CN205400738U - Major diameter shield constructs quick -witted synchronous concrete inverted arch making device - Google Patents

Major diameter shield constructs quick -witted synchronous concrete inverted arch making device Download PDF

Info

Publication number
CN205400738U
CN205400738U CN201620185812.2U CN201620185812U CN205400738U CN 205400738 U CN205400738 U CN 205400738U CN 201620185812 U CN201620185812 U CN 201620185812U CN 205400738 U CN205400738 U CN 205400738U
Authority
CN
China
Prior art keywords
inverted arch
trestle
landing stage
seal board
shrouding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620185812.2U
Other languages
Chinese (zh)
Inventor
陈昆鹏
王磊
袁文征
贾连辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201620185812.2U priority Critical patent/CN205400738U/en
Application granted granted Critical
Publication of CN205400738U publication Critical patent/CN205400738U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a major diameter shield constructs quick -witted synchronous concrete inverted arch making device. The device is including the landing stage, the landing stage bottom is equipped with oblique wheel pair, the track is equipped with on the landing stage upper berth, inverted arch making mould is installed to the landing stage bottom, inverted arch making mould front portion is equipped with and connects the sediment fill, inverted arch making mould includes side seal board and top shrouding, a left side, link to each other through tensioning adjustment device between the side seal board on the right side, the vertical spacing hydro -cylinder of landing stage bottom links to each other with the top shrouding, the landing stage bottom still is equipped with horizontal oil cylinder, horizontal oil cylinder links to each other with the boots board, the landing stage both sides still are equipped with the spacing hydro -cylinder of side shrouding that is used for restricting side shrouding leading wheel, side shrouding leading wheel links to each other with the side seal board, the side seal board passes through top shrouding leading wheel with the landing stage and links to each other. The utility model discloses a pertinence design shield constructs the back supporting system and the inverted arch landing stage of machine, and the tunnelling construction of realization tunnel is pour, is filled with the inverted arch and goes on in step, improves the level of mechanization that the inverted arch was pour, shortens the tunnel construction duration of a project, the improvement efficiency of construction.

Description

Large-diameter shield machine is with step concrete inverted arch making device
Technical field
This utility model relates to special mechanical equipment field, tunnel, is specifically related to concrete inverted arch pad device, it is achieved inverted arch is filled Tong Bu with shield driving.
Background technology
The advantages such as shield method has surrounding environment influence little, and automaticity is high, and construction is quickly, high-quality and efficient, safety and environmental protection, are adapted to features as poor geologic condition, constructing tunnel that settlement request is high.With the development of Shield Construction Technique, maturation, shield method increasingly comes into one's own and favors.But after generally, shield machine completes tunnel piercing and pipe sheet assembling, it is necessary to build inverted arch bottom section of jurisdiction, the railway roadbed for laying train passage provides early stage condition.Current inverted arch is filled after tunnel piercing completes or a delayed segment distance is just implemented, and mostly adopts the mode of artificial formwork erection, and mechanization degree is low.Not possessing synchronicity, in work progress, both coordinate bad, mutually can restrict, affect efficiency of construction.
Utility model content
The purpose of this utility model is for above-mentioned the deficiencies in the prior art, it is provided that a kind of large-diameter shield machine is with step concrete inverted arch making device.
The technical solution of the utility model is achieved in that a kind of large-diameter shield machine is with step concrete inverted arch making device, including trestle, tiltedly wheel it is provided with right bottom trestle, trestle upper berth is equipped with track, inverted arch making mould is installed bottom trestle, inverted arch making mould front portion is provided with dreg-accepting hopper, inverted arch making mould includes side seal board and top closing plate, left, it is connected by tightening regulator between right side seal board, vertical locating oil cylinder bottom trestle is used for promoting top closing plate to move along side shrouding directive wheel, cross cylinder it is additionally provided with bottom trestle, cross cylinder is connected with boots plate, trestle both sides are additionally provided with the side shrouding locating oil cylinder for constrained side banding plate directive wheel, side shrouding directive wheel is connected with side seal board, side seal board is connected by top closing plate directive wheel with trestle.
Described tightening regulator is tensioning bolt and nut.
This utility model is by the Rear impact of targeted design shield machine and inverted arch trestle, it is achieved set of tunneling construction and inverted arch build, fill and be synchronously performed, and improves the mechanization degree that inverted arch is built, shortens the constructing tunnel duration of a project, improves efficiency of construction.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the functional schematic of trestle.
Fig. 2 is A-A face sectional view in Fig. 1.
Fig. 3 is B-B face sectional view in Fig. 1.
Fig. 4 is the bottom platform view of trestle.
Fig. 5 is the functional schematic of inverted arch making mould.
Fig. 6 is the view profile of inverted arch making mould.
Fig. 7 is the enlarged diagram in C region in Fig. 6.
Wherein: 1. trailer, 2. connecting device, 3. trestle, 4. concreting marshalling, 5. inverted arch making mould, 6. descending track, 7. tiltedly wheel is right, 8. upward slope track, 9. dreg-accepting hopper, 10. boots plate, 11. cross cylinders, 12. top closing plates, 13. vertically locating oil cylinder, 14. side seal boards, 15. side shrouding directive wheels, 16. top closing plate directive wheel, 17. side shrouding locating oil cylinders, 18. tightening regulators.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not paying creative work premise, broadly fall into the scope of this utility model protection.
As shown in Fig. 1~7, a kind of large-diameter shield machine is with step concrete inverted arch making device, and including trestle 3, trailer 1 and trestle 3 are hinged by connecting device 2, coordinate tunneling synchronous.Being provided with bottom trestle 3 tiltedly that wheel is to 7, tiltedly wheel moves ahead offer support force to for trestle 3, and trestle 3 upper berth is equipped with track, and described track is twice, and section of jurisdiction transport marshalling and concreting marshalling can pass through trestle simultaneously, do not interfere with each other;Concreting marshalling 4 sails trestle into by inverted arch trestle back-connected upward slope track 8 device, carries out inverted arch Concrete Filled at trestle leading portion;Section of jurisdiction transport marshalling can proceed to trailer front portion, provides material for pipe sheet assembling.
Inverted arch making mould 5 is installed bottom trestle 3, inverted arch making mould 5 front portion is provided with dreg-accepting hopper 9, inverted arch making mould 5 includes side seal board 14 and top closing plate 12, left, it is connected by tightening regulator 18 between right side seal board 14, vertical locating oil cylinder 13 bottom trestle 3 is used for promoting top closing plate 12 to move along side shrouding directive wheel 15, cross cylinder 11 it is additionally provided with bottom trestle 3, cross cylinder 11 is connected with boots plate 10, trestle 3 both sides are additionally provided with the side shrouding locating oil cylinder 17 for constrained side banding plate directive wheel 15, side shrouding directive wheel 15 is connected with side seal board 14, side seal board 14 is connected by top closing plate directive wheel 16 with trestle 3.
In the application, it is filled with construction headspace for inverted arch under marshaling track laying and bridge in the middle part of trestle 3 bottom platform, coordinates tunneling synchronous, do not interfere with each other, do not produce impact.Inverted arch making mould 5 is installed bottom trestle 3, construction can be filled with at inverted arch under bridge, not interfere with each other, and described inverted arch making mould 5 and trestle 3 can self-movement, do not produce impact.
Wherein, tightening regulator 18 is tensioning bolt and nut.By regulating tensioning bolt, it is possible to regulate the distance between two side plates in left and right, tightening regulator can be finely tuned when concrete setting time.
A kind of large-diameter shield machine is with step concrete inverted arch paving method, carry out in the following manner: trailer 1 drives trestle 3 to move in tunnel by connecting device 2, tiltedly wheel is supported in tunnel-side to 7, the track by trestle that section of jurisdiction transport marshalling and concreting marshalling 4 can be simultaneously independent;Concreting marshalling 4 sails trestle into by inverted arch trestle back-connected upward slope track 8 device, carries out inverted arch Concrete Filled at trestle leading portion;Section of jurisdiction transport is organized as pipe sheet assembling and provides material;
The floating function of inverted arch making mould 5 is achieved in that concreting mouth is left in inverted arch making mould 5 front end, tank car travels to trestle, concreting is entered in mould, when shield advance followed by trestle 3, vertical locating oil cylinder 13 stretches out, top closing plate 12 is promoted to move along side shrouding directive wheel 15, it is achieved inverted arch making mould lag function;Cross cylinder 11 stretching out, retracting thus driving anterior boots plate 10 to move forward and backward, and the floating concrete built, unnecessary concrete is then fallen in anterior dreg-accepting hopper 9;
The demoulding functions of inverted arch making mould 5 is achieved in that after the filling of mould inner concrete is floating, regulate tightening regulator 18, the side seal board 14 about mould is made to separate with concrete, side shrouding locating oil cylinder 17 forward extends out, side seal board 14 synchronizing moving is driven time trestle 3 was moved forward, when fill is concrete, locating oil cylinder is retracted.
This utility model lays inverted arch trestle in shield machine trailer rear portion suitable distance, coordinates tunneling synchronous, trestle is provided with track, and can pass through section of jurisdiction marshaling and inverted arch casting concrete tank car;Meanwhile, under bridge, inverted arch is filled with construction, does not interfere with each other.Inverted arch trestle front and rear portions is connected to uphill, downhill rail set, in order to marshaling pass through, rear supporting inverted arch build marshaling go up a slope enter trestle, trestle carries out inverted arch concreting, with realize inverted arch fill be synchronously performed.This utility model apparatus structure is simple, dismantles easy to assembly, reasonable in design reliably.
More weak owing to just building complete concrete bearing capacity, for the problem solving train marshalling list transported material, supporting rear portion targeted design trestle work structure after shield, train marshalling list reaches trestle transported material to shield front end, and described trestle trailer supporting with after shield machine is connected, bottom arranges the mould of concrete inverted arch making, realize shield machine driving to be synchronously performed with the filling of follow-up inverted arch, optimize tunnel molding mode, improve concrete inverted arch filling quality, shorten the duration of a project, improve efficiency.After casting concrete, forming difference in height before and after inverted arch, for solving the problem (difference in height that marshalling is formed) of train marshalling list transported material by concrete inverted arch, trestle should possess following function:
1. trestle rear and front end arranges track uphill, downhill transition platform, and trestle is provided with track, it is achieved tunnel track organizes into groups track UNICOM with shield, meets the current of shield machine material transportation marshaling.
2. the realization built with step concrete inverted arch needs tank car that concrete is transported to trestle place, carries out inverted arch concreting on trestle, and therefore, trestle design should possess enough bearing capacitys and casting space.
3. being provided with casting space bottom trestle, first meet the layout building mould, length meets the strong times such as 30m concreting condensation.To ensure that inverted arch has enough intensity to meet the requirement that the current track of the equipment such as material marshalling is arranged.
This utility model requires the sliding mould of design for These characteristics, possesses following feature:
1. sliding formwork is step-by-step movement, meets after concreting completes under resting state, requirement to stable mould supporting before arriving molding condition;
2. after the demoulding, trestle provides counter-force to support, and realizes mould reach by oil cylinder, completes subsequent cycle and build the demand of distance;
3. sliding formwork top is provided with slide plate, rod etc., meets the demand of plane.
The foregoing is only preferred embodiment of the present utility model; not in order to limit this utility model; all within spirit of the present utility model and principle, any amendment of making, equivalent replacement, improvement etc., should be included within protection domain of the present utility model.

Claims (2)

  1. null1. a large-diameter shield machine is with step concrete inverted arch making device,Including trestle (3),Trestle (3) bottom is provided with tiltedly takes turns (7),Trestle (3) upper berth is equipped with track,It is characterized in that: trestle (3) bottom is provided with inverted arch making mould (5),Inverted arch making mould (5) front portion is provided with dreg-accepting hopper (9),Inverted arch making mould (5) includes side seal board (14) and top closing plate (12),Left、It is connected by tightening regulator (18) between right side seal board (14),The vertical locating oil cylinder (13) of trestle (3) bottom is used for promoting top closing plate (12) mobile along side shrouding directive wheel (15),Trestle (3) bottom is additionally provided with cross cylinder (11),Cross cylinder (11) is connected with boots plate (10),Trestle (3) both sides are additionally provided with side shrouding locating oil cylinder (17) for constrained side banding plate directive wheel (15),Side shrouding directive wheel (15) is connected with side seal board (14),Side seal board (14) is connected by top closing plate directive wheel (16) with trestle (3).
  2. 2. according to claim 1 large-diameter shield machine with step concrete inverted arch making device, it is characterised in that: described tightening regulator (18) is tensioning bolt and nut.
CN201620185812.2U 2016-03-10 2016-03-10 Major diameter shield constructs quick -witted synchronous concrete inverted arch making device Withdrawn - After Issue CN205400738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620185812.2U CN205400738U (en) 2016-03-10 2016-03-10 Major diameter shield constructs quick -witted synchronous concrete inverted arch making device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620185812.2U CN205400738U (en) 2016-03-10 2016-03-10 Major diameter shield constructs quick -witted synchronous concrete inverted arch making device

Publications (1)

Publication Number Publication Date
CN205400738U true CN205400738U (en) 2016-07-27

Family

ID=56441032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620185812.2U Withdrawn - After Issue CN205400738U (en) 2016-03-10 2016-03-10 Major diameter shield constructs quick -witted synchronous concrete inverted arch making device

Country Status (1)

Country Link
CN (1) CN205400738U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649636A (en) * 2016-03-10 2016-06-08 中铁工程装备集团有限公司 Synchronous inverted-arch concrete paving device and method of large-diameter shield tunneling machine
CN108265768A (en) * 2018-03-21 2018-07-10 中国五冶集团有限公司 A kind of dregs based on artificial push pipe excavates and movement system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649636A (en) * 2016-03-10 2016-06-08 中铁工程装备集团有限公司 Synchronous inverted-arch concrete paving device and method of large-diameter shield tunneling machine
CN105649636B (en) * 2016-03-10 2017-10-10 中铁工程装备集团有限公司 Large-diameter shield machine is with step concrete inverted arch making apparatus and method
CN108265768A (en) * 2018-03-21 2018-07-10 中国五冶集团有限公司 A kind of dregs based on artificial push pipe excavates and movement system
CN108265768B (en) * 2018-03-21 2023-02-14 中国五冶集团有限公司 Muck excavating and transferring system based on artificial pipe jacking

Similar Documents

Publication Publication Date Title
CN105649636B (en) Large-diameter shield machine is with step concrete inverted arch making apparatus and method
CN204627625U (en) Automatic walking lining trolley
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN103133012A (en) Open type tunnel boring machine (TBM) on-site concrete inverted arch synchronous lining trolley
CN208343136U (en) A kind of voluntarily prefabricated immersed tube template of tunneling boring
CN203308471U (en) Open type TBM cast-in-place concrete inverted arch synchronous lining trolley
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN103924985A (en) Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN107060823B (en) Non-dismantling trolley for tunnel anchor section secondary lining concrete construction
CN108756934A (en) Run disease tunnel assembled treatment structures construction operation trolley
CN107653755A (en) Solid concrete roabed, which pours, in Subway Tunnel separate tunnel inverse makees formula construction method
CN208380591U (en) Send rail tunnel hydraulic two linings trolley automatically
CN205400738U (en) Major diameter shield constructs quick -witted synchronous concrete inverted arch making device
CN104564102A (en) Tunnel lining concrete grouting device
CN104329096A (en) Shield station-crossing launching translation construction process
CN108638297A (en) Vertical shift trolley, adjusting part and application method for monorail track beam forms
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN104328717A (en) CRTS III type slab ballastless track self-compacting concrete casting tooling and method
CN203531924U (en) Lifting type moving trolley provided with tracks, wheels and templates
CN107190594B (en) A kind of construction method of rubber tire rail guided way
CN204662270U (en) A kind of case girder transferring system
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN210151779U (en) Municipal administration utility tunnel hydraulic template platform truck

Legal Events

Date Code Title Description
C14 Grant of patent or utility model