CN205296866U - Ceiling jib erection equipment - Google Patents

Ceiling jib erection equipment Download PDF

Info

Publication number
CN205296866U
CN205296866U CN201520893066.8U CN201520893066U CN205296866U CN 205296866 U CN205296866 U CN 205296866U CN 201520893066 U CN201520893066 U CN 201520893066U CN 205296866 U CN205296866 U CN 205296866U
Authority
CN
China
Prior art keywords
erection equipment
steel pipe
hanger erection
ceiling hanger
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520893066.8U
Other languages
Chinese (zh)
Inventor
陈振尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiuding Jiuhe Construction Group Co Ltd
Original Assignee
Beijing Jiuding Jiuhe Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiuding Jiuhe Construction Group Co Ltd filed Critical Beijing Jiuding Jiuhe Construction Group Co Ltd
Priority to CN201520893066.8U priority Critical patent/CN205296866U/en
Application granted granted Critical
Publication of CN205296866U publication Critical patent/CN205296866U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a jib erection equipment. And more particularly, the utility model relates to a ceiling jib erection equipment includes: at least one steel pipe, the both ends of steel pipe all are provided with the screw thread, the handle, its upper end is provided with the screw thread, and the lower extreme is provided with the portion of gripping, the upper end of handle through first connecting piece with the lower extreme of steel pipe is connected fixedly, the both ends of first connecting piece all are provided with the screw thread, the second connecting piece, its screw thread that sets up through the lower extreme with the steel pipe upper end is connected fixedly, the upper end of second connecting piece is provided with and waits to install jib matched with screw thread. The utility model provides a reasonable in design, simple structure, convenient operation, the ceiling jib erection equipment of workman's personal safety can be guaranteed to the while.

Description

Ceiling hanger erection equipment
Technical field
This utility model relates to a kind of hanger erection equipment. More specifically, this utility model relates to a kind of ceiling hanger erection equipment.
Background technology
In building engineering construction activity, all devices of ceiling is intended to rely on metal suspension rod and other steel parts to lift, so, installing suspension rod is an operation expending a large amount of manpowers. Conventional mounting suspension rod method be worker stands on ladder or stool, stand and raise one's hand, to ceiling spanner, suspension rod is installed, the drawback of traditional method is a lot: security performance is low, because standing on ladder or stool, has the risk thrown; Work efficiency is not high, and labor intensity is significantly high, and conventional mounting suspension rod method should be removed ladder, be climbed up and climb down again, always upper should lift spanner and suspension rod, and arm muscles is constantly in tense working state, generally to go up have a rest a little while.
Utility model content
A purpose of the present utility model is to solve at least the above, and provides the advantage that at least will be described later.
This utility model it is also an object that a kind of reasonable in design, simple in construction is provided, easy to operate, ensure that the ceiling hanger erection equipment of workman's personal safety simultaneously.
In order to realize according to these purposes of the present utility model and further advantage, it is provided that a kind of ceiling hanger erection equipment, including:
At least one steel pipe, the two ends of described steel pipe are provided with screw thread;
Handle, its upper end is provided with screw thread, and lower end is provided with grip part, and the upper end of described handle is connected fixing by the first connector with the lower end of described steel pipe, and the two ends of described first connector are provided with screw thread;
Second connector, its screw thread arranged by lower end is connected fixing with described steel pipe upper end, and the upper end of described second connector is provided with the screw thread matched with suspension rod to be installed.
Being connected by suspension rod to be installed fixing by multiple steel pipes that can freely dismantle assembling, easy construction, security performance is high, and hanger erection is firm simultaneously, and work efficiency is high, is beneficial to standardized work.
Preferably, in described ceiling hanger erection equipment, adjacent two steel pipes connect fixing by described first connector, it is possible to different according to ceiling height arbitrarily select, easy to assembly.
Preferably, in described ceiling hanger erection equipment, described first connector is internal thread straight joint, it is simple to Fast Installation, and is connected firmly.
Preferably, in described ceiling hanger erection equipment, described second connector upper end is built-in with hex nut, described suspension rod to be installed is fixed by described hex nut and described fastener for connection, not only it is connected firmly, simultaneously facilitates replacing, to meet the demand of different size suspension rod.
Preferably, in described ceiling hanger erection equipment, the external diameter of described hex nut is any one in 10mm, 12mm, 14mm or 16mm, matches with the suspension rod with different size.
Preferably, in described ceiling hanger erection equipment, described handle is set to T-shaped, and the main part of the grip part of described handle and described handle is vertically arranged, and designs hommization more, it is simple to operative.
Preferably, in described ceiling hanger erection equipment, the grip part of described handle is one-body molded with the main part of described handle, and processing is simple, and cost is low.
Preferably, in described ceiling hanger erection equipment, described steel pipe and handle are zinc-plated material.
Preferably, in described ceiling hanger erection equipment, the length of described steel pipe is 500mm, convenient for collecting.
Preferably, in described ceiling hanger erection equipment, the external diameter of described steel pipe is 25mm, and intensity is good, and the suspension rod of installation is solid.
This utility model at least includes following beneficial effect: worker stands can carry out ceiling on the ground and install suspension rod operation, eliminate the reliance on ladder or stool, security performance is high, avoid and stand on ladder or stool from the risk of high falling, and work efficiency is high, to stand in the speed installing suspension rod on ladder or stool fast more than three times than traditional. Simultaneously as be smoothly fastening nut of standing on the ground, being firmly uniform, can accurately grasp firmly size, that both will not twist very loose twists quick-fried without tension, firmly installs. Conveniently, all steel pipes can shrink folding pack and preserve for steel pipe easy accessibility, keeping. With low cost, all rod members are all adopt common standard component, without specific customization. The degree of firmly installing is 100%, than traditional raising 10%. Because being stand to operate on the ground, therefore greatly reducing labor intensity, conventional mounting arrangements should be removed ladder, climb up and climb down again, hands lifts spanner always, arm muscles is constantly in tense working state, generally to fill several have a rests. In addition, it is not necessary that professional's operation, popular construction, it is beneficial to standardized work.
Part is embodied by further advantage of the present utility model, target and feature by description below, and part also will by being understood by those skilled in the art research of the present utility model and practice.
Accompanying drawing explanation
Fig. 1 is the general assembly schematic diagram of ceiling hanger erection equipment described in the utility model;
Fig. 2 is the decomposing schematic representation of ceiling hanger erection equipment described in the utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is described in further detail, to make those skilled in the art can implement according to this with reference to description word.
Should be appreciated that used herein such as " have ", " comprising " and " including " term is not precluded from existence or the interpolation of other elements one or more or its combination.
As shown in Fig. 1��2, this utility model provides a kind of ceiling hanger erection equipment, including: at least one steel pipe 1, the two ends of described steel pipe are provided with external screw thread 11. Height according to ceiling assembles steel pipe, and the length of steel pipe can be pushed up with flat act both hands rod member and is advisable to ceiling. Handle 2, its upper end is provided with external screw thread 21, and lower end is provided with grip part 22, and the upper end of described handle is connected fixing by the first connector 3 with the lower end of described steel pipe, and the two ends of described first connector are provided with female thread 31.Second connector 4, its female thread arranged by lower end is connected fixing with described steel pipe upper end, and the upper end of described second connector is provided with the female thread 41 matched with suspension rod to be installed, and the second connector is arranged in multiple steel pipe the upper end of uppermost steel pipe. Being loaded by suspension rod to be installed in second connector and fasten, flat act installs the rod member of suspension rod, and the expansion bolt leaked outside by suspension rod is thrown in the hole being drilled, then rotates clockwise handle, fastening nut, then takes off rod member and can complete to install.
In described ceiling hanger erection equipment, adjacent two steel pipes connect fixing by described first connector, and one end of two steel pipes is inserted in the first connector respectively, tightens, and by the cooperation of external screw thread and female thread, two fastener for connection is fixed.
In described ceiling hanger erection equipment, described first connector is internal thread straight joint, and the externally threaded matching form at the shape of female thread at internal thread straight joint two ends and the external screw thread of handle upper end and steel pipe two ends closes, it is possible to for circular or polygon.
In described ceiling hanger erection equipment, described second connector upper end is built-in with hex nut, and described suspension rod to be installed is fixed by described hex nut and described fastener for connection. The external diameter of described hex nut is any one in 10mm, 12mm, 14mm or 16mm. Hex nut can be changed, thus adapting to different installation requirements according to the specification of suspension rod.
In described ceiling hanger erection equipment, described handle is set to T-shaped, and the main part 23 of the grip part of described handle and described handle is vertically arranged. The grip part of described handle is one-body molded with the main part of described handle, it is simple to machine-shaping. For the suspension rod bar footpath suspension rod more than more than 20mm, it is also possible to mix " torque-indicating wrench " on handle to grasp and to tighten degree.
In described ceiling hanger erection equipment, described steel pipe and handle are zinc-plated material.
In described ceiling hanger erection equipment, the length of described steel pipe is 500mm.
In described ceiling hanger erection equipment, the external diameter of described steel pipe is 25mm. By verification experimental verification repeatedly, the steel strength of 25mm is good, and when furred ceiling is higher than 4 meters, the pipe of 20mm is very soft, and the suspension rod of installation is shaky.
This equipment is applicable to install suspension rod operation not higher than 6 meters of all ceiling, and suspension rod bar footpath is between 6mm-25mm, and cost of manufacture is very low, small and exquisite easy-to-use, once volume production, very easily dominates the market rapidly. This equipment ruggedness is high, practical, greatly improves work efficiency, is substantially reduced labour cost, construction enterprises have huge economic benefit. This equipment can ensure that construction safety, it is ensured that the life security of workmen, effectively prevents high fall accident from occurring, and effectively avoids the huge economic loss brought because of security incident, construction enterprises have invisible social influence's benefit.
Although embodiment of the present utility model is disclosed as above, but listed utilization that it is not restricted in description and embodiment, it can be applied to various applicable field of the present utility model completely, for those skilled in the art, it is easily achieved other amendment, therefore, under the general concept limited without departing substantially from claim and equivalency range, this utility model is not limited to specific details and shown here as the legend with description.

Claims (10)

1. a ceiling hanger erection equipment, it is characterised in that including:
At least one steel pipe, the two ends of described steel pipe are provided with screw thread;
Handle, its upper end is provided with screw thread, and lower end is provided with grip part, and the upper end of described handle is connected fixing by the first connector with the lower end of described steel pipe, and the two ends of described first connector are provided with screw thread;
Second connector, its screw thread arranged by lower end is connected fixing with described steel pipe upper end, and the upper end of described second connector is provided with the screw thread matched with suspension rod to be installed.
2. ceiling hanger erection equipment as claimed in claim 1, it is characterised in that adjacent two steel pipes connect fixing by described first connector.
3. ceiling hanger erection equipment as claimed in claim 1, it is characterised in that described first connector is internal thread straight joint.
4. ceiling hanger erection equipment as claimed in claim 1, it is characterised in that described second connector upper end is built-in with hex nut, and described suspension rod to be installed is fixed by described hex nut and described fastener for connection.
5. ceiling hanger erection equipment as claimed in claim 4, it is characterised in that the external diameter of described hex nut is any one in 10mm, 12mm, 14mm or 16mm.
6. ceiling hanger erection equipment as claimed in claim 1, it is characterised in that described handle is set to T-shaped, and the main part of the grip part of described handle and described handle is vertically arranged.
7. ceiling hanger erection equipment as claimed in claim 6, it is characterised in that the grip part of described handle is one-body molded with the main part of described handle.
8. ceiling hanger erection equipment as claimed in claim 1, it is characterised in that described steel pipe and handle are zinc-plated material.
9. ceiling hanger erection equipment as claimed in claim 1, it is characterised in that the length of described steel pipe is 500mm.
10. ceiling hanger erection equipment as claimed in claim 1, it is characterised in that the external diameter of described steel pipe is 25mm.
CN201520893066.8U 2015-11-10 2015-11-10 Ceiling jib erection equipment Active CN205296866U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520893066.8U CN205296866U (en) 2015-11-10 2015-11-10 Ceiling jib erection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520893066.8U CN205296866U (en) 2015-11-10 2015-11-10 Ceiling jib erection equipment

Publications (1)

Publication Number Publication Date
CN205296866U true CN205296866U (en) 2016-06-08

Family

ID=56463734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520893066.8U Active CN205296866U (en) 2015-11-10 2015-11-10 Ceiling jib erection equipment

Country Status (1)

Country Link
CN (1) CN205296866U (en)

Similar Documents

Publication Publication Date Title
CN201808000U (en) Tool for screwing porcelain insulator bolts
CN203390893U (en) Sliding weight for pulling pin
CN205296866U (en) Ceiling jib erection equipment
CN102704828A (en) Multifunctional hook ladder
CN205104835U (en) A auxiliary device for power line erects
CN203813060U (en) Telescoping auxiliary device for erecting grounding wires
CN207004155U (en) A kind of adjustable tower erection instrument
CN104500512B (en) A kind of fixed structure boundling line side of returning device being fixed to electric pole
CN201474288U (en) Fastener of steel pipe scaffold
CN203006799U (en) Standard knot coupling sleeve stop device of tower crane
CN208005549U (en) A kind of multi-purpose formula construction spanner
CN205289839U (en) Ceiling furred ceiling auxiliary assembly that punches
CN204349332U (en) A kind of suspension clamp for electric line fastened tools with moment Presentation Function
CN205218960U (en) A straight -bar formula rotary device for screwing furred ceiling pole expansion bolts
CN203779402U (en) Screw rod fastener for expansion nut
CN204754175U (en) Construction is with simply climbing a support
CN204913719U (en) A spanner for high altitude construction
CN204645586U (en) Civil engineering scaffold U-shaped wall attaching parts
CN203377549U (en) Small holding pole attached to tower
CN203613786U (en) Cross fastener for scaffold
CN207568209U (en) A kind of sunpender fast fixing tool
CN203956804U (en) A kind of suspension rod quick-mounting instrument
CN205085883U (en) A ratchet spanner for electric power construction
CN202391149U (en) Protective barrier used in construction sites
CN202491197U (en) Mechanical kiln-maintaining tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant