CN205369321U - Ground is flexible prevention of seepage body structure of wall even - Google Patents
Ground is flexible prevention of seepage body structure of wall even Download PDFInfo
- Publication number
- CN205369321U CN205369321U CN201521144213.8U CN201521144213U CN205369321U CN 205369321 U CN205369321 U CN 205369321U CN 201521144213 U CN201521144213 U CN 201521144213U CN 205369321 U CN205369321 U CN 205369321U
- Authority
- CN
- China
- Prior art keywords
- wall
- ground
- seepage
- composite earth
- prevention
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model provides a ground is flexible prevention of seepage body structure of wall even, the seam position department encirclement that adjacent two links between the wall has compound native prevention of seepage to personally experience sth. Part of the body, and ground links the wall of leading of wall seam position and sets up direct the construction in the native prevention of seepage of the complex body after formation is earlier personally experienced sth. Part of the body in compound native prevention of seepage. The flexible seepage prevention structure of the company of a tilling land wall, the prevention of seepage body wherein is flexible, the modulus is less than the soil cement modulus, local even wall atress produces when warping, the prevention of seepage body wall body of closely laminating can warp along with the wall body, avoids appearing inflexible soil cement stake or spout the stake soon producing the gap between the stake wall when the wall body warp, arouses the phenomenon of seepage, because this prevention of seepage body is compound soil stake, and the interlock is formed by stacking each other, make the prevention of seepage body have and more closely prevent the seepage, convenient construction, simple structure saves advantages such as cost.
Description
Technical field
This utility model belongs to civil engineering, Construction Technique of Underground Works field, especially relates to a kind of for ground-connecting-wall joint, the construction method of the Anti-seeping technology of seam crossing and corresponding impervious body structure.
Background technology
Diaphram wall (is called for short " ground-connecting-wall ") as a kind of structural measure, is widely used in the underground engineering of building, water conservancy, water transport and municipal works.But the reasons such as the controllability due to construction, often there is percolating water situation in ground-connecting-wall.Current common treating method is: perform rotary churning pile etc. outside ground-connecting-wall, but, this treating method is because of a variety of causes of construction so that it is also there will be gap after construction, the situation of percolating water occurs.
This utility model is different from these existing methods, have developed a kind of ground-connecting-wall flexible barrier body structure, it is to avoid the appearance of seam seepage.
Utility model content
In view of this, this utility model is directed to a kind of ground-connecting-wall flexible barrier body structure, to avoid ground-connecting-wall seam seepage.
For reaching above-mentioned purpose, the technical solution of the utility model is achieved in that
A kind of ground-connecting-wall flexible barrier body structure, the seaming position place between adjacent two width ground-connecting-walls surrounds composite earth impervious body, and wall direct construction in composite earth impervious body after composite earth impervious body is initially formed of leading of ground-connecting-wall seaming position is offered.
Further, described composite earth impervious body is mutually twisted for several composite earth stakes and is formed by stacking.
Further, described composite earth stake is sodio swelled ground and original soil body is uniformly mixed merely by stirring and forms, and its infiltration coefficient reaches 10-6Cm/s to 10-7Cm/s, and intensity is not less than original soil body.
Further, described composite earth impervious body is that several composite earth stakes are constituted, and is engaged 100-200mm between adjacent two composite earth stakes.
Further, described composite earth impervious body, to arrange along ground-connecting-wall wall thickness direction, at least two row's composite earth stake outside ground-connecting-wall wall, ground-connecting-wall is at least one row's composite earth stake within the walls;Described composite earth impervious body is along the deep direction of ground-connecting-wall wall, with the scope of at least 7m under hole at the bottom of self-conductance wall;Described composite earth impervious body is along ground-connecting-wall axis direction, at seam both sides more than the extension 1m of ground-connecting-wall.
Relative to prior art, the construction method of ground-connecting-wall flexible barrier body structure described in the utility model has the advantage that
(1) ground-connecting-wall flexible barrier body structure described in the utility model, impervious body therein is flexible, modulus is less than soil cement modulus, when ground-connecting-wall stress is deformed, impervious body fits tightly body of wall, can deform with body of wall, it is to avoid occur that the cement earth pile of rigidity or rotary churning pile produce gap when deformation of wall between piling wall, cause the phenomenon of seepage.
(2) ground-connecting-wall flexible barrier body structure described in the utility model, owing to this impervious body is composite earth stake, and is mutually twisted and is formed by stacking, make impervious body have and more closely prevent seepage, convenient construction, and simple in construction saves the advantages such as cost.
(3) ground-connecting-wall flexible barrier body structure described in the utility model; it is performed before ground-connecting-wall is constructed; ground-connecting-wall is constructed in impervious body; body of wall seam is wrapped up by impervious body completely; even if occur body of wall seam crossing folder mud or be commonly called as open underpants phenomenon; but because the seam crossing of wall is in impervious body, there is the protection of impervious body, it is possible to effectively avoid the seepage that this kind of constructional deficiency produces.
Accompanying drawing explanation
The accompanying drawing constituting a part of the present utility model is further appreciated by of the present utility model for providing, and schematic description and description of the present utility model is used for explaining this utility model, is not intended that improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 connects wall joint composite earth impervious body site plan described in this utility model embodiment flexibly;
Fig. 2 connects wall joint composite earth impervious body profile described in this utility model embodiment flexibly.
Description of reference numerals:
1-composite earth impervious body;2-leads wall;3-ground-connecting-wall.
Detailed description of the invention
It should be noted that when not conflicting, the embodiment in this utility model and the feature in embodiment can be mutually combined.
In description of the present utility model, it will be appreciated that, term " " center ", " longitudinal direction ", " transverse direction ", " on ", D score, " front ", " afterwards ", " left side ", " right side ", " vertically ", " level ", " top ", " end ", " interior ", orientation or the position relationship of the instruction such as " outward " are based on orientation shown in the drawings or position relationship, it is for only for ease of description this utility model and simplifies description, rather than the device of instruction or hint indication or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.Additionally, term " first ", " second " etc. are only for descriptive purposes, and it is not intended that indicate or imply relative importance or the implicit quantity indicating indicated technical characteristic.Thus, the feature defining " first ", " second " etc. can express or implicitly include one or more these features.In description of the present utility model, except as otherwise noted, " multiple " are meant that two or more.
In description of the present utility model, it is necessary to explanation, unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection " should be interpreted broadly, for instance, it is possible to it is fixing connection, it is also possible to be removably connect, or connect integratedly;Can be mechanically connected, it is also possible to be electrical connection;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, it is possible to be the connection of two element internals.For the ordinary skill in the art, it is possible to understand above-mentioned term concrete meaning in this utility model by concrete condition.
Describe this utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
A kind of ground-connecting-wall flexible barrier body structure, the seaming position place between adjacent two width ground-connecting-walls surrounds composite earth impervious body, and wall 2 direct construction in composite earth impervious body after composite earth impervious body is initially formed of leading of ground-connecting-wall seaming position is offered.
Described composite earth impervious body 1 is mutually twisted for several composite earth stakes and is formed by stacking.Described composite earth stake is sodio swelled ground and original soil body is uniformly mixed merely by stirring and forms, and its infiltration coefficient reaches 10-6Cm/s to 10-7Cm/s, and intensity is not less than original soil body, but lower than the intensity of ground-connecting-wall body of wall.
This utility model be on construction ground in, first perform flexible compound soil impervious body 1, it is arranged over leading wall 2 at flexible compound soil impervious body 1, last ground-connecting-wall 3 of constructing in composite earth impervious body 1, because the deformation of composite earth impervious body 1 with ground-connecting-wall 3 has good servo, solve the leakage problems of current ground-connecting-wall 3 seam.
Because composite earth impervious body 1 is in the space of relatively ground-connecting-wall 3 seam expanded range, the infiltration coefficient of soil is made to be reduced to 10-6Cm/s to 10-7Cm/s, so, when ground-connecting-wall 3 is constructed, though occur body of wall seam crossing folder mud or be commonly called as open underpants phenomenon, but because the seam crossing of wall is in composite earth impervious body 1, have the protection of composite earth impervious body 1, it is possible to effectively avoid the seepage that this kind of constructional deficiency produces.
Owing to this composite earth impervious body 1 is composite earth stake, modulus is less than soil cement modulus, when ground-connecting-wall 3 stress is deformed, composite earth impervious body 1 fits tightly body of wall, can deform with body of wall, the cement earth pile or the rotary churning pile that avoid the occurrence of rigidity produce gap when deformation of wall between piling wall, cause the phenomenon of seepage.
Specific embodiment:
Surveying and locating, in place yet to be built, according to design drawing unwrapping wire, it is determined that ground-connecting-wall axis and each groove fragment position.According to soil property situation, set Irrigation Pressure, promote the construction parameters such as speed, utilize rig to spray in soil by sodium bentonite, and stir with original soil body, form composite earth stake.At ground-connecting-wall seaming position, the thickness direction along wall performs the composite earth stake being mutually twisted, and is engaged 100-200mm between two, to form the composite earth impervious body of flexibility.The boundary of works area of composite earth impervious body: along ground-connecting-wall axis direction, seam both sides extension 1m;Along wall thickness direction, outer 2 campsheds of wall, 1 campshed within the walls;Along the deep direction of wall, self-conductance wall 2 end, is with depth bounds no less than 7m (or with geological condition adjustment) beneath down to hole.Can adopt at composite earth impervious body position and change after wall 2 is led in the method process filling out compacting because of the original soil body of composite earth impervious body construction disturbance.Soil impervious body to be composite can carry out ground-connecting-wall construction according to a conventional method after having constructed 10 days in this position.
The foregoing is only preferred embodiment of the present utility model; not in order to limit this utility model; all within spirit of the present utility model and principle, any amendment of making, equivalent replacement, improvement etc., should be included within protection domain of the present utility model.
Claims (5)
1. a ground-connecting-wall flexible barrier body structure, it is characterized in that: the seaming position place between adjacent two width ground-connecting-walls surrounds composite earth impervious body, wall direct construction in composite earth impervious body after composite earth impervious body is initially formed of leading of ground-connecting-wall seaming position is offered.
2. a kind of ground-connecting-wall flexible barrier body structure according to claim 1, it is characterised in that: described composite earth impervious body is mutually twisted for several composite earth stakes and is formed by stacking.
3. a kind of ground-connecting-wall flexible barrier body structure according to claim 2, it is characterised in that: the intensity of described composite earth stake is not less than original soil body.
4. a kind of ground-connecting-wall flexible barrier body structure according to claim 1, it is characterised in that: described composite earth impervious body is that several composite earth stakes are constituted, and is engaged 100-200mm between adjacent two composite earth stakes.
5. a kind of ground-connecting-wall flexible barrier body structure according to any one in claim 2~4, it is characterized in that: the arrangement mode of the composite earth stake forming each composite earth impervious body is, along ground-connecting-wall wall thickness direction, at least two row's composite earth stake outside ground-connecting-wall wall, ground-connecting-wall is at least one row's composite earth stake within the walls;Described composite earth impervious body is along the deep direction of ground-connecting-wall wall, with scope no less than 7m beneath down to hole at the bottom of self-conductance wall;Described composite earth impervious body is along ground-connecting-wall axis direction, at seam both sides more than the extension 1m of ground-connecting-wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521144213.8U CN205369321U (en) | 2015-12-31 | 2015-12-31 | Ground is flexible prevention of seepage body structure of wall even |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521144213.8U CN205369321U (en) | 2015-12-31 | 2015-12-31 | Ground is flexible prevention of seepage body structure of wall even |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205369321U true CN205369321U (en) | 2016-07-06 |
Family
ID=56274915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521144213.8U Active CN205369321U (en) | 2015-12-31 | 2015-12-31 | Ground is flexible prevention of seepage body structure of wall even |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205369321U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507349A (en) * | 2015-12-31 | 2016-04-20 | 天然善德(天津)科技发展有限公司 | Ground connecting wall flexible impervious body construction method and structure thereof |
-
2015
- 2015-12-31 CN CN201521144213.8U patent/CN205369321U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507349A (en) * | 2015-12-31 | 2016-04-20 | 天然善德(天津)科技发展有限公司 | Ground connecting wall flexible impervious body construction method and structure thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109750660A (en) | Diaphram wall and its construction method with anti-seepage connector | |
CN103343538B (en) | Supporting and construction method of steel sheet pile under soft foundation of high flow plastic deep layer | |
CN103981879A (en) | Cofferdam structure and construction method thereof | |
CN101597904B (en) | Waterproof sheet pile cofferdam and construction method thereof | |
CN102852121B (en) | Artificial composite foundation for building clay core rock-fill dam on deep overburden and construction method for artificial composite foundation | |
CN106088102A (en) | Lattice type combined steel sheet pile cement soil composite pile and construction method thereof | |
CN108699798A (en) | Soil conservation dykes and dams system | |
CN102134853A (en) | CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof | |
CN103114609A (en) | Connection device of new and old underground diaphragm walls and construction method | |
CN109594575A (en) | A kind of open caisson periphery grouting and reinforcing soil body construction method | |
CN106759265A (en) | A kind of diaphram wall of fill concrete, its steel design and its construction method | |
CN205369321U (en) | Ground is flexible prevention of seepage body structure of wall even | |
CN105862875A (en) | Support structure and construction method thereof | |
CN110453675A (en) | One kind is folded to pour formula diaphram wall and its construction method | |
CN105113513B (en) | Anti-seepage foundation pit supporting structure and construction method | |
CN110359471B (en) | Anti-seepage damage structure of strong water-permeable sandy soil layer of underwater tunnel and construction method | |
KR101649448B1 (en) | An assembly for retaining sheet pile wall | |
CN204252148U (en) | High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure | |
CN105804090A (en) | Indoor piling wall support structure and construction method therefor | |
CN105507349A (en) | Ground connecting wall flexible impervious body construction method and structure thereof | |
CN107989025A (en) | The construction method of diaphram wall connection structure and diaphram wall | |
CN104790380B (en) | Underground diaphragm wall framework | |
CN203891042U (en) | Cofferdam structure | |
CN104912057B (en) | Construction method of underground continuous wall | |
CN104790430B (en) | Construction method of underground continuous wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210507 Address after: 300308 Tianjin Binhai New Area pilot free trade zone (Airport Economic Zone) room 212, No.1 Second Street, airport international logistics zone (No.392 entrusted by xinronghui (Tianjin) business secretary Co., Ltd.) Patentee after: Easy daily necessities (Tianjin) Co.,Ltd. Address before: 3-b-04, 3-b-05, hatching building 3, 188 Rixin Road, Binhai science and Technology Park, Binhai New Area, Tianjin 300450 Patentee before: NATURAL SHANDE (TIANJIN) TECHNOLOGY DEVELOPMENT Co.,Ltd. |