CN105060125B - High tower structure of cable crane and its method for dismounting - Google Patents

High tower structure of cable crane and its method for dismounting Download PDF

Info

Publication number
CN105060125B
CN105060125B CN201510553143.XA CN201510553143A CN105060125B CN 105060125 B CN105060125 B CN 105060125B CN 201510553143 A CN201510553143 A CN 201510553143A CN 105060125 B CN105060125 B CN 105060125B
Authority
CN
China
Prior art keywords
tower
king
pylon
head
hoist engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510553143.XA
Other languages
Chinese (zh)
Other versions
CN105060125A (en
Inventor
王毅华
谭志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Gorges Technology Co ltd
China Three Gorges Corp
Original Assignee
China Three Gorges Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges Corp filed Critical China Three Gorges Corp
Priority to CN201510553143.XA priority Critical patent/CN105060125B/en
Publication of CN105060125A publication Critical patent/CN105060125A/en
Application granted granted Critical
Publication of CN105060125B publication Critical patent/CN105060125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C21/00Cable cranes, i.e. comprising hoisting devices running on aerial cable-ways
    • B66C21/04Cable cranes, i.e. comprising hoisting devices running on aerial cable-ways with cable-ways supported at one end or both ends on bodily movable framework, e.g. framework mounted on rail track

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of high tower cable machine method for dismounting, king-tower is flexibly connected by king-tower tower head and king-tower tower body and forms, and king-tower tower body is made up of two tower body columns, and the top of two tower body columns is movably connected with king-tower tower head bottom;Pylon draws hoist engine, pylon to draw hoist engine to be respectively arranged at the near zone of king-tower tower body bottom from fall from outside drop, pylon draws hoist engine to be used for by the bottom of two tower body columns of king-tower tower body outwardly separately from outside drop, and pylon draws hoist engine to be used for receiving the bottom of two tower body columns of king-tower tower body inwardly from fall;The top that wind devices pass through top cable rope draw king-tower tower head is pulled at tower head top, pulls the middle part that wind devices pass through middle part cable rope draw king-tower tower head in the middle part of described tower head.The present invention is hung by hoist engine, mast and pulls wind devices and realizes steadily declining from fall and the whole king-tower of low level auxiliary fall process high-order, allows king-tower to drop on buttress, then dismantles again, removes very convenient.

Description

High tower structure of cable crane and its method for dismounting
Technical field
The present invention relates to high tower cable machine technical field, more particularly, to a kind of high tower structure of cable crane and its method for dismounting.
Background technology
The feature of cable machine is the supporting member using flexible cable as lifting, hoisting mechanism, and the two ends of cable wire are by being arranged at Supporting support (i.e. pylon) on ground is supported, and flexible cable (carrying rope) has loading trolley, outstanding under loading trolley Lift heavy thing and round operation on flexible cable, have the functions such as vertical transport or horizontal transport concurrently.Cable machine is in hydroelectric project One of the most frequently used construction equipment, cable machine has been equipped with up to the even upper km of hundreds of meters, weigh tens, up to a hundred tons of carrying Rope is so that the difficulty that cable machine peace is torn open is much larger than the crane gears such as conventional door machine, tower crane.The pylon of particularly high tower cable machine is high Degree may be up to nearly hundred meters, and traditional equipment peace is torn open method and implemented using other crane gears, that is,:Rise by using crawler type Heavy-duty machine or fixed crane gear (as door tower crane) are pacified piece by piece and are torn open, if running into the cable machine that tower height reaches nearly hundred meters When, so will must use the crane gear of super-tonnage, and this kind of large-tonnage crane gear will to site condition, means of transportation Ask very high.Conventional method for dismounting is:First hung on king-tower pylon using the crane gear of a super-tonnage, overlength crane arm Portion, removes main rope, the pygochord rope head on king-tower pylon respectively by another large-tonnage crane gear.Hang rising of king-tower top After king-tower pose adjustment is vertical by luffing by heavy equipment, untie the connecting bolt in the middle part of bottom girder, then this crane gear is micro- Fast off the hook, king-tower pylon in the presence of deadweight, open to both sides respectively, and king-tower highly constantly declines by two supporting legs, and final two Bar supporting leg falls on the ground.Pylon is carried out with temporary support again and carries out decomposing after fixing, remove.This method must use two Super-tonnage, the crane gear of overlength crane arm, thus less economical, and large lifting equipment having high demands, tearing open to place Dress is difficult.And, during pylon declines, only lean on supporting leg deadweight sometimes cannot overcome the resistance that supporting leg hinge corrosion leads to Power, thus lead to remove difficulty.
High tower cable machine is because demolishing process interference is more with limiting factor, equipment is old former to removing increase difficulty etc. Cause, the difficulty of dismounting is often higher than the difficulty installed.Determined by the landform that cable machine equipment is arranged, cable owner's tower pylon, secondary tower tower Frame is probably all high tower so that removing that difficulty is bigger, and traditional peace tears the economical difference of method, long in time limit, to place bar open The shortcomings of part has high demands.
Content of the invention
Part in view of the shortcomings of the prior art, it is an object of the invention to provide a kind of high tower cable machine dismounting side Method, the method is hung by hoist engine, mast and is pulled during wind devices can be implemented in the high-order auxiliary fall from fall and low level and entirely leads Tower steadily declines, and allows king-tower to drop on buttress, then dismantles again, removes very convenient.
The purpose of the present invention is achieved through the following technical solutions:
A kind of high tower structure of cable crane, draws hoist engine, pylon from drop including king-tower, secondary car, balance car, pylon from outside drop Draw hoist engine, tower head top to pull and pull wind devices in the middle part of wind devices and tower head, described king-tower is by king-tower tower head and the activity of king-tower tower body It is formed by connecting, be connected with main rope between described king-tower tower head and secondary car, be connected between described king-tower tower head and balance car Pygochord.Described king-tower tower body is made up of two tower body columns, and the top of two tower body columns is movably connected with king-tower tower head Bottom, the bottom of two tower body columns is connected by king-tower bottom girder respectively, is provided with king-tower walking mechanism in king-tower bottom girder bottom.Institute Stating pylon draws hoist engine, pylon to draw hoist engine to be respectively arranged at the ground of king-tower tower body near-bottom, institute from fall from outside drop Stating pylon draws hoist engine to be used for dividing the bottom of two tower body columns of king-tower tower body outwardly from during drop in dismounting from outside drop Open, pylon draws hoist engine to be used for receiving the bottom of two tower body columns of king-tower tower body inwardly from fall, it is to avoid too fast from fall And initiation potential, pylon outer draws hoist engine, pylon to draw hoist engine collective effect from fall and realize the rising of king-tower tower body from dropping (declining the adjustment of process status and balance) and decline;Described tower head top pull wind devices pass through top cable rope draw in The top of king-tower tower head, pulls wind devices and passes through middle part cable rope draw in the middle part of king-tower tower head, tower in the middle part of described tower head Head is pulled and is pulled the common draw of wind devices in the middle part of wind devices and tower head and in king-tower tower head and realize king-tower tower head in king-tower liter Plumbness all the time during fall.
In order to the present invention is better achieved, this high tower cable machine method for dismounting also includes mast and hangs to hang side with mast and pull wind setting Standby, mast is hung and is correspondingly arranged with described king-tower tower head, hangs described king-tower tower head by the hanging beam that mast hangs and realizes cable machine and tears open Auxiliary fall operation during removing;Mast hangs side to be pulled wind devices and acts on mast furred ceiling portion by hoist engine traction side cable rope.
Further technical scheme is:Cable machine dolly is provided with described main rope.
Further technical scheme is:Described pylon draws hoist engine to pass through pylon from outside drop and draws rope traction from fall is outer Outside the tower body column bottom of king-tower tower body, pylon from fall outer draw be provided with steel wire rope pylon from drop outer draw assembly pulley, and And this tower body column bottom be additionally provided with pylon from fall in draw the pylon of elevator machine travel to draw steel wire rope from fall, in pylon from dropping Inside draw steel wire rope to be provided with pylon and draw assembly pulley from fall.
A kind of method for dismounting of high tower structure of cable crane, its method for dismounting is as follows:
A, pull wind devices and hoist engine and install:Tower head top is pulled and pulls wind devices in the middle part of wind devices and tower head and pacified by earth anchor It is attached to corresponding position, tower head top is pulled wind devices and passed through top cable rope draw in the top of king-tower tower head, in tower head Portion pulls wind devices and passes through middle part cable rope draw in the middle part of king-tower tower head, is pulled in wind devices and tower head by tower head top Portion pulls the common draw of wind devices and in king-tower tower head and realizes king-tower tower head and be in plumbness;
B, king-tower are high-order to drop certainly:Pylon is drawn from outside drop hoist engine and pylon draw hoist engine to be installed to by earth anchor from fall The corresponding position of king-tower tower body bottom, king-tower tower body has two tower body columns, and each tower body column is all correspondingly arranged on One pylon draws hoist engine and pylon to draw hoist engine from drop from outside drop, and pylon draws hoist engine to pass through pylon from outside drop and draws from fall is outer Outside tower body column bottom, pylon draws hoist engine to pass through pylon from fall and draws rope traction in tower from fall rope traction Inside body column bottom;Pylon stands from dropping the outer tower body drawing hoist engine, pylon to draw hoist engine collective effect king-tower tower body from fall Post simultaneously realizes king-tower tower head, steady during king-tower tower body entire lowering, and during declining, main rope, pygochord also serve as Pull wind with wind vertical direction is pulled at tower head top, by the traction of hoist engine, main rope, pygochord are also served as and pull wind with tower head top Vertical direction pull wind so that king-tower tower head and king-tower tower body steadily decline;
C, the auxiliary fall of king-tower low level:Ground near king-tower pylon is disposed with mast hang, in the high-order fall process certainly of king-tower In, mast hangs adjustment luffing so that the fall region certainly of king-tower pylon avoided by crane arm, with sharp king-tower pylon from fall.When king-tower tower head From when dropping to mast furred ceiling portion, mast hangs luffing and makes crane arm near king-tower pylon, and mast lifts king-tower tower head for bottom, Mast hangs by discharging raising line, drives king-tower tower head steadily to decline, and mast hangs side and pulls wind devices by side cable rope traction work Hang for mast so that mast hangs not to both sides beat it is ensured that the stablizing of its state;
D, buttress support and remove:King-tower is dropped to extreme lower position and is supported, so by the buttress being arranged on ground After remove whole king-tower;Then complete secondary car, dismounting that balance car, mast hang, and reclaim main rope, pygochord, then complete each Hoist engine, pull the dismounting of wind devices.
In order to the dismounting of high tower structure of cable crane is better achieved, the method for dismounting of this high tower structure of cable crane is in step A Increase step A1 and B between, wherein step A1 is as follows:
A1, the adjustment of king-tower obliquity:If king-tower vertically no tilts, it is directly entered step B;If king-tower is in skewed State, then first will be lived with big butterfly clamp clip respectively at the two ends rope head of main rope and pygochord, then be equipped with the elevator of respective model respectively Machine, steel wire rope and assembly pulley, in order to hold each butterfly mounting board;By adjusting hoist engine folding and unfolding steel wire rope, by king-tower by tilting State adjusts to plumbness.
Step A1 concrete methods of realizing and effect are as follows:
1st, the adjustment of king-tower king-tower attitude from before the auxiliary fall of fall.Because part cable owner's tower running status is to incline to balance car direction An oblique low-angle, therefore for such cable machine, should first adjust king-tower attitude before fall certainly and auxiliary fall.First will be non-to main rope and pygochord Lived with big butterfly clamp clip at the rope head of king-tower side, be equipped with hoist engine, steel wire rope and the assembly pulley of respective model, in order to have enough Pulling force hold butterfly mounting board.The adjustment hoist engine folding and unfolding steel wire rope of main rope and pygochord, king-tower attitude is vertical by tilt adjustments Directly.
2nd, in king-tower from during fall and auxiliary fall, above-mentioned king-tower device for adjusting posture passes through at any time main rope, pygochord to be led Draw adjustment it is ensured that its attitude in both directions is vertical.The overtension of main rope, pygochord can be avoided simultaneously, to from fall, auxiliary Fall process produces and hinders.
3rd, cable machine coverage is big, disturbs big, it is to avoid the measure of interference in demolishing process:(1) during main rope declines, such as Meet the interference with main rope, main rope being driven, thus avoiding interference, but should adjust simultaneously in good time by the way of independent walking secondary tower Whole main rope adjusts hoist engine, to avoid main cable's tension excessive.(2) using support or interim carry the overhead mode of rope avoid with The interference of side.
The present invention compared with the prior art, has advantages below and beneficial effect:
(1) the structure of cable crane method for dismounting of the present invention is so that the installation and removal of cable owner's tower need not rely on ultra-large type rises Heavy equipment, is hung and pulls wind devices and can be implemented in whole king-tower during the high-order auxiliary fall from fall and low level by hoist engine, mast Steadily decline, allow king-tower to drop on buttress, then dismantle again, remove very convenient.
(2) present invention innovatively achieves large-tonnage, high tower, the tearing open of Dynamic stable structures using multiple stage hoist engine Remove;The hoist engine that the present invention adopts, steel wire rope etc. are with low cost, have wide range of applications, and can recycle, warp in sundry item Ji property is good;The present invention no particular/special requirement to place for the super large heavy-duty hoisting equipment, decreases the place increasing for advancing equipment and applies Work quantities, has saved the duration.
Brief description
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the king-tower structural representation of the present invention;
Fig. 3 is the high-order fall schematic diagram certainly of king-tower of the present invention;
Fig. 4 is the high-order vertical view principle schematic from fall of Fig. 3 king-tower;
Fig. 5 is the king-tower low level auxiliary fall schematic diagram of the present invention;
Fig. 6 is the process step block diagram of high tower structure of cable crane method for dismounting.
Wherein, entitled corresponding to the reference in accompanying drawing:
1- king-tower, 11- king-tower tower head, 12- king-tower tower body, 2- main rope, 3- pair car, 4- balance car, 5- pygochord, 6- cable machine dolly, 7- king-tower bottom girder, 8- king-tower walking mechanism, 9- pylon draws hoist engine from outside drop, and 91- pylon is outer from dropping Draw steel wire rope, 92- pylon draws assembly pulley from outside drop, 10- pylon draws hoist engine from fall, 101- pylon draws steel wire from fall Rope, 102- pylon draws assembly pulley from fall, and wind devices are pulled at 13- tower head top, pull wind devices, 15- mast in the middle part of 14- tower head Hang side and pull wind devices, 16- mast hangs.
Specific embodiment
With reference to embodiment, the present invention is described in further detail:
Embodiment
As shown in Fig. 1~Fig. 6, a kind of high tower structure of cable crane, outer from dropping including king-tower 1, secondary car 3, balance car 4, pylon Draw hoist engine 9, pylon to draw hoist engine 10, tower head top to pull in the middle part of wind devices 13 and tower head to pull wind devices 14 from fall, king-tower 1 by King-tower tower head 11 and king-tower tower body 12 are flexibly connected and form, and are connected with main rope 2, king-tower tower between king-tower tower head 11 and secondary car 3 Between 11 and balance car 4, it is connected with pygochord 5;King-tower tower body 12 is made up of two tower body columns, the top of two tower body columns Portion is movably connected on king-tower tower head 11 bottom respectively, and the bottom of two tower body columns is respectively equipped with king-tower bottom girder 7, in king-tower bottom girder 7 bottoms are provided with king-tower walking mechanism 8;Pylon draws hoist engine 9, pylon to draw hoist engine 10 to be respectively arranged at master from fall from outside drop On the ground of the near-bottom of tower tower body 12, pylon draws hoist engine 9 to be used for two tower body columns of king-tower tower body 12 from outside drop Bottom outwardly separately, pylon draws hoist engine 10 for receiving the bottom of two tower body columns of king-tower tower body 12 inwardly from fall Receive, pylon from drop outer draw hoist engine 9, pylon draw from fall hoist engine 10 collective effect and realize the rising of king-tower tower body 12 with Fall;Tower head top is pulled wind devices 13 and is passed through top cable rope draw in the top of king-tower tower head 11, pulls wind and set in the middle part of tower head Standby 14 pass through middle part cable rope draw in the middle part of king-tower tower head 11, and tower head top is pulled and pulled wind in the middle part of wind devices 13 and tower head The common draw of equipment 14 in king-tower tower head 11 and is realized king-tower tower head 11 and is in vertical configuration all the time in king-tower 1 lifting process State.
The secondary car 3 of the present embodiment is secondary tower, is no pylon, and king-tower is the cable machine of high tower is balance main rope load, many Number is provided with balance car 4 and pygochord 5 in the opposite side of king-tower 1.And, king-tower 1 often tilts small angle to balance car 4 direction Degree, to reduce the stress of balance car 4 and pygochord 5, stablizes overall structure.In cable machine running, with the change of main rope 2 load Change, king-tower 1 inclination angle has small change, but cable machine keeps dynamic stability under the balanced action of main rope 2 and pygochord 5 pulling force. This dynamic stability undoubtedly increased the dismounting difficulty of cable machine.King-tower tower height is high, overall weight is also greatly the difficult point removed.
This high tower structure of cable crane also include mast hang 16 and mast hang side and pull wind devices 15, mast hang 16 with king-tower tower head 11 are correspondingly arranged, and hang described king-tower tower head 11 by the hanging beam that mast hangs 16 and realize the auxiliary fall work in cable machine demolishing process Industry.Mast hangs side to be pulled wind devices 15 and hangs 16 tops by side cable rope draw in mast.
According to one embodiment of present invention, main rope 2 is provided with cable machine dolly 6.
According to one embodiment of present invention, pylon draws hoist engine 9 to draw steel wire rope 91 to lead by pylon from outside drop from fall is outer Draw outside the tower body column bottom of king-tower tower body 12, pylon is provided with steel wire rope 91 outer draws pulley from dropping from fall outer drawing in pylon Group 92, and this tower body column bottom also by pylon from fall in draw steel wire rope 101 traction be provided with pylon from fall in draw elevator Machine 10 traction pylon from fall in draw steel wire rope 101, pylon from fall in draw be provided with steel wire rope 101 pylon from drop in draw pulley Group 102.
A kind of method for dismounting of high tower structure of cable crane, its method for dismounting is as follows:
A, pull wind devices and hoist engine and install:Tower head top is pulled and pulls wind devices 14 in the middle part of wind devices 13 and tower head by ground Anchor is installed to corresponding position, and tower head top is pulled wind devices 13 and passed through top cable rope draw in the top of king-tower tower head 11 Portion, is pulled wind devices 14 and passes through middle part cable rope draw in the middle part of king-tower tower head 11, pulled by tower head top in the middle part of tower head Pull the common draw of wind devices 14 in the middle part of wind devices 13 and tower head in king-tower tower head 11 and to realize king-tower tower head 11 and be in vertically State;
B, king-tower are high-order to drop certainly:Pylon is drawn from outside drop hoist engine 9 and pylon draw hoist engine 10 to pacify by earth anchor from fall It is attached to the corresponding position of king-tower tower body 12 bottom, king-tower tower body 12 has two tower body columns, each tower body column is all right A pylon should be provided with draws hoist engine 9 and pylon to draw hoist engine 10 from fall from outside drop, and pylon draws hoist engine 9 to pass through from outside drop Pylon draws steel wire rope 91 to draw outside tower body column bottom from outside drop, and pylon draws hoist engine 10 to pass through pylon from fall from fall Steel wire rope 101 is drawn to draw inside tower body column bottom;Pylon draws hoist engine 9, pylon to draw hoist engine 10 from fall altogether from outside drop The tower body column of same-action king-tower tower body 12 simultaneously realizes king-tower tower head 11, steady during the entire lowering of king-tower tower body 12, And during declining, by the traction of hoist engine, main rope 2, pygochord 5 are also served as and pull wind vertical direction with tower head top Pull wind so that king-tower tower head 11 and king-tower tower body 12 steadily decline;
C, the auxiliary fall of king-tower low level:Mast is disposed with the ground near king-tower tower head 11 and hangs 16, mast hangs 16 adjustment and becomes Width makes crane arm avoid the fall region certainly of king-tower 1 pylon, with sharp king-tower 1 pylon from fall.When king-tower tower head 11 bottom drops to certainly When mast hangs 16 top, mast hangs 16 luffings and makes crane arm near king-tower 1 pylon, and mast hangs 16 and lifts king-tower tower head 11, Mast hangs 16 to be passed through to discharge raising line, drives king-tower tower head 11 steadily to decline, mast hangs 16 sides to be pulled wind devices 15 and pull wind by side Wire saws act on mast and hang 16 so that mast hangs 16 not to both sides beat it is ensured that the stablizing of its state;
D, buttress support and remove:King-tower 1 is dropped to extreme lower position and is supported, so by the buttress being arranged on ground After remove whole king-tower 1;Then complete secondary car 3, balance car 4, mast hang 16 dismounting, and reclaim main rope 2, pygochord 5, then complete Become each hoist engine, pull the dismounting of wind devices.
The method for dismounting of high tower structure of cable crane of the present invention is totally divided into three phases (as shown in Figure 6), first stage, Adjust king-tower attitude using hoist engine;Second stage, carried out using hoist engine king-tower high-order from dropping;Three phases, utilization Crane gear carries out the auxiliary fall of low level to cable owner's tower.
In order to the dismounting of high tower structure of cable crane is better achieved, the method for dismounting of this high tower structure of cable crane is in step A Increase step A1 and B between, wherein step A1 is as follows:
A1, the adjustment of king-tower obliquity:If king-tower 1 vertically no tilts, it is directly entered step B;If king-tower 1 is in inclination State, then first lived at the non-king-tower funiculus lateralis head of main rope 2 and pygochord 5 with big butterfly clamp clip respectively, then be equipped with corresponding type respectively Number hoist engine, steel wire rope and assembly pulley, in order to hold each butterfly mounting board;By adjusting hoist engine folding and unfolding steel wire rope, will lead Tower 1 is adjusted to plumbness by heeling condition.
Step A1 concrete methods of realizing and effect are as follows:
1st, the adjustment of king-tower attitude from before fall, auxiliary fall.Because cable owner's tower running status is to tilt one to balance car direction Low-angle, therefore should first adjust king-tower attitude before fall certainly and auxiliary fall.First big by using at the rope head of main rope and pygochord non-king-tower side Butterfly clamp clip is lived, and is equipped with hoist engine, steel wire rope and the assembly pulley of respective model, in order to hold butterfly mounting board.Main rope and pygochord Adjustment hoist engine folding and unfolding steel wire rope, king-tower attitude is vertical by tilt adjustments.
2nd, in king-tower from during fall and auxiliary fall, above-mentioned king-tower device for adjusting posture passes through at any time main rope, pygochord to be led Draw adjustment it is ensured that its attitude in both directions is vertical.The overtension of main rope, pygochord can be avoided simultaneously, to from fall, auxiliary Fall process produces and hinders.
3rd, cable machine coverage is big, disturbs big, it is to avoid the measure of interference in demolishing process:(1) during main rope declines, such as Meet the interference with main rope, main rope being driven, thus avoiding interference, but should adjust simultaneously in good time by the way of independent walking secondary tower Whole main rope adjusts hoist engine, to avoid main cable's tension excessive.(2) using support or interim carry the overhead mode of rope avoid with The interference of side.
First stage:Adjust king-tower attitude using hoist engine.First big by using at the rope head of main rope and pygochord non-king-tower side Butterfly clamp clip is lived, and is equipped with hoist engine, steel wire rope and the assembly pulley of respective model, in order to hold butterfly mounting board.Main rope and pygochord Adjustment hoist engine folding and unfolding steel wire rope, king-tower attitude is vertical by tilt adjustments.
Second stage:Carry out the high-order fall (as shown in Figure 3) certainly of king-tower using hoist engine, arrange many from before drop at king-tower To hoist engine and its steel wire rope, assembly pulley, predominantly inside king-tower bottom girder near on ground arrangement left and right both direction one To the releasing hoister machine from fall, outside king-tower bottom girder near arrange on ground and draw hoist engine outside a pair of king-tower bottom girder, in king-tower tower The top of head, middle part are respectively arranged a pair of tower head top, (two play the work of dual fail-safe to pulling wind to pull wind hoist engine in the middle part of tower head With arranging there is not interference up and down).After ready, the connecting bolt in the middle part of king-tower bottom girder is removed, using king-tower tower body two Put in outside in the deadweight of supporting leg and king-tower bottom girder and draw hoist engine it is ensured that cable machine tower body overcomes hinge resistance outward, be slowly subject to Control ground declines.During answer synchro measure, adjustment main rope and pygochord, tower head to pull wind hoist engine, keep the vertical of king-tower attitude.When When king-tower drops to certain altitude, when the horizontal component of tower body two supporting leg is excessive, for avoiding hoist engine, steel wire rope overload, need to enter Row is from the conversion dropped to auxiliary fall process.
Three phases:Using crane gear, the auxiliary fall of low level (as shown in Figure 5) is carried out to cable owner's tower.This stage cable owner Tower has been in relatively low height, thus can be using universal crane gear, and such as mast hangs, crawler crane etc. hangs on king-tower Portion, then removes king-tower from dropping hoist engine, after steel wire rope, synchronization control tower head pulls wind hoist engine, in measurement king-tower all directions On the premise of perpendicularity, mast hangs slow off the hook, and king-tower pylon slowly declines in the presence of deadweight, until two king-tower pylons two Supporting leg drops down onto on the buttress on ground completely.After fixing, king-tower pylon is carried out decomposing removing temporarily.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.

Claims (6)

1. a kind of high tower structure of cable crane, including king-tower (1), secondary car (3) and balance car (4), described king-tower (1) is by king-tower tower head (11) it is flexibly connected and forms with king-tower tower body (12), between described king-tower tower head (11) and secondary car (3), be connected with main rope (2), It is connected with pygochord (5) between described king-tower tower head (11) and balance car (4);It is characterized in that:Also include pylon to draw from outside drop Hoist engine (9), pylon draw hoist engine (10), tower head top to pull from fall and pull wind devices (14) in the middle part of wind devices (13) and tower head, Described king-tower tower body (12) is made up of two tower body columns, and the top of two tower body columns is movably connected with king-tower tower head (11) bottom, the bottom of two tower body columns is passed through king-tower bottom girder (7) and is connected, and is provided with king-tower walking in king-tower bottom girder (7) bottom Mechanism (8);Described pylon draws hoist engine (9), pylon to draw hoist engine (10) to be respectively arranged at king-tower tower body from fall from outside drop (12) bottom, described pylon draws hoist engine (9) to be used for the bottom court of two tower body columns of king-tower tower body (12) from outside drop Outward separately, pylon draws hoist engine (10) for removing two tower body columns of king-tower tower body (12) from during drop from fall Bottom receive inwardly, pylon outer draws hoist engine (9), pylon to draw hoist engine (10) collective effect from fall and realize king-tower from dropping The rise and fall of tower body (12);Described tower head top is pulled wind devices (13) and is passed through top cable rope draw in king-tower tower head (11) top, pulls wind devices (14) and passes through middle part cable rope draw in king-tower tower head (11) in the middle part of described tower head Portion, tower head top is pulled and is pulled the common draw of wind devices (14) in the middle part of wind devices (13) and tower head and in king-tower tower head (11) and realize All the time plumbness in king-tower (1) lifting process for the king-tower tower head (11).
2. according to the high tower structure of cable crane described in claim 1 it is characterised in that:Also include that mast hangs (16) and mast hangs side Pull wind devices (15), mast is hung (16) and is correspondingly arranged with described king-tower tower head (11), mast hangs side and pulls wind devices (15) by volume Raise machine travel cable rope and act on mast and hang (16) top.
3. according to the high tower structure of cable crane described in claim 1 it is characterised in that:On described main rope (2), cable machine is installed little Car (6).
4. according to the high tower structure of cable crane described in claim 1 it is characterised in that:Described pylon draws hoist engine (9) from outside drop Draw steel wire rope (91) to draw outside the tower body column bottom of king-tower tower body (12) from outside drop by pylon, draw from fall is outer in pylon Steel wire rope (91) is provided with pylon and draws assembly pulley (92) from outside drop, and certainly drops also by pylon inside this tower body column bottom Inside draw the pylon that hoist engine (10) draws to draw steel wire rope (101) from fall, draw from fall in pylon and be provided with tower on steel wire rope (101) Frame draws assembly pulley (102) from fall.
5. a kind of method for dismounting of high tower structure of cable crane it is characterised in that:Its method for dismounting is as follows:
A, pull wind devices and hoist engine and install:Tower head top is pulled and pulls wind devices (14) in the middle part of wind devices (13) and tower head by ground Anchor is installed to corresponding position, and tower head top is pulled wind devices (13) and passed through top cable rope draw in king-tower tower head (11) Top, pulls wind devices (14) and passes through middle part cable rope draw in the middle part of king-tower tower head (11), by tower head in the middle part of tower head Top is pulled and is pulled the common draw of wind devices (14) in the middle part of wind devices (13) and tower head and in king-tower tower head (11) and realize king-tower tower Head (11) is in plumbness;
B, king-tower are high-order to drop certainly:Pylon is drawn from outside drop hoist engine (9) and pylon draw hoist engine (10) to pacify by earth anchor from fall It is attached to the corresponding position of king-tower tower body (12) bottom, king-tower tower body (12) has two tower body columns, each tower body column All being correspondingly arranged on a pylon draws hoist engine (9) and pylon to draw hoist engine (10) from fall from outside drop, and pylon draws volume from outside drop Raising machine (9) draws steel wire rope (91) to draw outside tower body column bottom by pylon from outside drop, and pylon draws hoist engine from drop (10) passing through pylon draws steel wire rope (101) to draw inside tower body column bottom from fall;Pylon from drop outer draw hoist engine (9), Pylon draws the tower body column of hoist engine (10) collective effect king-tower tower body (12) from fall and realizes king-tower tower head (11), king-tower tower Steady during the entire lowering of body (12), and during declining, main rope (2), tail are made by the traction of hoist engine Rope (5) also serve as pull wind vertical direction with tower head top pull wind so that king-tower tower head (11) and king-tower tower body (12) steadily decline;
C, the auxiliary fall of king-tower low level:There is below king-tower tower head (11) mast walked for king-tower tower head (11) decline and hang (16), When king-tower tower head (11) bottom certainly drops to mast and hangs (16) top, mast hangs (16) and lifts king-tower tower head (11) and make king-tower Tower head (11) steadily declines, and mast hangs side to be pulled wind devices (15) and hang (16) by side cable rope draw in mast and make mast Hang (16) hoisting wirerope and be in vertical state all the time;
D, buttress support and remove:King-tower (1) is dropped to extreme lower position and is supported by the buttress being arranged on ground, then tears open Except whole king-tower (1);Then complete secondary car (3), balance car (4), mast hang the dismounting of (16), and reclaim main rope (2), pygochord (5), then complete each hoist engine, pull the dismounting of wind devices.
6. according to the high tower structure of cable crane described in claim 5 method for dismounting it is characterised in that:Increase between step A and B Plus step A1, wherein step A1 is as follows:
A1, the adjustment of king-tower obliquity:If king-tower (1) vertically no tilts, it is directly entered step B;If king-tower (1) is in inclination State, then first will be lived with big butterfly clamp clip respectively at the two ends rope head of main rope (2) and pygochord (5), then be equipped with corresponding type respectively Number hoist engine, steel wire rope and assembly pulley, in order to hold each butterfly mounting board;By adjusting hoist engine folding and unfolding steel wire rope, will lead Tower (1) is adjusted to plumbness by heeling condition.
CN201510553143.XA 2015-09-01 2015-09-01 High tower structure of cable crane and its method for dismounting Active CN105060125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510553143.XA CN105060125B (en) 2015-09-01 2015-09-01 High tower structure of cable crane and its method for dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510553143.XA CN105060125B (en) 2015-09-01 2015-09-01 High tower structure of cable crane and its method for dismounting

Publications (2)

Publication Number Publication Date
CN105060125A CN105060125A (en) 2015-11-18
CN105060125B true CN105060125B (en) 2017-03-08

Family

ID=54489719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510553143.XA Active CN105060125B (en) 2015-09-01 2015-09-01 High tower structure of cable crane and its method for dismounting

Country Status (1)

Country Link
CN (1) CN105060125B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107161890A (en) * 2017-06-12 2017-09-15 无锡石油化工起重机有限公司 It is provided with the loop wheel machine counter-jib of portable balance car
CN110065888B (en) * 2019-05-07 2020-04-28 中国水利水电第七工程局有限公司 Cable crane main cable dismantling construction method
CN111762697B (en) * 2020-05-11 2022-03-29 中铁六局集团有限公司 Large-span cable crane dismantling construction method adjacent to railway business line
CN111787086B (en) * 2020-06-24 2022-08-09 中国三峡建设管理有限公司 Method for identifying pile number of cable crane parking charging platform in concrete construction
CN113830687B (en) * 2021-09-10 2023-08-01 浙江天弘机器人科技有限公司 Tower crane assembling equipment and operation method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202090286U (en) * 2011-01-30 2011-12-28 中交三航局第三工程有限公司 Traction system suitable for self-anchored type double cable plane suspension bridge
CN104278637B (en) * 2014-09-23 2016-04-06 中铁大桥局集团第一工程有限公司 A kind of main rope of suspension bridge strand is without the cableway erection method in cat road
CN204474178U (en) * 2015-01-30 2015-07-15 中国水利水电第八工程局有限公司 A kind of cable crane

Also Published As

Publication number Publication date
CN105060125A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105060125B (en) High tower structure of cable crane and its method for dismounting
CN101434366B (en) Hoisting tool and hoisting method for column component
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN107161857A (en) Hoisting system and method suitable for erecting flat thin-wall component
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN104989111B (en) Steel construction high level construction method for hanging
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
US11279593B2 (en) Compensation line storing apparatus, jump lift and the usage method thereof
CN201495051U (en) Crane jib for flat-top tower crane
CN107344697A (en) Cable boom hoisting
CN102963817A (en) Tailing force-free large equipment hoisting vertical tail removal method
CN101284626A (en) Additional weight hoisting method
WO2022027883A1 (en) Cantilever crane
CN210763880U (en) A driving hoist device for steam turbine rotor lifts by crane
CN101343949B (en) Dislocation assembly network frame hoisting construction method and its hoisting system
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN207090834U (en) Cable boom hoisting
CN203451184U (en) Large-load high-position operation hanging basket suspension mechanism
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN201660377U (en) Special gantry crane for overlength and large-tonnage parts
EP2962978A1 (en) Device for lifting loads and method for erecting the same
CN111453630A (en) Bridge deck crane and using method thereof
CN105398936B (en) Cassette beam column boom hoisting
CN216920054U (en) Long heavy cable hanging installation device for multipoint hanging of underbridge expansion cable
CN208948707U (en) It is hanging multi-tower continuous across cable crane under a kind of overhead traveling crane with c-type

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100036 No.1 Yuyuantan South Road, Haidian District, Beijing

Patentee after: CHINA THREE GORGES Corp.

Address before: 100000 No. 1, Yuyuantan South Road, Haidian District, Beijing

Patentee before: CHINA THREE GORGES Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20211203

Address after: 100036 No.1 Yuyuantan South Road, Haidian District, Beijing

Patentee after: CHINA THREE GORGES Corp.

Patentee after: Three Gorges Technology Co.,Ltd.

Address before: 100036 No.1 Yuyuantan South Road, Haidian District, Beijing

Patentee before: CHINA THREE GORGES Corp.

TR01 Transfer of patent right