CN205330623U - Percussion drill shift unit - Google Patents
Percussion drill shift unit Download PDFInfo
- Publication number
- CN205330623U CN205330623U CN201620123776.7U CN201620123776U CN205330623U CN 205330623 U CN205330623 U CN 205330623U CN 201620123776 U CN201620123776 U CN 201620123776U CN 205330623 U CN205330623 U CN 205330623U
- Authority
- CN
- China
- Prior art keywords
- lumps
- wood
- steel
- shift unit
- flatcar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a percussion drill shift unit, includes the aversion platform of temporarily buildding at the construction field (site), and the top surface upper berth of aversion platform is equipped with the guide rail, and the wheel of aversion flatcar is placed on the guide rail, the aversion platform comprises the bottom lumps of wood group and the upper lumps of wood, and each lumps of wood that each lumps of wood and the upper lumps of wood of bottom lumps of wood group were organized is perpendicular, in the aversion flatcar, the both sides edge of wheel frame respectively is provided with the I -steel, is provided with two parallel square steel on the wheel frame between two I -steel. The utility model provides a percussion drill shift unit can solve the shift problem of difficulty of percussion drill in the underground continuous wall work progress, can convenient and fast remove the rig safely, great improvement work efficiency.
Description
Technical field
This utility model relates to a kind of shift unit, especially a kind of percussive drill shift unit。
Background technology
In recent years, concrete underground continuous wall is widely used in the hydraulic engineering in area on a large scale, the whole nation, and the geological conditions difference of encountered different regions is huge, and wherein the region of complex geologic conditions occupies major part。In this context, most diaphram wall engineering constrains the performance of large quantities of engineering driller in grooving difficulty, and impacts brill and can be competent at these complex environments, therefore impacts brill pore-creating grooving technology and have also been obtained extensive use in diaphram wall engineering。
Although impact brill pore-creating technique to can be suitably used under various severe geology and environmental condition, but in actual production, it is desirable to impact and bore and frequently just must can complete the slotted eye that a compliant requires by mobile drill。Impacting brill itself heavier, automaticity is not high, and traditional method for moving mainly has crane to hang transfer position and tire device two kinds of methods of displacement。Hang shifting method inefficiency, and dangerous, tire device is not suitable for soft base stratum, and both maximum common defects are to be both needed to readjust rig according to construction of diaphragm wall axis after telephone-moving to carry out centering, have had a strong impact on efficiency of construction。How to avoid these unfavorable factors, be that conventional impact bores construction technology urgent problem。
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of percussive drill shift unit, it is possible to solve the problem that percussive drill shifts difficulty in construction of diaphragm wall process, it is possible to convenient and swift mobile drill safely, significantly raising work efficiency。
For solving above-mentioned technical problem, this utility model be the technical scheme is that a kind of percussive drill shift unit, including the displacement platform built at the construction field (site) temporarily, the end face of displacement platform is equipped with guide rail, and the wheel of displacement flatcar is positioned on guide rail;
Displacement platform is made up of bottom lumps of wood group and upper strata lumps of wood group, and each lumps of wood of bottom lumps of wood group is vertical with each lumps of wood of upper strata lumps of wood group;
In displacement flatcar, the both sides of the edge of vehicle wheel frame are each provided with I-steel, and the vehicle wheel frame between two I-steel is provided with two parallel square steel。
Two square steel, between two I-steel and vehicle wheel frame by weld formed an overall displacement flatcar。
The lumps of wood of bottom lumps of wood group and upper strata lumps of wood group is of a size of: long 420 centimetres, wide 15 centimetres, high 15 centimetres。
The percussive drill shift unit that this utility model provides, by displacement flatcar is placed on the displacement platform built job site temporarily, displacement platform is built by the lumps of wood, each several part can be linked to be entirety after processing in advance, it is lifted to construction part with crane, then percussive drill is winched on device, with reinforcing bar, rig and flatcar are welded and fixed again, set up a stable operation platform that can fast move, the problem that percussive drill shifts difficulty in construction of diaphragm wall process can be solved, can convenient and swift mobile drill safely, raising work efficiency significantly;Simple in construction, processing and fabricating is convenient;In produced on-site, rig displacement directly just can complete with manpower, and speed is fast, and efficiency of construction is greatly improved, applied widely, it is adaptable to diaphragm wall technique under construction ground is bored in domestic impact。
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is structural representation of the present utility model。
Detailed description of the invention
As it is shown in figure 1, a kind of percussive drill shift unit, including the displacement platform 1 built at the construction field (site) temporarily, the end face of displacement platform 1 being equipped with guide rail 2, the wheel 3 of displacement flatcar 6 is positioned on guide rail 2;
Displacement platform 1 is made up of bottom lumps of wood group 1-1 and upper strata lumps of wood group 1-2, and each lumps of wood of bottom lumps of wood group 1-1 is vertical with each lumps of wood of upper strata lumps of wood group 1-2;
In displacement flatcar 6, the both sides of the edge of vehicle wheel frame are each provided with I-steel 4, and the vehicle wheel frame between two I-steel 4 is provided with two parallel square steel 5。
By welding one overall displacement flatcar 6 of formation between two square steel 5, two I-steel 4 and vehicle wheel frame。
The lumps of wood of bottom lumps of wood group 1-1 and upper strata lumps of wood group 1-2 is of a size of: long 420 centimetres, wide 15 centimetres, high 15 centimetres。
Displacement platform 1 is wide 420 centimetres, long 1000 centimetres, long 420 centimetres of displacement flatcar 6, wide 110 centimetres。
Of the present utility model build and use procedure is as follows:
1, smooth construction site, forms bottom lumps of wood group 1-1 and upper strata lumps of wood group 1-2 by the lumps of wood by horizontal and vertical laying, builds to obtain displacement platform 1;
2, guide rail 2 is laid to displacement platform 1;
3, I-steel 4, square steel 5, flatcar wheel 3 are welded into one and are integrally formed displacement flatcar 6, then lay to track 2;
4, with AFB32 shaped steel wire rope dop and reinforcing bar, shift unit is fixed;
5, percussive drill is lifted on shift unit, with reinforcing bar, reinforced frame, shift unit and rig is fixed, impact can be proceeded by and bore displacement。
Claims (3)
1. a percussive drill shift unit, it is characterised in that: including the displacement platform (1) temporarily built at the construction field (site), the end face of displacement platform (1) is equipped with guide rail (2), the wheel (3) of displacement flatcar (6) is positioned on guide rail (2);
Displacement platform (1) is made up of bottom lumps of wood group (1-1) and upper strata lumps of wood group (1-2), and each lumps of wood of bottom lumps of wood group (1-1) is vertical with each lumps of wood on upper strata lumps of wood group (1-2);
In displacement flatcar (6), the both sides of the edge of vehicle wheel frame are each provided with I-steel (4), and the vehicle wheel frame between two I-steel (4) is provided with two parallel square steel (5)。
2. percussive drill shift unit according to claim 1, it is characterised in that: two square steel (5), between two I-steel (4) and vehicle wheel frame by weld formed an overall displacement flatcar (6)。
3. percussive drill shift unit according to claim 1, it is characterised in that the lumps of wood on bottom lumps of wood group (1-1) and upper strata lumps of wood group (1-2) is of a size of: long 420 centimetres, wide 15 centimetres, high 15 centimetres。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620123776.7U CN205330623U (en) | 2016-02-17 | 2016-02-17 | Percussion drill shift unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620123776.7U CN205330623U (en) | 2016-02-17 | 2016-02-17 | Percussion drill shift unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205330623U true CN205330623U (en) | 2016-06-22 |
Family
ID=56314121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620123776.7U Active CN205330623U (en) | 2016-02-17 | 2016-02-17 | Percussion drill shift unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205330623U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121507A (en) * | 2016-08-15 | 2016-11-16 | 中交隧道工程局有限公司 | The operation platform of rotary drilling rig in foundation ditch |
CN108301783A (en) * | 2018-03-28 | 2018-07-20 | 四川宏华石油设备有限公司 | A kind of Integral moving device for drill |
-
2016
- 2016-02-17 CN CN201620123776.7U patent/CN205330623U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121507A (en) * | 2016-08-15 | 2016-11-16 | 中交隧道工程局有限公司 | The operation platform of rotary drilling rig in foundation ditch |
CN106121507B (en) * | 2016-08-15 | 2018-06-19 | 中交隧道工程局有限公司 | The construction platform of rotary drilling rig in foundation pit |
CN108301783A (en) * | 2018-03-28 | 2018-07-20 | 四川宏华石油设备有限公司 | A kind of Integral moving device for drill |
CN108301783B (en) * | 2018-03-28 | 2024-02-27 | 四川宏华石油设备有限公司 | Integral moving device for drilling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102797252A (en) | Construction method of underground continuous walls | |
CN204435376U (en) | A kind of intelligent pile machine equipment | |
CN103195058A (en) | Multi-casing structure capable of facilitating bridge-pile construction in cavern development areas and construction method thereof | |
CN101586340A (en) | Preconditioning process of continuous wall for weak weathering terrane grooving construction | |
CN205330623U (en) | Percussion drill shift unit | |
CN111058458A (en) | Construction method and structure based on cutter suction type ground connecting wall local replacement row pile support | |
CN112796307A (en) | Square pile construction method of rotary drilling rig | |
US8607898B2 (en) | Force compensator for top drive assembly | |
CN102561387A (en) | Reverse construction method of underground core-tube diaphragm wall | |
CN112813969A (en) | Steel pipe pile foundation and construction method thereof | |
CN208934591U (en) | Integral type full-sleeve full-rotation drill | |
CN205477366U (en) | A complete set of pipe vice clamping device of wedge for full -rotating drill | |
CN113293783B (en) | Construction method for hole leading of underwater steel cofferdam | |
CN102286976B (en) | Method for making pile foundation construction follow long steel pile casing construction in karst area | |
CN214577030U (en) | Complicated environment ultra-long distance pipe jacking structure | |
CN103850247B (en) | A kind of underground continuous wall connector guard shield and construction equipment and construction method | |
CN212612466U (en) | Special geological pile foundation construction equipment | |
CN104879060B (en) | A kind of method of the percussive drill flatcar and control percussive drill impervious wall construction precision of impervious wall construction | |
CN103225303B (en) | Construction method for driving piles in narrow space | |
CN105382056A (en) | Press device for correcting welding deformation of longitudinal joint of large-diameter steel pipe | |
CN105297724B (en) | Pile sinking construction method for precast concrete plank pile | |
CN207633149U (en) | A kind of auxiliary system of underpass construction | |
CN202157327U (en) | Jacking device for excavation of casting machine base auxiliary well hole piles | |
CN203866818U (en) | Construction equipment for connector protection plate of underground diaphragm wall | |
CN105583949B (en) | Pipe die positioned-lifting platform and pipe die positioned-lifting mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |