CN205382465U - Board -like mud -rock flow of ge bin - stake structure of blocking - Google Patents

Board -like mud -rock flow of ge bin - stake structure of blocking Download PDF

Info

Publication number
CN205382465U
CN205382465U CN201620064931.2U CN201620064931U CN205382465U CN 205382465 U CN205382465 U CN 205382465U CN 201620064931 U CN201620064931 U CN 201620064931U CN 205382465 U CN205382465 U CN 205382465U
Authority
CN
China
Prior art keywords
reinforced concrete
bin
mud
rock flow
blocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620064931.2U
Other languages
Chinese (zh)
Inventor
吴红刚
张乾翼
杨昊天
陈小云
冯文强
任庆钊
庞伟军
常刚
李元彪
苟海瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Research Institute Co Ltd of CREC
Original Assignee
Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec filed Critical Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Priority to CN201620064931.2U priority Critical patent/CN205382465U/en
Application granted granted Critical
Publication of CN205382465U publication Critical patent/CN205382465U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Board -like mud -rock flow of ge bin - stake structure of blocking. It keeps off mud -rock flow that native board, reinforced concrete friction pile and ge bin buffer layer the form structure of blocking, characterized by by reinforced concrete linking beam, reinforced concrete: reinforced concrete linking beam connects into a whole with the reinforced concrete friction pile, and the reinforced concrete friction pile keeps off native board with the reinforced concrete again and connects into whole, and check guest buffer layer is hugged closely and is kept off native postlaminar part at the reinforced concrete and arrange. Has following advantage: (1 ) dam height, storage capacity are big. (2 ) bearing capacity is big, structural strength is high. (3 )Higher row leads the ability.

Description

Ge Bin-peg board formula mud-rock flow is blocked structure
Technical field
This utility model relates to a kind of mud-rock flow and blocks structure, especially can improve height of dam and storage capacity, strengthen structural safety deposit, saves the structure of blocking of engineering material.
Background technology
At present, in known Controlling Debris Flow engineering frequently with method be that intercepting water in the steady slope by upstream and blocks bank protection etc. in middle reaches, reduce mud-rock flow solid matter, control debris flow scale, changing the character of debris flow body, being conducive to the row in downstream to lead effect, thus controlling the harm of mud-rock flow.Structure of blocking frequently with version have blocking dam, pile plate wall and Ge Bin etc..
Having the advantages of of blocking dam: (1) construction is simple;(2) when there being ground material, cost is suitable;(3) use is extensive, and it is strong that row leads ability.Shortcoming has: (1) quantity of masonry is big;(2) height of dam is unsuitable too high.
The advantage of pile plate wall is that (1) blocks ability greatly, and safety is high;(2) when dam abutment has and the disease such as caves in, the structural strengthening dam abutments such as friction pile, linking beam, anchor pole (rope) can be used;(3) area that ground material is relatively lacked, use pile plate wall block structure time, quantity of masonry is saved relatively, it is simple to build.Its shortcoming is that between stake, plate impact resistance is more weak, and meanwhile, the osculum that plate is arranged makes the structural strength of plate cut down bigger, it is easy to cause potential safety hazard.
Ge Bin has deformable, consume that impact energy is big, water penetration is high and the advantage such as easy for installation, but bearing capacity is limited.
Summary of the invention
In order to overcome, existing check dam dam quantity of masonry is big, height of dam is unsuitable too high, between pile plate wall stake, plate impact resistance is more weak, the shortcoming that lattice guest's bearing capacity is limited, this utility model provides a kind of Ge Bin-peg board formula mud-rock flow and blocks structure, this structure of blocking has the advantage that (1) is applicable to and builds high dam debris flow gully, and its storage capacity is big;(2) bearing capacity is big, structural strength is high;(3) higher row leads ability.
This utility model solves the technical scheme is that Ge Bin of its technical problem-peg board formula mud-rock flow and blocks structure, it is made up of friction pile, breast boards, linking beam and Ge Bin, it is characterized in that: reinforced concrete friction pile is connected into an entirety by reinforced concrete linking beam, reinforced concrete friction pile connects into again entirety with reinforced concrete breast boards, and lattice guest's cushion is close to reinforced concrete breast boards rear portion and arranges.Being that staged is close to and is arranged in breast boards rear portion by lattice guest, lattice guest's width is sequentially reduced from bottom to top.After upstream mud-rock flow sweeps away, that first impact is Ge Bin, owing to Ge Bin is that a kind of flexibility is blocked structure, its deformability is big, moment impact energy can be absorbed, liquid can pass through the macrovoid of lattice guest simultaneously, then pass through the osculum on pile plate wall to discharge, although the bearing capacity of lattice guest is less, but owing to it is close to pile plate wall, the lateral pressure of solid matter can pass to pile plate wall by lattice guest, such combinative structure combines pile plate wall and the advantage of two kinds of structures of blocking of Ge Bin, both ensure that the timely discharge of liquid, in turn ensure that pile plate wall is not broken by the moment impact energy of mud-rock flow, reach to improve the purpose of safety stock.The beneficial effects of the utility model are, existing height of dam, storage capacity are big, and the row that bearing capacity is big, structural strength is high and higher leads the advantage of ability, convenient to carry out again, and cost is reasonable, and single technology is ripe.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, this utility model is further illustrated.
Fig. 1 is control structure horizontal layout schematic diagram of the present utility model.
Fig. 2 is that control structure facade of the present utility model arranges schematic diagram.
Fig. 3 is that control structure section of the present utility model arranges schematic diagram.
Fig. 4 is the A--A sectional view of Fig. 1.
Fig. 5 is the B--B sectional view of Fig. 2.
1. reinforced concrete linking beam, 2. reinforced concrete breast boards in figure, 3. lattice guest cushion, 4. reinforced concrete friction pile, 5. above-ground route.
Detailed description of the invention
In FIG, reinforced concrete linking beam (1) is arranged in reinforced concrete friction pile (4) top, reinforced concrete friction pile (4) is connected into as a whole, reinforced concrete breast boards (2) is arranged in reinforced concrete friction pile (4) rear portion, and it is connected to become entirety with reinforced concrete friction pile (4), lattice guest's cushion (3) are arranged in reinforced concrete breast boards (2) rear portion closely, and the soil lateral pressure of mud-rock flow solid matter can be passed through lattice guest's cushion (3) and pass to reinforced concrete breast boards (2).

Claims (2)

1. Ge Bin-peg board formula mud-rock flow is blocked structure, it is made up of friction pile, breast boards, linking beam and Ge Bin, it is characterized in that: reinforced concrete friction pile is connected into an entirety by reinforced concrete linking beam, reinforced concrete friction pile connects into again entirety with reinforced concrete breast boards, and lattice guest's cushion is close to reinforced concrete breast boards rear portion and arranges.
2. Ge Bin according to claim 1-peg board formula mud-rock flow is blocked structure, it is characterized in that: be that staged is close to and is arranged in breast boards rear portion by lattice guest, and lattice guest's width is sequentially reduced from bottom to top.
CN201620064931.2U 2016-01-25 2016-01-25 Board -like mud -rock flow of ge bin - stake structure of blocking Expired - Fee Related CN205382465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620064931.2U CN205382465U (en) 2016-01-25 2016-01-25 Board -like mud -rock flow of ge bin - stake structure of blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620064931.2U CN205382465U (en) 2016-01-25 2016-01-25 Board -like mud -rock flow of ge bin - stake structure of blocking

Publications (1)

Publication Number Publication Date
CN205382465U true CN205382465U (en) 2016-07-13

Family

ID=56348807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620064931.2U Expired - Fee Related CN205382465U (en) 2016-01-25 2016-01-25 Board -like mud -rock flow of ge bin - stake structure of blocking

Country Status (1)

Country Link
CN (1) CN205382465U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525595A (en) * 2016-01-25 2016-04-27 中铁西北科学研究院有限公司勘察设计分公司 Gabion-piled slab type debris flow retaining structure and implementation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525595A (en) * 2016-01-25 2016-04-27 中铁西北科学研究院有限公司勘察设计分公司 Gabion-piled slab type debris flow retaining structure and implementation method thereof

Similar Documents

Publication Publication Date Title
CN202989867U (en) Junked tire protective surface combined steel-structure check dam
CN204703179U (en) A kind of composite geo-membrane sloping core cofferdam
CN205382465U (en) Board -like mud -rock flow of ge bin - stake structure of blocking
CN202323963U (en) Drainage and anchoring combined device for side slope
CN207469269U (en) A kind of hydraulic engineering High strength geogrid structure class ecological revetment
CN206873395U (en) A kind of ecological revetment dike
CN105525595A (en) Gabion-piled slab type debris flow retaining structure and implementation method thereof
CN203284795U (en) Buttressed retaining wall with anchor board
CN102888855B (en) Combined balance weight retaining wall
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN204282395U (en) A kind of stake holder counterfort retaining wall
CN103614986B (en) It a kind of is applicable to the pressure free current inlet method that Tailings Dam drains off floodwaters
CN206245323U (en) Open-pit mine blast slope reinforcement device
CN203855959U (en) Circular-section anti-slide pile with bilateral haunched beams
CN203639941U (en) Balance weight type retaining wall
CN208545758U (en) A kind of mud stone location roadbed high slope structure
CN207047874U (en) A kind of retaining wall structure administered for mine slope
CN105133676A (en) Building inclination rectification construction method
CN207160056U (en) Formula retaining structure is helped in a kind of storehouse
CN206298889U (en) Stake net mud-rock flow is blocked structure
CN205917649U (en) River bank slope protection structure
CN203716177U (en) Flexible retaining wall
CN209227475U (en) Ecological slope protection structure and ecological slope protection system
CN203462477U (en) Protection greening structure of rock abrupt slope or cement abrupt slope
CN114855761B (en) Wet type tailing pond closed reclamation structure and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220802

Address after: 730000 No. 365, East Democratic Road, Chengguan District, Gansu, Lanzhou

Patentee after: NORTHWEST RESEARCH INSTITUTE Co.,Ltd. OF C R E C

Address before: 730000 No. 365 East Democratic Road, Gansu, Lanzhou

Patentee before: SURVEY AND DESIGN BRANCH OF NORTHWEST RESEARCH INSTITUTE CO.,LTD. OF CREC

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160713

CF01 Termination of patent right due to non-payment of annual fee