CN205399346U - Shore protection scour protection structure - Google Patents

Shore protection scour protection structure Download PDF

Info

Publication number
CN205399346U
CN205399346U CN201620183556.3U CN201620183556U CN205399346U CN 205399346 U CN205399346 U CN 205399346U CN 201620183556 U CN201620183556 U CN 201620183556U CN 205399346 U CN205399346 U CN 205399346U
Authority
CN
China
Prior art keywords
wall
dowel
key
toe
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620183556.3U
Other languages
Chinese (zh)
Inventor
游湘
周钟
张旻
鲁毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201620183556.3U priority Critical patent/CN205399346U/en
Application granted granted Critical
Publication of CN205399346U publication Critical patent/CN205399346U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a water conservancy water and electricity structure, especially a concrete shore protection scour protection structure who is applicable to the high -velocity flow flood discharge and erodees the district. The utility model provides a construction convenience is and effective reliable shore protection scour protection structure, including the concrete revetment, still include the toe key -wall, the toe key -wall sets up the toe department at the concrete revetment, the bottom of toe key -wall is provided with one row at least dowel and restraints the stake to restraint the stake hole to the dowel and carry out consolidation grouting. Toe key -wall and above concrete all are located on waterly, and construction convenience can fully guarantee the construction quality of concrete to can bear flood discharge the erodeing the shore protection of surging. It restraints the stake to set up the dowel that is not less than flood discharge scouring depth below the key -wall to utilize a dowel bundle stake hole to carry out consolidation grouting, strengthen dashing the rock mass strength and the rock mass wholeness of cheating the within range, improve it and resist towards the ability, formed one firm resisting towards the line of defence under water.

Description

Shore protection anti-washing structure
Technical field
This utility model relates to a kind of water conservancy and hydropower structure, especially a kind of concrete revetment anti-washing structure suitable in high-velocity flow spillway section district.
Background technology
During high-velocity flow flood discharge, owing to its flood discharge energy is huge, downstream river course spillway section region shore slope is very easily destroyed by scour, it is therefore necessary to bank slope carries out reliable shore protection design for erosion protection.The anti-scouring wall under water adopted effectively reliable more at present, but difficulty of construction is bigger;Though anti-key-wall easy construction of washing in a pan waterborne, but not fully reach the anti-purpose washed in a pan, it is possible to damaged or destroyed by flood after flood and often repair.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of easy construction and effectively reliable shore protection anti-washing structure.
This utility model solves the shore protection anti-washing structure that its technical problem adopts, including concrete revetment, also including toe key-wall, described toe key-wall is arranged on the toe place of concrete revetment, the bottom of described toe key-wall is provided with at least one row's dowel bundle stake, and dowel bundle stake holes is carried out consolidation grouting.
Further, described toe key-wall is inverted trapezoidal shape.
Further, the degree of depth of described toe key-wall is 2.0~4.0m, minimum bottom width 1.0~3.0m.
Further, described toe key-wall is chamfer trapezoidal shape, its hypotenuse concrete revetment dorsad.
Further, the degree of depth 9.0~36.0m, the spacing 1.0~3.0m of described dowel bundle stake, gos deep into toe key-wall 0.8~3.0m.
Further, described dowel bundle stake is provided with 1~2 row.
The beneficial effects of the utility model are: toe key-wall and above concrete are respectively positioned on waterborne, and easy construction can fully ensure that concrete construction quality, surge washing away shore protection it is thus possible to bear flood discharge.The key-wall dowel bundle stake being not less than the spillway section degree of depth arranged below, and utilize dowel bundle stake holes to carry out consolidation grouting, strengthens rock mass strength and the rock mass globality of rushing within the scope of hole, improves its impact resistance, defines together firmly anti-impact defence line under water.Comprehensive above underwater protection measure waterborne, it is ensured that shore protection erosion control is effectively reliable.Suitable in the erosion control shore protection on high-velocity flow spillway section district batholith.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Parts, position and numbering in figure: concrete revetment 1, toe key-wall 2, dowel bundle stake 3, dowel bundle stake holes 4.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As it is shown in figure 1, this utility model is by concrete revetment 1, toe key-wall 2, dowel bundle stake 3 forms.
Concrete revetment 1 thickness 0.5~3.0m, it is ensured that enough erosion control rigidity.Toe arranges toe key-wall 2, and it is inverted trapezoidal, the degree of depth 2.0~4.0m, minimum bottom width 1.0~3.0m, conveniently excavates molding, and ensure that construction space and erosion control rigidity.Toe key-wall 2 and above concrete are respectively positioned on waterborne, and easy construction can fully ensure that concrete construction quality, surge washing away concrete revetment 1 it is thus possible to bear flood discharge.The toe key-wall 2 dowel bundle stake 3 being not less than the spillway section degree of depth arranged below, dowel bundle stake 3 degree of depth 9.0~36.0m, dowel bundle can be become by 2~3 tendons, its length can be formed by many bar connecting, spacing 1.0~3.0m, go deep into toe key-wall 2 concrete 0.8~3.0m, dowel bundle stake 3 can be made effectively basement rock and concrete revetment 1 to be linked to be entirety.When building toe key-wall 2 ground floor concrete, reserved dowel bundle stake holes 4, and utilize this hole as consolidation grouting hole, after toe key-wall 2 ground floor concreting completes, implementing to cover heavily segmentation consolidation grouting, consolidation grouting is put into the closely knit sealing of hole of dowel bundle slip casting and is continued Superstructure Construction after having inspected.Dowel bundle stake and consolidation grouting strengthen rock mass strength and the rock mass globality of rushing within the scope of hole, improve its impact resistance, define together firmly anti-impact defence line under water.
This utility model simple in construction, easy construction, investment cost is economized, and shore protection erosion control is effectively reliable.Suitable in the erosion control shore protection on high-velocity flow spillway section district batholith.
Embodiment
Some hydropower station water levels of upstream and downstream drop is big, and maximum drop reaches 240m;Flood discharge flow is big, design/check operating mode flow 3229/3320m3/s;Flood discharge power is big, and flood discharge power reaches 7750MW, and energy is concentrated, but downstream river course is narrow, enters pool water surface width only 60~100m, adopts this practicality shore protection anti-washing structure after deliberation.
Through test, this shore protection anti-washing structure is excellent after flood discharge.

Claims (6)

1. shore protection anti-washing structure, including concrete revetment (1), it is characterized in that: also include toe key-wall (2), described toe key-wall (2) is arranged on the toe place of concrete revetment (1), the bottom of described toe key-wall (2) is provided with at least one row's dowel bundle stake (3), and dowel bundle stake holes (4) is carried out consolidation grouting.
2. shore protection anti-washing structure as claimed in claim 1, it is characterised in that: described toe key-wall (2) is inverted trapezoidal shape.
3. shore protection anti-washing structure as claimed in claim 2, it is characterised in that: the degree of depth of described toe key-wall (2) is 2.0~4.0m, minimum bottom width 1.0~3.0m.
4. shore protection anti-washing structure as claimed in claim 2, it is characterised in that: described toe key-wall (2) is chamfer trapezoidal shape, its hypotenuse concrete revetment dorsad (1).
5. shore protection anti-washing structure as claimed in claim 1, it is characterised in that: the degree of depth 9.0~36.0m, the spacing 1.0~3.0m of described dowel bundle stake (3), gos deep into toe key-wall (2) 0.8~3.0m.
6. the shore protection anti-washing structure as described in claim 1 to 5 any claim, it is characterised in that: described dowel bundle stake (3) is provided with 1~2 row.
CN201620183556.3U 2016-03-10 2016-03-10 Shore protection scour protection structure Active CN205399346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620183556.3U CN205399346U (en) 2016-03-10 2016-03-10 Shore protection scour protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620183556.3U CN205399346U (en) 2016-03-10 2016-03-10 Shore protection scour protection structure

Publications (1)

Publication Number Publication Date
CN205399346U true CN205399346U (en) 2016-07-27

Family

ID=56440857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620183556.3U Active CN205399346U (en) 2016-03-10 2016-03-10 Shore protection scour protection structure

Country Status (1)

Country Link
CN (1) CN205399346U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090805A (en) * 2017-02-07 2017-08-25 中国地质科学院探矿工艺研究所 Method for protecting and reinforcing mud-rock flow sand blocking dam against scour
CN114411627A (en) * 2022-02-25 2022-04-29 中交(寿光)投资有限公司 Double combined wave-dissipating seawall with rough stone facing structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090805A (en) * 2017-02-07 2017-08-25 中国地质科学院探矿工艺研究所 Method for protecting and reinforcing mud-rock flow sand blocking dam against scour
CN114411627A (en) * 2022-02-25 2022-04-29 中交(寿光)投资有限公司 Double combined wave-dissipating seawall with rough stone facing structure

Similar Documents

Publication Publication Date Title
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN101775788B (en) Block stone-reinforced concrete piling composite groyne bank protection structure
CN104234013B (en) Reservoir dam
CN103526721B (en) A kind of permeable pile foundation groynes
CN204370373U (en) Seepage proof curtain structure closed by a kind of reservoir
CN203782664U (en) Anti-scour structure of sandy foundation water gate
CN205399346U (en) Shore protection scour protection structure
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN206693187U (en) A kind of spillway structure
CN208685572U (en) High outer water vertical shaft depressurizes discharge structure
CN203530921U (en) Water-permeable pile foundation spur dike
CN207277349U (en) A kind of highway bridge construction cofferdam device
CN106939580B (en) A kind of pipe laying type permeable spur that interlocks
CN206220172U (en) Tubular type diversion pumping plant
CN205369276U (en) Osmosis membrane cofferdam is prevented to preceding landing leg shaped steel
CN205711975U (en) A kind of Anti-slip type slope protection concrete prefabricated section
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN210636421U (en) Underwater hollowing defect repairing device for navigation wall pile foundation of ship lock on gravel layer foundation
CN104695392B (en) Plunge pool structure used for high arch dam, narrow canyon and large-flow flood discharge hole
CN208733589U (en) A kind of bank tower intake being built in steep side slope
CN106120640A (en) A kind of construction method preventing and treating mountain stream bridge foundation washout
CN206928260U (en) A kind of reservoir dam structure with flood discharge desilting function
CN206570772U (en) A kind of ecological earth and rockfill dam
CN206768738U (en) A kind of suspension type anti-scour wall protective slope structure
CN202482830U (en) A high roller compacted concrete anti-seepage dam with the height of over 200 m

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant