CN106710432A - Transformer inner fault simulated gas sampling device - Google Patents
Transformer inner fault simulated gas sampling device Download PDFInfo
- Publication number
- CN106710432A CN106710432A CN201710130038.4A CN201710130038A CN106710432A CN 106710432 A CN106710432 A CN 106710432A CN 201710130038 A CN201710130038 A CN 201710130038A CN 106710432 A CN106710432 A CN 106710432A
- Authority
- CN
- China
- Prior art keywords
- gas
- conservator
- fixed
- oil
- upper bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B25/00—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
- G09B25/02—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of industrial processes; of machinery
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Housings And Mounting Of Transformers (AREA)
Abstract
The present invention relates to a device for electric power industry experiments, and particularly to a main transformer inner fault simulated gas sampling device. A simulated gas generator (18) is fixed at the left side of the upper part of the bottom surface of a tool cabinet (19); a frame-like upper bracket (8) is fixed on the tool cabinet (19); a gas collecting box (6) is fixed at the left side of the interior of the upper bracket (8); an oil tank (10) is fixed at the right side of the gas collecting box (6); a check valve (7) is arranged in the gas collecting box (6); the check valve (7) is connected with a gas introduction pipe (12); an oil discharge valve (11) is arranged at the lower part of the right side surface of the oil tank (10); the right side surface of a gas relay QG is communicated with the upper part of the oil tank (10) through an oil/gas pipeline (21); an oil conservator bracket (3) is arranged above the left side surface of the upper bracket (8); a simulated oil conservator (1) is fixed onto the oil conservator bracket (3); and an oil injection hole (1-1) is formed in the simulated oil conservator (1). With the device of the invention adopted, the skill level of power transformation operation and maintenance staff can be greatly enhanced, the risk coefficient of on-site training or direct operation can be reduced. The device has the advantages of beautiful and neat appearance, small size and convenience in observation.
Description
Technical field
The invention belongs to power industry experiment equipment, more particularly to a kind of main transformer internal fault simulation collector.
Background technology
During transformer normal work, transformer oil is filled with inside gas relay.Inner air should be excluded, when
When transformer breaks down in the process of running, the transformer oil of fault point is decomposed, and the gas that it is produced is in gas relay
Assemble in device and act gas relay.In order to judge that residual air or internal fault generation are not drained to obtain during maintenance
Gas, when there is main transformer bulk gas protection act, should take gas sample carries out chromatography.The component of these gases and contain
Amount is one of important evidence that judgement equipment whether there is failure and nature of trouble.There are different back dissolving rates to reduce different component
Influence, it is necessary to gas sample is taken out within the time as short as possible, and is analyzed as early as possible so that judge power transformer interior fault property and
The order of severity of failure, development speed and trend.But for the action of on-load voltage regulating switch gas relay light gas, due to its with
Main transformer body working condition is entirely different, need not take gas sample, pneumatosis directly can be drained into slot signal.But by
The probability of happening for actually encountering generation gas in gas relay in operation maintenance personnel is relatively low, and on-site training difficulty is big, dangerous high,
Seldom actual to carry out gas collecting training, training is more based on theory, and live manipulative ability is weak.
The content of the invention
It is an object of the invention to overcome above-mentioned technical deficiency, there is provided a kind of simple structure, small volume, be easy to mobile and grasp
The main transformer internal fault simulation collector of work.
The present invention solve technical problem use technical scheme be:Main transformer internal fault simulation collector includes instrument
The table ﹑ combination tool boxes ﹑ of cabinet ﹑ ten thousand take the inverse power supply ﹑ rows that become of gas pipe ﹑ and walk to take turns branch frame ﹑ oil case ﹑ conservator supports on ﹑, are characterized in work
Left side above tool bottom of cabinet face is fixed with simulation aerogenesis apparatus, and the upper bracket of frame shape is fixed with above Tool Cabinet,
Left side in upper bracket is fixed with collector box, and fuel tank is fixed with the right side of collector box, with connecing on the left surface of collector box
Head connects the top of simulation aerogenesis apparatus with appendix, and check valve, check valve connection air entraining pipe, air entraining pipe are provided with collector box
It is placed in fuel tank, fuel outlet valve is provided with below the right flank of fuel tank, gas relay, gas is fixed with above upper bracket
The top of collector box is connected above relay with hollow soft siphunculus, in the right flank oil gas pipeline connection fuel tank of gas relay
Top, conservator support is fixed with the left side of upper bracket, fixed-analog conservator, simulation oil above conservator support
Oil filler point is provided with above pillow, the hole set up by conservator branch below simulation conservator connects gas relay with pipeline road
Left surface, circuit board is fixed with the back side top of upper bracket, weight gas is provided with the upper right corner before circuit board and is moved
Make lamp, light gas action lamp, alarm buzzer and signal home button.
The beneficial effects of the invention are as follows:Main transformer internal fault simulation collector is trained in power industry employee skills
Cheng Zhong, can significantly lift the level of skill of power transformation operation maintenance personnel, reduce on-site training or the directly danger coefficient of operation.This
The overall process of unit simulation gas shield action, disclosure satisfy that power transformation operation maintenance personnel takes gas to gas relay and collector box
Simulated drill, good appearance is clean and tidy, small volume, and observation is convenient, and placement location chooses flexible, can be placed in interior, substantially reduces
Training difficulty.
Brief description of the drawings
Implementation below in conjunction with accompanying drawing is illustrated.
Fig. 1 is main transformer internal fault simulation collector structure chart.
Fig. 2 is the circuit theory diagrams for simulating collector.
1- simulations conservator in figure;1-1- oil filler points;2- circuit boards;3- conservator supports;4- pipeline roads;5- is hollow soft logical
Pipe;6- collector boxs;6-1- collector box bleeder plugs;7- check valves;8- upper brackets;9- oil tank sealing covers;10- fuel tanks;10-1- fuel tanks
Manhole;11- fuel outlet valves;12- air entraining pipes;13- takes tracheae;14- universal meters;15- combined tool boxes;16- inverters;17-
Road wheel;18- simulates aerogenesis apparatus;19- Tool Cabinets;20- appendixs;21- oil-gas pipelines;QG- gas relays;D1- gas again
Body acts lamp;The light gas action lamps of D2-;F- buzzers;S- signal home buttons.
Specific embodiment
Embodiment, referring to the drawings 1, main transformer internal fault simulation collector is to be closed below, before opened type
The top of Tool Cabinet 19 is fixed with the upper bracket 8 of frame shape, and the left side in upper bracket 8 is fixed with collector box 6, in collector box
6 right side is fixed with fuel tank 10, and the upper of simulation aerogenesis apparatus 18 is connected with appendix 20 with joint on the left surface of collector box 6
Side.Check valve 7 is provided with collector box 6, the air entraining pipe 12 in the connection fuel tank 10 of check valve 7 sets in the lower right-hand side of fuel tank 10
There is fuel outlet valve 11.Gas relay QG is fixed with the top of upper bracket 8, with hollow soft siphunculus 5 above gas relay QG
The top of collector box 6 is connected, the top of fuel tank 10 is connected with oil gas pipeline 21 in the right flank of gas relay QG.In fuel tank 10
Top be provided with fuel tank manhole 10-1, be provided with oil tank sealing cover 9 above fuel tank manhole 10-1.On a left side for upper bracket 8
Side top is fixed with conservator support 3, the fixed-analog conservator 1 above conservator support 3, is provided with above simulation conservator 1
Oil filler point 1-1.The hole set above by conservator support 3 below simulation conservator 1, gas relay QG is connected with pipeline road 4
Left surface, be fixed with circuit board 2 in the back side top of upper bracket 8, gas again is provided with the upper right corner before circuit board 2
Body action lamp D1, light gas action lamp D2, alarm buzzer F and signal home button S.Rear side is fixed on the bottom surface of Tool Cabinet 19
Inverter 16 is provided with, combined tool box 15, universal meter 14 are provided with before inverter 16, set on the right side of universal meter 14
Take tracheae 13.Road wheel 17 is housed at the bottom surface corner of Tool Cabinet 19.
Referring to the drawings 2, the circuit theory diagrams in circuit board 2 include:Gas relay QG, weight gas action lamp D1,
Light gas action lamp D2, buzzer F, switch K1 ﹑ K2, normally closed switch K;Their annexation is the termination for switching K1 ﹑ K2
Positive source simultaneously connects gas relay QG, and the other end of switch K1 ﹑ K2 connects weight gas action lamp D1 and the action of light gas respectively
One end of lamp D2,1 pin of another termination buzzer F of action lamp D1 ﹑ D2,2 pin of buzzer F connect one end of normally closed switch K, normally closed
Switch another termination power cathode of K.
Main transformer internal fault simulation collector the course of work be:In collector using preceding, need to be by transformer oil
From the oil filler point 1-1 injections of the top of conservator 1, transformer oil is introduced into gas relay QG along oil pipeline 4, then by oil gas
Pipeline 21 enters fuel tank 10. when gas relay QG oil levels rise, and gas relay bleeder plug is opened, until bleeder plug is fuel-displaced
Afterwards, bleeder plug is closed, when oil level is risen at 1/3rd in simulation conservator 1, stops oiling.Open collector box bleeder plug 6-
1, transformer oil is introduced into collector box 6, after air entraining pipe 12 is fuel-displaced, bleeder plug 6-1 is closed, whole oiling process is completed.Then
Failure is simulated, device is connected into inverter 16, opened simulation aerogenesis apparatus 18 and switch, allow gas to enter by air entraining pipe 12
Enter fuel tank 10, a large amount of air accumulations enter gas relay QG, gas relay Q oil at the top of fuel tank 10 by oil-gas pipeline
Position declines, light gas shield action, while action indicator D2 is bright, buzzer F alarm sounds.Outward winding the bottom oil extraction of collector box 6
Plug plug, opens the bottom plug cock of collector box 6, slowly releases transformer oil in collector box 6, and gas in gas relay QG is imported
In collector box 6, when air entraining pipe 12 is lasting fuel-displaced, when light gas signal has disappeared and oil level begins to ramp up in collector box 6, gas is represented
Without pneumatosis in body relay QG, fuel drain plug is closed.In gas relay QG gas collectings with emulsion tube one end connecting needle
Formula takes tracheae 13, drains inner air tube, and the emulsion tube other end is connected with vent valve, gas in gas relay QG is pumped into and is taken
In tracheae 13.When collector box 6 gathers gas, the bottom fuel drain plug plug of collector box 6 of outwarding winding slowly releases transformation in collector box 6
Device oil, gas in gas relay QG is imported in collector box 6, is taken emulsion tube one end and is connected with tracheae 13 is taken, and is drained empty in pipe
Gas, the emulsion tube other end is connected with vent valve, and slowly press-in takes tracheae to the gas allowed in gas relay QG under pressure
13.Two pipe gases are taken altogether, often pipe takes gas 60ml~80ml, one manages for operation maintenance personnel according to gas color and lights experiment, sentences
Disconnected nature of trouble, another Guan Song specialized departments carry out gas detection.
Claims (1)
1. a kind of main transformer internal fault simulation collector, including Tool Cabinet(19)﹑ universal meters(14)﹑ combined tool boxes
(15)﹑ takes tracheae(13)﹑ inverters(16)﹑ road wheels(17)﹑ upper brackets(8)﹑ fuel tanks(10)﹑ conservator supports(3), its feature
It is in Tool Cabinet(19)Left side above bottom surface is fixed with simulation aerogenesis apparatus(18), in Tool Cabinet(19)Top fix set
The upper bracket of framed shape(8), in upper bracket(8)Interior left side is fixed with collector box(6), in collector box(6)Right side fix
It is provided with fuel tank(10), collector box(6)Left surface on use joint and appendix(20)Connection simulation aerogenesis apparatus(18)Top,
In collector box(6)Inside it is provided with check valve(7), check valve(7)Connection air entraining pipe(12), air entraining pipe(12)It is placed in fuel tank(10)It is interior,
In fuel tank(10)Right flank lower section be provided with fuel outlet valve(11), in upper bracket(8)Top be fixed with gas relay QG, gas
With hollow soft siphunculus above body relay QG(5)Connection collector box(6)Top, in the right flank oil gas of gas relay QG
Pipeline(21)Connection fuel tank(10)Top, in upper bracket(8)Left side above be fixed with conservator support(3), in conservator branch
Frame(3)Above fixed-analog conservator(1), simulate conservator(1)Above be provided with oil filler point(1-1), simulate conservator(1)Below
By conservator support(3)If hole pipeline road(4)The left surface of connection gas relay QG, in upper bracket(8)Rear side
It is fixedly arranged above circuit board(2), in circuit board(2)Before weight gas action lamp D1, light gas be provided with the upper right corner move
Make lamp D2, alarm buzzer F and signal home button S.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710130038.4A CN106710432B (en) | 2017-03-07 | 2017-03-07 | Fault simulation gas taking device in transformer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710130038.4A CN106710432B (en) | 2017-03-07 | 2017-03-07 | Fault simulation gas taking device in transformer |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106710432A true CN106710432A (en) | 2017-05-24 |
CN106710432B CN106710432B (en) | 2022-12-30 |
Family
ID=58912215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710130038.4A Active CN106710432B (en) | 2017-03-07 | 2017-03-07 | Fault simulation gas taking device in transformer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106710432B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107633753A (en) * | 2017-10-25 | 2018-01-26 | 广州供电局有限公司 | Transformer training platform |
CN109254233A (en) * | 2018-10-24 | 2019-01-22 | 国网山东省电力公司电力科学研究院 | A kind of transformer electric fault gas simulator |
CN110108962B (en) * | 2019-05-20 | 2021-01-05 | 保定天威保变电气股份有限公司 | Transformer gas collection test device and test method |
CN112863818A (en) * | 2020-12-31 | 2021-05-28 | 杭州柯林电气股份有限公司 | Intelligent gas collecting box of transformer and control method thereof |
CN113109517A (en) * | 2021-04-21 | 2021-07-13 | 国网陕西省电力公司电力科学研究院 | Network access detection device and method of gas relay gas monitoring device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050233463A1 (en) * | 2004-04-14 | 2005-10-20 | Powertech Labs Inc. | Method and device for the detection of SF6 decomposition products |
CN204269430U (en) * | 2014-11-05 | 2015-04-15 | 国网山东新泰市供电公司 | The online gas harvester of transformer |
CN104569652A (en) * | 2014-11-28 | 2015-04-29 | 国网河南省电力公司电力科学研究院 | Gas fixed-value checking table for simulating heavy gas fault realization of transformer and checking method |
CN205404216U (en) * | 2016-02-25 | 2016-07-27 | 国网黑龙江省电力有限公司哈尔滨供电公司 | Gas device is got to power transformer gas |
CN106443307A (en) * | 2013-05-07 | 2017-02-22 | 陈国栋 | Online insulation monitoring system for power transformation equipment |
CN206649811U (en) * | 2017-03-07 | 2017-11-17 | 国家电网公司 | Transformer internal fault simulates collector |
-
2017
- 2017-03-07 CN CN201710130038.4A patent/CN106710432B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050233463A1 (en) * | 2004-04-14 | 2005-10-20 | Powertech Labs Inc. | Method and device for the detection of SF6 decomposition products |
CN106443307A (en) * | 2013-05-07 | 2017-02-22 | 陈国栋 | Online insulation monitoring system for power transformation equipment |
CN204269430U (en) * | 2014-11-05 | 2015-04-15 | 国网山东新泰市供电公司 | The online gas harvester of transformer |
CN104569652A (en) * | 2014-11-28 | 2015-04-29 | 国网河南省电力公司电力科学研究院 | Gas fixed-value checking table for simulating heavy gas fault realization of transformer and checking method |
CN205404216U (en) * | 2016-02-25 | 2016-07-27 | 国网黑龙江省电力有限公司哈尔滨供电公司 | Gas device is got to power transformer gas |
CN206649811U (en) * | 2017-03-07 | 2017-11-17 | 国家电网公司 | Transformer internal fault simulates collector |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107633753A (en) * | 2017-10-25 | 2018-01-26 | 广州供电局有限公司 | Transformer training platform |
CN109254233A (en) * | 2018-10-24 | 2019-01-22 | 国网山东省电力公司电力科学研究院 | A kind of transformer electric fault gas simulator |
CN110108962B (en) * | 2019-05-20 | 2021-01-05 | 保定天威保变电气股份有限公司 | Transformer gas collection test device and test method |
CN112863818A (en) * | 2020-12-31 | 2021-05-28 | 杭州柯林电气股份有限公司 | Intelligent gas collecting box of transformer and control method thereof |
CN113109517A (en) * | 2021-04-21 | 2021-07-13 | 国网陕西省电力公司电力科学研究院 | Network access detection device and method of gas relay gas monitoring device |
Also Published As
Publication number | Publication date |
---|---|
CN106710432B (en) | 2022-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106710432A (en) | Transformer inner fault simulated gas sampling device | |
CN207602111U (en) | A kind of oil-immersed power transformer protection simulator | |
CN103713110A (en) | Landfill soil slope unstability centrifugal model testing device based on liquid-gas coupling effect | |
CN206818462U (en) | A kind of transformer analog oil gas sampler | |
CN206649811U (en) | Transformer internal fault simulates collector | |
CN201594031U (en) | Leak testing device of transformer oil box | |
CN105096684B (en) | A kind of sludge of sewage treatment plant incinerator training operation platform | |
CN105096676B (en) | A kind of sludge of sewage treatment plant anaerobic digester training operation platform and wire examination method | |
CN203954262U (en) | Multi-functional air detects purification and sterilization deodorizing sterilizing equipment | |
CN215265164U (en) | Real device of instructing of water treatment pump station system | |
CN204027851U (en) | Detection device for water tank | |
CN205778844U (en) | High-water-cut oil-producing well complete analysis oil sample sampler | |
CN208953299U (en) | A kind of novel track vehicle toilet waste collector maintenance test equipment | |
CN202770816U (en) | Environment-friendly horizontally perpendicular burning test cabinet | |
CN209525093U (en) | A kind of equipment that detection automotive oil tank valve closes height | |
CN105261455A (en) | Transformer with simple apparatus for filling oil and exhausting air in charged state, and method for filling oil and exhausting air | |
CN113109517A (en) | Network access detection device and method of gas relay gas monitoring device | |
CN106908261B (en) | Global function Simulation of Boiler test experimental bed | |
CN208921560U (en) | A kind of transformer test fuel tank | |
CN207024424U (en) | Oil-drainage nitrogen-filling fire-extinguishing | |
RU180581U1 (en) | TRAINING SIMULATOR | |
CN205773298U (en) | Engine oil seal equipment | |
CN109238755A (en) | A kind of novel track vehicle toilet waste collector maintenance test equipment | |
CN110634346A (en) | Gas operation training and checking device and checking method thereof | |
CN219417382U (en) | Device for rapidly identifying formaldehyde removal performance of material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |