CN103225303B CN201310153412.4A CN201310153412A CN103225303B CN 103225303 B CN103225303 B CN 103225303B CN 201310153412 A CN201310153412 A CN 201310153412A CN 103225303 B CN103225303 B CN 103225303B
Authority
CN
China
Prior art keywords
steel pipe
pile
pipe pile
construction
single hop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310153412.4A
Other languages
Chinese (zh)
Other versions
CN103225303A (en
Inventor
李文峰
江园春
王建荣
黄炳昌
高彬
郑敏
马振艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201310153412.4A priority Critical patent/CN103225303B/en
Publication of CN103225303A publication Critical patent/CN103225303A/en
Application granted granted Critical
Publication of CN103225303B publication Critical patent/CN103225303B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to the field of pile foundation construction, in particular to a construction method for driving piles in a narrow space. The construction method comprises the following steps: 1, cleaning a construction site; and 2, measuring and paying off on the construction site; and the construction method further comprises the following steps: 3, preparing steel pipe pile material; 4, arranging pile driving equipment in place; 5, conveying sectioned steel pipe piles; 6, hanging the sectioned steel pipe piles in place; 7, welding single-section steel pipe piles; 8, controlling the verticality of the welded piles; and 9, finishing the pile driving operation, and evacuating equipment. Through the adoption of the method, the area of the site occupied by the construction is small, the operation is convenient, and the surrounding interference in operation is small, therefore, the construction method is especially suitable for pile foundation operation such as site transformation of large metallurgy projects and the like.

Description

Pile construction method is pressed down in small space
Technical field
The present invention relates to pile foundation construction field, particularly relate to the piling construction technology in small space.
Background technology
In metallurgical engineering, building engineering field, adopt pile foundation to improve supporting capacity below a lot of transformations and newly-increased basis, and above-mentioned transformation project often construction site narrow space, top and surrounding volume are subject to the restriction of height and distance, during pile foundation construction, the normal operation not affecting original project should be ensured, also will guarantee that transformation progress is unaffected, the piling Technology of crude oil is difficult to the needs meeting field operation.
Summary of the invention
The object of the invention is to, provide a kind of under the prerequisite not affecting original project, can carry out the construction method of lower stake operation in small space, thus overcome existing pile foundation operation cannot small space launch defect.
In order to achieve the above object, the present invention is achieved in that
Press down a pile construction method in small space, it comprises:
Step 1, construction plant cleaning;
Step 2, construction plant surveying setting-out;
It is characterized in that: also comprise
Step 3, steel pipe pile material prepare: the height, the surrounding volume size that obtain according to construction plant surveying setting-out, carry out cutting section operation to whole steel pipe pile, enable to erect in the length of single hop steel pipe pile height on construction ground;
The configuration of step 4, pile compacting equipment is in place: according to length and single bearing capacity of pile foundation size of single hop steel pipe pile, loads height and the weight counterweight of coupling, be equipped with arm above pile press counterweight to stake machine;
The transport of step 5, one-tenth section steel pipe pile: lay two tracks be parallel to each other at stake machine side and be transported to by a machine so that the steel pipe pile of section will be become;
Step 6, become the hoisted in position of section steel pipe pile: to be lifted by crane by single hop steel pipe pile with the arm coordinative construction personnel above pile press counterweight and to be transported to assigned address in place and carry out lower stake operation by pile press;
The welding of step 7, single hop steel pipe pile: under the preceding paragraph single hop steel pipe pile after dress, repeats step 6 and rear one section of single hop steel pipe pile and the single hop steel pipe pile completing lower stake is carried out weld job;
Step 8, the degree control of pile body welded: adopt multiple point in the pile body top same level of having welded that magnetic is set and hang to hang down and detect verticality, and carry out measuring for verticality at the horizontal guiding ruler of joint use of single hop steel pipe pile;
Step 9, lower stake operation complete, equipment is withdrawn.
The present invention adopts said method, the shared site area of its construction is little, easy to operate, operation time little to around disturbing, be therefore particularly suitable for metallurgically waiting the pile foundation operations such as the place transformation of mega project.
Accompanying drawing explanation
Fig. 1 is the structural representation of press apparatus in the present invention.
Fig. 2 is the track schematic diagram for steel pipe pile transport in the present invention.
Detailed description of the invention
The present invention is further illustrated below by way of specific embodiment.
Press down a pile construction method in small space, it comprises:
Step 1, construction plant cleaning;
Step 2, construction plant surveying setting-out;
It is characterized in that: also comprise
Step 3, steel pipe pile material prepare: the height, the surrounding volume size that obtain according to construction plant surveying setting-out, carry out cutting section operation to whole steel pipe pile, enable to erect in the length of single hop steel pipe pile 6,8 height on construction ground;
As shown in Figure 1, the configuration of step 4, pile compacting equipment is in place: according to length and single bearing capacity of pile foundation size of single hop steel pipe pile 6,8, loads height and the weight counterweight 3 of coupling, be equipped with arm 2 above pile press 1 counterweight 3 to pile press 1;
As shown in Figure 2, the transport of step 5, one-tenth section steel pipe pile: lay two tracks be parallel to each other 7 at pile press 1 side other will the steel pipe pile 8 of section be become to be transported to pile press 1;
Step 6, become the hoisted in position of section steel pipe pile: to be lifted by crane by single hop steel pipe pile 6 with the arm 2 coordinative construction personnel above pile press 1 counterweight 3 and to be transported to assigned address in place and carry out lower stake operation by pile press 1;
The welding of step 7, single hop steel pipe pile: after the preceding paragraph single hop steel pipe pile 6 times dresses, repeats step 6 and rear one section of single hop steel pipe pile 6 is carried out weld job with the single hop steel pipe pile 6 completing lower stake;
Step 8, the degree control of pile body welded: adopt multiple point in the pile body top same level of having welded that magnetic is set and hang vertical 4 and detect verticality, and carry out measuring for verticality at the horizontal guiding ruler 5 of the joint use of single hop steel pipe pile 6;
Step 9, lower stake operation complete, equipment is withdrawn.
The present invention adopts said method, the shared site area of its construction is little, easy to operate, operation time little to around disturbing, be therefore particularly suitable for metallurgically waiting the pile foundation operations such as the place transformation of mega project.

Claims (1)

1. press down a pile construction method in small space, it comprises:
Step 1, construction plant cleaning;
Step 2, construction plant surveying setting-out;
It is characterized in that: also comprise
Step 3, steel pipe pile material prepare: the height, the surrounding volume size that obtain according to construction plant surveying setting-out, carry out cutting section operation to whole steel pipe pile, enable to erect in the length of single hop steel pipe pile height on construction ground;
The configuration of step 4, pile compacting equipment is in place: according to length and single bearing capacity of pile foundation size of single hop steel pipe pile, loads height and the weight counterweight of coupling, be equipped with arm above pile press counterweight to stake machine;
The transport of step 5, one-tenth section steel pipe pile: lay two tracks be parallel to each other at stake machine side and be transported to by a machine so that the steel pipe pile of section will be become;
Step 6, become the hoisted in position of section steel pipe pile: to be lifted by crane by single hop steel pipe pile with the arm coordinative construction personnel above pile press counterweight and to be transported to assigned address in place and carry out lower stake operation by pile press;
The welding of step 7, single hop steel pipe pile: under the preceding paragraph single hop steel pipe pile after dress, repeats step 6 and rear one section of single hop steel pipe pile and the single hop steel pipe pile completing lower stake is carried out weld job;
Step 8, the degree control of pile body welded: adopt multiple point in the pile body top same level of having welded that magnetic is set and hang to hang down and detect verticality, and carry out measuring for verticality at the horizontal guiding ruler of joint use of single hop steel pipe pile;
Step 9, lower stake operation complete, equipment is withdrawn.
CN201310153412.4A 2013-04-28 2013-04-28 Construction method for driving piles in narrow space Expired - Fee Related CN103225303B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310153412.4A CN103225303B (en) 2013-04-28 2013-04-28 Construction method for driving piles in narrow space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310153412.4A CN103225303B (en) 2013-04-28 2013-04-28 Construction method for driving piles in narrow space

Publications (2)

Publication Number Publication Date
CN103225303A CN103225303A (en) 2013-07-31
CN103225303B true CN103225303B (en) 2015-06-03

Family

ID=48835928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310153412.4A Expired - Fee Related CN103225303B (en) 2013-04-28 2013-04-28 Construction method for driving piles in narrow space

Country Status (1)

Country Link
CN (1) CN103225303B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109385997B (en) * 2017-08-04 2021-01-15 上海宝冶集团有限公司 Construction method of PHC tubular pile under narrow field condition
CN108798506B (en) * 2018-06-11 2024-02-20 中铁工程装备集团有限公司 Small-size stake machine of low formula

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1034750C (en) * 1992-09-11 1997-04-30 管明德 Anchor beam type hydrostatic piledriving method and equipment thereof
JP5069873B2 (en) * 2006-06-08 2012-11-07 住友林業株式会社 Steel pipe pile construction method
CN101718092A (en) * 2009-11-27 2010-06-02 上海隧道工程股份有限公司 Environment micro-turbulence static pressing pile construction technology under low-headroom condition
CN201746049U (en) * 2010-06-17 2011-02-16 国鼎(南通)管桩有限公司 Steel tube concrete pile translation device
CN102359109A (en) * 2011-08-08 2012-02-22 长沙天为工程机械制造有限公司 Static pile press for narrow site and ultra-short side pile distance construction

Also Published As

Publication number Publication date
CN103225303A (en) 2013-07-31

Similar Documents

Publication Publication Date Title
CN104016089A (en) Slipping installation method of big flue of sintering machine and rail installation mechanism thereof
CN103967284B (en) The steel column installation method of reserved stigma docking
CN204040035U (en) A kind of positioning guiding structure of steel pile casting
CN103225303B (en) Construction method for driving piles in narrow space
CN104060543A (en) Installation device of prefabricated bridge deck
CN207347033U (en) A kind of small-sized hanging apparatus of civil engineering
CN208415013U (en) track fast dismounting device
CN202247942U (en) Overhanging type lifter foundation
CN104818729B (en) Can be for the mutual foundation of big or small tower crane conversion
CN106760558B (en) Aerial aligning method after a kind of installation of suspension type boiler drum
CN104499706A (en) Elevator well template platform and construction method thereof
CN204002876U (en) A kind of steel chassis for tunnel construction
CN206554104U (en) A kind of steel lifted trunk is accurately positioned mounting structure
CN206667061U (en) A kind of continous way suspension bridge cat road head-rope crosses tower structure
CN105064333A (en) Large-diameter cast-in-place concrete pile lengthened template support system
CN205330623U (en) Percussion drill shift unit
CN108217448A (en) A kind of integrated bridge floor device for hoisting for composite beam construction
CN211898417U (en) Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted
CN203806943U (en) Lifting device
CN103552937A (en) Tower type hoisting and distributing dual-purpose machine
CN103132508A (en) Pile-filling machine
CN102561201A (en) T-beam installer
CN206951856U (en) A kind of portable manual Multipurpose bending machine
CN208684247U (en) A kind of prefabricated subsection hanging apparatus
CN203877824U (en) Lifting barrow

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model