CN203462477U - Protection greening structure of rock abrupt slope or cement abrupt slope - Google Patents

Protection greening structure of rock abrupt slope or cement abrupt slope Download PDF

Info

Publication number
CN203462477U
CN203462477U CN201320331314.0U CN201320331314U CN203462477U CN 203462477 U CN203462477 U CN 203462477U CN 201320331314 U CN201320331314 U CN 201320331314U CN 203462477 U CN203462477 U CN 203462477U
Authority
CN
China
Prior art keywords
anchor pole
slope
cement
steep rocky
protecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320331314.0U
Other languages
Chinese (zh)
Inventor
李宇波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320331314.0U priority Critical patent/CN203462477U/en
Application granted granted Critical
Publication of CN203462477U publication Critical patent/CN203462477U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a protection greening structure of a rock abrupt slope or a cement abrupt slope. The structure comprises a plurality of anchor poles and a plurality of geotechnical net bands; the lower parts of the anchor poles are respectively fixed in anchor holes in the rock abrupt slope; the anchor holes form a matrix; a horizontal distance between two anchor holes is 80-120 cm and a vertical distance is 35-50 cm; the length of an exposed part of each of the anchor poles is 30-70 cm; the geotechnical net bands are fixed on the anchor poles; and one horizontally draped geotechnical net band connects adjacent left and right anchor poles. According to the utility model, soil fixing bands formed by the anchor poles and the geotechnical net bands are laid and filled with culture soil, and are used for fixing the culture soil, so a lot of construction materials can be saved, engineering cost is low and environment is protected.

Description

The protecting and greening structure on a kind of steep rocky slope or cement abrupt slope
[technical field]
The utility model relates to side slope protection greening, relates in particular to the protecting and greening structure on a kind of steep rocky slope or cement abrupt slope.
[background technology]
In the construction of the infrastructure such as highway, railway, water power, often to excavate a large amount of side slopes.If side slope is not carried out protecting and greening, often can cause a large amount of secondary barrens and produce serious soil erosion and shallow failure etc.Engineering slope is as adopted stone, concrete, building block etc. that side slope surface is covered, although can reinforcing side slope shallow-layer, easily cause the pollution of ecological disruption and vision.For the side slope of rock matter or cement is afforested, the more slow side slope of the gradient can directly adopt alien earth sparging grass planting technology to realize, for steeper side slope, the lattice girder sash of common employing concreting adds the solid indigenous method of plastic wire and realizes, this method need to consume more steel, cement, engineering cost is high, and environment is had a negative impact, concrete frame is isolated by the liquid manure supply of surrounding environment on rock side slope, can not form self-supply system, afforestation effect is poor, difficult in maintenance, operation cost is high, and greening can not be lasting.
[summary of the invention]
The technical problems to be solved in the utility model is to provide that a kind of consumption is few compared with material, and engineering cost is low, environmental protection, and the protecting and greening structure on applicable steep rocky slope or cement abrupt slope.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is, the protecting and greening structure on a kind of steep rocky slope or cement abrupt slope, comprise complex root anchor pole and a plurality of geotechnological guipures, the bottom of anchor pole is fixed in the anchor hole of steep rocky slope, described anchor hole forms matrix, and the horizontal spacing of anchor hole is 80-120cm, and longitudinal pitch is 30-50cm; Anchor pole exposed parts length is 30-70cm, and geotechnological guipure is fixed on anchor pole, and the horizontal geotechnological guipure drawing connects the adjacent anchor pole in left and right.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, comprises the geotechnological guipure of oblique pull, and the two ends of the geotechnological guipure of oblique pull connect respectively the adjacent anchor pole in left and right, the middle part of the geotechnological guipure of oblique pull with above or below contiguous geotechnological guipure be connected.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, in perpendicular longitudinally, the angle of anchor pole and steep rocky slope is 50-70 °.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, comprise the first stay cord, the first stay cord connects longitudinally contiguous anchor pole, and the first end of the first stay cord is fixed on the lower end of top anchor pole exposed parts, and the second end is fixed on the middle part of below anchor pole exposed parts.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, described anchor pole is S shape, comprises upper boom, king-rod and lower beam, S shape anchor pole is arranged in perpendicular longitudinally; The bottom of lower beam is fixed in anchor hole, and the second end of the first stay cord is fixed on the connecting portion of below anchor pole upper boom and king-rod.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, comprise the second stay cord, the second stay cord connects longitudinally contiguous anchor pole, and the first end of the second stay cord is fixed on the lower end of top anchor pole lower beam exposed parts, and the second end is fixed on the connecting portion of below anchor pole lower beam and king-rod.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, the length of lower beam exposed parts is 10-20cm, and the length of king-rod is 25-35cm, and the length of upper boom is 10-20cm.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, in perpendicular longitudinally, the angle of lower beam and upper boom and steep rocky slope is 50-70 °, the angle of king-rod and steep rocky slope is 0-30 °.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, king-rod is vertically arranged.
The protecting and greening structure on above-described steep rocky slope or cement abrupt slope, the slope angle of steep rocky slope is greater than 75 °; Anchor pole is plastic bar, and geotechnological guipure is plastics guipure; The degree of depth of anchor hole is 50-100cm.
The protecting and greening structure on the utility model steep rocky slope or cement abrupt slope is filled out compost at the solid soil zone middle berth of anchor pole and the formation of geotechnological guipure, utilize anchor pole and compost fixed on abrupt slope with the solid soil zone that geotechnological guipure forms, can save a large amount of structure materials, engineering cost is low, and environmental protection.
[accompanying drawing explanation]
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Fig. 1 is the sectional view of the protecting and greening structure embodiment 1 on the utility model steep rocky slope or cement abrupt slope.
Fig. 2 is that A in Fig. 1 is to view.
Fig. 3 is the schematic diagram that the protecting and greening structure embodiment 1 geotechnological guipure on the utility model steep rocky slope or cement abrupt slope is connected with anchor pole.
Fig. 4 is the structural representation of the protecting and greening structure embodiment 2 on the utility model steep rocky slope or cement abrupt slope.
Fig. 5 is the sectional view of the protecting and greening structure embodiment 3 on the utility model steep rocky slope or cement abrupt slope.
Fig. 6 is the partial enlarged drawing at I position in Fig. 4.
[specific embodiment]
The protecting and greening structure on the utility model embodiment 1 steep rocky slope or cement abrupt slope as shown in Figure 1 to Figure 3, comprise many anchor poles 1 and many geotechnological guipures 2, the bottom of anchor pole 1 is fixed in the anchor hole 1001 of steep rocky slope 10, the domatic upper formation matrix of anchor hole 1001 steep rocky slopes.The slope angle α of steep rocky slope 10 is greater than 75 °.
Anchor pole 1 is the plastic bar of diameter 16-20cm, and geotechnological guipure 2 is plastics guipure.
The degree of depth L2 of anchor hole 1001 is 50-100cm, and the horizontal spacing L4 between two left and right anchor holes 1001 is 80-120cm, and longitudinally the spacing L3 between (up and down) is 30-50cm.Anchor pole 1 exposed parts length L 1 is 30-70cm.
Geotechnique's guipure 2 is fixed on the exposed parts of anchor pole 1, and the horizontal geotechnological guipure drawing 2 connects the adjacent anchor pole 1 in left and right.Geotechnique's guipure 2 is with anchor pole 1 fixedly time, and the top of anchor pole 1 interlocks through the mesh 201 of geotechnological guipure 2, if desired, then with bandage by geotechnological guipure 2 colligations on anchor pole 1.
Anchor pole 1 in perpendicular longitudinally, with the angle β of steep rocky slope 10 be 50-70 °.In order to improve the supporting force of anchor pole 1, stay cord 3 connects longitudinally contiguous anchor pole, and the upper end of stay cord 3 is fixed on the lower end of top anchor pole 1 exposed parts, and the lower end of stay cord 3 is fixed on the middle part of below anchor pole 1 exposed parts.
Anchor pole 1 and geotechnological guipure 2 are combined into solid soil zone above, and the space middle berth between solid soil zone is filled out compost 20, utilize anchor pole 1 and compost 20 are fixed on abrupt slope with the solid soil zone that geotechnological guipure 2 forms.
The protecting and greening structure on the utility model embodiment 2 steep rocky slopes or cement abrupt slope as shown in Figure 4, with the difference of embodiment 1 be, except there being the geotechnological guipure 2A drawing, the geotechnological guipure 2B that also comprises oblique pull, the two ends of oblique pull geotechnique guipure 2B connect respectively the adjacent anchor pole in left and right 1, and the middle part of the geotechnological guipure 2 that the middle part of the geotechnological guipure 2 of oblique pull and top (or below) are contiguous is by tied rope 71e
Link together.The participation of oblique pull geotechnique guipure 2B, is divided into interconnective triangle fritter by the compost in solid soil zone 20, has improved the force-bearing situation of solid soil zone.
The protecting and greening structure on the utility model embodiment 3 steep rocky slopes or cement abrupt slope as shown in Figure 5 and Figure 6, with the difference of embodiment 1 and 2 is, anchor pole 1 is S shape, and S shape anchor pole 1 comprises upper boom 101, king-rod 102 and lower beam 103.The length of lower beam 103 exposed parts is 10-20cm, and the length of king-rod 102 is 25-35cm, and the length of upper boom 101 is 10-20cm.
Crooked S shape anchor pole 1 is arranged in perpendicular longitudinally, and the bottom of lower beam 103 is fixed in anchor hole 1001.
In perpendicular longitudinally, lower beam 103 and upper boom 101 are respectively 50-70 ° with angle β 1 and the β 3 of steep rocky slope 10, in the present embodiment, and β 1=β 3.The angle β 2 of king-rod 102 and steep rocky slope 10 be 0-30 ° in the present embodiment, king-rod 102 is vertically arranged.
Upper stay cord 3A connects longitudinally contiguous anchor pole up and down, and the inner of upper stay cord 3A is fixed on the lower end of top anchor pole 1 exposed parts, and the outer end of upper stay cord 3A is fixed on the connecting portion of below anchor pole 1 upper boom 101 and king-rod 102.
Lower stay cord 3B connects longitudinally contiguous anchor pole up and down equally, and the upper end of lower stay cord 3B is fixed on the lower end of top anchor pole 1 exposed parts, and lower end is fixed on the connecting portion of below anchor pole lower beam 103 and king-rod 102.
The present embodiment is compared with 2 with embodiment 1, Gu the supporting capacity of soil zone obviously improves, Gu native better effects if, the life-span is longer.
The above embodiment of the utility model adopts the geonet of 75,000 Ns, 10-15cm earth firmly can be fixed on the abrupt slope of rock matter or cement, and earth is difficult for being washed away by heavy rain.

Claims (10)

1. the protecting and greening structure on steep rocky slope or cement abrupt slope, comprises complex root anchor pole and a plurality of geotechnological guipures, and the bottom of anchor pole is fixed in the anchor hole of steep rocky slope, it is characterized in that, described anchor hole forms matrix, and the horizontal spacing of anchor hole is 80-120cm, and longitudinal pitch is 30-50cm; Anchor pole exposed parts length is 30-70cm, and geotechnological guipure is fixed on anchor pole, and the horizontal geotechnological guipure drawing connects the adjacent anchor pole in left and right.
2. the protecting and greening structure on steep rocky slope according to claim 1 or cement abrupt slope, it is characterized in that, the geotechnological guipure that comprises oblique pull, the two ends of the geotechnological guipure of oblique pull connect respectively the adjacent anchor pole in left and right, the middle part of the geotechnological guipure of oblique pull with above or below contiguous geotechnological guipure be connected.
3. the protecting and greening structure on steep rocky slope according to claim 1 or cement abrupt slope, is characterized in that, in perpendicular longitudinally, the angle of anchor pole and steep rocky slope is 50-70 °.
4. the protecting and greening structure on steep rocky slope according to claim 1 or cement abrupt slope, it is characterized in that, comprise the first stay cord, the first stay cord connects longitudinally contiguous anchor pole, the first end of the first stay cord is fixed on the lower end of top anchor pole exposed parts, and the second end is fixed on the middle part of below anchor pole exposed parts.
5. the protecting and greening structure on steep rocky slope according to claim 4 or cement abrupt slope, is characterized in that, described anchor pole is S shape, comprises upper boom, king-rod and lower beam, and S shape anchor pole is arranged in perpendicular longitudinally; The bottom of lower beam is fixed in anchor hole, and the second end of the first stay cord is fixed on the connecting portion of below anchor pole upper boom and king-rod.
6. the protecting and greening structure on steep rocky slope according to claim 5 or cement abrupt slope, it is characterized in that, comprise the second stay cord, the second stay cord connects longitudinally contiguous anchor pole, the first end of the second stay cord is fixed on the lower end of top anchor pole lower beam exposed parts, and the second end is fixed on the connecting portion of below anchor pole lower beam and king-rod.
7. the protecting and greening structure on steep rocky slope according to claim 5 or cement abrupt slope, is characterized in that, the length of lower beam exposed parts is 10-20cm, and the length of king-rod is 25-35cm, and the length of upper boom is 10-20cm.
8. the protecting and greening structure on steep rocky slope according to claim 1 or cement abrupt slope, is characterized in that, in perpendicular longitudinally, the angle of lower beam and upper boom and steep rocky slope is 50-70 °, and the angle of king-rod and steep rocky slope is 0-30 °.
9. the protecting and greening structure on steep rocky slope according to claim 1 or cement abrupt slope, is characterized in that, king-rod is vertically arranged.
10. the protecting and greening structure on steep rocky slope according to claim 1 or cement abrupt slope, is characterized in that, the slope angle of steep rocky slope is greater than 75 °; Anchor pole is plastic bar, and geotechnological guipure is plastics guipure; The degree of depth of anchor hole is 50-100cm.
CN201320331314.0U 2013-06-04 2013-06-04 Protection greening structure of rock abrupt slope or cement abrupt slope Expired - Fee Related CN203462477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320331314.0U CN203462477U (en) 2013-06-04 2013-06-04 Protection greening structure of rock abrupt slope or cement abrupt slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320331314.0U CN203462477U (en) 2013-06-04 2013-06-04 Protection greening structure of rock abrupt slope or cement abrupt slope

Publications (1)

Publication Number Publication Date
CN203462477U true CN203462477U (en) 2014-03-05

Family

ID=50174850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320331314.0U Expired - Fee Related CN203462477U (en) 2013-06-04 2013-06-04 Protection greening structure of rock abrupt slope or cement abrupt slope

Country Status (1)

Country Link
CN (1) CN203462477U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631474A (en) * 2015-03-09 2015-05-20 深圳市红树林园林绿化工程有限公司 Slope protection and afforestration structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631474A (en) * 2015-03-09 2015-05-20 深圳市红树林园林绿化工程有限公司 Slope protection and afforestration structure

Similar Documents

Publication Publication Date Title
CN106193066B (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN201343733Y (en) Ecological protection structure with steady rock side slope
CN105155548A (en) Cable double-row pile (wall) supporting structure
CN103806451B (en) A kind of anchorage type foundation ditch strengthening structure and construction method thereof
CN204551491U (en) A kind of side slope protection greening structure
CN203238642U (en) Supporting retaining wall of foundation pit
CN104947628B (en) Based on the ecotechnology having the solid bag of otolith cage
CN206873395U (en) A kind of ecological revetment dike
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN203462477U (en) Protection greening structure of rock abrupt slope or cement abrupt slope
CN207904939U (en) A kind of ecological revetment grass planting plane
CN205188976U (en) Drag -line double row pile supporting construction
CN204690762U (en) The protecting and greening structure of a kind of geotechnological guipure and land waste side slope
CN104631474B (en) A kind of side slope protection greening structure
CN103306290B (en) Permafrost region pole and tower foundation foundation soil returns fast and freezes backfill construction method
CN204418192U (en) Bayonet type grass planting grid
CN104895008B (en) The construction method of environmentally friendly ecology wallboard type with ribbing barricade shore protection
CN103195077A (en) Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN203462476U (en) Protection and greening structure of weathered stone edge slope
CN203129163U (en) Reinforcing framework structure for dam foundation
CN206986915U (en) A kind of fan platform installation foundation
CN208328984U (en) Ecological gridiron barricade
CN204780948U (en) Protection afforestation structure on geonet area and rock matter abrupt slope
CN207775818U (en) A kind of anchoring grid bank protection
CN207405634U (en) Multiple rows of Miniature anti-slide pile adds anchor cable structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140305

Termination date: 20150604

EXPY Termination of patent right or utility model