CN102565702A - 风力发电机试验台 - Google Patents

风力发电机试验台 Download PDF

Info

Publication number
CN102565702A
CN102565702A CN201110454795XA CN201110454795A CN102565702A CN 102565702 A CN102565702 A CN 102565702A CN 201110454795X A CN201110454795X A CN 201110454795XA CN 201110454795 A CN201110454795 A CN 201110454795A CN 102565702 A CN102565702 A CN 102565702A
Authority
CN
China
Prior art keywords
generator
voltage
current transformer
network fault
electric network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110454795XA
Other languages
English (en)
Inventor
杜睿
陈昱燃
郑世辉
闵泽生
陈建国
蒋驰雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Dongfang Electric Autocontrol Engineering Co ltd
DEC Dongfang Turbine Co Ltd
Original Assignee
Sichuan Dongfang Electric Autocontrol Engineering Co ltd
DEC Dongfang Turbine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Dongfang Electric Autocontrol Engineering Co ltd, DEC Dongfang Turbine Co Ltd filed Critical Sichuan Dongfang Electric Autocontrol Engineering Co ltd
Priority to CN201110454795XA priority Critical patent/CN102565702A/zh
Publication of CN102565702A publication Critical patent/CN102565702A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

本发明公开了一种风力发电机的试验台,所述试验台包括电网故障模拟设备、变压器、拖动电机及变频器、发电机及变流器、温湿度控制箱、开关柜和中央控制台。本试验台可模拟风力发电机在风场运行时遇到的各种工况,并可测试各种风力发电机的发电机性能和变流器性能,尤其是可以测试机组的低电压穿越性能。

Description

风力发电机试验台
技术领域
本发明属于测试技术领域,具体涉及一种风力发电机试验台,用于风力发电机出厂检验的性能测试。
背景技术
近年来,风力发电在国家政策的扶持下高速发展,但随着风电装机容量的不断增加,风电在电力系统中的地位发生了转变。风电装机容量较小时,它的运行对系统稳定性的影响可以不予考虑;当风电装机容量越来越大,在系统中所占比例逐年增加时,它的运行对系统稳定性的影响将变得不容忽视。
为了保证电力系统的安全稳定运行,欧洲、北美及澳大利亚的一些电力协会或电网公司都制定了风机并网的技术导则,其中对并网风机的LVRT低电压穿越能力提出了严格的规定,在我国,相应的国标也在报批之中。
我国目前生产的双馈风力发电机,由于发电机定子与电网直接相连,当电网电压跌落对将导致转子侧过压和过电流。虽然变流器有撬棒保护电路(无源crowbar),但只是一种电压跌落发生时对变流器自身的保护措施,它动作之后必须停机,不能实现低电压穿越。
国家电网的低电压穿越标准(LVRT)强制实施后,我国的风电产品将不能满足该标准的要求,因此,我国的风力发电机制造商竞相研发用于风力发电机的低电压穿越装置,目前已有多款产品问世,这些产品是否真正具备低电压穿越能力,还需进行严格的出厂检验。显然,该实验需将低电压穿越装置装入机组,进行整机实验,但是,现有的试验设备还不能模拟电网故障,无法进行机组低电压穿越性能试验。
另外,风力发电机的使用环境差异很大,在高纬度地区的高原风场,夏季高温,冬季高寒,昼夜温差大,终年少雨,空气干燥,低纬度地区的海滩风场,终年高温高湿。而风电产品出厂检验时,性能试验是在室内进行的,没有考虑温湿度影响,与产品的实际使用环境差异很大。
发明内容
本发明的目的,是提供一种风力发电机全功能、全工况试验台,该试验台不仅可以测试发电机的性能,也可测试变流器的性能,尤其能够测试风力发电机的低电压穿越性能,并可测试各种特定工况下的性能。
本发明技术方案如下:
一种风力发电机试验台,包括:
-温湿度控制箱,用于放置试验对象,模拟实验对象的温度湿度环境;
-发电机及其变流器,用于发电,并将发出的电流变为工频交流电流;
-有载调压变压器,其初级连接变流器的输出端,次级连接电网,用于将输出电压调整至并网电压;
-拖动电动机,通过联轴器与发电机连接,用于替代风轮,作为发电机的原动机,驱动发电机发电;
-拖动电动机变频器,用于调整拖动电动机的转速,使拖动电动机可模拟风轮转速;
-10Kv环网,用于接受发电机发出的电能,并向拖动电动机供电;
-降压变压器,连接在10Kv环网与拖动电动机之间,用于将10Kv环网电压降至拖动电动机的额定电压;
-电网故障模拟装置,连接10Kv环网,用于模拟电网故障;
-中央控制台,用于控制试验过程,检测试验数据;
在上述结构中,试验对象是发电机/和变流器。
所述电网故障模拟装置包括电网电压跌落模拟单元、电网电压波动模拟单元、电网频率偏移模拟单元、电网电压偏差模拟单元、电网电压三相不平衡模拟单元及电网谐波模拟单元。
所述中央控制台包括控制器、通讯控制模块、采集卡、计算机;所述通讯控制模块包括:电网故障模拟装置通讯控制模块、有载调压变压器远程调压监控模块、高低温箱控制模块、拖动电机变频器监控模块、拖动电机监控模块、开关柜远程监控模块、发电机监控模块及变流器监控模块;所述采集卡包括:模拟量采集卡、数字量采集卡和SOE采集卡。
所述发电机是直驱同步发电机或双馈感应发电机。
本发明的技术效果如下:
试验台成功的对风力发电机进行了全功能测试,可模拟各种电网故障及环境变化,验证了风力发电机稳态运行及应对环境变化和电网故障的能力,尤其是低电压穿越的能力,保证了风力发电机发电机在电厂的稳定运行。与其他风力发电机试验台相比,本试验台应用范围广,既可单独测试风力发电用变流器或发电机,也可以对整个风力发电机组进行试验。不但可以进行风力发电机的稳态全功率测试,还可以在测试时模拟环境温度、湿度变化、风力大小变化以及各种电网故障,以达到全面全功能测试风力发电机的目的。
附图说明
图1为试验台的电气系统结构图;
图2为中央控制台的监控结构框图;
图3为试验台工作流程图;
图4为电网故障模拟装置工作流程图;
图5为中央控制台的硬件结构图;
图6为拖动电机启动流程图;
图7为试验台控制逻辑图。
具体实施方式
参见图1和图2,本发明是一种风力发电机试验台,本试验台可模拟风力发电机在风场运行时遇到的各种工况,从而达到在变流器出厂前对其进行全功能全工况测试的目的,保证了变流器在风场运行的可靠性。
该风力发电机试验台,包括:
-温湿度控制箱,用于放置试验对象,模拟实验对象的温度湿度环境;
-发电机及其变流器,用于发电,并将发出的电流变为工频交流电流;
-有载调压变压器,其初级连接变流器的输出端,次级连接电网,用于将输出电压调整至并网电压;
-拖动电动机,通过联轴器与发电机连接,用于替代风轮,作为发电机的原动机,驱动发电机发电;
-拖动电动机变频器,用于调整拖动电动机的转速,使拖动电动机可模拟风轮转速;
-10Kv环网,用于接受发电机发出的电能,并向拖动电动机供电;
-降压变压器,连接在10Kv环网与拖动电动机之间,用于将10Kv环网电压降至拖动电动机的额定电压;
-电网故障模拟装置,连接10Kv环网,用于模拟电网故障;
-中央控制台,用于控制试验过程,检测试验数据;
在上述结构中,试验对象是发电机/和变流器。
中央控制台的工作原理是:模拟量采集卡、数字量采集卡、SOE采集卡和通讯控制模块接收上述设备的实时信号、通过内部计算单元计算并产生上述设备的控制信号,并将该控制信号返回到上述设备。中央控制台由控制器、通讯控制模块、采集卡、计算机组成。
通讯控制模块包括:电网故障模拟装置通讯控制模块、有载调压变压器远程调压监控模块、温湿度控制箱控制模块、拖动电机变频器监控模块、拖动电机监控模块、开关柜远程监控模块、发电机监控模块及变流器监控模块;所述采集卡包括:模拟量采集卡、数字量采集卡和SOE采集卡。拖动电机变频器监控模块控制拖动电机变流器对拖动电机启动、停止和转速进行调节。电网故障模拟装置通讯控制模块控制电网故障模拟装置模拟电网各种工况,来进行各种电网故障模拟试验。发电机监控模块及变流器监控模块控制待测变流器和发电机,进行各种试验。温湿度控制箱控制模块控制温湿度控制箱,进行环境温度和湿度调节。有载调压变压器远程调压监控模块控制有载调压变压器,进行电网电压的变化。开关柜远程监控模块控制电气系统中的各个开关柜,进行合闸、分闸及跳闸动作。
中央控制台远程监视电网故障模拟设备的数据包括:电网故障模拟设备进线电压及电流、电网故障模拟设备输出电压及电流、电网故障模拟设备输入及输出功率、电网故障模拟设备直流母线电压、电网故障模拟设备工作温度、电网模拟设备工作模式、电网故障模拟设备的工作状态、电网故障模拟装置的输出电压谐波含量、电网故障模拟装置的输出电压波动幅度百分比、电网故障模拟装置的电压输出频率、电网故障模拟装置的输出三相电压偏差、电网故障模拟装置的输出电压电流波形、电网故障模拟装置的故障字和报警字。
中央控制台远程监视变压器的数据包括:变压器输入电压电流、变压器输出电压电流、变压器三相绕组温度、变压器工作环境温度、变压器有载调压档位。
中央控制台远程监视拖动电机数据包括:拖动电机转速、拖动电机转子电压、拖动电机转子电流、拖动电机转子绕组温度、拖动电机定子电压、拖动电机定子电流、拖动电机定子绕组温度、拖动电机扭矩、拖动电机轴伸端温度、拖动电机非轴伸端温度、拖动电机振动频率幅度。
中央控制台远程监视发电机数据包括:发电机转速、发电机转子电压、发电机转子电流、发电机转子绕组温度、发电机定子电压、发电机定子电流、发电机输出功率、发电机定子绕组温度、发电机扭矩、发电机轴伸端温度、发电机非轴伸端温度、发电机振动频率幅度。
中央控制台远程监视拖动电机变频器数据包括:拖动电机变频器进线电压电流、拖动电机变频器输出电压电流、拖动电机变频器工作温度、拖动电机变频器直流母线电压、拖动电机变频器工作状态、拖动电机变频器工作模式、拖动电机变频器输出力矩、拖动变频器故障字、拖动变频器报警字。
中央控制台远程监视高低温箱数据包括:高低温箱实时功率、高低温箱内部温度、高低温箱内部湿度、高低温箱工作状态、高低温箱工作模式、高低温箱故障字、高低温箱报警字。
中央控制台远程监视待测变流器数据包括:待测变流器输入电压、待测变流器输入电流、待测变流器输出电压、待测变流器输出电流、待测变流器输入功率、待测变流器输出功率、待测变流器输入电压波形、待测变流器输入电流波形、待测变流器输出电压波形、待测变流器输出电流波形、待测变流器直流母线电压、待测变流器工作模式、待测变流器工作温度、待测变流器故障字、待测变流器报警字。
中央控制台远程监视开关柜数据包括:开关柜合分闸状态、开关柜报警字、开关柜故障字。
中央控制台远程控制的设备包括:电网故障模拟设备、变压器、拖动电机及变频器、发电机、待测变流器、高低温箱和开关柜。
中央控制台远程控制电网故障模拟设备的数据包括:电网故障模拟设备启动、电网故障模拟设备停机、电网故障模拟设备紧急停机、电网故障模拟设备输出电压幅值、电网故障模拟设备输出电压波动幅值、电网故障模拟设备输出电压频率、电网故障模拟设备输出电压三相不平衡度、电网故障模拟设备输出电压谐波含量、电网故障模拟设备输出电压跌落百分比、电网故障模拟设备输出电压跌落时间、电网故障模拟设备输出电压恢复时间、电网故障模拟设备输出电压跌落持续时间、电网故障模拟设备输出电压跌落深度、电网故障模拟设备输出电压恢复深度。
中央控制台远程控制变压器的数据包括:有载调压器变压器输出电压。
中央控制台远程控制拖动电机变频器和拖动电机的数据包括:拖动电机变频器启动、拖动变频器停止、拖动变频器急停、拖动变频器输出电压幅值、拖动变频器输出功率、拖动电机转速、拖动电机启动、拖动电机停机、拖动电机紧急停机。
中央控制台远程控制待测变流器和发电机的数据包括:待测变流器输出电压幅值、待测变流器输出电压频率、待测变流器输出电流、待测变流器直流母线电压、待测变流器输出功率、待测变流器启动、待测变流器停机、待测变流器紧急停机、发电机输出功率。
中央控制台远程控制高低温箱的数据包括:高低温箱内部温度、高低温箱内部湿度、高低温箱启动、高低温箱停机。
中央控制台远程控制开关柜的数据包括:开关柜合闸、开关柜分闸。
在试验台设备发生故障时,如过压、过流、过温等情况出现时,中央控制台会进行报警,提醒操作人员进行处理,紧急情况时可根据预设值进行试验台紧急停机。
试验台可以对风力发电用变流器和发电机进行完整的出厂试验、型式试验以及模拟风场环境试验。
试验台对风力发电用变流器和发电机可进行的出厂试验包括:空载试验、带载试验、对拖性能试验。
试验台对风力发电用变流器和发电机可进行的型式试验包括:低电压穿越试验、高电压穿越试验、电网电压波动试验、电网电压不平衡试验、电网频率偏移试验。
试验台对风力发电用变流器和发电机可进行的模拟风场环境试验包括:风速模拟试验、温度变化试验、湿度变化试验。
试验台可以对各种类型的风力发电用变流器和发电机进行测试,包括且不限于:双馈发电机及变流器、直驱发电机及变流器、鼠笼发电机及变流器等。
电网故障模拟设备输入电压为10kV,输出电压为0-11kV可调。可模拟的电网故障包括:电网电压跌落、电网电压波动、电网频率偏移、电网电压偏差、电网电压三相不平衡及电网谐波。
高低温箱环境温度可调范围为-40℃到80℃,环境湿度可调范围为20%到98%。
参见图3试验台的工作可分为稳态工作、电网故障模拟状态、环境变化模拟状态、电网故障及环境变化模拟状态。
其中,稳态工作的原理是:环网柜将10kV送至开关柜2和开关柜3,闭合开关柜2后通过有载调压变压器T2将电网电压调整至690V,闭合开关柜3后通过变压器T1调整电网电压至690V。再通过控制拖动电机变流器来调整拖动电机的转速。达到并网转速后,待测试变流器控制发电机并网发电,测试过程中可以调整拖动电机转速,使发电机从次同步转速到同步转速再到超同步转速,待测变流器根据转速-转矩曲线调整转矩,转矩越大,发电越多,最终达到额定功率,从而达到验证待测变流器稳态工作能力的目的。
参见图1、2、3、4,电网故障模拟状态的原理是:环网柜将10kV送至电网故障模拟装置,电网故障模拟装置再输出电压至有载调压器T2,通过T2调整电压至690V。电网供电至开关柜3,闭合开关柜3后通过变压器T1调整电网电压至690V。再通过控制拖动电机变流器来调整拖动电机的转速。达到并网转速后,待测试变流器控制发电机并网发电。并网发电过程中,通过控制电网故障模拟设备,可以模拟电网电压跌落、电网电压波动、电网频率偏移、电网电压偏差、电网电压三相不平衡及电网谐波。在电网故障模拟过程中,还可以控制拖动电机进行转速变化,从而验证待测变流器在各种不同的电网故障中的工作能力。
环境变化模拟状态的工作原理是:将待测变流器放入高低温箱中。电网供电至开关柜2和开关柜3,闭合开关柜2后通过有载调压变压器T2将电网电压调整至690V,闭合开关柜3后通过变压器T1调整电网电压至690V。再通过控制拖动电机变流器来调整拖动电机的转速。达到并网转速后,待测试变流器控制发电机并网发电。并网发电过程中,通过控制高低温箱,可进行环境温度变化及环境湿度变化,在温度和湿度变化的同时还可控制拖动电机进行转速变化,从而验证待测变流器在各种不同的环境中的工作能力。
电网故障及环境变化模拟状态的工作原理是:将待测变流器放入高低温箱中。电网供电至电网故障模拟装置,电网故障模拟装置再输出电压至有载调压器T2,通过T2调整电压至690V。电网供电至开关柜3,闭合开关柜3后通过变压器T1调整电网电压至690V。再通过控制拖动电机变流器来调整拖动电机的转速。达到并网转速后,待测试变流器控制发电机并网发电。并网发电过程中,通过控制电网故障模拟设备进行各种电网故障模拟,同时可控制高低温箱进行环境温度及环境湿度变化,还可控制拖动电机进行转速变化,从而测试待测变流器在各种工况下的工作能力。
参见图5、6、7,中央控制台的基本结构由计算机、控制器、采集卡和通讯控制器组成。中央控制台的基本工作原理是:模拟量采集卡、数字量采集卡、SOE采集卡将现场设备的传感器、继电器、辅助触点的数据通过线缆采集回控制器,通讯控制器通过通讯电缆与现场设备通讯并将数据采集回控制器,控制器将所有数据处理后传送到计算机画面上进行显示,操作人员再根据显示的数据和需要进行的试验进行启动、停止、紧急停机、参数调整等工作,并且由控制器进行处理后,经过通讯控制器、模拟量采集卡、数字量采集卡发送给现场设备执行,来达到远程监视和控制的目的。

Claims (6)

1.一种风力发电机试验台,包括:
-温湿度控制箱,用于放置试验对象,模拟实验对象的温度湿度环境;
-发电机及其变流器,用于发电,并将发出的电流变为工频交流电流;
-有载调压变压器,其初级连接变流器的输出端,次级连接电网,用于将输出电压调整至并网电压;
-拖动电动机,通过联轴器与发电机连接,用于替代风轮,作为发电机的原动机,驱动发电机发电;
-拖动电动机变频器,用于调整拖动电动机的转速,使拖动电动机可模拟风轮转速;
-10Kv环网,用于接受发电机发出的电能,并向拖动电动机供电;
-降压变压器,连接在10Kv环网与拖动电动机之间,用于将10Kv环网电压降至拖动电动机的额定电压;
-电网故障模拟装置,连接10Kv环网,用于模拟电网故障;
-中央控制台,用于控制试验过程,检测试验数据;
在上述结构中,试验对象是发电机/和变流器。
2.如权利要求1所述的风力发电机试验台,其特征在于,所述电网故障模拟装置包括电网电压跌落模拟单元、电网电压波动模拟单元、电网频率偏移模拟单元、电网电压偏差模拟单元、电网电压三相不平衡模拟单元及电网谐波模拟单元。
3.如权利要求1所述的风力发电机试验台,其特征在于,所述中央控制台包括控制器、通讯控制模块、采集卡、计算机。
4.如权利要求3所述的风力发电机试验台,其特征在于,所述通讯控制模块包括电网故障模拟装置通讯控制模块、有载调压变压器远程调压监控模块、温湿度控制箱控制模块、拖动电机变频器监控模块、拖动电机监控模块、开关柜远程监控模块、发电机监控模块及变流器监控模块。
5.如权利要求3所述的风力发电机试验台,其特征在于,所述采集卡包括模拟量采集卡、数字量采集卡和SOE采集卡。
6.如权利要求1所述的风力发电机试验台,其特征在于,所述发电机是直驱同步发电机或双馈感应发电机。
CN201110454795XA 2011-12-30 2011-12-30 风力发电机试验台 Pending CN102565702A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110454795XA CN102565702A (zh) 2011-12-30 2011-12-30 风力发电机试验台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110454795XA CN102565702A (zh) 2011-12-30 2011-12-30 风力发电机试验台

Publications (1)

Publication Number Publication Date
CN102565702A true CN102565702A (zh) 2012-07-11

Family

ID=46411607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110454795XA Pending CN102565702A (zh) 2011-12-30 2011-12-30 风力发电机试验台

Country Status (1)

Country Link
CN (1) CN102565702A (zh)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102778648A (zh) * 2012-08-03 2012-11-14 国电联合动力技术(连云港)有限公司 适用于6mw中压双馈风力发电机组的台位实验装置
CN102818953A (zh) * 2012-08-03 2012-12-12 北京金风科创风电设备有限公司 风况模拟系统及其在风电机组试验台上实现的方法
CN102981121A (zh) * 2012-08-24 2013-03-20 西北电网有限公司 风电机组移动式低电压穿越试验装置安全链及实现方法
CN103021254A (zh) * 2012-12-19 2013-04-03 沈阳工业大学 大型风机缩比模型教学实训实验台及其并网检测方法
CN103197174A (zh) * 2013-03-12 2013-07-10 上海市电力公司 一种储能并网系统一体化量测装置
CN103454521A (zh) * 2013-08-02 2013-12-18 国家电网公司 一种风电场电网运行模拟装置
CN103630771A (zh) * 2013-11-06 2014-03-12 天津瑞能电气有限公司 一种风力发电用变频器全功率的测试平台
CN103675674A (zh) * 2012-09-12 2014-03-26 上海万德风力发电股份有限公司 一种基于永磁风力发电机电磁模型的仿真测试方法
CN104298121A (zh) * 2013-07-15 2015-01-21 哈尔滨工业大学(威海) 面向控制技术研究的双馈风力发电系统模拟实验平台
CN104793091A (zh) * 2015-05-13 2015-07-22 中国航空工业集团公司北京长城计量测试技术研究所 一种双馈变流器的现场测试与评估方法
CN105116176A (zh) * 2015-09-08 2015-12-02 宁波拓普智能刹车系统有限公司 一种用于测试电机在不同温度环境下工作的测试台
CN105301499A (zh) * 2015-12-04 2016-02-03 哈尔滨理工大学 基于dsp的风力发电机组无传感器故障诊断
CN105445539A (zh) * 2015-11-24 2016-03-30 中国电力科学研究院 一种光伏发电站动态无功性能测试方法和系统
CN105676100A (zh) * 2016-01-19 2016-06-15 中国南方电网有限责任公司超高压输电公司检修试验中心 一种潮湿环境下可控硅电子设备加压试验方法
CN105790502A (zh) * 2016-03-11 2016-07-20 广东明阳龙源电力电子有限公司 一种基于双馈式风力发电机的通用风电变流器实验平台
CN106199428A (zh) * 2016-07-08 2016-12-07 兰州电机股份有限公司 高压大功率双馈型风力发电机试验系统及其测控系统
CN107329012A (zh) * 2016-04-28 2017-11-07 北京金风科创风电设备有限公司 风力发电机组变流器的测试系统
CN107621618A (zh) * 2017-09-08 2018-01-23 南方电网科学研究院有限责任公司 一种集成光学强电场传感器稳定性测试系统及方法
CN108363005A (zh) * 2018-01-30 2018-08-03 佛山赛宝信息产业技术研究院有限公司 电机可靠性测试方法
CN109358266A (zh) * 2018-09-27 2019-02-19 固力发电气有限公司 一种基于4g通讯技术架空远传型故障指示器系统
CN109599886A (zh) * 2017-09-30 2019-04-09 株洲中车时代电气股份有限公司 一种高电压穿越试验系统
CN109976247A (zh) * 2019-04-22 2019-07-05 国网上海市电力公司 一种配电站通信故障自动监控系统和方法
CN110632408A (zh) * 2018-06-25 2019-12-31 北京天诚同创电气有限公司 模拟电网故障的电子设备测试方法和装置
CN111398700A (zh) * 2019-01-02 2020-07-10 株洲中车时代电气股份有限公司 一种变流器模块可靠性试验方法及系统
CN113359030A (zh) * 2021-06-09 2021-09-07 西安热工研究院有限公司 基于外部漏磁检测的风力发电机短路故障模拟平台

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201145718Y (zh) * 2007-12-31 2008-11-05 比亚迪股份有限公司 一种dc-dc变换器的测试装置
CN201259465Y (zh) * 2008-08-27 2009-06-17 华锐风电科技有限公司 兆瓦级风力发电机组测试加载试验平台
CN101871997A (zh) * 2010-06-18 2010-10-27 深圳市禾望电气有限公司 一种风力发电机组电网适应性测试装置
CN101881814A (zh) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN201707414U (zh) * 2010-06-24 2011-01-12 四川吉风电源科技有限公司 风力发电机变频器模拟试验装置
CN201885875U (zh) * 2010-12-10 2011-06-29 福建南电股份有限公司 兆瓦级双馈风力发电机试验装置
CN102261947A (zh) * 2011-04-25 2011-11-30 上海电机学院 风力发电机振动监测诊断装置及风力发电机测试装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201145718Y (zh) * 2007-12-31 2008-11-05 比亚迪股份有限公司 一种dc-dc变换器的测试装置
CN201259465Y (zh) * 2008-08-27 2009-06-17 华锐风电科技有限公司 兆瓦级风力发电机组测试加载试验平台
CN101871997A (zh) * 2010-06-18 2010-10-27 深圳市禾望电气有限公司 一种风力发电机组电网适应性测试装置
CN201707414U (zh) * 2010-06-24 2011-01-12 四川吉风电源科技有限公司 风力发电机变频器模拟试验装置
CN101881814A (zh) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN201885875U (zh) * 2010-12-10 2011-06-29 福建南电股份有限公司 兆瓦级双馈风力发电机试验装置
CN102261947A (zh) * 2011-04-25 2011-11-30 上海电机学院 风力发电机振动监测诊断装置及风力发电机测试装置

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102818953B (zh) * 2012-08-03 2015-08-19 北京金风科创风电设备有限公司 风况模拟系统及其在风电机组试验台上实现的方法
CN102818953A (zh) * 2012-08-03 2012-12-12 北京金风科创风电设备有限公司 风况模拟系统及其在风电机组试验台上实现的方法
CN102778648A (zh) * 2012-08-03 2012-11-14 国电联合动力技术(连云港)有限公司 适用于6mw中压双馈风力发电机组的台位实验装置
CN102981121A (zh) * 2012-08-24 2013-03-20 西北电网有限公司 风电机组移动式低电压穿越试验装置安全链及实现方法
CN102981121B (zh) * 2012-08-24 2015-09-23 西北电网有限公司 风电机组移动式低电压穿越试验装置安全链及实现方法
CN103675674B (zh) * 2012-09-12 2016-05-18 上海万德风力发电股份有限公司 一种基于永磁风力发电机电磁模型的仿真测试方法
CN103675674A (zh) * 2012-09-12 2014-03-26 上海万德风力发电股份有限公司 一种基于永磁风力发电机电磁模型的仿真测试方法
CN103021254A (zh) * 2012-12-19 2013-04-03 沈阳工业大学 大型风机缩比模型教学实训实验台及其并网检测方法
CN103197174A (zh) * 2013-03-12 2013-07-10 上海市电力公司 一种储能并网系统一体化量测装置
CN104298121A (zh) * 2013-07-15 2015-01-21 哈尔滨工业大学(威海) 面向控制技术研究的双馈风力发电系统模拟实验平台
CN104298121B (zh) * 2013-07-15 2017-08-29 哈尔滨工业大学(威海) 面向控制技术研究的双馈风力发电系统模拟实验平台
CN103454521A (zh) * 2013-08-02 2013-12-18 国家电网公司 一种风电场电网运行模拟装置
CN103454521B (zh) * 2013-08-02 2015-09-09 国家电网公司 一种风电场电网运行模拟装置
CN103630771A (zh) * 2013-11-06 2014-03-12 天津瑞能电气有限公司 一种风力发电用变频器全功率的测试平台
CN104793091A (zh) * 2015-05-13 2015-07-22 中国航空工业集团公司北京长城计量测试技术研究所 一种双馈变流器的现场测试与评估方法
CN105116176A (zh) * 2015-09-08 2015-12-02 宁波拓普智能刹车系统有限公司 一种用于测试电机在不同温度环境下工作的测试台
CN105445539A (zh) * 2015-11-24 2016-03-30 中国电力科学研究院 一种光伏发电站动态无功性能测试方法和系统
CN105445539B (zh) * 2015-11-24 2021-04-30 中国电力科学研究院 一种光伏发电站动态无功性能测试方法和系统
CN105301499A (zh) * 2015-12-04 2016-02-03 哈尔滨理工大学 基于dsp的风力发电机组无传感器故障诊断
CN105676100A (zh) * 2016-01-19 2016-06-15 中国南方电网有限责任公司超高压输电公司检修试验中心 一种潮湿环境下可控硅电子设备加压试验方法
CN105790502A (zh) * 2016-03-11 2016-07-20 广东明阳龙源电力电子有限公司 一种基于双馈式风力发电机的通用风电变流器实验平台
CN107329012A (zh) * 2016-04-28 2017-11-07 北京金风科创风电设备有限公司 风力发电机组变流器的测试系统
CN106199428A (zh) * 2016-07-08 2016-12-07 兰州电机股份有限公司 高压大功率双馈型风力发电机试验系统及其测控系统
CN106199428B (zh) * 2016-07-08 2023-04-14 兰州电机股份有限公司 高压大功率双馈型风力发电机试验系统及其测控系统
CN107621618A (zh) * 2017-09-08 2018-01-23 南方电网科学研究院有限责任公司 一种集成光学强电场传感器稳定性测试系统及方法
CN109599886A (zh) * 2017-09-30 2019-04-09 株洲中车时代电气股份有限公司 一种高电压穿越试验系统
CN109599886B (zh) * 2017-09-30 2020-07-14 株洲中车时代电气股份有限公司 一种高电压穿越试验系统
CN108363005A (zh) * 2018-01-30 2018-08-03 佛山赛宝信息产业技术研究院有限公司 电机可靠性测试方法
CN110632408A (zh) * 2018-06-25 2019-12-31 北京天诚同创电气有限公司 模拟电网故障的电子设备测试方法和装置
CN109358266A (zh) * 2018-09-27 2019-02-19 固力发电气有限公司 一种基于4g通讯技术架空远传型故障指示器系统
CN111398700A (zh) * 2019-01-02 2020-07-10 株洲中车时代电气股份有限公司 一种变流器模块可靠性试验方法及系统
CN109976247A (zh) * 2019-04-22 2019-07-05 国网上海市电力公司 一种配电站通信故障自动监控系统和方法
CN113359030A (zh) * 2021-06-09 2021-09-07 西安热工研究院有限公司 基于外部漏磁检测的风力发电机短路故障模拟平台

Similar Documents

Publication Publication Date Title
CN102565702A (zh) 风力发电机试验台
Mohod et al. A STATCOM-control scheme for grid connected wind energy system for power quality improvement
CN101881814B (zh) 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN103541860A (zh) 用于自适应地控制风电场涡轮机的方法和装置
CN107783041A (zh) 变频器驱动电机系统供电扰动耐受性测试、评价方法及装置
CN101888093B (zh) 风力发电系统的低压穿越模拟系统
CN106246463A (zh) 风力发电机组变桨系统的测试系统及评估方法
CN103257316B (zh) 一种多功能风力发电机组试验系统
CN102411367A (zh) 大型风力发电机组主控测试系统及方法
CN102104258B (zh) 风力发电机组与海上平台电网不停产并网试验系统及方法
CN103021254A (zh) 大型风机缩比模型教学实训实验台及其并网检测方法
Jassmann et al. CertBench: Conclusions from the comparison of certification results derived on system test benches and in the field
Badr et al. Comparison between aggregation techniques for PMSG wind farm
CN105403776A (zh) 基于磁粉制动器的变频器低电压穿越能力的测试方法
CN102830692A (zh) 风电机组主控制系统低电压穿越一致性测试系统及其方法
CN205721145U (zh) 一种双馈风力发电系统的动态实时仿真测试模型装置
CN104298121B (zh) 面向控制技术研究的双馈风力发电系统模拟实验平台
Xiaolin et al. Test method for inertia and damping of photovoltaic virtual synchronous generator based on power angle transfer function
CN102854463A (zh) 一种兆瓦级风力模拟试验系统及试验方法
CN203365567U (zh) 一种模拟风电现场运行工况的风力发电变流器测试平台
CN202133730U (zh) 风电机组低电压穿越补偿系统的测试装置
Nelson et al. Fault ride-through capabilities of siemens full-converter wind turbines
EP2620780A1 (en) Grid performance test unit for wind turbines
CN201707414U (zh) 风力发电机变频器模拟试验装置
CN202853913U (zh) 风力发电机组电动变桨系统加载试验台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120711