CN205276840U - Scaffold of building engineering construction usefulness - Google Patents

Scaffold of building engineering construction usefulness Download PDF

Info

Publication number
CN205276840U
CN205276840U CN201620015132.6U CN201620015132U CN205276840U CN 205276840 U CN205276840 U CN 205276840U CN 201620015132 U CN201620015132 U CN 201620015132U CN 205276840 U CN205276840 U CN 205276840U
Authority
CN
China
Prior art keywords
working plate
underframe
chassis
base
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620015132.6U
Other languages
Chinese (zh)
Inventor
冯琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian International University
Original Assignee
Xian International University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian International University filed Critical Xian International University
Priority to CN201620015132.6U priority Critical patent/CN205276840U/en
Application granted granted Critical
Publication of CN205276840U publication Critical patent/CN205276840U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold of building engineering construction usefulness, including chassis, chassis base and chassis working plate, the chassis includes chassis base, electric lift rod and chassis working plate, universal wheel and sleeve are installed to chassis base lower extreme, forked support and electric lift rod are installed to chassis base upper end, the chassis working plate is installed on electric lift rod and forked support top, install stand and control button on the chassis working plate, and control button passes through the wire and is connected with electric lift rod. The utility model is simple in operation, convenience safe in utilization has played the guard action better, and is novel in design unique, and the function is more many, conveniently better makes things convenient for construction worker to carry out height adjustment with to press close to construction worker required, has certain innovation effect, for constructor provides convenient and swift, makes the scaffold be fit for the constructor use better, can comprehensive promotion and application.

Description

The scaffolding of a kind of building engineering construction
Technical field
The utility model relates to scaffold device field, specifically the scaffolding of a kind of building engineering construction.
Background technology
At present; scaffolding is applied extremely extensive in building operation; existing scaffolding workman's material transfer is inconvenient; and workman comparatively bothers up and down, workman climbs and often produces certain potential safety hazard, and very inconvenient and not quick when next layer wants last layer; although the housing of scaffolding has support to erect protection and supporting role; but nonetheless can not solve unexpected generation, and the inconvenience of existing scaffolding altitude mixture control, add difficulty of construction.
Summary of the invention
For the deficiency that above-mentioned prior art exists, the purpose of this utility model is to provide the scaffolding of a kind of building engineering construction.
In order to realize above-mentioned purpose, the technical scheme that the utility model adopts is: the scaffolding of a kind of building engineering construction, comprises underframe, underframe base, increases frame and underframe working plate; Described underframe comprises underframe base, electric up-down bar and underframe working plate, the described lower end of underframe base is provided with universal wheel and sleeve, described underframe base upper end is provided with bow and electric up-down bar, described underframe working plate is arranged on electric up-down bar and bow top, described underframe working plate is provided with column and push button, and push button is connected with electric up-down bar by wire.
Further, described bow comprises upper rack posts, lower fulcrum bar and roller bearing, and upper rack posts is connected with lower fulcrum bar by roller bearing.
Further, the described frame that increases comprises increasing overhead base and increases frame working plate, the described lower end of increasing overhead base is provided with universal wheel and sleeve, described increasing overhead base upper end is provided with bow and electric up-down bar, the described frame working plate that increases is arranged on electric up-down bar and bow top, described in increase frame working plate be provided with column and push button.
Further, described underframe base and increasing is provided with four on overhead base and universal takes turns, and universal wheel is provided with locking mechanism.
Further, described sleeve is nested on column, and is fixed by standing bolt between sleeve and column.
Further, described underframe working plate, increase overhead base and increase frame working plate all has groove.
Adopt after technique scheme, the utility model compared to the prior art advantageously:
The scaffolding of building engineering construction described in the utility model, by arranging electric up-down bar, make scaffolding lifting more for convenience, by having groove on working plate, make workman's material transfer more for convenience, simple to operate, safe and convenient to use, serve provide protection better, novel in design unique, function is more, facilitate better and press close to needed for builder, builder is facilitated to carry out height adjustment, there is certain innovation effect, for workmen provides conveniently with quick, make scaffolding be applicable to workmen better to use, can popularize in an all-round way and apply.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is illustrated further:
Fig. 1 is the structural representation of the utility model underframe;
Fig. 2 is the structural representation that the utility model increases frame;
Fig. 3 is the structural representation that the utility model sleeve and column are installed.
In Reference numeral: 1-underframe working plate; 2-electric up-down bar; 3-wire; 4-push button; 5-column; 6-underframe base; 7-bow; 8-is universal to take turns; 9-sleeve; 10-underframe; 11-increases frame working plate; 12-increases frame; 13-increases overhead base; 14-standing bolt.
Embodiment
The following stated is only better embodiment of the present utility model, does not therefore limit protection domain of the present utility model.
Embodiment, as Figure 1-3, the scaffolding of a kind of building engineering construction, comprises underframe 10, underframe base 6, increases frame 12 and underframe working plate 1, underframe 10 comprises underframe base 6, electric up-down bar 2 and underframe working plate 1, underframe base 6 times ends are provided with universal takes turns 8 and sleeve 9, underframe base 6 upper end is provided with bow 7 and electric up-down bar 2, underframe working plate 1 is arranged on electric up-down bar 2 and bow 7 top, underframe working plate 1 is provided with column 5 and push button 4, and push button 4 is connected with electric up-down bar 2 by wire 3, bow 7 comprises upper rack posts, lower fulcrum bar and roller bearing, and upper rack posts is connected with lower fulcrum bar by roller bearing, increase frame 12 comprise increasing overhead base 13 and increase frame working plate 11, increase overhead base 13 times ends to be provided with and universal take turns 8 and sleeve 9, increase overhead base 13 upper end and bow 7 and electric up-down bar 2 are installed, increase frame working plate 11 and it is arranged on electric up-down bar 2 and bow 7 top, increase and frame working plate 11 is provided with column 5 and push button 4, underframe base 6 and increasing is provided with four and universal takes turns 8 on overhead base 13, and universal take turns 8 and be provided with locking mechanism, sleeve 9 is nested on column 5, and fixed by standing bolt 14 between sleeve 9 and column 5, underframe working plate 1, increase overhead base 13 and increase and frame working plate 11 all has groove.
Principle of work: during use, height according to construction, decision need to not need installation to increase frame 12, as needs increase, then will increase frame 12 sleeve 9 is arranged on underframe working plate 1 column 5, worker stands is on working plate, by push button 4, regulate working plate height, by having groove on working plate, make workman's material transfer more for convenience, simple to operate, safe and convenient to use, serve provide protection better, novel in design unique, function is more, facilitate better and press close to needed for builder, builder is facilitated to carry out height adjustment, there is certain innovation effect, for workmen provides conveniently with quick, make scaffolding be applicable to workmen better to use, can popularize in an all-round way and apply.
To those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, it is possible to realize the utility model in other specific forms. Therefore, no matter from which point, embodiment all should be regarded as exemplary, and right and wrong are restrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, it is intended that all changes in the implication of the equivalent important document dropping on claim and scope included in the utility model. Any Reference numeral in claim should be considered as the claim involved by limiting.
The above; it is only better embodiment of the present utility model; not in order to limit the utility model, every any trickle amendment, equivalent replacement and improvement above embodiment done according to technical spirit of the present utility model, all should be included within the protection domain of technical solutions of the utility model.

Claims (5)

1. a scaffolding for building engineering construction, comprises underframe (10), underframe base (6), increase frame (12) and underframe working plate (1), it is characterized in that: described underframe (10) comprises underframe base (6), electric up-down bar (2) and underframe working plate (1), the lower end of described underframe base (6) is provided with universal takes turns (8) and sleeve (9), described underframe base (6) upper end is provided with bow (7) and electric up-down bar (2), described underframe working plate (1) is arranged on electric up-down bar (2) and bow (7) top, described underframe working plate (1) is provided with column (5) and push button (4), and push button (4) is connected with electric up-down bar (2) by wire (3), the described frame (12) that increases comprises increasing overhead base (13) and increases frame working plate (11), the lower end of described increasing overhead base (13) is provided with universal takes turns (8) and sleeve (9), described increasing overhead base (13) upper end is provided with bow (7) and electric up-down bar (2), the described frame working plate (11) that increases is arranged on electric up-down bar (2) and bow (7) top, described in increase frame working plate (11) be provided with column (5) and push button (4).
2. the scaffolding of a kind of building engineering construction according to claim 1, it is characterised in that: described bow (7) comprises upper rack posts, lower fulcrum bar and roller bearing, and upper rack posts is connected with lower fulcrum bar by roller bearing.
3. the scaffolding of a kind of building engineering construction according to claim 1, it is characterised in that: described underframe base (6) and increasing is provided with four and universal takes turns (8) on overhead base (13), and universal take turns (8) are provided with locking mechanism.
4. the scaffolding of a kind of building engineering construction according to claim 1, it is characterised in that: described sleeve (9) is nested on column (5), and is fixed by standing bolt (14) between sleeve (9) and column (5).
5. the scaffolding of a kind of building engineering construction according to claim 1, it is characterised in that: described underframe working plate (1), increase overhead base (13) and increase frame working plate (11) all has groove.
CN201620015132.6U 2016-01-08 2016-01-08 Scaffold of building engineering construction usefulness Expired - Fee Related CN205276840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620015132.6U CN205276840U (en) 2016-01-08 2016-01-08 Scaffold of building engineering construction usefulness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620015132.6U CN205276840U (en) 2016-01-08 2016-01-08 Scaffold of building engineering construction usefulness

Publications (1)

Publication Number Publication Date
CN205276840U true CN205276840U (en) 2016-06-01

Family

ID=56061424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620015132.6U Expired - Fee Related CN205276840U (en) 2016-01-08 2016-01-08 Scaffold of building engineering construction usefulness

Country Status (1)

Country Link
CN (1) CN205276840U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437117A (en) * 2016-09-18 2017-02-22 广西钦州展兴建设工程有限公司 Electric scaffold
CN108049620A (en) * 2017-12-20 2018-05-18 玉林市金腾建材有限公司 A kind of construction scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437117A (en) * 2016-09-18 2017-02-22 广西钦州展兴建设工程有限公司 Electric scaffold
CN108049620A (en) * 2017-12-20 2018-05-18 玉林市金腾建材有限公司 A kind of construction scaffold

Similar Documents

Publication Publication Date Title
CN203911299U (en) Electronic auxiliary platform for changing respirator silica gel of large transformer
CN204212064U (en) A kind of bridge construction Handy movable operation platform
CN205276840U (en) Scaffold of building engineering construction usefulness
CN103950872A (en) Upright tube hoisting multifunctional tool of substation altitude plant
CN203833575U (en) Vertical rod hoisting multifunctional tool of substation high-altitude device
CN202423906U (en) Overhaul platform for isolating switch
CN205654065U (en) Saddle formula platform load synchronizer that climbs
CN203430409U (en) Sectional mobile inclined ladder
CN205012626U (en) A scaffold for railway tunnel maintenance
CN203924649U (en) Construction work maintenance work frame
CN103803425A (en) Electric hoist gantry crane
CN203486864U (en) Lifting workbench
CN206308987U (en) A kind of convenient Liftable and movable scaffold for building
CN203348844U (en) Movable support frame
CN202081631U (en) Jacking seat
CN205713033U (en) Pipe interior operating platform
CN219918168U (en) Telescopic bracket for overhauling transformer substation equipment
CN204983585U (en) Scaffold that availability factor is high
CN203372667U (en) Safe operation oil tank
CN205472415U (en) A can horizontal displacement device for jack construction
CN203599234U (en) Pneumatic jacking part for winding and unwinding
CN211078400U (en) High altitude construction platform pedal structure
CN105155862B (en) Portable outdoor operation protection frame for aluminum and plastic window decoration
CN204645565U (en) A kind of spiral case overhaul working platform
CN203904850U (en) Walking device of double-girder gantry bridge erecting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20170108

CF01 Termination of patent right due to non-payment of annual fee