CN205329517U - Take shelter bridge in fire control lane - Google Patents

Take shelter bridge in fire control lane Download PDF

Info

Publication number
CN205329517U
CN205329517U CN201521039999.7U CN201521039999U CN205329517U CN 205329517 U CN205329517 U CN 205329517U CN 201521039999 U CN201521039999 U CN 201521039999U CN 205329517 U CN205329517 U CN 205329517U
Authority
CN
China
Prior art keywords
bridge
corridor
shelter bridge
fire engine
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521039999.7U
Other languages
Chinese (zh)
Inventor
田海荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521039999.7U priority Critical patent/CN205329517U/en
Application granted granted Critical
Publication of CN205329517U publication Critical patent/CN205329517U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a take shelter bridge in fire control lane, include the shelter bridge according to integral type structural design construction, shelter bridge pontic top is equipped with one or many corridor rooms, and the corridor room be one deck or multilayer, and the unilateral of shelter bridge or two side are equipped with the fire control lane according to the construction of public road bridge roof beam structural design, and the setting move towards to extend along the shelter bridge in the fire control lane, fire control lane setting in the both sides of shelter bridge, improve patency and stream of people's diversity of fire control greatly.

Description

A kind of shelter bridge with fire engine way
Technical field
This utility model belongs to bridge construction technical field, relates to a kind of shelter bridge with fire engine way。
Background technology
Shelter bridge is also known as Hongqiao, Scolopendra bridge etc., for there being the bridge on top, can protect bridge, simultaneously also can sun-rain-shading, have a rest for people, exchange, the effect such as party。Owing to shelter bridge belongs to crowded place, the passage on shelter bridge is all comparatively crowded, so the not reserved fire-fighting designated lane of existing shelter bridge, hides some dangers for for security against fire。
Utility model content
For above-mentioned the deficiencies in the prior art, this utility model provides a kind of shelter bridge with fire engine way。
This utility model be employed technical scheme comprise that, a kind of shelter bridge with fire engine way, including the shelter bridge designed and constructed according to integral structure, shelter bridge pontic is arranged over one or room, many corridors, room, corridor is one or more layers, the one side of shelter bridge or bilateral are provided with the fire engine way according to the construction of highway bridge structural design, and fire engine way moves towards extended along shelter bridge。
Further, when Langfang is for there being many, it is provided with between room, corridor between two and is exclusively used in the fire engine way that fire-fighting is speedily carried out rescue work。
Further, when room, corridor is multilamellar, between any one or more same floor on room, adjacent corridor, connect by connecting corridor。
Further, the both sides of fire engine way are provided with for by the railing of its isolation。
Further, it is provided with footpath between fire engine way and room, corridor。
Further, being vertically arranged with some bridge posts bottom shelter bridge bridge floor, be connected to some horizontally disposed conversion beams between each bridge post, the bottom of every bridge post is connected on bridge pier by bridge post cushion cap。
The beneficial effects of the utility model are, fire engine way are arranged on the both sides of shelter bridge, are greatly improved patency and artificial abortion's diversity of fire-fighting;Meanwhile, it is then connected on bridge pier by some longitudinally disposed bridge posts and horizontally disposed some conversion beams bottom shelter bridge, it is possible to the load conversion on room, corridor is gone to bridge post。
Accompanying drawing explanation
Fig. 1 is the front view of a kind of shelter bridge with fire engine way of this utility model。
In figure, 1. room, corridor, 2. fire engine way, 3. connect corridor, 4. railing, 6. bridge post cushion cap, 7. bridge post, 8. conversion beam, 9. bridge pier。
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, this utility model is described in detail。
This utility model provides a kind of shelter bridge with fire engine way, and referring to Fig. 1, shelter bridge pontic is arranged over room, corridor 1, and the fire engine way 2 that the one side of shelter bridge or bilateral are provided with, fire engine way 2 moves towards extended along shelter bridge。
Shelter bridge can arrange the room, corridor 1 of or many, when room, corridor 1 has many, it is possible to arrange between room, corridor 1 between two and be exclusively used in the fire engine way 2 that fire-fighting is speedily carried out rescue work。
Owing to shelter bridge relates only to dead load, so shelter bridge is designed and constructed according to integral structure, and fire engine way 2 relates to dead load and dynamic loading, so fire engine way 2 is constructed according to the standard of highway bridge structural design。
Room, corridor 1 may be arranged as one or more layers, when room, corridor 1 is multilamellar, it is possible between any one or more same floor on room, adjacent corridor 1, connects by connecting corridor 3, certainly, can also be not provided with between two connecting corridor 3 between room, corridor 1。Such as, can only will be connected by connection corridor 3 between the second layer in room, two corridors 1, or will connect each through connection corridor 3 between each layer in room, two corridors 1, in a word, according to design needs, between two can be not provided with between room, corridor 1 connect corridor 3, or select at certain one or more layers arrange connection corridor 3。
Being additionally provided with footpath between fire engine way 2 and room, corridor 1, do not affect the current of fire fighting truck, meanwhile, the both sides of fire engine way are provided with for by the railing 4 of its isolation。In the non-emergent moment, this fire engine way 2 is closed by railing 4, to avoid other public vehicles to take this fire engine way 2。
Fire engine way 2 is placed on the both sides of shelter bridge, patency and artificial abortion's diversity of fire-fighting can be greatly improved, while making full use of space, it is also possible to meet the requirement of new fire codes at present, utilize traffic fire-fighting it is also possible to allow the convenient visitor of environment on shelter bridge visit。
Being vertically arranged with some bridge posts 7 bottom shelter bridge bridge floor, be connected to some horizontally disposed conversion beams 8 between each bridge post 7, the bottom of every bridge post 7 is connected on bridge pier 9 by bridge post cushion cap 6。
The bridge pier 9 on shelter bridge basis and the connected mode in room, corridor 1 are for be directly vertically connected with, and the load of bridge pier more than 9 considers load and room, corridor 1 other loads above in room, corridor 1 by static load, and all loads in room, corridor 1 are changed by the conversion beam between bridge pier 9。Owing to bridge post 7 is longitudinally disposed at below bridge floor, directly bear the load in room, corridor, and conversion beam 8 is fixedly connected between each bridge post 7, load conversion on room, corridor can be gone to bridge post 7 by conversion beam 8, bridge post cushion cap 6 can be arranged on river horizontal plane, can also be arranged under river horizontal plane, require to select according to the water blocking rate of shelter bridge。

Claims (6)

1. the shelter bridge with fire engine way, it is characterized in that, including the shelter bridge designed and constructed according to integral structure, described shelter bridge pontic is arranged over one or room, many corridors (1), described room, corridor (1) is one or more layers, the one side of described shelter bridge or bilateral are provided with the fire engine way (2) according to the construction of highway bridge structural design, and fire engine way (2) moves towards extended along shelter bridge。
2. a kind of shelter bridge with fire engine way as claimed in claim 1, it is characterised in that when described room, corridor (1) has many, is provided with the fire engine way (2) being exclusively used in fire-fighting and speedily carrying out rescue work between described room, corridor between two (1)。
3. a kind of shelter bridge with fire engine way as claimed in claim 1 or 2, it is characterized in that, when room, described corridor (1) is for multilamellar, between any one or more same floor on room, adjacent corridor (1), connect by connecting corridor (3)。
4. a kind of shelter bridge with fire engine way as claimed in claim 1 or 2, it is characterised in that the both sides of described fire engine way (2) are provided with for by the railing (4) of its isolation。
5. a kind of shelter bridge with fire engine way as claimed in claim 1 or 2, it is characterised in that be provided with footpath between described fire engine way (2) and room, corridor (1)。
6. a kind of shelter bridge with fire engine way as claimed in claim 1 or 2, it is characterized in that, some bridge posts (7) it are vertically arranged with bottom described shelter bridge bridge floor, being connected to some horizontally disposed conversion beams (8) between each described bridge post (7), the bottom of every described bridge post (7) is connected on bridge pier (9) by bridge post cushion cap (6)。
CN201521039999.7U 2015-12-12 2015-12-12 Take shelter bridge in fire control lane Active CN205329517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521039999.7U CN205329517U (en) 2015-12-12 2015-12-12 Take shelter bridge in fire control lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521039999.7U CN205329517U (en) 2015-12-12 2015-12-12 Take shelter bridge in fire control lane

Publications (1)

Publication Number Publication Date
CN205329517U true CN205329517U (en) 2016-06-22

Family

ID=56212828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521039999.7U Active CN205329517U (en) 2015-12-12 2015-12-12 Take shelter bridge in fire control lane

Country Status (1)

Country Link
CN (1) CN205329517U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369728A (en) * 2015-12-12 2016-03-02 田海荣 Gallery bridge with fire-fighting lanes
CN107012975A (en) * 2017-03-15 2017-08-04 浙江水利水电学院 The water-retaining structure and construction method of a kind of ancient building shelter bridge

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369728A (en) * 2015-12-12 2016-03-02 田海荣 Gallery bridge with fire-fighting lanes
CN107012975A (en) * 2017-03-15 2017-08-04 浙江水利水电学院 The water-retaining structure and construction method of a kind of ancient building shelter bridge
CN107012975B (en) * 2017-03-15 2019-04-09 浙江水利水电学院 A kind of water-retaining structure and construction method of ancient building shelter bridge

Similar Documents

Publication Publication Date Title
CN205329517U (en) Take shelter bridge in fire control lane
CN205368994U (en) Asymmetric shelter bridge of building on public road bridge both sides
CN105386401A (en) Asymmetric gallery bridges constructed at two sides of highway bridge
CN203878452U (en) Novel gallery bridge
CN105369728A (en) Gallery bridge with fire-fighting lanes
CN104975559A (en) Corridor bridge apparatus
CN103556843B (en) Outdoor platform evacuation system for vertical transportation trunk and branch conversion of high-rise building
CN103696352B (en) A kind of people's car separation dual-channel ecofallows commercial gallery bridge
CN208152670U (en) Act of rescue space structure in a kind of skyscraper
WO2019085733A1 (en) Mega structure of building
CN204728188U (en) The combined bridge of a kind of shelter bridge and formation thereof
CN104499412A (en) Multi-bungalow covered bridge reconstructed based on highway bridge
CN203594244U (en) Outdoor platform evacuation system for switching of vertical transportation trunk road and branch roads of high-rise building
CN204370290U (en) A kind of walking shelter bridge with sightseeing passage
CN204370288U (en) A kind of shelter bridge based on road bridge reconstruction
CN205348937U (en) Take shelter bridge of memorial archway
CN207959517U (en) A kind of mammoth structure building
CN201924646U (en) Convenient transportation system of building complex
CN201952935U (en) Multi-high-rise building equipment conversion layer device
CN206337867U (en) A kind of self-propelled stereoscopic garage
CN207469864U (en) Intelligent emergency is taken refuge room
DK179211B1 (en) A Bridge Construction
CN105386636A (en) Gallery bridge with memorial archways
CN205502718U (en) Tent
CN104975560A (en) Novel lounge bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant