CN205404216U CN201620143946.8U CN201620143946U CN205404216U CN 205404216 U CN205404216 U CN 205404216U CN 201620143946 U CN201620143946 U CN 201620143946U CN 205404216 U CN205404216 U CN 205404216U
Authority
CN
China
Prior art keywords
gas
conduit
connector
power transformer
syringe needle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620143946.8U
Other languages
Chinese (zh)
Inventor
张鸣
张一鸣
张维
张春岩
张忠宜
刘鲁嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
HARBIN POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical HARBIN POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd
Priority to CN201620143946.8U priority Critical patent/CN205404216U/en
Application granted granted Critical
Publication of CN205404216U publication Critical patent/CN205404216U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

Gas device is got to power transformer gas belongs to power transformer operation operating repair device field. Present power transformer buchholz relay is got the gas device and is had loaded down with trivial details, the unsafe problem as a result of step. Gas device is got to power transformer gas, a pipe (2) and gaseous lead -out hole (8) intercommunication, the other end fixed mounting syringe needle (9) of A pipe (2), B pipe (4) are gone up the installation and are ended air cock (10), and B pipe (4) both ends are fixed intercommunication gas storage bag (5) and rubber seal ware (3) respectively. The gas operation is got to syringe needle (9) cartridge of going up the installation with A pipe (2) in rubber seal ware (3). The utility model is simple in operation, fast easy, the testing result is reliable.

Description

Power transformer gas collector
Technical field
This utility model relates to a kind of power transformer gas collector.
Background technology
It is always relatively difficult that power transformer Buchholz relay takes gas work, it is equipped with negligible amounts as well as collector, some transformer station is even without special collector, once there be gas to enter into inside Buchholz relay, taking-up gas censorship at short notice can not be accomplished, cause that gas different component back dissolving phenomenon occurs, affect the testing result of gas, it is impossible to the correct character assessing power transformer interior fault and the order of severity, development speed and trend.
Take now the method that gas adopts and remain use: injector for medical purpose, mosquito forceps, the combination of tourniquet.This method has Railway Project: first, complex operation: once step is wrong, takes gas operation failure, and the gas in gas relay is limited, is impermissible for waste.Loaded down with trivial details step, even if the person on duty known a thing or two also cannot accomplish skillfully to take gas.Second, operation easier is big: the old-fashioned gas method that takes needs the longer operating time, takes gas operation and is inherently in operation under high altitude environment, and transformator upper space is limited, this brings very big inconvenience to the gas work that takes of person on duty and professional and technical personnel, is unfavorable for carrying out and carrying out of work.3rd, one man operation is inconvenient, owing to glass syringe is very frangible, the process carrying out extraction gas not only to observe practical situation in conduit, also after taking gas, to block with mosquito forceps rapidly, gas process needs accomplish that multiple step tightly coordinates whole taking, once careless and inadvertent, cause that taking makings amount deviation occurs, affects testing result.4th, after getting experimental gas with glass syringe, due to the fragility of glass, it is unfavorable for transport and preserves, and the sealing property of glass syringe is bad, of long duration, internal gas sampled can swap with extraneous gas, can affect the final result of experiment.
Utility model content
The purpose of this utility model is to solve lack special power transformer Buchholz relay collector at present and take complex steps, the inaccurate problem of result that gas operation exists, and proposes a kind of power transformer gas collector.
A kind of power transformer gas collector, its composition includes: vent valve, A conduit, rubber seal device, B conduit and gas-storing bag;Vent valve has the vent valve knob of control gas discharging, the gas relief valve connecting power transformer and the gas leadout hole being attached with A conduit;One end of A conduit connects with gas leadout hole, the other end fixed installation syringe needle of A conduit;B conduit is installed only air cock, the fixing connection in one end of B conduit gas-storing bag, the other end of B conduit fixing connection rubber seal device;
During duty, the syringe needle that A conduit is installed is inserted in rubber seal device, makes A conduit connect with B conduit.
The beneficial effects of the utility model are:
This utility model simplifies operating procedure, accelerates and takes gas speed, decreases because gas back dissolving affects the component detection of gas, it is to avoid the dissipation amount of taken gas, it is ensured that the reliability of testing result.
It is simpler that this utility model makes to take gas work, letter and understandable operating procedure fundamentally solves an operational difficult problem, it is possible to one man operation, solve the unfavorable keeping of gas, the problem of transport inconvenience.
Owing to this utility model volume is little, convenient storage, simple to operate easy to learn, it is suitable for person on duty and technical staff uses, and also cheap, volume production is convenient.
Accompanying drawing explanation
Fig. 1 be this utility model relate to power transformer gas collector pre-installation time structural representation;
Fig. 2 is the overall structure schematic diagram of this utility model use procedure;
Detailed description of the invention
Detailed description of the invention one:
The power transformer gas collector of present embodiment, shown in Fig. 1, its composition includes: vent valve 1, A conduit 2, rubber seal device 3, B conduit 4 and gas-storing bag 5;Vent valve 1 has the vent valve knob 6 of control gas discharging, the gas relief valve 7 connecting power transformer and the gas leadout hole 8 being attached with A conduit 2;One end of A conduit 2 connects with gas leadout hole 8, the other end fixed installation syringe needle 9 of A conduit 2;B conduit 4 is installed the other end fixing connection rubber seal device 3 of the fixing connection in one end gas-storing bag 5, the B conduit 4 of only air cock 10, B conduit 4;
During duty, the syringe needle 9 that A conduit 2 is installed is inserted in rubber seal device 3, makes A conduit 2 connect with B conduit 4.
Detailed description of the invention two:
With detailed description of the invention one the difference is that, the power transformer gas collector of present embodiment, one end that described A conduit 2 is connected with gas leadout hole 8 is internal thread interface, and arranges rubber cushion inside internal thread interface so that better tightness, gas not easily scatters and disappears.
Detailed description of the invention three:
With detailed description of the invention one or two the difference is that, the power transformer gas collector of present embodiment, described syringe needle 9 is also installed the first connector 11;Described rubber seal device 3 also sets up with the first connector 11 with the use of the second connector 12, and by the first connector 11 and the second connector 12, the rubber seal device 3 of A conduit 2 and B conduit 4 is fixed.
Detailed description of the invention four:
With detailed description of the invention three the difference is that, the power transformer gas collector of present embodiment, described first connector 11 is with externally threaded hollow tubular structure, on the outer wall being arranged on syringe needle 9 root that first connector 11 is rotated by bearing, or the first connector 11 is fixedly installed on the outer wall of syringe needle 9 root;
When on the outer wall being arranged on syringe needle 9 root that the first connector 11 is rotated by bearing, second connector 12 is for having female nut, and second connector 12 be fixedly mounted on rubber seal device 3, spin between the first connector 11 and the second connector 12 cooperation;
When the first connector 11 is fixedly installed on the outer wall of syringe needle 9 root, the second connector 12 is also fixedly mounted on rubber seal device 3, is connected by snap between the first connector 11 and the second connector 12.
Detailed description of the invention five:
With detailed description of the invention one, two, three or four the difference is that, the power transformer gas collector of present embodiment, described syringe needle 9 internal diameter is 3.0-5.0mm.
Detailed description of the invention six:
With detailed description of the invention five the difference is that, the power transformer gas collector of present embodiment, the internal diameter of described A conduit 2 is 3.0-5.0mm, and length is 10-20cm.
Detailed description of the invention seven:
With detailed description of the invention one, two, three, four or six the difference is that, the power transformer gas collector of present embodiment, the internal diameter of described B conduit 4 is 4.0-6.0mm, and length is 10-20cm.
Detailed description of the invention eight:
With detailed description of the invention seven the difference is that, the power transformer gas collector of present embodiment, the number of the only air cock 10 that described B conduit 4 is installed is 1 or 2, and described only air cock 10 is the one in air-stopping valve or mosquito forceps.
Detailed description of the invention nine:
With detailed description of the invention one, two, three, four, six or eight the difference is that, the power transformer gas collector of present embodiment, described gas-storing bag 5 is of a size of 23.5 × 14.0cm, and the wall thickness of described gas-storing bag 5 is 0.5mm;Polypropylene elected as by the making material of described gas-storing bag 5.
Operation principle:
After being connected by the first connector 11 and the second connector and fixed between A conduit 2 with B conduit 4, A conduit 2 connects with B conduit 4;The internal not gas of Buchholz relay, when breaking down inside power equipment, can produce hydrogen H2, methane CH4, ethane C2H6, ethylene C2H4, acetylene C2H2, these 7 kinds of gases of carbon monoxide CO, carbon dioxide CO2 inside it under normal circumstances.Utilizing in conservator the difference in height of liquid level in liquid level and Buchholz relay to produce pressure, the gas in Buchholz relay can overflow automatically, flows through A conduit, B conduit enters eventually in gas-storing bag;
The gas method that takes of power transformer gas is:
Step one, being spun by the internal thread interface end of gas leadout hole 8 with A conduit 2, a handle held on syringe needle 9, another hands slowly opens vent valve knob 6, closes vent valve knob 6, discharge the residual air in A conduit 2 after releasing about 3ML gas;
Step 2, taking the gas-storing bag 5 with B conduit 4 of evacuation, the handle in hand-held needle 9 makes syringe needle 9 thrust in rubber seal device 3, and making A conduit 2 and B conduit 4 is connected state;Now, one portable liter of gas-storing bag 5 is until the level height higher than gas leadout hole 8, another hands slowly opens vent valve knob 6 until making the gas being subject to oil level differential pressure inside Buchholz relay all discharge and have insulating oil to occur in A conduit 2, now close vent valve knob 6 immediately, simultaneously close off only air cock 10;
Step 3, syringe needle 9 and rubber seal device 3 are disconnected, the internal thread interface end of A conduit 2 is backed out from gas leadout hole 8, and seals gas leadout hole 8 with nut;Close the only air cock 10 on B conduit 4, B conduit 4 and gas-storing bag 5 are delivered to laboratory and chemically examines.
Wherein, selecting gas-storing bag 5 and B conduit 4 evacuation when dispatching from the factory of polypropylene PP material making, blend rubber sealer 3 is sealed, in case the residual gas having affects testing result.
Or take gas method by what following steps realized power transformer gas:
Step one, being spun by the internal thread interface end of gas leadout hole 8 with A conduit 2, a handle held on syringe needle 9, another hands slowly opens vent valve knob 6, closes vent valve knob 6, discharge the residual air in A conduit 2 after releasing about 3ML gas;
Step 2, taking the gas-storing bag 5 with B conduit 4 of evacuation, the handle in hand-held needle 9 makes syringe needle 9 thrust in rubber seal device 3, and making A conduit 2 and B conduit 4 is connected state, and makes the first connector 11 and the second connector 12 is fixing connects;Now, one portable liter of gas-storing bag 5 is until the level height higher than gas leadout hole 8, another hands slowly opens vent valve knob 6 until making the gas being subject to oil level differential pressure inside Buchholz relay all discharge and have insulating oil to occur in A conduit 2, now close vent valve knob 6 immediately, simultaneously close off only air cock 10;
Step 3, disconnect the first connector 11 and the second connector 12, syringe needle 9 and rubber seal device 3 are disconnected, the internal thread interface end of A conduit 2 is backed out from gas leadout hole 8, and seals gas leadout hole 8 with nut;Close the only air cock 10 on B conduit 4, B conduit 4 and gas-storing bag 5 are delivered to laboratory and chemically examines.
Wherein, selecting gas-storing bag 5 and B conduit 4 evacuation when dispatching from the factory of polypropylene PP material making, blend rubber sealer 3 is sealed, in case the residual gas having affects testing result.
This utility model also can have other various embodiments; when without departing substantially from this utility model spirit and essence thereof; those skilled in the art are when can make various corresponding change and deformation according to this utility model, but these change accordingly and deformation all should belong to the scope of the claims appended by this utility model.

Claims (8)

1. a power transformer gas collector, it is characterised in that: its composition includes: vent valve (1), A conduit (2), rubber seal device (3), B conduit (4) and gas-storing bag (5);Vent valve (1) has the vent valve knob (6) of control gas discharging, the gas relief valve (7) connecting power transformer and the gas leadout hole (8) being attached with A conduit (2);One end of A conduit (2) connects with gas leadout hole (8), other end fixed installation syringe needle (9) of A conduit (2);B conduit (4) is upper installs only air cock (10), one end of B conduit (4) fixing connection gas-storing bag (5), the other end of B conduit (4) fixing connection rubber seal device (3);
During duty, the upper syringe needle (9) installed of A conduit (2) is inserted in rubber seal device (3).
2. power transformer gas collector according to claim 1, it is characterised in that: one end that described A conduit (2) is connected with gas leadout hole (8) is internal thread interface, and arranges rubber cushion inside internal thread interface.
3. power transformer gas collector according to claim 1 or claim 2, it is characterised in that: described syringe needle (9) is also installed the first connector (11);Described rubber seal device (3) also sets up with the first connector (11) with the use of the second connector (12), and by the first connector (11) and the second connector (12), the rubber seal device (3) of A conduit (2) and B conduit (4) is fixing.
4. power transformer gas collector according to claim 3, it is characterized in that: described first connector (11) is for externally threaded hollow tubular structure, on the outer wall being arranged on syringe needle (9) root that first connector (11) is rotated by bearing, or the first connector (11) is fixedly installed on the outer wall of syringe needle (9) root;
When on the outer wall being arranged on syringe needle (9) root that the first connector (11) is rotated by bearing, second connector (12) is for having female nut, and second connector (12) be fixedly mounted on rubber seal device (3), spin between the first connector (11) and the second connector (12) cooperation;
When on the outer wall that the first connector (11) is fixedly installed at syringe needle (9) root, second connector (12) is also fixedly mounted on rubber seal device (3), is connected by snap between the first connector (11) and the second connector (12).
5. power transformer gas collector according to claim 1,2 or 4, it is characterised in that: described syringe needle (9) internal diameter is 3.0-5.0mm.
6. power transformer gas collector according to claim 5, it is characterised in that: the internal diameter of described A conduit (2) is 3.0-5.0mm, and length is 10-20cm.
7. power transformer gas collector according to claim 1,2,4 or 6, it is characterised in that: the internal diameter of described B conduit (4) is 4.0-6.0mm, and length is 10-20cm.
8. power transformer gas collector according to claim 7, it is characterized in that: the number of the upper only air cock (10) installed of described B conduit (4) is 1 or 2, and described only air cock (10) is the one in air-stopping valve or mosquito forceps.
CN201620143946.8U 2016-02-25 2016-02-25 Gas device is got to power transformer gas Withdrawn - After Issue CN205404216U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620143946.8U CN205404216U (en) 2016-02-25 2016-02-25 Gas device is got to power transformer gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620143946.8U CN205404216U (en) 2016-02-25 2016-02-25 Gas device is got to power transformer gas

Publications (1)

Publication Number Publication Date
CN205404216U true CN205404216U (en) 2016-07-27

Family

ID=56424994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620143946.8U Withdrawn - After Issue CN205404216U (en) 2016-02-25 2016-02-25 Gas device is got to power transformer gas

Country Status (1)

Country Link
CN (1) CN205404216U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486550A (en) * 2016-02-25 2016-04-13 国网黑龙江省电力有限公司哈尔滨供电公司 Gas pumping device and method of electric transformer
CN106710432A (en) * 2017-03-07 2017-05-24 国家电网公司 Transformer inner fault simulated gas sampling device
CN113567625B (en) * 2021-07-22 2024-05-24 国电南瑞科技股份有限公司 Automatic measuring device for free gas of oil immersed transformer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486550A (en) * 2016-02-25 2016-04-13 国网黑龙江省电力有限公司哈尔滨供电公司 Gas pumping device and method of electric transformer
CN105486550B (en) * 2016-02-25 2018-10-23 国网黑龙江省电力有限公司哈尔滨供电公司 Power transformer gas collector and its take gas method
CN106710432A (en) * 2017-03-07 2017-05-24 国家电网公司 Transformer inner fault simulated gas sampling device
CN106710432B (en) * 2017-03-07 2022-12-30 国家电网公司 Fault simulation gas taking device in transformer
CN113567625B (en) * 2021-07-22 2024-05-24 国电南瑞科技股份有限公司 Automatic measuring device for free gas of oil immersed transformer

Similar Documents

Publication Publication Date Title
CN206696045U (en) A kind of simulated experiment collector
CN205404216U (en) Gas device is got to power transformer gas
CN201517957U (en) Seal wiring seat air-tightness detection device
CN204649369U (en) A kind of oil tank of transformer leak detection tool equipment
CN105486550A (en) Gas pumping device and method of electric transformer
CN203324056U (en) Gas relay gas taking device of transformer
CN202708246U (en) Breakaway valve
CN104316367A (en) Gas collecting device
CN206280623U (en) A kind of Valve joint, air-conditioning system
CN210531864U (en) Pipeline shutoff gasbag device
CN109000061B (en) A general joint of getting gas for SF6 gas test
CN203849067U (en) Transformer gas relay sampling device
CN202126344U (en) Air-tightness detecting device for valve-regulated sealed lead-acid battery
CN105571893A (en) Closed sampling device with fast connectors
CN214010698U (en) Tee bend slot pipe fitting gas tightness check out test set
CN104048857A (en) Transformer gas relay sampling apparatus
CN202350973U (en) Pressure gauge seat capable of automatically preventing leakage
CN206738585U (en) A kind of oil-filled power equipment takes fuel tap
CN107167307B (en) Method and special equipment for testing air permeability of heat-shrinkable sealing cap
CN208171757U (en) A kind of pressure vessel pressure test device
CN212986785U (en) Control valve for gas meter interface
CN221034425U (en) Direct plug with prompt function
CN201392282Y (en) Sputum specimen cup
CN200983382Y (en) A quick connector of small hydrogen charging
CN202532173U (en) Multifunctional explosion-proof safety stopper for low-temperature gas cylinder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160727

Effective date of abandoning: 20181023

AV01 Patent right actively abandoned