CN107804785A - A kind of generator unit stator lifting steering and its method - Google Patents

A kind of generator unit stator lifting steering and its method Download PDF

Info

Publication number
CN107804785A
CN107804785A CN201711214103.8A CN201711214103A CN107804785A CN 107804785 A CN107804785 A CN 107804785A CN 201711214103 A CN201711214103 A CN 201711214103A CN 107804785 A CN107804785 A CN 107804785A
Authority
CN
China
Prior art keywords
generator unit
unit stator
steel wire
bridge
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711214103.8A
Other languages
Chinese (zh)
Inventor
尹伟金
李红林
罗国根
闵子浔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI THERMAL POWER CONSTRUCTION CORP
Original Assignee
JIANGXI THERMAL POWER CONSTRUCTION CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI THERMAL POWER CONSTRUCTION CORP filed Critical JIANGXI THERMAL POWER CONSTRUCTION CORP
Priority to CN201711214103.8A priority Critical patent/CN107804785A/en
Publication of CN107804785A publication Critical patent/CN107804785A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The present invention discloses a kind of generator unit stator lifting steering and its method, the generator unit stator lifting steering includes the bridge-type double beam crane (A) of 2 flexible connections, 1 special homemade to lift shoulder pole girder (B), fixed pulley assembly, movable pulley component, steel wire rope component and 1 set of lifting steering assistance device, the fixed pulley assembly is included in original fixed pulley (A1) by the main hoisting mechanism of every bridge-type double beam crane and in each increased 2 additional fixed pulley (A2) in its both sides, the movable pulley component includes original movable pulley and the other each increased 2 additional movable pulleys (A5) of the main hook (A4) of connection below every bridge-type double beam monkey (A3);The steel wire rope component includes the main hoisting mechanism steel wire rope passed around again and the hoisting wirerope newly established, by original, " five or five walk ten " repacks " seventy-seven walk 14 " multiplying power into the multiplying power of the main hoisting mechanism steel wire rope, reduces the pulling force that main hoisting mechanism goes out head end.

Description

A kind of generator unit stator lifting steering and its method
Technical field
The invention belongs to power construction industry large scale equipment to lift field, is related to a kind of generator unit stator lifting steering And its method.
Background technology
In power construction engineering, generator unit stator is one of engineering large scale equipment, and the work work of its hoisting engineering is strong Degree is high, and installation, the workload removed are big, more and more stronger to the dependence of professional tool.
Generator unit stator, which generally requires, to be longitudinally arranged on steam turbine building operating layer platform, and generator unit stator is typically by transporting Then generator unit stator is unloaded, is rotated by 90 °, lifted in place to access path by wooden handcart axial transport using specific purpose tool.Generate electricity Machine stator, which is lifted and turned to, traditionally typically two methods, and one kind is hung using Lao Xinge or Double-bridge type double girder crane Dress, on ground, access path is rotated by 90 °, and then installation is in place, but Lao Xinge lifting input costs are larger, prepare the duration compared with It is long, and lift and 250t steering suspension hooks are must be equipped with below shoulder pole, the height and hoisting wirerope plus other special hangers Length, the headroom size of lifting altitude reduce, and ordinary circumstance is difficult to meet lifting and steering demand.Secondly, conventional bridge-type double beam The hanging device that crane hanging component method is attached on bridge-type double beam crane is more, and weight is larger, two bridge-type double beams of computer room Crane can not meet that lifting requires.Another method is that ground turns to, and generator unit stator is unloaded to ground first, then adopted Coordinate hydraulic pressure thruster to be rotated by 90 ° generator unit stator with rotating disk or rail, but this method waste time and energy and limitation very Greatly, it is necessary to the instrument of specialty and troop.
Therefore, how with reference to rational safe efficient, convenient, the reliable Hoisting Program of field condition formulation, ensureing to pacify On the premise of complete, the weight of additional load is effectively reduced, stator hoisting is solved and turns to problem, simplify process, so as to shorten the time, To whole duration important in inhibiting.
The content of the invention
Goal of the invention:In view of the above-mentioned problems existing in the prior art, there is provided a kind of generator unit stator lifting steering and Its method, hoisting high-efficiency, safety and steady, process is simple, and auxiliary equipment weight is small, without using traditional steering suspension hook, utilizes Field condition, equipment are with regard to that can complete stator hoisting and turn to task.
Technical scheme:A kind of generator unit stator lifts steering, including the bridge-type double beam crane of 2 flexible connections, 1 Root it is special it is homemade lift shoulder pole girder, fixed pulley assembly, movable pulley component, steel wire rope component and 1 set lifting steering assistance device, The fixed pulley assembly be included in every bridge-type double beam crane the other original fixed pulley of main hoisting mechanism (main winch) and In each increased 2 additional fixed pulleys in its both sides, the movable pulley component includes original movable pulley and risen in every bridge-type double beam Each increased 2 additional movable pulleys by the main hook of connection below heavy-duty machine dolly;The steel wire rope component includes the master passed around again Hoisting mechanism steel wire rope and the hoisting wirerope newly established, by original, " five or five walk ten " changes the multiplying power of the main hoisting mechanism steel wire rope " seventy-seven walk 14 " multiplying power is dressed up, reduces the pulling force that main hoisting mechanism goes out head end;The hoisting wirerope includes:2 φ 52mm × 21m jack lines, shoulder pole girder and generator unit stator are lifted for bundling;2 φ 52mm × 12m steel wire ropes, for bundling Main hook is with lifting shoulder pole girder;4 φ 26mm × 7m steel wire ropes, for hanging additional movable pulley;4 φ 26mm × 6m steel wire ropes, For hanging additional fixed pulley.
The symmetrical use φ 52mm × 12m steel wire ropes in shoulder pole girder both ends that lift are together with the main hook colligation, together When main hook by 2 additional movable pulleys setting up by 4 φ 26mm × 7m steel wire ropes and shackle binding hang on it is described lift it is flat On spreader beam;Generator unit stator is symmetrical to hang on described lift below shoulder pole girder with 2 φ 52mm × 21m jack lines bindings.
The specification of the two-beam bridge bridge-type double beam crane crane is 75/20t, and reinforcement type, girder, which is reinforced, carries energy Power reaches 100t;
The design load for lifting shoulder pole girder reaches 250t;
The additional movable pulley and additional fixed pulley are 20t simple gate snatch blocks;
If a set of lifting steering assistance device includes 4 5t chain blocks, 4 100t hydraulic jack, dry type Number wire line shoe, some 35t shackles, some φ 30mm round steel, the spirit level that are Y-50, the chain block determines in generator Protecting against shock is used when son turns to, and the round steel is used for rolling generator stator, and the wire line shoe is used to press from both sides steel wire rope, the shackle For being used cooperatively with steel wire rope brachycephaly, the spirit level is used to measure bridge-type double beam crane amount of deflection.
The invention also discloses a kind of generator unit stator to lift forward method, and its flow is as follows:Bridge-type double beam crane is determined Position → installation adds fixed pulley → installation and adds movable pulley → pass around main hoisting mechanism steel wire rope → bridge-type double beam crane A again And car → installation lifting lifts shoulder pole girder B → adjustment dolly A3 is positioned → and determines generator unit stator E drop off location → generator Stator E unloads → by the way of two dolly A3 move toward one anothers, drive generator unit stator E once to turn to 45 ° → adjustment dolly Move toward one another, bis- 45 ° of steerings of generator unit stator E → adjustment dolly A3 → dolly A3 are formally lifted by crane A3 → two dolly A3 again Inspections → rise to operating layer → generator unit stator E translations → generator unit stator E just is hung in examination before positioning → life hook inspection → lifting Position → rigging out → bridge-type double beam crane A systems are recovered.
Beneficial effects of the present invention:The present invention passes through each increase by 2 by 2 75t bridge-type double beam crane hoisting mechanisms 20t fixed pulleys, each 2 20t movable pulleys of increase by main hook, passing around steel wire rope again, " five or five, which walk ten ", repacks that " seventy-seven walk into by former 14 " multiplying power, 200t generator unit stators are lifted, preparation is easy, quick, hoisting high-efficiency, safety and steady;Without using tradition Steering suspension hook, reduce load weight, dolly do move toward one another i.e. can be achieved generator unit stator be rotated by 90 °, solution determinant steering Problem;After separate unit bridge-type double beam crane is transformed, its cart (referring to girder and its driving running gear), dolly (are located in Walking, raising and drive mechanism assembly on cart), main hook (referring to the hook below dolly), auxiliary hook is (below the dolly referred to Small hook) can also freely work, do not limited by the preparatory stage, do not have above bridge-type double beam crane optional equipment and weight, The headroom size of stator hoisting lifting altitude is added, expands application;, operation rate of machinery is effectively increased, is reduced Because of the long-term influence for taking bridge-type double beam crane to other operations;It is simple to lift preparatory process, auxiliary equipment weight reduces, bridge Formula double girder crane itself disclosure satisfy that peace tears work requirements open, without any mechanical engagement, save mechanical one-shift expense and reduction The labor intensity of early stage;Gather materials on the spot, make full use of field condition, equipment to complete the lifting of generator unit stator and turn to appoint Business, reduce the usage amount to special Work tool, reduce engineering cost.
Brief description of the drawings
Fig. 1 is that bridge-type double beam crane of the present invention installs extra pulley additional and passes around construction of wire rope schematic diagram again;
Fig. 2 is two bridge-type double beam Crane Combine structural representations of the invention;
Fig. 3 lifts shoulder pole girder construction scheme of installation for present invention lifting;
Fig. 4 is that generator unit stator of the present invention center in place and dolly position schematic diagram;
Fig. 5 is generator unit stator drop off location schematic top plan view of the present invention;
Fig. 6 is that generator unit stator of the present invention once turns to the position schematic top plan view after 45 °;
Fig. 7 is the secondary position schematic top plan view turned to after 45 ° of generator unit stator of the present invention;
Fig. 8 is that formally raw hook hangs schematic diagram to bridge-type double beam crane of the present invention.
Embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, the present invention is carried out below in conjunction with the accompanying drawings detailed Thin description.
A kind of generator unit stator lifts steering, including the bridge-type double beam crane A of 2 flexible connections, 1 it is special from System lift shoulder pole girder B, fixed pulley assembly, movable pulley component, steel wire rope component and 1 set lift by crane steering assistance device, described fixed Pulley assembly is included in original fixed pulley A1 on main hoisting mechanism (main winch) side of every bridge-type double beam crane and at it Each increased 2 additional fixed pulley A2 in both sides, the movable pulley component include original movable pulley and in every bridge-type double beam liftings Each increased 2 additional movable pulley A5 by the main hook A4 of connection below machine dolly A3;The steel wire rope component includes passing around again Main hoisting mechanism steel wire rope and the hoisting wirerope newly established, " five or five walk by former for the multiplying power of the main hoisting mechanism steel wire rope Ten " repack " seventy-seven walk 14 " multiplying power into, reduce the pulling force that main hoisting mechanism goes out head end;The hoisting wirerope includes:2 Root φ 52mm × 21m jack line C1, shoulder pole girder B and generator unit stator E are lifted for bundling;2 φ 52mm × 12m steel wire ropes C2, for bundling main hook A4 and lifting shoulder pole girder B;4 φ 26mm × 7m steel wire rope C3, for hanging additional movable pulley A5;4 φ 26mm × 6m steel wire rope C4, for hanging additional fixed pulley A2.
It is described to lift the symmetrical use φ 52mm × 12m steel wire ropes C2 in shoulder pole girder B both ends with the main hook A4 colligations one Rise, while the 2 additional movable pulley A5 set up by main hook A4 are hung on by 4 φ 26mm × 7m steel wire ropes C3 and shackle binding It is described to lift on shoulder pole girder B;Generator unit stator E is symmetrical to hang on the lift with 2 φ 52mm × 21m jack lines C1 bindings Hang below shoulder pole girder B.
The specification of the two-beam bridge bridge-type double beam crane crane A is 75/20t, and reinforcement type, girder, which is reinforced, carries energy Power reaches 100t;
The design load for lifting shoulder pole girder B reaches 250t;
The additional fixed pulley A2 and additional movable pulley A5 is 20t simple gate snatch blocks;
If a set of lifting steering assistance device includes 4 5t chain blocks, 4 100t hydraulic jack, dry type Number wire line shoe, some 35t shackles, some φ 30mm round steel, the spirit level that are Y-50, the chain block determines in generator Protecting against shock is used when son turns to, and the round steel is used for rolling generator stator, and the wire line shoe is used to press from both sides steel wire rope, the shackle For being used cooperatively with steel wire rope brachycephaly, the spirit level is used to measure bridge-type double beam crane amount of deflection.
The invention also discloses a kind of generator unit stator to lift forward method, and its flow is as follows:Bridge-type double beam crane A determines Position → installation adds fixed pulley A2 → installation adds movable pulley A5 → and passes around main hoisting mechanism steel wire rope → bridge-type double beam again Heavy-duty machine A and car → installation lifting lifts shoulder pole girder B → determine generator unit stator E drop off location → adjustment dolly A3 positioning → hair Motor stator E unloads → by the way of two dolly A3 move toward one anothers, drive generator unit stator E once to turn to 45 ° → adjustment Positions of the φ 52mm × 21m jack lines C1 on shoulder pole girder B is lifted, dolly A3 → two dolly A3 move toward one anothers again are adjusted, Secondary turn to before 45 ° → adjustment dolly A3 → dolly A3 formally lifts by crane positioning → life hook inspection → lifting of generator unit stator tries to hang inspection Look into → rise rise to operating layer → generator unit stator E translations → generator unit stator E it is in place → rigging out, bridge-type double beam crane A System is recovered.
The embodiment of detailed process is as follows:
1st, bridge-type double beam crane positions:Barrier cleaning, cleaning are carried out to job site according to the requirement confided a technological secret After completion, bridge-type double beam crane is positioned temporarily, begins preparing for work.
The 2nd, additional fixed pulley A2, additional movable pulley A5 are installed, pass around steel wire rope again:Two bridge-type double beams are transformed respectively to rise The main hoisting system of heavy-duty machine, increase by two additional fixed pulley A2 and two additional movable pulley A5 respectively, and pass around steel wire rope again (shown in Fig. 1), making the multiplying power that passes around of bridge-type double beam crane main hook rope, " five or five, which walk ten " multiplying powers, is changed into that " seventy-seven walk ten from original Four " multiplying powers, the steel wire rope multiplying power of main winch is changed, to reduce the pulling force that hoist engine goes out head end.According to Fig. 1 institutes The mode shown carries out transformation and passed around.
3rd, bridge-type double beam Crane Combine:Buffer unit of two bridge-type double beam cranes with respect to binding site is removed, Bridge-type double girder crane is started, the main hook A4 center distance regulations by two bridge-type double beam cranes are 7900mm, by two bridge-types Double girder crane is flexibly connected, and (so-called flexible connection refers to be connected with chain block, only controls the distance pulled open, respectively voluntarily Walk, as long as the distance pulled open can within effective range;If be rigidly connected, such as with channel-section steel directly by two bridge-type double beams Crane connects, and the distance between such two bridge-type double beam cranes are definite values, if two bridge-type double beam cranes are different Step starts, and is one walking of a dragging it is difficult to walk, and is flexibly connected and avoids this drawback.), as shown in Figure 2.
4th, installation lifting lifts shoulder pole girder B:Shoulder pole girder B and bridge-type double beam will be lifted with 2 φ 52mmx12m steel wire ropes C2 The main hook A4 colligations of crane together, totally 14 bursts of stress (14 strands be mode that steel wire rope passes around assembly pulley);Generator unit stator E Hung on and lifted on shoulder pole girder B with 2 φ 52mmx21m jack lines C1 bindings, totally 14 bursts of stress;The 20t set up adds movable pulley A5 is hung on and lifted on shoulder pole girder B (as shown in Figure 3) with φ 26mmx7m steel wire ropes C3 and shackle binding.
5th, determine that generator determines E drop off location, the dolly A3 positioning of adjustment bridge-type double beam crane:With generator unit stator Line on the basis of E centers in place, determine dolly A3 positions;Secondly door (#23-#24 axles access path) the 0m ground subscript in computer room Generator unit stator E center of unloading is shown, it is determined that unload center when on the basis of generator unit stator E center in place, that is, generate electricity Machine stator E centre distances A arrange center line 13000mm, distance #23 axle 4750mm, be illustrated in figure 4 generator unit stator E it is in place in The heart and dolly A3 positioning schematic diagrames.
6th, generator unit stator E unloads:When generator unit stator E is transported to computer room by flat car, position is stopped on request, Now generator unit stator E transverse center overlaps with lifting shoulder pole girder B, by single φ 52mm × 21m jack lines C1 walk four across Shoulder pole girder B is lifted, every φ 52mm × 21m jack line C1 pocket hangs over generator unit stator E the same side (left side or right side) On two joint hinge E1, and ensure set-points of two φ 52mm × 21m jack lines C1 on shoulder pole girder B is lifted respectively with it is a certain Two joint hinge E1 of side are on same vertical line.After all preparations are ready, two bridge-type double beam crane A while raising, Stop when generator unit stator E, which rises, to be risen to and leave transport vehicle flat board 200mm completely, check whether hoisting system is normal, confirm nothing After by mistake, drive away flat car, and generator unit stator E is unloaded to ground and is laid flat.Fig. 5 show generator unit stator drop off location vertical view Schematic diagram.
7th, by the way of two dolly move toward one anothers, generator unit stator is driven once to turn to 45 °:First by 2 dollies A3 and generator unit stator E are adjusted on straight line, that is, it is vertical with generator unit stator E longitudinal centre lines to lift shoulder pole girder B, two Dolly A3 simultaneously raising, by generator unit stator bottom leave ground about 100mm or so stop raising, two dolly A3 respectively along Respective two-beam type crane A big beam orbit does move toward one another, and drive lifts shoulder pole girder B and slowly rotated, and is suspended on binding Lift the generator unit stator E below shoulder pole girder B freely to turn to, two dolly A3 are among moving process, two two-beam type liftings Machine A centre-to-centre spacing gradually finely tunes diminution, until 2 immediate end carriages of bridge-type double beam crane have been drawn close mutually, when 2 dollies Stop movement when A3 move toward one anothers can not walk, now generator unit stator E completes once to turn to 45 ° or so, generator unit stator E bottoms Portion is diagonally tensed using 2 5t cucurbits chains.Now 2 dolly A3 while loose hook, ground is dropped down onto by generator unit stator E.Fig. 6 is Generator unit stator E once turns to the position view after 45 °.
8th, positions of the φ 52mm × 21m jack lines C1 on shoulder pole girder B is lifted, adjustment dolly A3 are adjusted:Releasing lifts flat φ 52mm × 21m jack line C1 between spreader beam B and generator unit stator E, according to generator unit stator E both ends joint hinge E1 spacing, Positions of the φ 52mm × 21m jack lines C1 on shoulder pole girder B is lifted is adjusted, its binding position on generator unit stator E is by original Two dolly A3 are adjusted to suitable position by the homonymy joint hinge position adjustment come to same end joint hinge position, now every Dolly A3 just with before and after its original position on the contrary, and 2 dolly A3 not on the same line.5t cucurbit chains are released, are hung At other 2 of generator unit stator E bottoms it is diagonal on and tense, prevent what generator unit stator direct rotating band during lifting from coming to rush Hit.
9th, two dollies move toward one another again, generator unit stator is secondary to turn to 45 °:Two dolly A3 position and steel wire rope Gone through after adjustment, after everything is ready, two dolly A3 while raising, when generator unit stator E leaves ground about 100mm or so, stop raising, now slowly unclamp 2 5t cucurbit chains, make generator unit stator E continue to rotate, while 2 small The slow move toward one anothers of car A3, until 2 dolly A3 are on same straight line, stop raising, now generator unit stator E from 45 ° of rotations, finally by fine setting dolly A3 and bridge-type double beam crane A spacing, generator unit stator E are adjusted in place to 90 °. Generator unit stator E, which is turned to, to be completed.Fig. 7 is bis- position views turned to after 45 ° of generator unit stator E.
10th, inspection is hung in examination before dolly formally lifts by crane positioning, raw hook inspection, lifting:First to two bridge-type double beam crane A Crossbeam, additional movable pulley and additional movable pulley, cart, dolly, hoisting system, brakes, safety device, electrical system etc. Comprehensively checked;Secondly check finish confirm it is errorless after, to generator unit stator E give birth to hook, by single φ during raw hook 52mm × 21m jack lines C1 walks eight, and same root φ 52mm × 21m jack line C1 pockets hang two of same one end (adjusting end or electric end) On joint hinge E1, and ensure set-points of the φ 52mm × 21m jack lines C1 on shoulder pole girder B is lifted with joint hinge E1 in same vertical line On, after raw hook finishes, hook up at a slow speed, raising process pays attention to checking binding main hook A4 steel wire rope, is the steel for hanging extra pulley Cord, jack line etc. stressing conditions.Stop when generator unit stator E is hung into ground about 100mm, crawl is hooked up, bridge is done in off the hook The retardation test of formula double girder crane, after confirming that braking is good, check generator unit stator E levelness, it is necessary to which confirmation is hung Stator E is in horizontality after rising, and otherwise ensures that lifting shoulder pole girder B is in horizontal by the main hook A4 adjusted respectively under dolly State carries.As shown in Figure 8.
11st, rise and rise to operating layer:Confirm it is errorless after, two bridge-type double beam crane A slowly continue raising, raising simultaneously During keep two bridge-type double beam crane A lifting velocity consistent, and pay attention to observing and ensure generator unit stator E level State.Stop until generator unit stator E is risen when being raised above steam turbine building 12.6m operating layer barriers 500mm or so, treat stabilization Afterwards, two bridge-type double beam crane A run to directly over basis and stopped slowly to generator unit stator E basic direction running.
12nd, generator unit stator translation, generator unit stator are in place:After treating stabilization, fine motion adjustment generator unit stator E's is in place Position, generator unit stator E center line is set to be overlapped with center line in place.Two bridge-type double beam crane A of commander while loose hook, make Generator unit stator E falls on platen, and finally by adjusting, stator core is in place by end cap, is careful not to clashing and breaking generator unit stator E peaces Fill the pre-embedded bolt screw thread in region.
13rd, rigging out, bridge-type double beam crane system recover:After generator unit stator E is steady in place, jack line is removed, Shoulder pole girder B will be lifted to be placed on steam turbine 12.6m free time platforms, bridge-type double beam crane A is untied and lift shoulder pole girder B connection, Two bridge-type double beam crane A flexible connecting device, additional movable pulley A2 and additional movable pulley A5 are removed respectively, and recover two Platform bridge-type double beam crane A main hoisting mechanism steel wire rope.All Work tools for using of lifting are withdrawn, by bridge-type double beam lifting Machine A recovers the state to lifting, this end of job.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, in the spiritual and former of invention Any modification, equivalent substitution and improvements made within then etc., it should be included within the system architecture and method of the present invention.

Claims (5)

1. a kind of generator unit stator lifts steering, it is characterised in that includes the bridge-type double beam crane of 2 flexible connections (A), 1 it is special it is homemade lift shoulder pole girder (B), fixed pulley assembly, movable pulley component, steel wire rope component and 1 set lifting turn to Auxiliary equipment, the fixed pulley assembly are included in original fixed pulley (A1) by the main hoisting mechanism of every bridge-type double beam crane And in each increased 2 additional fixed pulleys (A2) in its both sides, the movable pulley component includes original movable pulley and in every bridge-type The other each increased 2 additional movable pulleys (A5) of the main hook (A4) of connection below double girder crane dolly (A3);The steel wire rope group Part includes the main hoisting mechanism steel wire rope passed around again and the hoisting wirerope newly established, times of the main hoisting mechanism steel wire rope By original, " five or five walk ten " repacks " seventy-seven walk 14 " multiplying power into rate, reduces the pulling force that main hoisting mechanism goes out head end;Described Hanging steel wire rope includes:2 φ 52mm × 21m jack lines (C1), shoulder pole girder (B) and generator unit stator (E) are lifted for bundling;2 Root φ 52mm × 12m steel wire ropes (C2), for bundling main hook (A4) and lifting shoulder pole girder (B);4 φ 26mm × 7m steel wire ropes (C3), for hanging additional movable pulley (A5);4 φ 26mm × 6m steel wire ropes (C4), for hanging additional fixed pulley (A2).
2. generator unit stator according to claim 1 lifts steering, it is characterised in that described to lift shoulder pole girder (B) Both ends are symmetrical to use φ 52mm × 12m steel wire ropes (C2) together with the main hook (A4) colligation, while increases by main hook (A4) If 2 additional movable pulleys (A5) hung on by 4 φ 26mm × 7m steel wire ropes (C3) and shackle binding and described lift shoulder pole On beam (B);Symmetrical hung on the binding of 2 φ 52mm × 21m jack lines (C1) of generator unit stator (E) described lifts shoulder pole Below beam (B).
3. generator unit stator according to claim 1 lifts steering, it is characterised in that the bridge-type double beam crane (A) specification is 75/20t, reinforcement type, and girder reinforces bearing capacity and reaches 100t;The design load for lifting shoulder pole girder (B) reaches 250t;The additional fixed pulley (A2) and additional movable pulley (A5) are 20t simple gate snatch blocks.
4. a kind of generator unit stator lifting steering according to claim 1, it is characterised in that a set of lifting turns Include 4 5t chain blocks, 4 100t hydraulic jack, some model Y-50 wire line shoe, some to auxiliary equipment 35t shackles, some φ 30mm round steel, spirit level, chain block protecting against shock when generator unit stator turns to are used, the circle Steel is used for rolling generator stator, and the wire line shoe is used to press from both sides steel wire rope, and the shackle is used to coordinate with steel wire rope brachycephaly and made With the spirit level is used to measure deflection of travelling crane.
5. the lifting forward method of steering is lifted according to any described a kind of generator unit stator in Claims 1-4, its It is characterised by, its flow is as follows:Double girder overhead crane (A) positioning → installation adds fixed pulley (A2) → installation and adds movable pulley (A5) → pass around main hoisting mechanism steel wire rope → double girder overhead crane (A) and car → installation lifting again and lift shoulder pole girder (B) → determine that drop off location → adjustment dolly (A3) positioning → generator unit stator (E) is unloaded → of generator unit stator (E) uses two The mode of dolly (A3) move toward one another, generator unit stator (E) is driven once to turn to 45 ° → adjustment φ 52mm × 21m jack lines C1 Position on shoulder pole girder B is lifted, adjust dolly (A3) → two dolly (A3) move toward one another again, generator unit stator (E) two Secondary turn to before 45 ° → adjustment dolly (A3) → dolly (A3) formally lifts by crane positioning → life hook inspection → lifting tries to hang inspection → raising To operating layer → generator unit stator (E) translation → generator unit stator (E) it is in place → rigging out, double girder overhead crane (A) system System recovers.
CN201711214103.8A 2017-11-28 2017-11-28 A kind of generator unit stator lifting steering and its method Withdrawn CN107804785A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711214103.8A CN107804785A (en) 2017-11-28 2017-11-28 A kind of generator unit stator lifting steering and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711214103.8A CN107804785A (en) 2017-11-28 2017-11-28 A kind of generator unit stator lifting steering and its method

Publications (1)

Publication Number Publication Date
CN107804785A true CN107804785A (en) 2018-03-16

Family

ID=61590741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711214103.8A Withdrawn CN107804785A (en) 2017-11-28 2017-11-28 A kind of generator unit stator lifting steering and its method

Country Status (1)

Country Link
CN (1) CN107804785A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111470423A (en) * 2020-04-22 2020-07-31 中国能源建设集团天津电力建设有限公司 Method for hoisting generator stator of thermal power generating unit
CN113233311A (en) * 2021-06-07 2021-08-10 浙江陀曼精密机械有限公司 Novel machine tool assembling and hoisting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111470423A (en) * 2020-04-22 2020-07-31 中国能源建设集团天津电力建设有限公司 Method for hoisting generator stator of thermal power generating unit
CN113233311A (en) * 2021-06-07 2021-08-10 浙江陀曼精密机械有限公司 Novel machine tool assembling and hoisting device

Similar Documents

Publication Publication Date Title
CN105421249B (en) Dragging- hoisting combined type hanging basket structure and construction method
CN104805773B (en) The Segmental assembling bridge-erecting machine of little curved bridge of constructing
CN203373014U (en) Static load loading apparatus of overhead and gantry crane
CN103523683B (en) Construction method for dismantling tower crane by use of small hoisting equipment
CN102747841A (en) Curtain wall assembly, turnover and hoisting equipment and construction method thereof
CN101624164B (en) Hoisting method of machine set generator stator and special mechanism thereof
CN103863938B (en) For carrying the safty hoisting device of wind tunnel experiment car
CN106988227A (en) A kind of suspension bridge steel truss girder rotary body device and construction method
CN207877135U (en) A kind of wheel-track type girder gantry crane
CN107804785A (en) A kind of generator unit stator lifting steering and its method
CN104477774A (en) Crane steel wire rope anti-swing system
CN105621280A (en) Device and method for mounting and dismounting crane boom
CN106976797A (en) Three suspension centres turn round suspender
CN106315426B (en) A kind of assembling flat-top tower crane for building is installed, jacking method
CN207738303U (en) A kind of generator unit stator lifting steering
CN103318774A (en) Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister
CN213387490U (en) Anti-swing device for crane lifting appliance
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN105484166A (en) Ladder-shaped mast type cantilever assembling crane
CN103086276A (en) Construction method for hoisting bridge type crane in high-rise well tower type building
CN105781108B (en) A kind of construction method for being used to close on large-scale steel-mould trolley entirety transition between place
CN205529915U (en) Ladder type masts type hangs pieces together loop wheel machine
CN107161879A (en) Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN101787687B (en) Offshore oil drilling platform sledge block and hoisting technology thereof
CN109378767A (en) A kind of lifting engineering method of hoist engine to skyscraper electricity well inner cable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180316

WW01 Invention patent application withdrawn after publication