CN205348461U - Empty core plate shear wall structure of assembled - Google Patents

Empty core plate shear wall structure of assembled Download PDF

Info

Publication number
CN205348461U
CN205348461U CN201620069322.6U CN201620069322U CN205348461U CN 205348461 U CN205348461 U CN 205348461U CN 201620069322 U CN201620069322 U CN 201620069322U CN 205348461 U CN205348461 U CN 205348461U
Authority
CN
China
Prior art keywords
hollow
wall panel
hollow wall
wall
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201620069322.6U
Other languages
Chinese (zh)
Inventor
肖正元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanneng Integrated Housing Co Ltd
Original Assignee
Sanxin Housing Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanxin Housing Manufacturing Co Ltd filed Critical Sanxin Housing Manufacturing Co Ltd
Priority to CN201620069322.6U priority Critical patent/CN205348461U/en
Application granted granted Critical
Publication of CN205348461U publication Critical patent/CN205348461U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种装配式空心板剪力墙结构。所述剪力墙结构包括至少4面装配式剪力墙;每面装配式剪力墙包括自下而上依次设置的多块空心墙板,上下相邻两块空心墙板的连接处形成水平拼缝,且在该拼缝处设有暗梁;每块空心墙板上竖向设有多个墙板预留抽孔,且在墙板预留抽孔内布置有竖向连接件;在相邻两面装配式剪力墙的连接处,相应的空心墙板的端部具有向外延伸的悬挑薄壁和预埋墙板连接件,且在连接处设有现浇节点连接件。本实用新型通用性强,成本相对较低,易于生产,且施工便捷。

The utility model discloses an assembled hollow plate shear wall structure. The shear wall structure includes at least 4 prefabricated shear walls; each prefabricated shear wall includes a plurality of hollow wall panels arranged in sequence from bottom to top, and the joints of two adjacent hollow wall panels form a horizontal Joints, and concealed beams are provided at the joints; each hollow wall panel is vertically provided with multiple wall panel reserved pumping holes, and vertical connectors are arranged in the wall panel reserved pumping holes; At the junction of two adjacent prefabricated shear walls, the end of the corresponding hollow wall panel has a cantilevered thin wall and a pre-embedded wall panel connector extending outward, and a cast-in-place node connector is provided at the junction. The utility model has strong versatility, relatively low cost, easy production and convenient construction.

Description

一种装配式空心板剪力墙结构A prefabricated hollow slab shear wall structure

技术领域 technical field

本实用新型涉及一种装配式空心板剪力墙结构,属于建筑工业化领域。 The utility model relates to an assembled hollow plate shear wall structure, which belongs to the field of building industrialization.

背景技术 Background technique

现有预制装配式剪力墙结构体系中,预制剪力墙均采用分层预制(按楼层高度)、现场拼装的形式施工。上下层预制剪力墙之间的竖向钢筋,采用灌浆套筒、波纹管浆锚、约束浆锚形式连接。此三种连接形式的剪力墙结构,墙板均为实心墙板,墙板重量较大,起吊难度大。 In the existing prefabricated shear wall structure system, the prefabricated shear walls are all constructed in the form of layered prefabrication (according to the floor height) and on-site assembly. The vertical steel bars between the upper and lower prefabricated shear walls are connected in the form of grouting sleeves, bellows grout anchors, and restraint grout anchors. In the shear wall structure of these three connection forms, the wall panels are all solid wall panels, and the wall panels are heavy and difficult to lift.

《装配式剪力墙结构设计规程》DB11/1003-2013(北京市地方标准)中规定,7度地区,房屋高度低于60m时可采用预制圆孔板剪力墙体系。该体系中,圆孔板剪力墙分层预制(按楼层高度),圆孔内布置墙板竖向连接钢筋,上下层钢筋搭接连接。圆孔板按一定的宽度模数拼接,墙板竖向拼缝较多,且施工时有大量外侧模板,现场施工不便利。 "Code for Design of Prefabricated Shear Wall Structure" DB11/1003-2013 (Beijing local standard) stipulates that in the 7th degree area, the prefabricated circular hole plate shear wall system can be used when the building height is less than 60m. In this system, the circular hole plate shear wall is prefabricated in layers (according to the floor height), and the vertical connection steel bars of the wall panels are arranged in the circular holes, and the upper and lower layers of steel bars are lapped and connected. The round hole panels are spliced according to a certain width modulus, and there are many vertical joints on the wall panels, and there are a large number of outer formworks during construction, which is inconvenient for on-site construction.

此外,在现有的空心墙板结构体系中,线管预埋需沿圆孔通道竖向布置,线管水平敷设时,需要现场开槽处理,施工效率低。 In addition, in the existing hollow wall panel structure system, the pre-embedded line pipes need to be arranged vertically along the circular hole passage, and when the line pipes are laid horizontally, on-site slotting is required, resulting in low construction efficiency.

实用新型内容 Utility model content

本实用新型旨在提供一种装配式空心板剪力墙结构,该装配式空心板剪力墙结构通用性强,成本相对较低,易于生产,且施工便捷。 The utility model aims to provide an assembled hollow slab shear wall structure, which has strong versatility, relatively low cost, easy production and convenient construction.

为了实现上述目的,本实用新型所采用的技术方案是: In order to achieve the above object, the technical solution adopted in the utility model is:

一种装配式空心板剪力墙结构,包括至少4面装配式剪力墙,至少4面装配式剪力墙依次连接而围成封闭式剪力墙结构;每面装配式剪力墙包括自下而上依次设置的多块空心墙板,上下相邻两块空心墙板的连接处形成水平拼缝,且在该拼缝处的墙体内设有横向布置的暗梁;每块空心墙板上竖向设有多个墙板预留抽孔,上下相邻两块空心墙板对应的墙板预留抽孔对接连通,且在对接连通的墙板预留抽孔内布置有竖向连接件;在相邻两面装配式剪力墙的连接处,相应的空心墙板的端部具有向外延伸的悬挑薄壁和预埋墙板连接件,且在连接处设有现浇节点连接件,水平相邻的两块空心墙板的预埋墙板连接件之间以及预埋墙板连接件与现浇节点连接件之间均固定相连。 A prefabricated hollow slab shear wall structure, comprising at least 4 prefabricated shear walls, at least 4 prefabricated shear walls connected in sequence to form a closed shear wall structure; each prefabricated shear wall includes A plurality of hollow wall panels arranged in sequence from bottom to top, a horizontal seam is formed at the junction of two adjacent hollow wall panels, and hidden beams arranged horizontally are arranged in the wall at the joint; each hollow wall There are a plurality of wallboard reserved pumping holes vertically on the board, the wallboard reserved pumping holes corresponding to two adjacent hollow wallboards are butt connected, and vertical holes are arranged in the butt connected wallboard reserved pumping holes. Connectors; at the junction of two adjacent prefabricated shear walls, the ends of the corresponding hollow wall panels have cantilevered thin walls and pre-embedded wall panel connectors extending outward, and there are cast-in-place nodes at the junction The connectors are fixedly connected between the pre-embedded wall panel connectors of two horizontally adjacent hollow wall panels and between the pre-embedded wall panel connectors and the cast-in-place node connectors.

由此,上下相邻两块空心墙板拼接,通过横向布置的暗梁加固,相邻两块空心墙板之间通过悬挑薄壁和预埋墙板连接件、现浇节点连接件固定后浇筑相连,结构可靠,同时,通过竖向布置的墙板预留抽孔浇筑,进一步增强了墙体的结构整体性,且施工方便易行。 As a result, two adjacent hollow wall panels are spliced together and reinforced by horizontally arranged hidden beams, and the two adjacent hollow wall panels are fixed by cantilevered thin walls, pre-embedded wall panel connectors, and cast-in-place node connectors. The pouring is connected and the structure is reliable. At the same time, the vertically arranged wall panels are reserved for pouring, which further enhances the structural integrity of the wall, and the construction is convenient and easy.

根据本实用新型的实施例,还可以对本实用新型作进一步的优化,以下为优化后形成的技术方案: According to the embodiments of the present invention, the present invention can also be further optimized, and the following is the technical scheme formed after optimization:

优选地,每面装配式剪力墙由3-6块空心墙板装配而成,且至少一面装配式剪力墙中部位置设有窗户安装区域。 Preferably, each prefabricated shear wall is assembled from 3-6 hollow wall panels, and at least one prefabricated shear wall is provided with a window installation area in the middle.

作为一种具体的结构形式,设有窗户安装区域的单面剪力墙包括位于最下层的一块空心墙板,位于最上层的一块空心墙板,以及设置在最下层的一块空心墙板与最上层的一块空心墙板之间的两块中间空心墙板;两块中间空心墙板、最下层的一块空心墙板、以及最上层的一块空心墙板之间围成所述窗户安装区域。 As a specific structural form, a single-sided shear wall with a window installation area includes a hollow wall panel at the bottom, a hollow wall panel at the top, and a hollow wall panel and the bottom The window installation area is surrounded by two middle hollow wall panels between one hollow wall panel on the upper floor; the two middle hollow wall panels, one hollow wall panel on the lowermost floor, and one hollow wall panel on the uppermost floor.

每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板的上端面形成水平设置的下凹槽,所述上层空心墙板的下端面形成水平设置的上凹槽;所述下凹槽的两个侧壁的顶端和上凹槽的两个侧壁的底端对接相连而形成水平拼缝。上凹槽开口朝下的,下凹槽开口朝上,优选地,所述下凹槽和上凹槽对接形成横向设置的贯通通道,该贯通通道内设有所述的暗梁。贯通通道的纵截面优选为方形。 Among the two upper and lower adjacent hollow wall panels of each prefabricated shear wall, the upper end surface of the lower hollow wall panel forms a horizontally arranged lower groove, and the lower end surface of the upper layer hollow wall panel forms a horizontally arranged upper groove; The top ends of the two side walls of the lower groove and the bottom ends of the two side walls of the upper groove are butted and connected to form a horizontal seam. The opening of the upper groove is downward, and the opening of the lower groove is upward. Preferably, the lower groove and the upper groove are butted to form a transversely arranged through channel, and the hidden beam is arranged in the through channel. The longitudinal section of the through channel is preferably square.

为了增加暗梁的结构强度,所述暗梁为横向设置的箍筋,所述预埋墙板连接件为箍筋或弯钩筋,所述现浇节点连接件为箍筋。进一步地,所述暗梁内设有梁纵筋;所述预埋墙板连接件和现浇节点连接件内均设有现浇节点纵筋。 In order to increase the structural strength of the concealed beam, the concealed beam is a horizontally arranged stirrup, the pre-embedded wall panel connector is a stirrup or hook tendon, and the cast-in-place node connector is a stirrup. Further, beam longitudinal reinforcements are provided in the concealed beams; cast-in-place node longitudinal reinforcements are provided in the pre-embedded wallboard connectors and cast-in-place node connectors.

所述暗梁内沿其长度方向设有预埋线管或/和水管的通道。优选地,每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板或上层空心墙板内预埋有与所述线管连通的线盒,所述下层空心墙板或上层空心墙板内侧壁上预设有给水点位。 Channels for pre-embedded wire pipes or/and water pipes are provided in the hidden beam along its length direction. Preferably, among the upper and lower adjacent hollow wall panels of each prefabricated shear wall, the lower hollow wall panel or the upper hollow wall panel is pre-embedded with a wire box communicating with the line pipe, and the lower hollow wall panel Or a water supply point is preset on the inner wall of the upper hollow wall panel.

优选地,所述墙板预留抽孔为方孔或圆孔。 Preferably, the pumping holes reserved for the wall panels are square holes or round holes.

与现有技术相比,本实用新型的有益效果是:本实用新型的剪力墙结构施工简单,通用性强,连接稳固,成本相对较低,易于生产,极大地加快了施工速度,提高了施工效率。 Compared with the prior art, the beneficial effects of the utility model are: the shear wall structure of the utility model is simple in construction, strong in versatility, stable in connection, relatively low in cost, easy to produce, greatly accelerated in construction speed, and improved construction efficiency.

以下结合附图和实施例对本实用新型作进一步阐述。 Below in conjunction with accompanying drawing and embodiment the utility model is described further.

附图说明 Description of drawings

图1是本实用新型的预制空心墙板体系拼装示意图; Fig. 1 is the assembling schematic diagram of the prefabricated hollow wall panel system of the present invention;

图2是本实用新型的预制墙板抽孔大样图; Fig. 2 is a large sample drawing of the prefabricated wall panel of the present invention;

图3是本实用新型预制墙板立面分隔图; Fig. 3 is the partition diagram of the facade of the prefabricated wall panel of the present invention;

图4是本实用新型薄壁现浇节点平面示意图; Fig. 4 is a schematic plan view of a thin-wall cast-in-place node of the present invention;

图5是本实用新型墙顶翻边示意图; Fig. 5 is a schematic diagram of a wall top flanging of the utility model;

图6是本实用新型带窗户安装区域的剪力墙示意图; Fig. 6 is a schematic diagram of a shear wall with a window installation area of the present invention;

图7是本实用新型水平连接缝中电线管敷设大样图; Fig. 7 is a large sample diagram of laying wire pipes in the horizontal connection seam of the utility model;

图8是本实用新型水平连接缝中水管敷设大样图; Fig. 8 is a large sample diagram of water pipe laying in the horizontal joint of the utility model;

图9是本实用新型水平连接缝处的局部放大图。 Fig. 9 is a partially enlarged view of the horizontal joint of the utility model.

具体实施方式 detailed description

一种装配式空心墙板剪力墙结构,如图1-3所示,包括4面装配式剪力墙,4面装配式剪力墙依次连接而围成封闭式剪力墙结构;每面装配式剪力墙包括自下而上依次设置的多块空心墙板,上下相邻两块空心墙板的连接处形成水平拼缝5,且在该拼缝5处的墙体内设有横向布置的暗梁3;每块空心墙板20上竖向设有多个墙板预留抽孔18,上下相邻两块空心墙板对应的墙板预留抽孔18对接连通,且在对接连通的墙板预留抽孔18内布置有竖向连接件26,上下的竖向连接件26依次串接固定相连;如图4和5所示,在相邻两面装配式剪力墙的连接处,即拐角处,相应的空心墙板20的端部具有向外延伸的悬挑薄壁21和预埋墙板连接件23,且在连接处设有现浇节点连接件22,水平相邻的两块空心墙板20的预埋墙板连接件23之间以及预埋墙板连接件23与现浇节点连接件22之间均固定相连;所述暗梁3为横向设置的箍筋,所述预埋墙板连接件23为箍筋或弯钩筋和现浇节点连接件22为箍筋。所述暗梁3内设有梁纵筋4;所述预埋墙板连接件23和现浇节点连接件22内均设有现浇节点纵筋24。如图7和8所示,所述暗梁3内沿其长度方向设有预埋线管16、线盒19或/水管17。 A prefabricated hollow wall panel shear wall structure, as shown in Figure 1-3, includes 4 prefabricated shear walls, and the 4 prefabricated shear walls are connected in turn to form a closed shear wall structure; each side The prefabricated shear wall includes a plurality of hollow wall panels arranged in sequence from bottom to top, and the joints of two adjacent hollow wall panels form a horizontal joint 5, and a horizontal joint is provided in the wall at the joint 5. Arranged hidden beam 3; each hollow wall panel 20 is vertically provided with a plurality of wall panel reserved pumping holes 18, and the wall panel reserved pumping holes 18 corresponding to two adjacent hollow wall panels are butted and connected, and when the butt joint Vertical connectors 26 are arranged in the reserved pumping holes 18 of the connected wall panels, and the upper and lower vertical connectors 26 are sequentially connected in series and fixedly connected; At the corner, the end of the corresponding hollow wall panel 20 has a cantilevered thin wall 21 and a pre-embedded wall panel connector 23 extending outward, and there is a cast-in-place node connector 22 at the connection, which is horizontally adjacent Between the pre-embedded wall panel connectors 23 of the two hollow wall panels 20 and between the pre-embedded wall panel connectors 23 and the cast-in-place node connectors 22 are fixedly connected; the hidden beam 3 is a horizontally arranged stirrup, The pre-embedded wallboard connectors 23 are stirrups or hook bars and the cast-in-place node connectors 22 are stirrups. The concealed beam 3 is provided with beam longitudinal ribs 4; the pre-embedded wall panel connector 23 and the cast-in-place node connector 22 are both provided with cast-in-place node longitudinal ribs 24 . As shown in FIGS. 7 and 8 , the hidden beam 3 is provided with a pre-embedded line pipe 16 , a wire box 19 or a water pipe 17 along its length direction.

优选地,每面装配式剪力墙由3-6块空心墙板装配而成,且至少一面装配式剪力墙中部位置设有窗户安装区域12。本实施例中,不带窗户的剪力墙自下而上由3块空心墙板13,14,15拼接而成,带窗户的剪力墙由4块空心墙板1,2,10,11拼接而成。如图1和图6所示,设有窗户安装区域12的单面剪力墙包括位于最下层的一块空心墙板1,位于最上层的一块空心墙板11,以及设置在最下层的一块空心墙板1与最上层的一块空心墙板11之间的两块中间空心墙板2,10;两块中间空心墙板2,10、最下层的一块空心墙板1、以及最上层的一块空心墙板11之间围成所述窗户安装区域12。 Preferably, each prefabricated shear wall is assembled from 3-6 hollow wall panels, and at least one prefabricated shear wall is provided with a window installation area 12 in the middle. In this embodiment, the shear wall without windows is spliced from bottom to top by 3 hollow wall panels 13, 14, 15, and the shear wall with windows is composed of 4 hollow wall panels 1, 2, 10, 11 stitched together. As shown in Figures 1 and 6, a single-sided shear wall with a window installation area 12 includes a hollow wall panel 1 at the bottom, a hollow wall panel 11 at the top, and a hollow wall panel at the bottom. Two middle hollow wall panels 2,10 between the wall panel 1 and the uppermost hollow wall panel 11; two middle hollow wall panels 2,10, one lowermost hollow wall panel 1, and one uppermost hollow wall panel The window installation area 12 is enclosed between the wall panels 11 .

如图9所示,每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板的上端面形成水平设置的下凹槽8,所述上层空心墙板的下端面形成水平设置的上凹槽9;所述下凹槽8的两个侧壁7的顶端和上凹槽9的两个侧壁6的底端对接相连而形成水平拼缝。所述下凹槽8和上凹槽9对接形成横向设置的贯通通道,该贯通通道内设有所述的暗梁3。 As shown in Figure 9, among the two adjacent hollow wall panels up and down of each prefabricated shear wall, the upper end surface of the lower hollow wall panel forms a lower groove 8 arranged horizontally, and the lower end surface of the upper hollow wall panel forms The upper groove 9 arranged horizontally; the top ends of the two side walls 7 of the lower groove 8 and the bottom ends of the two side walls 6 of the upper groove 9 are butted and connected to form a horizontal seam. The lower groove 8 and the upper groove 9 are butted to form a transversely arranged through channel, and the hidden beam 3 is arranged in the through channel.

每面装配式剪力墙的上下相邻两块空心墙板中,下层空心墙板1或上层空心墙板2内预埋有与所述线管16连通的线盒19,所述下层空心墙板1或上层空心墙板2内侧壁上预设有给水点位25。所述墙板预留抽孔18为方孔或圆孔。 Among the upper and lower adjacent hollow wall panels of each prefabricated shear wall, the lower hollow wall panel 1 or the upper hollow wall panel 2 is pre-embedded with a wire box 19 communicating with the line pipe 16, and the lower hollow wall panel A water supply point 25 is preset on the inner wall of the panel 1 or the upper hollow wall panel 2 . The pumping hole 18 reserved by the wallboard is a square hole or a round hole.

水电管线施工时,如图7所示,在同一构件内同一回路上的两个插座点位间,管线连接时的施工工序为:下层空心墙板安装完成→开孔→安装线盒→敷设管线(暗梁钢筋敷设后,在空心墙板拼缝中敷设线管)→线管线盒对接→上层空心墙板安装。其中h为线盒离地高度。如图8所示,给水管水平管可利用空心墙板的水平接缝敷设。具体施工工序为:下层空心墙板安装完成→敷设水管(暗梁钢筋敷设后,在空心墙板拼缝中敷设水管)→上层空心墙板安装。 During the construction of water and electricity pipelines, as shown in Figure 7, between two socket points on the same circuit in the same component, the construction process when connecting the pipelines is: the installation of the lower hollow wall panel is completed → opening → installation of the wire box → laying the pipeline (After laying the hidden beam reinforcement, lay the wire pipe in the joint of the hollow wall panel) → butt joint of the wire and conduit box → install the upper hollow wall panel. Where h is the height of the wire box from the ground. As shown in Figure 8, the horizontal pipes of the water supply pipes can be laid using the horizontal joints of the hollow wall panels. The specific construction process is: the installation of the lower hollow wall panels is completed → the laying of water pipes (after the hidden beam reinforcement is laid, the water pipes are laid in the joints of the hollow wall panels) → the installation of the upper hollow wall panels.

如图1所示,本实用新型采用了多种不同于传统结构体系的多种连接形式: As shown in Figure 1, the utility model adopts a variety of connection forms different from the traditional structural system:

首先,剪力墙预制部分采用抽空设计,抽空部分可为圆孔,也可为方孔。抽孔内布置剪力墙竖向连接钢筋,竖向钢筋采用绑扎形式搭接。剪力墙抽空后,可大大降低墙板重量,预制构件易于起吊,如图2。 First of all, the prefabricated part of the shear wall adopts an evacuated design, and the evacuated part can be a round hole or a square hole. The vertical connecting steel bars of the shear wall are arranged in the pumping holes, and the vertical steel bars are lapped in the form of binding. After the shear wall is evacuated, the weight of the wall panel can be greatly reduced, and the prefabricated components are easy to lift, as shown in Figure 2.

其次,预制剪力墙空心墙板在一个层高高度范围内设置两条水平分隔缝,墙板沿高度划分为三段,分别为窗台高度H1、窗高H2、窗顶梁高H3,如图3所示。墙板沿高度分隔后,沿墙板分缝位置做贯通的结构暗梁。暗梁可以保证墙板沿竖向的整体性,且能够解决墙板水平接缝漏水的问题。分隔后,墙板高度减小,质量减轻,便于工厂批量化生产。预制墙板的竖缝位置根据建筑的开间、进深尺寸确定,采用整间宽度,减少现场竖向拼缝数量。 Secondly, the hollow wall panels of the prefabricated shear walls are provided with two horizontal separation joints within the height range of a floor, and the wall panels are divided into three sections along the height, which are window sill height H1, window height H2, and window beam height H3, as shown in the figure 3. After the wall panels are separated along the height, a structural concealed beam is made through the joints of the wall panels. The concealed beam can ensure the vertical integrity of the wall panels and can solve the problem of water leakage at the horizontal joints of the wall panels. After separation, the height of the wall panel is reduced and the quality is reduced, which is convenient for mass production in the factory. The vertical joint position of the prefabricated wall panel is determined according to the bay and depth of the building, and the entire width is used to reduce the number of vertical joints on site.

预制剪力墙空心墙板与竖向现浇节点拼接处设置悬挑薄壁。节点混凝土浇筑,现场支模时,此薄壁结构可当外侧模板使用。简化现场支模工艺,加快现场施工进度,项目可达到整体无外架的效果。如图4、图5。 Overhanging thin walls are set at the joints of prefabricated shear wall hollow wall panels and vertical cast-in-place nodes. This thin-walled structure can be used as the outer formwork when the joint concrete is poured and the formwork is set up on site. Simplify the on-site formwork process, speed up the on-site construction progress, and the project can achieve the effect of no external frame as a whole. As shown in Figure 4 and Figure 5.

如图5所示,预制剪力墙空心墙板与楼面交接位置,沿外侧设置翻边,翻边高度同楼板厚度。此种结构设计方式,可以解决楼板浇筑时楼面外侧支模问题,简化现场支模工艺,加快现场施工进度。同时可以保证楼板浇筑后,墙体外观平整,提高现场浇筑的施工质量。 As shown in Figure 5, at the junction position between the prefabricated shear wall hollow wall panel and the floor, flanging is provided along the outer side, and the flanging height is the same as the thickness of the floor slab. This structural design method can solve the problem of formwork on the outside of the floor when the floor is poured, simplify the on-site formwork process, and speed up the on-site construction progress. At the same time, it can ensure that the appearance of the wall is smooth after the floor slab is poured, and the construction quality of on-site pouring can be improved.

利用上述的装配式空心板剪力墙结构的施工方法如下步骤: The construction method of the above-mentioned prefabricated hollow slab shear wall structure is as follows:

S1、布置竖向连接件形成所述装配式空心墙板结构的竖向连接筋; S1, arranging vertical connectors to form vertical connecting ribs of the fabricated hollow wall panel structure;

S2、吊装最下层的空心墙板,使竖向连接件穿过最下层的所述空心墙板的墙板预留抽孔; S2, hoisting the lowermost hollow wall panel, so that the vertical connector passes through the reserved pumping hole of the lowermost hollow wall panel;

S3、最下层空心墙板安装就位,使相邻两块空心墙板端部的悬挑薄壁垂直或水平拼接,且相邻两块空心墙板端部的预埋墙板连接件之间固定相连;并在最下层的空心墙板顶端布设暗梁,并使所述竖向连接件穿过暗梁; S3. The lowest layer of hollow wall panels is installed in place, so that the cantilevered thin walls at the ends of two adjacent hollow wall panels are spliced vertically or horizontally, and between the embedded wall panel connectors at the ends of two adjacent hollow wall panels fixedly connected; and laying hidden beams at the top of the lowest hollow wall panel, and allowing the vertical connectors to pass through the hidden beams;

S4、暗梁布置完成后,根据水电线路布置情况,沿暗梁和墙板预留抽孔内预埋线管线盒或/水管; S4. After the hidden beam layout is completed, according to the layout of the water and electricity lines, pre-embed the pipeline box or/water pipe in the pumping hole reserved along the hidden beam and wall panel;

S5、最下层空心墙板内混凝土现浇,待管线完成布置后,浇筑墙板预留抽孔、暗梁以及相邻两面装配式剪力墙现浇节点处的混凝土; S5. The concrete in the hollow wall panel of the lowest layer is poured in-situ. After the pipeline layout is completed, the concrete for the pumping holes, concealed beams and the cast-in-situ joints of the adjacent two prefabricated shear walls shall be poured in the wall panel;

S6、中层及顶层空心墙板的施工,施工过程中,重复下层墙板施工中S2—S5的过程步骤,待顶层的空心墙板浇筑完成后,进行后续楼面施工。 S6. The construction of the hollow wall panels on the middle and top floors. During the construction process, repeat the process steps of S2-S5 in the construction of the lower wall panels.

当然,也可在整个层高高度范围内的墙板安装完成后,一次性完成整个层高范围内抽孔及暗梁的混凝土浇筑。 Of course, it is also possible to complete the concrete pouring of the pumping holes and hidden beams within the entire story height range at one time after the installation of the wall panels within the entire story height range is completed.

上述实施例阐明的内容应当理解为这些实施例仅用于更清楚地说明本实用新型,而不用于限制本实用新型的范围,在阅读了本实用新型之后,本领域技术人员对本实用新型的各种等价形式的修改均落入本申请所附权利要求所限定的范围。 The above-mentioned embodiments should be understood that these embodiments are only used to illustrate the utility model more clearly, and are not intended to limit the scope of the utility model. After reading the utility model, those skilled in the art will understand each aspect of the utility model Modifications in various equivalent forms all fall within the scope defined by the appended claims of this application.

Claims (10)

1. an assembled cored slab shear wall structure, it is characterised in that including at least 4 fabricated shear walls, at least 4 fabricated shear walls are sequentially connected with and surround closed shear wall structure;Every fabricated shear wall includes the polylith hollow wall panel set gradually from bottom to top, and the junction of neighbouring two pieces of hollow wall panels forms horizontal piece (5), and is provided with the dark beam (3) of lateral arrangement in the body of wall at this piece (5) place;Every piece of hollow wall panel (20) is vertically provided with multiple wallboard is reserved takes out hole (18), wallboard corresponding to neighbouring two pieces of hollow wall panels be reserved to be taken out hole (18) and is docked and connected, and is provided with vertical connector (26) in hole (18) the wallboard being docked and connected reserved taking out;Junction at two adjacent surfaces fabricated shear wall, the end of corresponding hollow wall panel (20) has outward extending thin-walled of encorbelmenting (21) and pre-buried wall board connector (23), and cast-in-place node connector (22) it is provided with in junction, all it is fixedly linked between the pre-buried wall board connector (23) of two pieces of hollow wall panels (20) that level is adjacent and between pre-buried wall board connector (23) and cast-in-place node connector (22).
2. assembled cored slab shear wall structure according to claim 1, it is characterised in that every fabricated shear wall is assembled by 3-6 block hollow wall panel, and at least one fabricated shear wall medium position is provided with window installation region (12).
3. assembled cored slab shear wall structure according to claim 2, it is characterized in that, the one side shear wall being provided with window installation region (12) includes being positioned at undermost one piece of hollow wall panel (1), it is positioned at one piece of hollow wall panel (11) of the superiors, and it is arranged on two pieces of central hollow wallboards (2,10) between undermost one piece of hollow wall panel (1) and one piece of hollow wall panel (11) of the superiors;Two pieces of central hollow wallboards (2,10), between undermost one piece of hollow wall panel (1) and one piece of hollow wall panel (11) of the superiors, surround described window installation region (12).
4. according to the assembled cored slab shear wall structure one of claim 1-3 Suo Shu, it is characterized in that, in neighbouring two pieces of hollow wall panels of every fabricated shear wall, the upper surface of lower floor's hollow wall panel forms horizontally disposed low groove (8), and the lower surface of described upper strata hollow wall panel forms horizontally disposed upper groove (9);The top of two sidewalls (7) of described low groove (8) is docked with the bottom of two sidewalls (6) of upper groove (9) and is connected and forms horizontal piece.
5. assembled cored slab shear wall structure according to claim 4, it is characterised in that described low groove (8) and upper groove (9) docking form the through channel of horizontally set, are provided with described dark beam (3) in this through channel.
6. according to the assembled cored slab shear wall structure one of claim 1-3 Suo Shu, it is characterized in that, the stirrup that described dark beam (3) is horizontally set, described pre-buried wall board connector (23) is stirrup or crotch muscle, and described cast-in-place node connector (22) is stirrup.
7. assembled cored slab shear wall structure according to claim 6, it is characterised in that be provided with the vertical muscle (4) of beam in described dark beam (3);The vertical muscle (24) of cast-in-place node it is equipped with in described pre-buried wall board connector (23) and cast-in-place node connector (22).
8. according to the assembled cored slab shear wall structure one of claim 1-3 Suo Shu, it is characterised in that be provided with pre-embedded pipe (16) along its length in described dark beam (3) or/and the passage of water pipe (17).
9. assembled cored slab shear wall structure according to claim 8, it is characterized in that, in neighbouring two pieces of hollow wall panels of every fabricated shear wall, the line box (19) connected with described spool (16) it is embedded with, described lower floor hollow wall panel (1) or be preset with to water spot position (25) on upper strata hollow wall panel (2) medial wall in lower floor's hollow wall panel (1) or upper strata hollow wall panel (2).
10. according to the assembled cored slab shear wall structure one of claim 1-3 Suo Shu, it is characterised in that described wallboard is reserved takes out hole (18) for square hole or circular hole.
CN201620069322.6U 2016-01-25 2016-01-25 Empty core plate shear wall structure of assembled Expired - Lifetime CN205348461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620069322.6U CN205348461U (en) 2016-01-25 2016-01-25 Empty core plate shear wall structure of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620069322.6U CN205348461U (en) 2016-01-25 2016-01-25 Empty core plate shear wall structure of assembled

Publications (1)

Publication Number Publication Date
CN205348461U true CN205348461U (en) 2016-06-29

Family

ID=56183929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620069322.6U Expired - Lifetime CN205348461U (en) 2016-01-25 2016-01-25 Empty core plate shear wall structure of assembled

Country Status (1)

Country Link
CN (1) CN205348461U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544798A (en) * 2016-01-25 2016-05-04 三新房屋制造股份有限公司 Assembled-type hollow-slab shear wall structure and construction method thereof
CN110644613A (en) * 2019-09-23 2020-01-03 上海宝冶建筑工程有限公司 Convenient pull-up formula board strutting arrangement that encorbelments of dismantling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544798A (en) * 2016-01-25 2016-05-04 三新房屋制造股份有限公司 Assembled-type hollow-slab shear wall structure and construction method thereof
CN110644613A (en) * 2019-09-23 2020-01-03 上海宝冶建筑工程有限公司 Convenient pull-up formula board strutting arrangement that encorbelments of dismantling

Similar Documents

Publication Publication Date Title
CN105544798B (en) Assembled hollow slab shear wall structure and construction method thereof
CN103790265B (en) A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall
CN115030307B (en) Local steel-concrete combined assembled beam column node
CN100402765C (en) Box-type building model and its construction method
CN107313517B (en) Connection node between laminated wall and intermediate floor laminated floor
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN103924710B (en) Low layer assembled combined wall house Plate Welding node structure
CN101736809B (en) Spatial light steel reinforced concrete frame building and construction method thereof
CN102535738A (en) A prefabricated house wall panel and a fully prefabricated house using the wall panel and its installation method
CN107558603A (en) A kind of assembled arthitecutral structure system and its construction method
CN205776895U (en) Heat insulation prefabricated body of wall and prefabricated buildings
CN211114066U (en) Assembled lightweight concrete slab type house structure
CN103061517B (en) A sub-structure modular prefabricated assembled node-type frame structure assembly method
CN204385886U (en) Villages and small towns low layer assembling damping architectural structure system
CN210067020U (en) A sub-structure assembled frame structure
CN111236416A (en) Prefabricated reinforced concrete structure house and installation method thereof
CN204530982U (en) A kind of prefabricated assembled special-shaped wallette limb industrialization Housing Structure System
CN103711232A (en) L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method
CN110984367B (en) Prefabricated building frame structure component and construction method thereof
CN210713195U (en) A frame structure prefabricated concrete house
CN205348461U (en) Empty core plate shear wall structure of assembled
CN112523545A (en) Basic module for building and low and multi-storey modular building structure system
CN102242551B (en) Reinforcing bars building block reinforced concrete structure and shock insulation, shock absorption system
CN205742262U (en) Concrete prefabricated board pin-connected panel underground structure
CN205329970U (en) Precast concrete wallboard and wall panel structure system of dark frame in area of structure thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 410005 Hunan province Changsha Kaifu District, Furong Road Xingang Street Jinpen Hill Community Building Room 618

Patentee after: SANNENG INTEGRATED HOUSING Co.,Ltd.

Address before: 410005, room 618, golden hill community office building, Xingang street, Furong North Road, Changsha, Hunan

Patentee before: SANXIN HOUSING MANUFACTURING Co.,Ltd.