CN201914868U - Tower crane attached mounting-demounting hoisting device - Google Patents

Tower crane attached mounting-demounting hoisting device Download PDF

Info

Publication number
CN201914868U
CN201914868U CN2011200458331U CN201120045833U CN201914868U CN 201914868 U CN201914868 U CN 201914868U CN 2011200458331 U CN2011200458331 U CN 2011200458331U CN 201120045833 U CN201120045833 U CN 201120045833U CN 201914868 U CN201914868 U CN 201914868U
Authority
CN
China
Prior art keywords
tower crane
pulley
balance arm
lifting
equilibrium arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200458331U
Other languages
Chinese (zh)
Inventor
刘福元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN DONGJIAN MACHINERY MANUFACTURING Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200458331U priority Critical patent/CN201914868U/en
Application granted granted Critical
Publication of CN201914868U publication Critical patent/CN201914868U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a building tower crane hoisting device, namely a tower crane attached mounting-demounting hoisting device. The device comprises a lifting cantilever fixed on a balance arm on one side of a tower crane, wherein a left pulley spindle and a right pulley spindle transversely placed are arranged at the outer end of the lifting cantilever extending outside, and the outer ends of the left and the right pulleys are provided with pulleys which are corresponding to a left pulley and a right pulley fixedly arranged on the balance arm; and a hoisting winch is arranged on the balance arm, and a steel wire rope on the hoisting winch is fixed on the balance arm after penetrating the right pulley of the balance arm, the pulley on the right pulley spindle, a lifting hook, the pulley on the left pulley spindle and the left pulley of the balance arm. The device is reserved on a balance arm on the other side of the tower crane, mainly used for lifting and fixing pull rods when a tower body of the tower crane is stably fixed, and also can be used for assisting lifting. When the tower body of the tower crane is stably fixed, the device can mechanically lift heavier pull rods so as to avoid using ordinary hemp ropes to lift the pull rods, and the device can fix the tower body safely and fast.

Description

Tower crane adheres to peace and tears lifting appliance open
Technical field
The utility model relates to a kind of tower crane lifting appliance for building, and promptly tower crane adheres to peace and tears lifting appliance open.
Background technology
In the prior art, the construction machinery equipment tower crane is made up of tower body and left and right equilibrium arm.After tower crane frame was set to certain altitude, tower body will be captiveed joint with the building that build on the next door by at least two above auxiliary connecting rods usually, to increase stability.Because pull bar is heavier, install and fix pull bar under the equilibrium arm of suspension hook and can mention having by the tower crane suspension hook, but the pull bar installation in opposite side equilibrium arm bottom needs manually use the rope pull-up, install and fix, often rupture in the practical operation because of rope, pull bar falls from eminence, has hidden danger.
The utility model content
The purpose of this utility model is to provide a kind of at above-mentioned deficiency to set up lifting appliance at tower crane equilibrium arm opposite side, is used to make things convenient for the tower crane of steady brace to adhere to peace and tears lifting appliance open.
Technical solution of the present utility model is: tower crane adheres to peace to be torn lifting appliance open and comprises the cantilever that hoists that is fixed on the tower crane one lateral balance arm, and there is horizontal left and right sheave shaft at the place, outer end that leans out of the cantilever that hoists, and there is pulley left and right sheave shaft axle outer end; Be fixed with the left and right pulley of equilibrium arm on the corresponding equilibrium arm of left and right sheave shaft top sheave; Equilibrium arm is provided with winch, fixes behind steel wire penetrating equilibrium arm right pulley, right pulley axle top sheave, suspension hook, left chain wheel axle top sheave and the equilibrium arm left chain wheel with on the equilibrium arm on it.This device is standby on tower crane opposite side equilibrium arm, and lifting steady brace usefulness also can be made service hoisting when being mainly used in tower crane tower body held stationary.
The utility model has the advantages that: during tower crane tower body held stationary, can realize the pull bar that mechanical lifting is heavier, avoid using the common rope made of hemp to play suspending bars, realization safety, quick tower body are fixed.
Below in conjunction with accompanying drawing embodiment of the present utility model is described in further detail.
Description of drawings
Fig. 1 is the tower crane structure diagram.
Fig. 2 is the utility model structure diagram.
The specific embodiment
Referring to Fig. 1, tower crane is made up of tower body 1 and left and right equilibrium arm 2,3.Tower body is captiveed joint with the building that build on the next door by pull bar 4,5, to increase stability.Pull bar 5 can be sling by the suspension hook under the right equilibrium arm 3 and install and fix, and pull bar 4 can adhere to peace by the tower crane on the left equilibrium arm 2 and tear lifting appliance 6 open and sling and install and fix.
Referring to Fig. 2, tower crane adheres to peace to be torn lifting appliance 6 open and comprises the cantilever 7 that hoists that is fixed on the left equilibrium arm 2, and there is horizontal left and right sheave shaft 8,9 at the place, outer end that leans out of the cantilever 7 that hoists, and there is pulley 10,11 8,9 outer ends of left and right sheave shaft; Be fixed with the left and right pulley 12,13 of equilibrium arm on left and right sheave shaft 8,9 top sheaves 10, the 11 corresponding left equilibrium arms 2; Left side equilibrium arm 2 is provided with winch 14, and steel rope 15 passes on equilibrium arm right pulley 13, right pulley axle top sheave 11, suspension hook 16, left chain wheel axle top sheave 10 and equilibrium arm left chain wheel 12 backs and the left equilibrium arm 2 fixing on it.In the tower crane operator's compartment, start winch 14, realize suspension hook 16 liftings, be used for suspending bars.The cantilever 7 that hoists can be fixed on left equilibrium arm 2 in the left, right, front and rear adjustment, to satisfy on-the-spot actual needs.

Claims (1)

1. a tower crane adheres to peace and tears lifting appliance open, it is characterized in that comprising the cantilever that hoists (7) that is fixed on the tower crane one lateral balance arm (2), there is horizontal left and right sheave shaft (8,9) at the hoist outer end place of leaning out of cantilever (7), and there is pulley (10,11) left and right sheave shaft (8, a 9) axle outer end; Be fixed with the left and right pulley of equilibrium arm (12,13) on left and right sheave shaft (8,9) top sheave (10,11) the corresponding equilibrium arms (2); Equilibrium arm (2) is provided with winch (14), and steel rope on it (15) passes equilibrium arm right pulley (13), right pulley axle top sheave (11), suspension hook (16), left chain wheel axle top sheave (10) and equilibrium arm left chain wheel (12) back and goes up fixing with equilibrium arm (2).
CN2011200458331U 2011-02-23 2011-02-23 Tower crane attached mounting-demounting hoisting device Expired - Fee Related CN201914868U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200458331U CN201914868U (en) 2011-02-23 2011-02-23 Tower crane attached mounting-demounting hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200458331U CN201914868U (en) 2011-02-23 2011-02-23 Tower crane attached mounting-demounting hoisting device

Publications (1)

Publication Number Publication Date
CN201914868U true CN201914868U (en) 2011-08-03

Family

ID=44414676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200458331U Expired - Fee Related CN201914868U (en) 2011-02-23 2011-02-23 Tower crane attached mounting-demounting hoisting device

Country Status (1)

Country Link
CN (1) CN201914868U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583163A (en) * 2012-03-20 2012-07-18 西安市第四建筑工程公司 Steel wire rope symmetrically disassembling process flow for tower crane attachment device
CN102627228A (en) * 2012-04-11 2012-08-08 中联重科股份有限公司 Tower crane and lifting hook assembly thereof
CN103979438A (en) * 2014-06-05 2014-08-13 南通市达欣工程股份有限公司 Auxiliary device for disassembling tower crane attachment bracket
CN105060138A (en) * 2015-09-07 2015-11-18 鞍钢房产建设有限公司 Disassembling and installation method for tower crane attachment
CN107161879B (en) * 2017-06-27 2018-08-03 中建二局第二建筑工程有限公司 Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN114031002A (en) * 2021-11-03 2022-02-11 上海建工七建集团有限公司 Tower crane wall-attached connecting piece dismounting device and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583163A (en) * 2012-03-20 2012-07-18 西安市第四建筑工程公司 Steel wire rope symmetrically disassembling process flow for tower crane attachment device
CN102627228A (en) * 2012-04-11 2012-08-08 中联重科股份有限公司 Tower crane and lifting hook assembly thereof
CN102627228B (en) * 2012-04-11 2014-05-21 中联重科股份有限公司 Tower crane and lifting hook assembly thereof
CN103979438A (en) * 2014-06-05 2014-08-13 南通市达欣工程股份有限公司 Auxiliary device for disassembling tower crane attachment bracket
CN105060138A (en) * 2015-09-07 2015-11-18 鞍钢房产建设有限公司 Disassembling and installation method for tower crane attachment
CN105060138B (en) * 2015-09-07 2017-04-19 鞍钢房产建设有限公司 Disassembling and installation method for tower crane attachment and device thereof
CN107161879B (en) * 2017-06-27 2018-08-03 中建二局第二建筑工程有限公司 Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN114031002A (en) * 2021-11-03 2022-02-11 上海建工七建集团有限公司 Tower crane wall-attached connecting piece dismounting device and method

Similar Documents

Publication Publication Date Title
CN201914868U (en) Tower crane attached mounting-demounting hoisting device
CN103613031B (en) Voltage transformer simple and easy hoisting device
CN106276631A (en) A kind of roofing device for hoisting and crane and the method for dismounting of crane arm
CN103754775B (en) Arm disassembling method and auxiliary disassembling device of swing arm tower crane
CN103663189A (en) Swing arm tower crane installation method
CN103708360B (en) Swing arm tower crane, standard knot introduction system thereof and standard knot introduction method
CN203306917U (en) Unhooking-proof safety device of crane hook
CN205419580U (en) A hoist and mount system for dismantling tower crane overlength pull rod
CN203998770U (en) A kind of movable pulley falling proof device
CN201199661Y (en) Parallel dnockout core holder for rotor
CN203998705U (en) Single arm frame steel wire rope luffing stationary crane
CN103264966A (en) Self-hoisting device and method of dismounting member of tower crane
CN202390116U (en) High-intensity small-tonnage hoist
CN203529821U (en) Variable amplitude trolley for tower crane
CN202988609U (en) Diagonal bracing type derrick crane
CN201125127Y (en) Ultralong electric gourd
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN202718381U (en) Transfer-free lifting device
CN202558444U (en) Steel penstock hoisting balance beam device
CN101934994A (en) Building high-altitude vertical hoisting double-guide cable system and assisting method
CN202064624U (en) Drop-preventing safe mechanism for lifting scaffold of building construction
CN209009987U (en) Wind generator set blade hanging apparatus
CN208249682U (en) A kind of wind wheel slipping tail tooling
CN204508645U (en) A kind of tower crane self-unloading counter weight device
CN203284098U (en) Disassembled and assembled part self-lifting device for tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HARBIN DONGJIAN MACHINERY MANUFACTURING CO., LTD.

Free format text: FORMER OWNER: LIU FUYUAN

Effective date: 20120702

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 134001 TONGHUA, JILIN PROVINCE TO: 150038 HARBIN, HEILONGJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120702

Address after: 150038 Xiangyang Industrial Zone, Xiangfang District, Heilongjiang, Harbin

Patentee after: Harbin Dongjian Machinery Manufacturing Co., Ltd.

Address before: 134001 Tonghua city of Jilin Province Dongchang District Construction Street No. 4093 Tonghua construction Industrial Co. Ltd. crane at

Patentee before: Liu Fuyuan

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20200223

CF01 Termination of patent right due to non-payment of annual fee