CN204002876U - A kind of steel chassis for tunnel construction - Google Patents
A kind of steel chassis for tunnel construction Download PDFInfo
- Publication number
- CN204002876U CN204002876U CN201420475913.4U CN201420475913U CN204002876U CN 204002876 U CN204002876 U CN 204002876U CN 201420475913 U CN201420475913 U CN 201420475913U CN 204002876 U CN204002876 U CN 204002876U
- Authority
- CN
- China
- Prior art keywords
- steel
- operation platform
- auxiliary operation
- tunnel construction
- car skeleton
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 48
- 239000010959 steel Substances 0.000 title claims abstract description 48
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 230000002787 reinforcement Effects 0.000 claims abstract description 11
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 8
- 229910052742 iron Inorganic materials 0.000 claims abstract description 4
- 241000282326 Felis catus Species 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 abstract description 9
- 239000011435 rock Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000008400 supply water Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
For a steel chassis for tunnel construction, comprise the car skeleton that i iron is welded, described car skeleton top is equipped with steel mesh reinforcement; Described car skeleton is provided with multistage auxiliary operation platform, between multistage auxiliary operation platform, has difference in height; Described auxiliary operation platform comprises the telescopic steel pipe being fixedly connected on car skeleton, and telescopic steel pipe is provided with steel plate piece, on described auxiliary operation platform, is equipped with steel mesh reinforcement; Described car skeleton is provided with for supplying water or the supervisor of air feed, and supervisor connects multiple being in charge of.A kind of steel chassis for tunnel construction of the utility model, for processing voluntarily easy making; Effectively ensure Tunnel excavation progress and guarantee tunnel construction quality.
Description
Technical field
The utility model relates to a kind of steel chassis, particularly a kind of steel chassis for tunnel construction.
Background technology
At present, in Construction of Hydropower Engineering, particularly, in all Tunnel excavations, generally adopt rock bolting jumbo to carry out anchor pole, anchor pile construction, but use rock bolting jumbo construction cost too high in the time of light section cavern excavation.
Summary of the invention
In order to overcome having high input that rock bolting jumbo carries out that the construction of anchor pole, anchor pile causes, the high in cost of production problem of adopting.The utility model provides a kind of steel chassis for tunnel construction, for processing voluntarily easy making; Effectively ensure Tunnel excavation progress and guarantee tunnel construction quality.
The technical scheme that the utility model is taked is: a kind of steel chassis for tunnel construction, comprise the car skeleton that i iron is welded, and described car skeleton top is equipped with steel mesh reinforcement; Described car skeleton is provided with multistage auxiliary operation platform, between multistage auxiliary operation platform, has difference in height; Described auxiliary operation platform comprises the telescopic steel pipe being fixedly connected on car skeleton, and telescopic steel pipe is provided with steel plate piece, on described auxiliary operation platform, is equipped with steel mesh reinforcement; Described car skeleton is provided with for supplying water or the supervisor of air feed, and supervisor connects multiple being in charge of.
Described steel mesh reinforcement is welded by Φ 32 screw-thread steels and Φ 25 screw-thread steel square crossings.
Described multistage auxiliary operation platform is three grades, along vertical short transverse, be equidistantly distributed in car skeleton both sides.Described multistage auxiliary operation platform is provided with cat ladder.
Described supervisor, be in charge of and be equipped with valve.
Described multiple caliber difference of being in charge of.
A kind of steel chassis for tunnel construction of the utility model.
1), multistage auxiliary operation platform is provided with scalable steel pipe, is convenient to adapt to the excavation supporting in footpath, different hole.
2), the auxiliary operation platform of chassis divides three grades, every one-level auxiliary operation platform can meet the excavation supporting of differing heights.
3), car skeleton be provided with for supply water or air feed water main and air main, supervisor on be welded with being in charge of of different tube diameters, to meet water supply and the air feed demand of distinct device.
4), all adopt worked materials, carry out the construction of anchor pole and anchor pile, construction is protected in concrete spray.Quick and easy for installation, at the bottom of cost.Can ensure that construction speed can meet again quality requirement.
Brief description of the drawings
Fig. 1 is the utility model device plan structure schematic diagram;
Fig. 2 is that the A-A of Fig. 1 is to structural representation;
Fig. 3 is that the B-B of Fig. 1 is to structural representation;
Fig. 4 is that the C-C of Fig. 1 is to structural representation;
Fig. 5 is that the D-D of Fig. 1 is to structural representation;
Fig. 6 is that the E-E of Fig. 5 is to structural representation;
Fig. 7 is the F place enlarged diagram of Fig. 4.
Detailed description of the invention
As shown in Fig. 1 ~ Fig. 7, a kind of steel chassis for tunnel construction, comprises the car skeleton 1 that adopts I32 i iron to be welded, and described car skeleton 1 top is equipped with steel mesh reinforcement 2.Described steel mesh reinforcement 2 is welded by Φ 32 screw-thread steels and Φ 25 screw-thread steel square crossings.
Described car skeleton 1 is provided with multistage auxiliary operation platform 4, between multistage auxiliary operation platform 4, has difference in height.Every one-level auxiliary operation platform can meet the excavation supporting of differing heights.Described auxiliary operation platform 4 comprises the telescopic steel pipe 5 being fixedly connected on car skeleton 1, and telescopic steel pipe 5 adopts Φ 100 telescopic steel pipes, is convenient to adapt to the excavation supporting in footpath, different hole.Telescopic steel pipe 5 is provided with steel plate piece 6, on described auxiliary operation platform 4, is equipped with steel mesh reinforcement 2.
The utility model preferably described multistage auxiliary operation platform 4 is three grades, along vertical short transverse, be equidistantly distributed in car skeleton 1 both sides.Described multistage auxiliary operation platform 4 is provided with cat ladder 3.
Described car skeleton 1 two ends is welded with respectively for supplying water or the supervisor 7 of the Φ 100 of air feed, and supervisor 7 connects and is multiplely in charge of 8.Described supervisor 7, be in charge of and on 8, be equipped with valve 9.Described multiple 8 caliber differences of being in charge of, to meet water supply and the air feed demand of distinct device.First by pumping plant 7 supply water to being responsible for, air feed, then according to the actual conditions of cavern excavation supporting, being in charge of of selecting to match 8 is connected with construction equipment, opens the supply of just can construct after valve 9 use wind, water.
Claims (6)
1. for a steel chassis for tunnel construction, comprise the car skeleton (1) that i iron is welded, it is characterized in that, described car skeleton (1) top is equipped with steel mesh reinforcement (2); Described car skeleton (1) is provided with multistage auxiliary operation platform (4), between multistage auxiliary operation platform (4), has difference in height; Described auxiliary operation platform (4) comprises the telescopic steel pipe (5) being fixedly connected on car skeleton (1), and telescopic steel pipe (5) is provided with steel plate piece (6), is equipped with steel mesh reinforcement (2) on described auxiliary operation platform (4); Described car skeleton (1) is provided with for supplying water or the supervisor (7) of air feed, and supervisor (7) connects multiple being in charge of (8).
2. a kind of steel chassis for tunnel construction according to claim 1, is characterized in that, described steel mesh reinforcement (2) is welded by Φ 32 screw-thread steels and Φ 25 screw-thread steel square crossings.
3. a kind of steel chassis for tunnel construction according to claim 1, is characterized in that, described multistage auxiliary operation platform (4) is three grades, along vertical short transverse, be equidistantly distributed in car skeleton (1) both sides.
4. according to a kind of steel chassis for tunnel construction described in claim 1 or 3, it is characterized in that, described multistage auxiliary operation platform (4) is provided with cat ladder (3).
5. a kind of steel chassis for tunnel construction according to claim 1, is characterized in that, described supervisor (7), is in charge of and on (8), is equipped with valve (9).
6. a kind of steel chassis for tunnel construction according to claim 1, is characterized in that, described multiple being in charge of (8) caliber difference.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420475913.4U CN204002876U (en) | 2014-08-22 | 2014-08-22 | A kind of steel chassis for tunnel construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420475913.4U CN204002876U (en) | 2014-08-22 | 2014-08-22 | A kind of steel chassis for tunnel construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204002876U true CN204002876U (en) | 2014-12-10 |
Family
ID=52042895
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420475913.4U Expired - Fee Related CN204002876U (en) | 2014-08-22 | 2014-08-22 | A kind of steel chassis for tunnel construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204002876U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106121680A (en) * | 2016-08-29 | 2016-11-16 | 中国葛洲坝集团第工程有限公司 | Wet shotcreting lining cutting boom truck |
| CN106194211A (en) * | 2016-08-29 | 2016-12-07 | 中国葛洲坝集团第工程有限公司 | TBM tunnels tunnel rail mounted wet shotcreting lining cutting composed bogie |
| CN107676113A (en) * | 2017-11-14 | 2018-02-09 | 云南省建筑科学研究院 | A kind of telescopic tunnel support Mobile workbench |
-
2014
- 2014-08-22 CN CN201420475913.4U patent/CN204002876U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106121680A (en) * | 2016-08-29 | 2016-11-16 | 中国葛洲坝集团第工程有限公司 | Wet shotcreting lining cutting boom truck |
| CN106194211A (en) * | 2016-08-29 | 2016-12-07 | 中国葛洲坝集团第工程有限公司 | TBM tunnels tunnel rail mounted wet shotcreting lining cutting composed bogie |
| CN106121680B (en) * | 2016-08-29 | 2018-07-27 | 中国葛洲坝集团第一工程有限公司 | Wet shotcreting lining cutting boom truck |
| CN106194211B (en) * | 2016-08-29 | 2019-07-09 | 中国葛洲坝集团第一工程有限公司 | TBM tunnels tunnel rail mounted wet shotcreting lining cutting composed bogie |
| CN107676113A (en) * | 2017-11-14 | 2018-02-09 | 云南省建筑科学研究院 | A kind of telescopic tunnel support Mobile workbench |
| CN107676113B (en) * | 2017-11-14 | 2024-02-20 | 云南省建筑科学研究院 | Telescopic tunnel supporting operation trolley |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103123016B (en) | Construction method for laying gas pipelines along bridge | |
| CN204899180U (en) | Steel construction jar body aerial working platform simply sets up device | |
| CN103243961A (en) | Titanium plate steel inner tank reversed construction device for chimney of thermal power station | |
| CN204002876U (en) | A kind of steel chassis for tunnel construction | |
| CN204282388U (en) | A kind of pile foundation reinforcement structure adopting compound pile to construct | |
| CN203559531U (en) | Metal roof forming and transportation integrated construction device | |
| CN104314081A (en) | Deep foundation pit driftway-free basement concrete pumping construction device | |
| CN104818729B (en) | Can be for the mutual foundation of big or small tower crane conversion | |
| CN201495556U (en) | Structure for quickly hoisting and centering base of large steel frame | |
| CN105464689A (en) | Steel trolley for tunnel construction | |
| CN203497150U (en) | Scaffold for hatch coaming of ship | |
| CN204000885U (en) | Metro Deep Excavation concrete support hangs mould mould | |
| CN203050207U (en) | Cone hopper bin jig frame formwork | |
| CN203768940U (en) | Angle steel tower foundation of overhead power transmission line | |
| CN202055507U (en) | Desulfurizing tower examination and repair platform | |
| CN203686351U (en) | Bridge-type pipe penetrating device | |
| CN202989788U (en) | Inner supporting member for steel corrugated culvert | |
| CN205296213U (en) | Utility tunnel lining cutting platform truck | |
| CN203938968U (en) | The auxiliary hanging basket of installation of continuous beam arch suspension rod bottom anchored end | |
| CN203920973U (en) | A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel | |
| CN204021215U (en) | A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam | |
| CN210637094U (en) | Repeatedly usable's portable artifical pillar | |
| CN103343546B (en) | Universal tower crane concrete foundation | |
| CN202787297U (en) | Tower crane base | |
| CN204000814U (en) | Steel casing is planted a platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: CHINA GEZHOUBA GROUP NO. 6 ENGINEERING CO., LTD. Free format text: FORMER NAME: GEZHOUBA GROUP NO. 6 ENGINEERING CO., LTD. |
|
| CP01 | Change in the name or title of a patent holder |
Address after: 443002 Xiling, Hubei Province sheep mountain road, No. 29, No. Patentee after: CHINA GEZHOUBA GROUP NO.6 ENGINEERING Co.,Ltd. Address before: 443002 Xiling, Hubei Province sheep mountain road, No. 29, No. Patentee before: GEZHOUBA GROUP NO.6 ENGINEERING Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 |