CN205369050U - Vertical water -drain mast of bridge of can walking installation platform truck - Google Patents
Vertical water -drain mast of bridge of can walking installation platform truck Download PDFInfo
- Publication number
- CN205369050U CN205369050U CN201620115999.9U CN201620115999U CN205369050U CN 205369050 U CN205369050 U CN 205369050U CN 201620115999 U CN201620115999 U CN 201620115999U CN 205369050 U CN205369050 U CN 205369050U
- Authority
- CN
- China
- Prior art keywords
- main body
- body frame
- operating system
- bridge
- tapping pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title abstract description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title abstract 4
- 238000010079 rubber tapping Methods 0.000 claims description 38
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 239000002965 rope Substances 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 12
- 241000893018 Armeria Species 0.000 abstract 1
- 230000000576 supplementary Effects 0.000 abstract 1
- 239000000203 mixture Substances 0.000 description 7
- 230000000875 corresponding Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 210000002356 Skeleton Anatomy 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Abstract
The utility model provides a vertical water -drain mast of bridge of can walking installation platform truck, by a plurality of partial constitutions, the installation platform truck includes: traveling system, main body frame, the system of lifting by crane, operating system and weighting system, main body frame installs on traveling system, the system of lifting by crane, operating system and weighting system install on main body frame, and system of lifting by crane and weighting system are located one side of main body frame, and operating system is located main body frame's opposite side, operating system comprises staircase and operation platform, and operation platform can pack up and put down, and when installation bridge outside water -drain mast and inboard water -drain mast, operating system is " L " type and " mountain " style of calligraphy respectively. The utility model has the advantages of when the operation, the artificial use that significantly reduces, and only need practice thrift mechanical input cost beginning to use twice supplementary construction of crane after construction and construction finish, shorten construction period for constructor's safety through the use of safety belt, has been guaranteed to the construction progress.
Description
Technical field
This utility model relates to a kind of bridge longitudinal direction tapping pipe and installs chassis, installs chassis more particularly, to one bridge longitudinal direction tapping pipe of can walking.
Background technology
In bridge construction process, the safety of bridge when must install longitudinal tapping pipe to ensure to rain, tapping pipe is lifted into tapping pipe installation site for using crane by traditional installation method, manually install, wasting time and energy, installation cost is high, and bridge mostly is elevated structure, personal safety ensures low, and this utility model is in that to provide one can walk bridge longitudinal direction tapping pipe installation chassis to solve the problems referred to above.
Utility model content
Based on the above-mentioned problems in the prior art, the purpose of this utility model be in that provide one can walk bridge longitudinal direction tapping pipe install chassis.
The purpose of this utility model realizes mainly through following technical scheme.
One can walk bridge longitudinal direction tapping pipe install chassis, comprising: running gear, main body frame, tackling system, operating system and Weighting system, described main body frame is arranged in running gear, described tackling system, operating system and Weighting system are arranged on main body frame, tackling system and Weighting system are positioned at the side of main body frame, operating system is positioned at the opposite side of main body frame, described operating system is by staircase and what operating platform formed, operating platform can be packed up and put down, when operating system is used for installing tapping pipe outside bridge, for " L " type, when operating system is used for installing tapping pipe inside bridge, for " mountain " font.
Before starting working, truck crane first can walk bridge longitudinal direction tapping pipe install chassis hoisted in position, before using, need to carry out counterweight and lifting weight prestrain test, it is ensured that the safety in use procedure.Load test completes and without after potential safety hazard, come into operation, in use, tapping pipe corresponding installation position bottom bridge is deposited, will be stored in the tapping pipe bottom bridge by tackling system and winch to corresponding installation site, personnel enter operating system, and seat belt is tied up on the operating platform of operating system, then carried out assembly by workmen and weld the fixing skeleton of tapping pipe, after completing this section of tapping pipe installation, operator return bridge floor, bridge longitudinal direction tapping pipe of can walking is installed chassis and is moved to next installation paragraph, construction is continued by above-mentioned same step cycle.
Preferably, described running gear is the platform floor of agricultural carriage.
Preferably, described main body frame is formed by equal leg angle, channel-section steel and steel-pipe welding.
It is further preferred that described main body frame is rectangular.
Preferably, described tackling system is made up of the motor hoist being fixed on Weighting system limit, a steel wire rope and the fixed pulley that is arranged on main body frame, lifts by crane for tapping pipe.
Preferably, described Weighting system be lengthen bottom main body frame form one can the platform of preloading.
Compared with prior art, a kind of bridge longitudinal direction tapping pipe of walking of the present utility model installs having the beneficial effects that of chassis:
Structure composition and the working method of chassis are installed by described a kind of bridge longitudinal direction tapping pipe of walking, can when operation, greatly reduce artificial use, and have only to after starting construction and construction to use twice crane auxiliary construction, save mechanical input cost, shorten the construction period, accelerating construction progress, by the use of seat belt, it is ensured that the safety of workmen.
Accompanying drawing explanation
Fig. 1 is that the walked bridge longitudinal direction tapping pipe erecting bed car according to this utility model preferred embodiment composition is for installing structural representation during tapping pipe outside bridge.
Fig. 2 is that the walked bridge longitudinal direction tapping pipe erecting bed car according to this utility model preferred embodiment composition is for installing structural representation during tapping pipe inside bridge.
In figure:
1-running gear;2-main body frame;3-tackling system;4-operating system;5-Weighting system.
Detailed description of the invention
Hereinafter, with reference to accompanying drawing, specific embodiment of the utility model being described in detail, according to the description that these are detailed, one of ordinary skill in the art are it can be clearly understood that this utility model, and can implement this utility model.When without prejudice to this utility model principle, the feature in each different embodiment can be combined obtaining new embodiment, or substitutes some feature in some embodiment, it is thus achieved that other preferably implements embodiment.
Embodiment 1: Fig. 1 illustrates that a kind of bridge longitudinal direction tapping pipe erecting bed car of walking according to this utility model preferred embodiment composition is for installing structural representation during tapping pipe outside bridge.As it is shown in figure 1, a kind of bridge longitudinal direction tapping pipe erecting bed car of walking is for installing structural representation during tapping pipe outside bridge, it is made up of multiple parts.Described installation car includes: running gear 1, main body frame 2, tackling system 3, operating system 4, Weighting system 5.nullDescribed running gear 1 is the platform floor of agricultural carriage,Described main body frame 2 is arranged in running gear 1,And by 10# equal leg angle、The steel-pipe welding of 5# channel-section steel and diameter 40mm forms,Rectangular,Long 2.9 meters,Wide 1.5 meters,High 0.7 meter,Described tackling system 3、Operating system 4 and Weighting system 5 are arranged on main body frame 2,Tackling system 3 and Weighting system 5 are positioned at the side of main body frame 2,Operating system 4 is positioned at the opposite side of main body frame 2,Described tackling system 3 is by a motor hoist that hoisting weight is 500-1000Kg being fixed on Weighting system 5 limit、Steel wire rope and the fixed pulley composition being arranged on main body frame 2,Described operating system 4 is made up of a staircase and an operating platform,L-shaped structure,And operating platform can pack up,Described Weighting system 5 be lengthen bottom main body frame 2 0.5m form one can the platform of preloading.
Embodiment 2: Fig. 2 illustrates that a kind of bridge longitudinal direction tapping pipe erecting bed car of walking according to this utility model preferred embodiment composition is for installing structural representation during tapping pipe inside bridge.As in figure 2 it is shown, a kind of bridge longitudinal direction tapping pipe erecting bed car of walking is for installing structural representation during tapping pipe inside bridge, it is made up of multiple parts.Described installation car includes: running gear 1, main body frame 2, tackling system 3, operating system 4, Weighting system 5.nullDescribed running gear 1 is the platform floor of agricultural carriage,Described main body frame 2 is arranged in running gear 1,And by 10# equal leg angle、The steel-pipe welding of 5# channel-section steel and diameter 40mm forms,Rectangular,Long 2.9 meters,Wide 1.5 meters,High 0.7 meter,Described tackling system 3、Operating system 4 and Weighting system 5 are arranged on main body frame 2,Tackling system 3 and Weighting system 5 are positioned at the side of main body frame 2,Operating system 4 is positioned at the opposite side of main body frame 2,Described tackling system 3 is by a motor hoist that hoisting weight is 500-1000Kg being fixed on Weighting system 5 limit、Steel wire rope and the fixed pulley composition being arranged on main body frame 2,Described operating system 4 is made up of a staircase and two operating platforms,In " mountain " font structure,And operating platform can pack up,Described Weighting system 5 be lengthen bottom main body frame 2 0.5m form one can the platform of preloading.
Although this utility model being described above by referring to specific embodiment, but one of ordinary skill in the art should be appreciated that in principle disclosed in this utility model with in scope, it is possible to disclosed in this utility model, configuration and details make many amendments.Protection domain of the present utility model is determined by appended claim, and whole amendments that the claim equivalent literal meaning that is intended in claim technical characteristic or scope comprise.
Claims (5)
1. a bridge longitudinal direction tapping pipe of can walking installs chassis, it is made up of multiple parts, described bridge longitudinal direction tapping pipe of walking is installed chassis and is included: running gear (1), main body frame (2), tackling system (3), operating system (4) and Weighting system (5), it is characterized in that, described main body frame (2) is arranged in running gear (1), described tackling system (3), operating system (4) and Weighting system (5) are arranged on main body frame (2), tackling system (3) and Weighting system (5) are positioned at the side of main body frame (2), operating system (4) is positioned at the opposite side of main body frame (2), described operating system (4) is by staircase and what operating platform formed, operating platform can be packed up and put down, operating system (4) has " L " type and two kinds of models of " mountain " font.
2. bridge longitudinal direction tapping pipe of can walking as claimed in claim 1 installs chassis, it is characterised in that the platform floor that running gear (1) is agricultural carriage.
3. bridge longitudinal direction tapping pipe of can walking as claimed in claim 1 installs chassis, it is characterised in that main body frame (2) is formed by equal leg angle, channel-section steel and steel-pipe welding, and rectangular.
4. bridge longitudinal direction tapping pipe of can walking as claimed in claim 1 installs chassis, it is characterized in that, tackling system (3) is made up of the motor hoist being fixed on Weighting system (5) limit, a steel wire rope and the fixed pulley that is arranged on main body frame (2).
5. bridge longitudinal direction tapping pipe of can walking as claimed in claim 1 installs chassis, it is characterised in that Weighting system (5) be lengthen in main body frame (2) bottom form one can the platform of preloading.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620115999.9U CN205369050U (en) | 2016-02-05 | 2016-02-05 | Vertical water -drain mast of bridge of can walking installation platform truck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620115999.9U CN205369050U (en) | 2016-02-05 | 2016-02-05 | Vertical water -drain mast of bridge of can walking installation platform truck |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205369050U true CN205369050U (en) | 2016-07-06 |
Family
ID=56263186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620115999.9U Expired - Fee Related CN205369050U (en) | 2016-02-05 | 2016-02-05 | Vertical water -drain mast of bridge of can walking installation platform truck |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205369050U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886250A (en) * | 2019-12-25 | 2020-03-17 | 南京林业大学 | Lifting device for dismantling concrete bridge anti-collision guardrail and construction method thereof |
-
2016
- 2016-02-05 CN CN201620115999.9U patent/CN205369050U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886250A (en) * | 2019-12-25 | 2020-03-17 | 南京林业大学 | Lifting device for dismantling concrete bridge anti-collision guardrail and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493352B (en) | Method for bridge-spanning construction by using tyre carrier | |
CN103277582A (en) | Method for mounting inclined shaft internal pressure steel tube | |
CN102251483B (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN104192735B (en) | A kind of minor crane | |
CN107762159A (en) | Large-span steel truss high-altitude sliding in place method | |
CN103670435A (en) | Existing line railway tunnel defect comprehensive improvement operation trolley | |
CN106544959B (en) | The construction method of king-tower lifting segment and bridge main tower saddle containing saddle | |
CN205369050U (en) | Vertical water -drain mast of bridge of can walking installation platform truck | |
CN103899093A (en) | Step-by-step hoisting construction method of mega-frame steel truss beam | |
CN102877638A (en) | Operating platform and operating method for constructing suspension steel structure system | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN104973517A (en) | Electric gantry platform for installing sintering machine head equipment and application method thereof | |
CN202465099U (en) | Single-girder partial hanging gantry crane | |
CN203794505U (en) | Internal climbing steel beam conveying device of internal climbing movable arm tower crane | |
CN106968371B (en) | A kind of construction method of the high wing articulated structure drifted by wind of curtain wall construction | |
CN202729645U (en) | Tower crane with elevator | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN105040592B (en) | A kind of horizontal drawing cable bridge and its erection method | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN107804785A (en) | A kind of generator unit stator lifting steering and its method | |
CN207047703U (en) | A kind of beam piece prestressed stretch-draw jack easy device in place | |
CN103669867B (en) | Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method | |
CN207312994U (en) | Power station major diameter surge shaft steel lining cantilevered annular track boom hoisting | |
CN206092015U (en) | Lining cutting formworking jumbo | |
CN202787930U (en) | Hanging basket for high-place operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160706 Termination date: 20210205 |