall attaching rod (8) it is provided with between column crane mast section (1) and building (7),Arm (3) is provided with walking mechanism (9),One end of main lifting steel wire (10) is connected with the unwinding device in walking mechanism (9),The other end of main lifting steel wire (10) is connected with wall attaching rod (8) one end by hook,One end of secondary lifting steel wire (11) is connected with hoist engine (5),The other end of secondary lifting steel wire (11) is connected with wall attaching rod (8) other end afterwards by above-mentioned pulley (6).
CN201620296115.4U 2016-04-11 2016-04-11 A hoist and mount system for dismantling tower crane overlength pull rod Active CN205419580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620296115.4U CN205419580U (en) 2016-04-11 2016-04-11 A hoist and mount system for dismantling tower crane overlength pull rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620296115.4U CN205419580U (en) 2016-04-11 2016-04-11 A hoist and mount system for dismantling tower crane overlength pull rod

Publications (1)

Publication Number Publication Date
CN205419580U true CN205419580U (en) 2016-08-03

Family

ID=56521250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620296115.4U Active CN205419580U (en) 2016-04-11 2016-04-11 A hoist and mount system for dismantling tower crane overlength pull rod

Country Status (1)

Country Link
CN (1) CN205419580U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107161879B (en) * 2017-06-27 2018-08-03 中建二局第二建筑工程有限公司 Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN111891919A (en) * 2020-08-06 2020-11-06 李妍 Method for replacing and hoisting window cleaning machine of high building
CN112443149A (en) * 2019-09-02 2021-03-05 广东博智林机器人有限公司 Method for mounting and dismounting anti-deflection device of outer wall jacking tower
CN112573405A (en) * 2021-03-01 2021-03-30 河南工学院 Tower crane abnormity early warning method and system based on image processing

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107161879B (en) * 2017-06-27 2018-08-03 中建二局第二建筑工程有限公司 Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN112443149A (en) * 2019-09-02 2021-03-05 广东博智林机器人有限公司 Method for mounting and dismounting anti-deflection device of outer wall jacking tower
CN112443149B (en) * 2019-09-02 2022-06-14 广东博智林机器人有限公司 Method for mounting and dismounting anti-deflection device of outer wall jacking tower
CN111891919A (en) * 2020-08-06 2020-11-06 李妍 Method for replacing and hoisting window cleaning machine of high building
CN111891919B (en) * 2020-08-06 2022-11-01 李妍 Method for replacing and hoisting window cleaning machine of high building
CN112573405A (en) * 2021-03-01 2021-03-30 河南工学院 Tower crane abnormity early warning method and system based on image processing
CN112573405B (en) * 2021-03-01 2021-05-25 河南工学院 Tower crane abnormity early warning method and system based on image processing

Similar Documents

Publication Publication Date Title
CN205419580U (en) A hoist and mount system for dismantling tower crane overlength pull rod
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN101214908A (en) Gin pole integrated dismounting method for tower crane
CN201914868U (en) Tower crane attached mounting-demounting hoisting device
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN212198153U (en) Lifting hook for building construction tower crane
CN202880719U (en) Olecranon-shaped arm head of hoisting multiplying power winding rope of movable arm tower-type crane
CN103264966A (en) Self-hoisting device and method of dismounting member of tower crane
CN205802841U (en) Manual multifunctional ground jack
CN202717497U (en) Lifting device of prefabricated composite floor slab
CN204752012U (en) Wall -hanging miniature hoist
CN201722053U (en) Hoisting mechanism used for upright column hoisting
TWI525032B (en) Double safety cage structure
CN202744175U (en) Sling used for hoisting precast concrete columns
CN202164065U (en) Rope breakage protecting device for tower crane
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN201223653Y (en) Bight for safety operation of conical roof
CN210855056U (en) Novel movable arm crane for hoisting steel wire rope winding system
CN208843629U (en) A kind of crane upper mechanism is from dismantling device and crane
CN203462739U (en) Double-hook upside down type electric chain hoist
CN209352490U (en) Hang single-stranded motor hoist
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN202704797U (en) Hoisting device of guide wheel
CN202064624U (en) Drop-preventing safe mechanism for lifting scaffold of building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant