CN205346605U - Card formula beam column hoisting accessory - Google Patents

Card formula beam column hoisting accessory Download PDF

Info

Publication number
CN205346605U
CN205346605U CN201521077733.1U CN201521077733U CN205346605U CN 205346605 U CN205346605 U CN 205346605U CN 201521077733 U CN201521077733 U CN 201521077733U CN 205346605 U CN205346605 U CN 205346605U
Authority
CN
China
Prior art keywords
main
pull rope
crossbeam
capstan winch
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521077733.1U
Other languages
Chinese (zh)
Inventor
王华生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing fenggong building materials Co. Ltd.
Original Assignee
Chongqing Wangdefu Metal Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Wangdefu Metal Structure Co Ltd filed Critical Chongqing Wangdefu Metal Structure Co Ltd
Priority to CN201521077733.1U priority Critical patent/CN205346605U/en
Application granted granted Critical
Publication of CN205346605U publication Critical patent/CN205346605U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a card formula beam column hoisting accessory, its characterized in that includes main capstan winch, vice capstan winch and main elevator, main elevator is equipped with the crossbeam, crossbeam one end is connected with the linking arm of downward extension, the linking arm lower extreme be connected with with the parallel xarm that is located the crossbeam below of crossbeam, the xarm end is equipped with the lower spacing arch of directional crossbeam, horizontal both ends head is equipped with the last spacing arch of directional xarm, it gets into the opening to go up spacing arch and be equipped with the girder steel between spacing arch down, crossbeam upper portion is connected with the perpendicular arm that upwards extends, it is equipped with the connecting hole to erect the arm upper end, the winding has main haulage rope on the main capstan winch, main haulage rope tying -up is on the connecting hole, the winding has vice haulage rope on the vice capstan winch, vice traction rope connection has the latch hook, main haulage rope, vice haulage rope is flagging behind a set of coaxial pulley diversion in the telescopic boom end, the utility model discloses can adjust the gesture of lifting by crane the girder steel better.

Description

Cassette beam column boom hoisting
Technical field
This utility model relates to a kind of steel beam column beam column boom hoisting, particularly relates to a kind of cassette beam column boom hoisting.
Background technology
Along with economical flourish, China has become as the first big producing country in the world, under the big drive produced, China's construction business have also been obtained fast development, wherein steel structure is built with its cost low, construction speed is able to substantial amounts of application soon, in actual installation, the component assembly such as crossbeam and column of often slinging connects, no matter it is that single-point extension hangs or multiple spot is hung and hung when slinging, pull rope is all synchronize volume to rise, if the component that lifting is risen has inclination, it is difficult to adjust, docking just becomes extremely to be not easy, usually affect erection schedule, this still awaits technological innovation and solves.
Utility model content
A kind of cassette beam column boom hoisting is provided in order to solve the problems referred to above this utility model.
The technical solution adopted in the utility model is: a kind of cassette beam column boom hoisting, it is characterised in that include main capstan winch, secondary capstan winch and main elevator;Main elevator is provided with crossbeam, crossbeam one end is connected to the linking arm of stretching, extension downwards, linking arm lower end is connected to the transverse arm that be positioned at crossbeam below parallel with crossbeam, it is protruding that transverse arm termination is provided with the lower limit pointing to crossbeam, it is protruding that horizontal two ends is provided with the upper limit pointing to transverse arm, it is provided with girder steel between upper limit projection and lower limit projection and enters gap, crossbeam top is connected to the vertical arm stretched upwards, vertical arm upper end is provided with connecting hole, main capstan winch is wound with main pull rope, main pull rope tying-up is on connecting hole, secondary capstan winch is wound with secondary pull rope, secondary pull rope is connected to latch hook, main pull rope, secondary pull rope is sagging after pulley break-in one group coaxial in telescoping boom termination.
Further, described transverse arm bottom is connected to the plumbing arm of stretching, extension downwards, and plumbing arm lower end is provided with connecting hole, and connecting hole is connected to the 3rd pull rope, 3rd pull rope is connected to the 3rd capstan winch, and the 3rd pull rope and main pull rope, secondary pull rope are sagging after pulley break-in one group coaxial in telescoping boom termination.
Further, described main elevator, main pull rope, respectively two, main capstan winch.
Further, described gap is respectively provided on two sides with hook, is connected by chain between hook.
Further, described gap is provided with the lock pin of locking gap.
When this utility model uses the girder steel that level of slinging is installed, it is fixed on the side of girder steel center of gravity by latch hook with secondary pull rope, main elevator is snapped in the opposite side of girder steel center of gravity by gap, then main capstan winch and secondary capstan winch synchronous hoisting girder steel are utilized, in the process fallen after lifting, girder steel is if any inclination, the main capstan winch of independent folding and unfolding or secondary capstan winch can be utilized to be adjusted to level, it is ensured that girder steel two ends synchronize to drop on fixing component, it is to avoid one end falls the phenomenon that the other end is not easy to ajust;Sling vertically-mounted girder steel time, it is fixed on girder steel upper end by latch hook with secondary pull rope, main elevator card is snapped in girder steel middle and lower part by gap, and vertical arm upward, is respectively started main capstan winch, two pull ropes tightened by secondary capstan winch, then synchronous hoisting makes girder steel level sling, will not producing traction phenomena, individually tighten up secondary pull rope and make girder steel hold up after proper height of slinging, main elevator is stuck on girder steel, coordinating main pull rope that girder steel can be made to more they tend to vertical state, the 3rd leads better enforcement alignment installs.
Accompanying drawing explanation
Fig. 1 is the main elevator overview of this utility model embodiment one.
Fig. 2 is the main elevator overview of this utility model embodiment two.
Accompanying drawing labelling: 1 crossbeam;2 linking arms;3 transverse arms;4 lower limit are protruding;5 upper limits are protruding;6 girder steels;7 vertical arm;8,11 connecting hole;9 hooks;10 plumbing arms.
Detailed description of the invention
Main elevator in this utility model embodiment one as it is shown in figure 1, this cassette beam column boom hoisting is provided with two capstan winches and main elevator, two capstan winch respectively main capstan winches, secondary capstan winches;Main elevator is provided with crossbeam 1, crossbeam one end is connected to the linking arm 2 of stretching, extension downwards, linking arm lower end is connected to the transverse arm 3 that be positioned at crossbeam below parallel with crossbeam, transverse arm termination is provided with the lower limit projection 4 pointing to crossbeam, horizontal two ends is provided with the upper limit projection 5 pointing to transverse arm, can the girder steel of spacing entrance, it is provided with girder steel 6 between upper limit projection and lower limit projection and enters gap, crossbeam top is connected to the vertical arm 7 stretched upwards, vertical arm upper end is provided with connecting hole 8, main capstan winch is wound with main pull rope, main pull rope tying-up is on connecting hole, secondary capstan winch is wound with secondary pull rope, secondary pull rope is connected to latch hook, main pull rope, secondary pull rope is sagging after pulley break-in one group coaxial in telescoping boom termination;Gap is respectively provided on two sides with hook 9, is connected by chain and prevent girder steel from coming off between hook.
When this utility model uses the girder steel that level of slinging is installed, it is fixed on the side of girder steel center of gravity by latch hook with secondary pull rope, main elevator is snapped in the opposite side of girder steel center of gravity by gap, then main capstan winch and secondary capstan winch synchronous hoisting girder steel are utilized, in the process fallen after lifting, girder steel is if any inclination, the main capstan winch of independent folding and unfolding or secondary capstan winch can be utilized to be adjusted to level, it is ensured that girder steel two ends synchronize to drop on fixing component, it is to avoid one end falls the phenomenon that the other end is not easy to ajust;Sling vertically-mounted girder steel time, it is fixed on girder steel upper end by latch hook with secondary pull rope, main elevator card is snapped in girder steel middle and lower part by gap, and vertical arm upward, is respectively started main capstan winch, two pull ropes tightened by secondary capstan winch, then synchronous hoisting makes girder steel level sling, will not producing traction phenomena, individually tighten up secondary pull rope and make girder steel hold up after proper height of slinging, main elevator is stuck on girder steel, coordinating main pull rope that girder steel can be made to more they tend to vertical state, the 3rd leads better enforcement alignment installs.
In this utility model embodiment one, main elevator is as shown in Figure 2, the transverse arm bottom of this cassette beam column boom hoisting is connected to the plumbing arm 10 of stretching, extension downwards, plumbing arm lower end is provided with connecting hole 11, connecting hole is connected to the 3rd pull rope, 3rd pull rope is connected to the 3rd capstan winch, 3rd pull rope and main pull rope, secondary pull rope are sagging after pulley break-in one group coaxial in telescoping boom termination, and the 3rd capstan winch can individually be opened, and can regulate the attitude of girder steel when lifting by crane vertically-mounted girder steel from both direction.
During enforcement, main elevator, main pull rope, main capstan winch can respectively two, and both direction can be divided into during use to be stuck on girder steel, it is possible to rush both direction and regulate girder steel attitude;Hook and chain can be also lock pin, and lock pin is arranged on gap, it is possible to locking gap.
Being only this utility model preferred embodiment in sum, all equivalences done according to the application are modified and prior art interpolation is accordingly to be regarded as this utility model technology category.

Claims (5)

1. a cassette beam column boom hoisting, it is characterised in that include main capstan winch, secondary capstan winch and main elevator;Main elevator is provided with crossbeam, crossbeam one end is connected to the linking arm of stretching, extension downwards, linking arm lower end is connected to the transverse arm that be positioned at crossbeam below parallel with crossbeam, it is protruding that transverse arm termination is provided with the lower limit pointing to crossbeam, it is protruding that horizontal two ends is provided with the upper limit pointing to transverse arm, it is provided with girder steel between upper limit projection and lower limit projection and enters gap, crossbeam top is connected to the vertical arm stretched upwards, vertical arm upper end is provided with connecting hole, main capstan winch is wound with main pull rope, main pull rope tying-up is on connecting hole, secondary capstan winch is wound with secondary pull rope, secondary pull rope is connected to latch hook, main pull rope, secondary pull rope is sagging after pulley break-in one group coaxial in telescoping boom termination.
2. cassette beam column boom hoisting according to claim 1, it is characterized in that described transverse arm bottom is connected to the plumbing arm of stretching, extension downwards, plumbing arm lower end is provided with connecting hole, connecting hole is connected to the 3rd pull rope, 3rd pull rope is connected to the 3rd capstan winch, and the 3rd pull rope and main pull rope, secondary pull rope are sagging after pulley break-in one group coaxial in telescoping boom termination.
3. cassette beam column boom hoisting according to claim 1, it is characterised in that respectively two, described main elevator, main pull rope, main capstan winch.
4. cassette beam column boom hoisting according to claim 1, it is characterised in that described gap is respectively provided on two sides with hook, is connected by chain between hook.
5. cassette beam column boom hoisting according to claim 1, it is characterised in that described gap is provided with the lock pin of locking gap.
CN201521077733.1U 2015-12-22 2015-12-22 Card formula beam column hoisting accessory Expired - Fee Related CN205346605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521077733.1U CN205346605U (en) 2015-12-22 2015-12-22 Card formula beam column hoisting accessory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521077733.1U CN205346605U (en) 2015-12-22 2015-12-22 Card formula beam column hoisting accessory

Publications (1)

Publication Number Publication Date
CN205346605U true CN205346605U (en) 2016-06-29

Family

ID=56168823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521077733.1U Expired - Fee Related CN205346605U (en) 2015-12-22 2015-12-22 Card formula beam column hoisting accessory

Country Status (1)

Country Link
CN (1) CN205346605U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105398936A (en) * 2015-12-22 2016-03-16 重庆旺德福金属结构有限公司 Clamping type beam column hoisting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105398936A (en) * 2015-12-22 2016-03-16 重庆旺德福金属结构有限公司 Clamping type beam column hoisting device

Similar Documents

Publication Publication Date Title
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
KR101213756B1 (en) Method for installing flare tower
CN105256728B (en) A kind of cantilever erection method of the Chinese human relations formula steel truss girder of cable-stayed bridge
CN105113803B (en) High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN105060125B (en) High tower structure of cable crane and its method for dismounting
CN102910532B (en) Method for butting and hoisting large box type derricks in air
CN205346605U (en) Card formula beam column hoisting accessory
CN205381860U (en) Rotatory elevator steel constructs component hoisting accessory
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN204983693U (en) Hoist device slides in mountain area corridor truss high altitude
CN201237543Y (en) Ocean derrick loading test seat
CN109958819A (en) A kind of gas pipeline laying method and its supporting structure
CN207030735U (en) Prefabricated balcony lifts servicing unit
CN205346622U (en) Steel constructs component bikini and lifts by crane installation device
CN105398936B (en) Cassette beam column boom hoisting
CN105398944B (en) Steel structure component bikini lifts by crane erecting device
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN105520681A (en) Pitching-type folding-arm window cleaning machine
CN103058083B (en) Bolt sphere truss gig
CN204355947U (en) Large-scale without eye plate lifting beam device
CN105438958B (en) Rotating lifting steel-fastening structure component boom hoisting
CN209555785U (en) A kind of external quality of pier coating decoration platform suitable for high pier bridge
CN110436335A (en) A kind of deck unit erection gantry installing mechanism and its application method
CN206667594U (en) A kind of hanging apparatus of steel core concrete column
CN105781092A (en) Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170104

Address after: Hu Jia Gou agency 400899 Chongqing Wandong Wansheng District of the town of Xinhua Village

Patentee after: Chongqing fenggong building materials Co. Ltd.

Address before: 402284 Jiangjin District, Chongqing Industrial Park

Patentee before: CHONGQING WANGDEFU METAL STRUCTURE CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629

Termination date: 20171222

CF01 Termination of patent right due to non-payment of annual fee