CN205404757U - 一种新型双馈风力发电机试验平台 - Google Patents
一种新型双馈风力发电机试验平台 Download PDFInfo
- Publication number
- CN205404757U CN205404757U CN201620155538.4U CN201620155538U CN205404757U CN 205404757 U CN205404757 U CN 205404757U CN 201620155538 U CN201620155538 U CN 201620155538U CN 205404757 U CN205404757 U CN 205404757U
- Authority
- CN
- China
- Prior art keywords
- double
- fed
- current
- fed generator
- current transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Eletrric Generators (AREA)
- Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
Abstract
一种新型双馈风力发电机试验平台,包括变频器,与变频器连接的电动机,通过联轴器与电动机连接的双馈发电机,采集双馈发电机定子三相电流信号的电流互感器及采集双馈发电机定子三相电压信号的分压线,采集双馈发电机轴承处振动信号的振动传感器,依次与双馈发电机转子三相电流输入线连接的励磁电流不平衡装置、变流器,采集双馈发电机转子三相电流信号的电流互感器,与双馈发电机各故障引线连接的短路柜,与定子电流互感器及分压线、振动传感器和转子电流互感器连接的监测系统信号采集装置,与变频器、监测系统信号采集装置、变流器、励磁电流不平衡装置和短路柜连接的包含有电脑、显示灯及各种按钮的控制台;本实用新型提高了试验平台利用率。
Description
技术领域
本实用新型属于风力发电领域、故障诊断领域,具体涉及一种新型双馈风力发电机试验平台。
背景技术
目前已有的试验平台主要采用对托模式,即通过一台电动机带动双馈发电机运行。试验平台主要由电动机变频器、电动机、双馈发电机、双馈变流器及相关的控制、监测系统等构成。
在模拟双馈发电机各短路故障、三相不平衡故障时,目前国内外已有的故障模拟试验平台都是在发电机制造过程中通过在相应线圈上串联电阻、直接短路的方式来实现,即平台所采用的发电机本身就是带缺陷的发电机,平台无法获得发电机正常状态信号。且目前已有的各发电机故障模拟试验平台无法实现可反复进行非破坏性试验的功能,所采用的发电机的结构跟实际双馈放电机结构相差较大,也无法实现对于发电机转子各电气故障可控的模拟,在同一个试验平台可模拟的故障类型较少,无法再同一平台上模拟多种短路故障,尤其是无法模拟转子各短路故障。
发明内容
针对现有技术中存在的不足,本实用新型的目的在于提供一种新型双馈风力发电机试验平台,本实用新型给出的试验平台采用的双馈发电机的结构跟实际运行的双馈发电机结构相似,通过短路柜、励磁电流不平衡装置实现了可反复进行非破坏性试验的功能,在同一个试验台上可模拟各类短路故障,包括定/转子匝间短路、相间短路、相对地短路,短路位置分为定/转子线圈位于铁芯槽内和端部处,还可模拟转子励磁电流不平衡故障;同一个试验台上模拟多种故障类型相对降低了试验台制造成本,有效提高了试验平台利用率。
为实现以上目的,本实用新型采用的技术方案为:
一种新型双馈风力发电机试验平台,包括变频器1,与变频器1连接的电动机2,通过联轴器3与电动机2连接的模拟故障用的双馈发电机4,采集双馈发电机4定子三相电流信号的电流互感器及采集双馈发电机定子三相电压信号的分压线5,采集双馈发电机4轴承处振动信号的振动传感器7,依次与双馈发电机4转子三相电流输入线连接的励磁电流不平衡装置10、变流器8、采集双馈发电机转子三相电流信号的电流互感器9,与双馈发电机4各故障引线连接的通过内部的控制器控制各短路故障切入与切出的短路柜11,与定子电流互感器及分压线5、振动传感器7和转子电流互感器9连接的监测系统信号采集装置6,与变频器1、监测系统信号采集装置6、变流器8、励磁电流不平衡装置10和短路柜11连接的包含有电脑、显示灯及各种按钮的控制台12。
和现有技术相比较,本实用新型具备如下优点:
1、借助本实用新型试验平台中的短路柜实现了可反复进行非破坏性试验的功能,在同一个试验台上可模拟双馈发电机定/转子各类短路故障。
2、实现了双馈发电机转子各短路故障可控的模拟。
3、借助本实用新型试验平台中的励磁电流不平衡装置实现了对双馈发电机转子励磁电流不平衡故障的模拟。
4、借助短路柜中的可编程控制器避免了操作人员直接接触强电,保证了工作的安全性。
上述优点产生的效果:实现了在同一个试验台进行多种故障的模拟功能,相对降低了试验台制造成本,有效提高了试验平台利用率。
附图说明
图1为本实用新型试验平台构成框图。
具体实施方式
为了使本实用新型的目的、技术方案及优点更加清楚简明,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。
如图1所示,本实用新型一种新型双馈风力发电机试验平台,包括变频器1,与变频器1连接的电动机2,通过联轴器3与电动机2连接的模拟故障用的双馈发电机4,采集双馈发电机4定子三相电流信号的电流互感器及采集双馈发电机定子三相电压信号的分压线5,采集双馈发电机4轴承处振动信号的振动传感器7,依次与双馈发电机4转子三相电流输入线连接的励磁电流不平衡装置10、变流器8、采集转子三相电流信号的电流互感器9和,与双馈发电机4各故障引线连接的通过内部的控制器控制各短路故障切入与切出的短路柜11,与定子电流互感器及分压线5、振动传感器7和转子电流互感器9连接的监测系统信号采集装置6,与变频器1、监测系统信号采集装置6、变流器8、励磁电流不平衡装置10和短路柜11连接的包含有电脑、显示灯及各种按钮的控制台12。
下面详细说明本实用新型试验平台各部件的作用:
变频器1:控制电动机2的转速及输出功率。
电动机2:驱动双馈发电机4。
联轴器3:连接电动机2及双馈发电机4。
双馈发电机4:模拟风力机用双馈发电机,在发电机上模拟故障。
定子电流互感器及分压线5:采集双馈发电机三相定子电流及电压信号。
监测系统信号采集装置6:采集、处理通过振动传感器7、定子电流互感器及分压线5、转子电流互感器9获得监测信号。
振动传感器7:采集双馈发电机4轴承处振动信号。
变流器8:给双馈发电机转子励磁,并控制双馈发电机的并网与脱网。
转子电流互感器9:采集双馈发电机转子三相电流信号。
励磁电流不平衡装置10:模拟双馈发电机转子励磁电流不平衡。
短路柜11:连接双馈发电机各故障引线,并通过内部的可编程控制器控制各短路故障切入与切出。
控制台12:包含有电脑、显示灯及各种按钮,用以控制电动机变频器1、短路柜11、监测系统信号采集装置6、变流器8、励磁电流不平衡装置10,并显示监测系统各信号信息、变流器工作信息。
Claims (1)
1.一种新型双馈风力发电机试验平台,其特征在于:包括变频器(1),与变频器(1)连接的电动机(2),通过联轴器(3)与电动机(2)连接模拟故障用的双馈发电机(4),采集双馈发电机(4)定子三相电流信号的电流互感器及采集双馈发电机定子三相电压信号的分压线(5),采集双馈发电机(4)轴承处振动信号的振动传感器(7),依次与双馈发电机(4)转子三相电流输入线连接的励磁电流不平衡装置(10)、变流器(8)、采集双馈发电机转子三相电流信号的电流互感器(9),与双馈发电机(4)各故障引线连接的通过内部的控制器控制各短路故障切入与切出的短路柜(11),与定子电流互感器及分压线(5)、振动传感器(7)和转子电流互感器(9)连接的监测系统信号采集装置(6),与变频器(1)、监测系统信号采集装置(6)、变流器(8)、励磁电流不平衡装置(10)和短路柜(11)连接的包含有电脑、显示灯及各种按钮的控制台(12)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620155538.4U CN205404757U (zh) | 2016-03-01 | 2016-03-01 | 一种新型双馈风力发电机试验平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620155538.4U CN205404757U (zh) | 2016-03-01 | 2016-03-01 | 一种新型双馈风力发电机试验平台 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205404757U true CN205404757U (zh) | 2016-07-27 |
Family
ID=56947712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620155538.4U Expired - Fee Related CN205404757U (zh) | 2016-03-01 | 2016-03-01 | 一种新型双馈风力发电机试验平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205404757U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108776303A (zh) * | 2018-06-08 | 2018-11-09 | 上海金艺检测技术有限公司 | 成组变频异步电机信号动态分时采集装置 |
CN113359030A (zh) * | 2021-06-09 | 2021-09-07 | 西安热工研究院有限公司 | 基于外部漏磁检测的风力发电机短路故障模拟平台 |
JP2022500678A (ja) * | 2018-09-19 | 2022-01-04 | 西安高圧電器研究院有限責任公司Xi’an High Voltage Apparatus Research Institute Co., Ltd. | 海洋電気器具の短絡ブレイク試験システム |
-
2016
- 2016-03-01 CN CN201620155538.4U patent/CN205404757U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108776303A (zh) * | 2018-06-08 | 2018-11-09 | 上海金艺检测技术有限公司 | 成组变频异步电机信号动态分时采集装置 |
JP2022500678A (ja) * | 2018-09-19 | 2022-01-04 | 西安高圧電器研究院有限責任公司Xi’an High Voltage Apparatus Research Institute Co., Ltd. | 海洋電気器具の短絡ブレイク試験システム |
JP7166466B2 (ja) | 2018-09-19 | 2022-11-07 | 西安高圧電器研究院有限責任公司 | 海洋電気器具の短絡ブレイク試験システム |
CN113359030A (zh) * | 2021-06-09 | 2021-09-07 | 西安热工研究院有限公司 | 基于外部漏磁检测的风力发电机短路故障模拟平台 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201955405U (zh) | 一种变频器负载测试系统 | |
CN102200096B (zh) | 用于优化风力涡轮机操作的方法和装置 | |
CN108196187B (zh) | 双馈风力发电机转子绕组三相不对称负载故障诊断方法 | |
CN205404757U (zh) | 一种新型双馈风力发电机试验平台 | |
EP2296265A2 (en) | System for detecting generator winding faults | |
KR101089606B1 (ko) | 풍력 발전 시뮬레이션 시스템 | |
CN203981851U (zh) | 励磁式发电机故障模拟系统 | |
CN101881814A (zh) | 一种新型的兆瓦级风力发电机组试验系统及其试验方法 | |
CN102565702A (zh) | 风力发电机试验台 | |
CN208722447U (zh) | 一种电机测试实验系统 | |
CN104062587B (zh) | 励磁式发电机故障模拟系统 | |
CN103558552A (zh) | 互感式三相电机电流噪声故障检测法和实施该方法的装置 | |
CN104155567A (zh) | 一种双馈式发电机转子匝间短路故障位置的定位方法 | |
CN202837502U (zh) | 风力发电机组转矩特性模拟系统 | |
CN103630838B (zh) | 一种双馈发电机对拖温升试验方法 | |
CN104298121B (zh) | 面向控制技术研究的双馈风力发电系统模拟实验平台 | |
CN109062077B (zh) | 抽水蓄能可变速机组发电及电动试验系统及其控制方法 | |
CN110905733A (zh) | 一种变桨柜测试系统 | |
CN201331570Y (zh) | 50Hz电网下60Hz双馈异步发电机测试系统 | |
CN102830353A (zh) | 直驱式兆瓦级永磁同步发电机的全功率试验装置 | |
CN102818953B (zh) | 风况模拟系统及其在风电机组试验台上实现的方法 | |
CN201707414U (zh) | 风力发电机变频器模拟试验装置 | |
CN104767223B (zh) | 一种旋转式发电机组与原动机软连接并网系统及其使用方法 | |
CN103487753B (zh) | 一种测试风力发电机组动态性能的方法及试验台 | |
Xiao et al. | Stator winding inter-turn short circuit and rotor eccentricity diagnosis of permanent magnet synchronous generator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160727 Termination date: 20180301 |