CN204212064U - Convenient and fast movable construction platform for bridge construction - Google Patents

Convenient and fast movable construction platform for bridge construction Download PDF

Info

Publication number
CN204212064U
CN204212064U CN201420664704.4U CN201420664704U CN204212064U CN 204212064 U CN204212064 U CN 204212064U CN 201420664704 U CN201420664704 U CN 201420664704U CN 204212064 U CN204212064 U CN 204212064U
Authority
CN
China
Prior art keywords
hanging basket
platform
construction
fixed
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420664704.4U
Other languages
Chinese (zh)
Inventor
周叶飞
曾明雄
李晓坤
吴浪
侯宝磊
孙海鹏
贾卫亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
City Construction Co Ltd Of China Railway 15th Bureau Group
China Railway 15th Bureau Group Co Ltd
Original Assignee
7th Construction Co Ltd Of China 15th Corp
China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 7th Construction Co Ltd Of China 15th Corp, China Railway 15th Bureau Group Co Ltd filed Critical 7th Construction Co Ltd Of China 15th Corp
Priority to CN201420664704.4U priority Critical patent/CN204212064U/en
Application granted granted Critical
Publication of CN204212064U publication Critical patent/CN204212064U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型涉及一种桥梁施工用便捷移动式施工平台,其特征在于:包括行走平台,所述行走平台的两侧对称固装有吊篮,所述行走平台的下表面设有行走轮组,所述行走平台下表面固定有两个L型连接板,两个L型连接板对称安装;其上安装有限位约束轮组,所述限位约束轮组的上表面与桥梁的上檐贴合;所述吊篮上设有爬梯,所述吊篮的四周设有刚性护栏,在护栏上捆绑有防护网,在吊篮的底部固装有钢性踏板,所述钢性踏板的上表面设有防滑纹;所述吊篮与主梁之间设有防止施工平台窜动和摆动的定位支撑机构。该施工平台具有装拆方便,移动灵活,安全可靠,操作方便、造价低等优点,实用性强等优点。

The utility model relates to a convenient mobile construction platform for bridge construction, which is characterized in that it includes a walking platform, and hanging baskets are fixedly fixed on both sides of the walking platform, and the lower surface of the walking platform is provided with walking wheels. Two L-shaped connecting plates are fixed on the lower surface of the walking platform, and the two L-shaped connecting plates are installed symmetrically; a limit-limited wheel set is installed on it, and the upper surface of the limit-limited wheel set fits with the upper eaves of the bridge ; The hanging basket is provided with a climbing ladder, a rigid guardrail is provided around the hanging basket, a protective net is bound on the guardrail, a rigid pedal is fixedly installed at the bottom of the hanging basket, and the upper surface of the rigid pedal is provided with a There are anti-slip lines; a positioning support mechanism is provided between the hanging basket and the main beam to prevent the construction platform from moving and swinging. The construction platform has the advantages of convenient assembly and disassembly, flexible movement, safety and reliability, convenient operation, low cost and strong practicability.

Description

一种桥梁施工用便捷移动式施工平台A convenient mobile construction platform for bridge construction

技术领域technical field

本实用新型属于桥梁施工技术领域,特别是涉及一种桥梁施工用便捷移动式施工平台。The utility model belongs to the technical field of bridge construction, in particular to a convenient mobile construction platform for bridge construction.

背景技术Background technique

在某些桥梁施工过程中,如钢箱梁安装对接施工和焊缝检测等,需要借助施工辅助设施近距离接触施工作业面,有时受桥梁所处环境条件的制约,桥下无法搭设施工支架或者即使搭设支架也不便于施工,在这种情况下,需要施工平台进行辅助施工。目前,现有技术中通常采用搭设挑架的方法,用钢管搭设施工平台,其缺点是耗费大量钢管、拆卸麻烦、工期长、费用大等。除此之外,虽目前已有一些比较简便挂篮,但安全性不高,在相对较高的及风力较大条件下稳定性较差,施工使用时存在一定的安全风险。During the construction of some bridges, such as steel box girder installation butt joint construction and weld inspection, etc., it is necessary to use construction auxiliary facilities to get close to the construction work surface. Even if the support is erected, it is not convenient for construction. In this case, a construction platform is required for auxiliary construction. At present, in the prior art, the method of erecting a cantilever is usually adopted, and steel pipes are used to build a construction platform. The disadvantages are that a large amount of steel pipes are consumed, disassembly is troublesome, the construction period is long, and the cost is high. In addition, although there are some relatively simple hanging baskets, the safety is not high, and the stability is poor under relatively high and windy conditions, and there are certain safety risks during construction and use.

发明内容Contents of the invention

本实用新型为解决公知技术中存在的技术问题而提供一种装拆方便,移动灵活,安全可靠,操作方便、造价低等优点,实用性强的桥梁施工用便捷移动式施工平台。The utility model provides a convenient mobile construction platform for bridge construction with the advantages of convenient assembly and disassembly, flexible movement, safety and reliability, convenient operation and low cost to solve the technical problems in the known technology.

本实用新型为解决公知技术中存在的技术问题所采取的技术方案是:The technical scheme that the utility model takes for solving the technical problem existing in the known technology is:

一种桥梁施工用便捷移动式施工平台,其特征在于:包括行走平台,所述行走平台的两侧对称固装有吊篮,所述行走平台的下表面设有行走轮组,所述行走平台下表面固定有两个L型连接板,两个L型连接板对称安装;其上安装有限位约束轮组,所述限位约束轮组的上表面与主梁的上檐贴合;所述吊篮上设有爬梯,所述吊篮的四周设有刚性护栏,在护栏上捆绑有防护网,在吊篮的底部固装有钢性踏板,所述钢性踏板的上表面设有防滑纹;所述吊篮与主梁之间设有防止施工平台窜动和摆动的定位支撑机构。A convenient mobile construction platform for bridge construction, characterized in that: it includes a walking platform, the two sides of the walking platform are symmetrically fixed with hanging baskets, the lower surface of the walking platform is provided with walking wheels, and the walking platform There are two L-shaped connecting plates fixed on the lower surface, and the two L-shaped connecting plates are installed symmetrically; a limit-limited wheel set is installed on it, and the upper surface of the limit-limited wheel set fits with the upper eaves of the main beam; There is a climbing ladder on the hanging basket, a rigid guardrail is set around the hanging basket, a protective net is bound on the guardrail, a steel pedal is fixed on the bottom of the hanging basket, and the upper surface of the steel pedal is provided with anti-skid lines ; A positioning support mechanism is provided between the hanging basket and the main beam to prevent the construction platform from moving and swinging.

本实用新型还可以采用如下技术措施:The utility model can also adopt the following technical measures:

所述定位支撑结构包括固定于吊篮横向护栏上的支架,铰接于支架一端带有把手的摆杆,与摆杆另一端铰接的连接板,与连接板的另一端铰接的推杆。The positioning support structure includes a bracket fixed on the horizontal guardrail of the hanging basket, a swing rod with a handle hinged at one end of the bracket, a connecting plate hinged with the other end of the swing rod, and a push rod hinged with the other end of the connecting plate.

所述定位支撑结构包括固定在吊篮横向护栏上的螺套,所述螺套内配装有螺杆,在吊篮内螺杆的端部连接有旋转手柄。The positioning support structure includes a screw sleeve fixed on the horizontal guardrail of the hanging basket, a screw rod is equipped in the screw sleeve, and a rotating handle is connected to the end of the screw rod in the hanging basket.

本实用新型具有的优点和积极效果是:由于本实用新型采用上述技术方案,即本施工平台主要利用了桥主梁的结构特征进行设计,充分利用了在高空中可以利用的空间和构件,本实用新型就是利用来了主梁的上表面作为行走面,主梁上檐作为限位约束面,从而保证本施工平台能够在主梁上平稳的行走,而且不需要其它牵引驱动装置,操作人员根据实际工位自行移动即可,而且省力,滑动到指定位置后通过定位支撑结构将工作平台与主梁之间锁紧定位,避免在实际施工过程中因非人为移动该施工平台,综上所述该施工平台具有装拆方便,移动灵活,安全可靠,操作方便、造价低等优点,实用性强等优点。The advantages and positive effects of the utility model are: because the utility model adopts the above-mentioned technical scheme, that is, the construction platform mainly utilizes the structural characteristics of the bridge girder for design, and fully utilizes the space and components available in the high altitude. The utility model uses the upper surface of the main girder as the walking surface, and the upper eaves of the main girder as the limiting surface, so as to ensure that the construction platform can walk on the main girder stably, and does not need other traction and driving devices. The actual work station can be moved by itself, and it is labor-saving. After sliding to the designated position, the working platform and the main beam are locked and positioned by the positioning support structure, so as to avoid the construction platform due to non-human movement during the actual construction process. The construction platform has the advantages of convenient assembly and disassembly, flexible movement, safety and reliability, convenient operation, low cost and strong practicability.

附图说明Description of drawings

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2是第一种定位支撑结构的结构示意图;Fig. 2 is a structural schematic diagram of the first positioning support structure;

图3是另一种定位支撑结构的结构示意图。Fig. 3 is a structural schematic diagram of another positioning support structure.

图中:1、行走平台;2、吊篮;2-1、爬梯;2-2、刚性护栏;2-3、钢性踏板;2-4、防护网;3、行走轮组;4、L型连接板;5、限位约束轮组;6、主梁;6-1、上檐;7、定位支撑结构;7-10、支架;7-11、摆杆;7-12、连接板;7-13、推杆;7-20、螺套;7-21、螺杆;7-22、旋转手柄。In the figure: 1, walking platform; 2, hanging basket; 2-1, climbing ladder; 2-2, rigid guardrail; 2-3, steel pedal; 2-4, protective net; Type connecting plate; 5, limit restraint wheel set; 6, main beam; 6-1, upper eaves; 7, positioning support structure; 7-10, bracket; 7-11, swing rod; 7-13, push rod; 7-20, screw sleeve; 7-21, screw rod; 7-22, rotary handle.

具体实施方式Detailed ways

为能进一步了解本实用新型的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:In order to further understand the invention content, characteristics and effects of the present utility model, the following examples are given, and detailed descriptions are as follows in conjunction with the accompanying drawings:

请参阅图1,一种桥梁施工用便捷移动式施工平台,包括行走平台1,所述行走平台的两侧对称固装有吊篮2,所述行走平台的下表面设有行走轮组3,所述行走平台下表面固定有两个L型连接板4,两个L型连接板对称安装;其上安装有限位约束轮组5,所述限位约束轮组的上表面与主梁6的上檐6-1贴合;所述吊篮上设有爬梯2-1,此爬梯虽然是公知技术,但是在本施工平台上的安全性是相对突出的;而且方便操作人员的上或者下;所述吊篮的四周设有刚性护栏2-2,在护栏上捆绑有防护网2-4,防护网起到了第二道防线,有进一步提高了安全防护性能,同时在心理上也给予操作者一安全感;在吊篮的底部固装有钢性踏板2-3,所述钢性踏板的上表面设有防滑纹,防滑纹的设计有进一步提高了操作人员的安全性;所述吊篮与主梁之间设有防止施工平台窜动和摆动的定位支撑机构7。Please refer to Figure 1, a convenient mobile construction platform for bridge construction, including a walking platform 1, hanging baskets 2 are mounted symmetrically on both sides of the walking platform, and a walking wheel set 3 is provided on the lower surface of the walking platform. Two L-shaped connecting plates 4 are fixed on the lower surface of the walking platform, and the two L-shaped connecting plates are installed symmetrically; a limit-limited wheel set 5 is installed on it, and the upper surface of the limit-limited wheel set and the main beam 6 The upper eaves 6-1 fit together; the hanging basket is provided with a climbing ladder 2-1. Although this climbing ladder is a known technology, its safety on the construction platform is relatively prominent; and it is convenient for operators to go up or down; Rigid guardrails 2-2 are arranged around the hanging basket, and protective nets 2-4 are bound on the guardrails. The protective nets serve as the second line of defense, further improving the safety protection performance, and at the same time giving the operator psychological protection. A sense of security; the bottom of the hanging basket is fixed with a rigid pedal 2-3, and the upper surface of the rigid pedal is provided with anti-slip lines, and the design of the anti-slip lines has further improved the safety of the operator; the hanging basket A positioning support mechanism 7 to prevent the construction platform from moving and swinging is provided between the main beam.

本实用新型还可以采用如下技术措施:The utility model can also adopt the following technical measures:

请参阅图2,所述定位支撑结构7包括固定于吊篮横向护栏上的支架7-10,铰接于支架一端带有把手的摆杆7-11,与摆杆另一端铰接的连接板7-12,与连接板的另一端铰接的推杆7-13,通过扳动摆杆实现推杆的伸缩,从而实现与主梁之间的定位和支撑,定位主要避免施工平台在非人为作用下自行溜车的问题;支撑主要解决了因滑动间隙而带来的摆动,提高了安全性。Referring to Fig. 2, the positioning support structure 7 includes a bracket 7-10 fixed on the horizontal guardrail of the hanging basket, a swing bar 7-11 with a handle hinged at one end of the bracket, and a connecting plate 7-11 hinged with the other end of the swing bar. 12. The push rod 7-13 hinged with the other end of the connecting plate can realize the expansion and contraction of the push rod by pulling the swing rod, so as to realize the positioning and support with the main beam. The problem of slipping the car; the support mainly solves the swing caused by the sliding gap and improves the safety.

另外,所述定位支撑结构还可以采用如下结构,请参阅图3,即包括固定在吊篮横向护栏上的螺套7-20,所述螺套内配装有螺杆7-21,在吊篮内螺杆的端部连接有旋转手柄7-22。其作用与上述的定位支撑结构一致,也是解决了定位和支撑作用。In addition, the positioning support structure can also adopt the following structure, please refer to Figure 3, that is, it includes a screw sleeve 7-20 fixed on the horizontal guardrail of the hanging basket, and a screw rod 7-21 is equipped in the screw sleeve. The end of the internal screw is connected with a rotary handle 7-22. Its function is consistent with the above-mentioned positioning support structure, and it also solves the positioning and supporting functions.

综上所述,本施工平台主要利用了桥主梁的结构特征进行设计,充分利用了在高空中可以利用的空间和构件,本实用新型就是利用来了主梁的上表面作为行走面,主梁上檐作为限位约束面,从而保证本施工平台能够在主梁上平稳的行走,而且不需要其它牵引驱动装置,操作人员根据实际工位自行移动即可,而且省力,滑动到指定位置后通过定位支撑结构将工作平台与主梁之间锁紧定位,避免在实际施工过程中因非人为移动该施工平台,因此,该施工平台具有装拆方便,移动灵活,安全可靠,操作方便、造价低等优点,实用性强等优点。To sum up, the construction platform mainly utilizes the structural features of the main girder of the bridge for design, making full use of the space and components that can be used in the high altitude. The upper eaves of the beam are used as the limit and constraint surface, so as to ensure that the construction platform can walk smoothly on the main beam, and no other traction drive device is needed. The operator can move by himself according to the actual work position, and saves effort. After sliding to the designated position The working platform and the main beam are locked and positioned by the positioning support structure, so as to avoid the construction platform from being unintentionally moved during the actual construction process. Therefore, the construction platform has the advantages of convenient assembly and disassembly, flexible movement, safety and reliability, convenient operation and low cost. Low-level advantages, strong practicability and other advantages.

以上所述仅是对本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,凡是依据本实用新型的技术实质对以上实施例所做的任何简单修改,等同变化与修饰,均属于本实用新型技术方案的范围内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model in any form. Any simple modifications made to the above embodiments according to the technical essence of the present utility model are equivalent to changes and modifications. All belong to the scope of the technical solution of the utility model.

Claims (3)

1. a bridge construction Handy movable operation platform, it is characterized in that: comprise travelling platform, the bilateral symmetry of described travelling platform is fixed with hanging basket, the soffit of described travelling platform is provided with walking wheels, described travelling platform soffit is fixed with two L-type junction plates, and two L-type junction plate symmetries are installed; It is provided with spacing constraint wheels, the described upper surface of spacing constraint wheels and the upper eaves of bridge are fitted;
Described hanging basket is provided with cat ladder, and the surrounding of described hanging basket is provided with stiff safety fence, and on guardrail, binding has protective screening, and be fixed with rigidity pedal in the bottom of hanging basket, the upper surface of described rigidity pedal is provided with anti-slip veins;
The supporting mechanism for location preventing operation platform play and swing is provided with between described hanging basket and girder.
2. bridge construction Handy movable operation platform according to claim 1, it is characterized in that: described positioning support structure comprises the support be fixed on the horizontal guardrail of hanging basket, be articulated with the handled fork of support one end band, the junction plate hinged with the fork other end, the push rod hinged with the other end of junction plate.
3. bridge construction Handy movable operation platform according to claim 1, it is characterized in that: described positioning support structure comprises the swivel nut be fixed on the horizontal guardrail of hanging basket, be fitted with screw rod in described swivel nut, be connected with rotary handle in the end of hanging basket inner screw.
CN201420664704.4U 2014-11-06 2014-11-06 Convenient and fast movable construction platform for bridge construction Expired - Fee Related CN204212064U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420664704.4U CN204212064U (en) 2014-11-06 2014-11-06 Convenient and fast movable construction platform for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420664704.4U CN204212064U (en) 2014-11-06 2014-11-06 Convenient and fast movable construction platform for bridge construction

Publications (1)

Publication Number Publication Date
CN204212064U true CN204212064U (en) 2015-03-18

Family

ID=52980751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420664704.4U Expired - Fee Related CN204212064U (en) 2014-11-06 2014-11-06 Convenient and fast movable construction platform for bridge construction

Country Status (1)

Country Link
CN (1) CN204212064U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545150A (en) * 2016-11-09 2017-03-29 中交路桥华东工程有限公司 A kind of cantilevered operation platform
CN106677513A (en) * 2017-01-21 2017-05-17 浙江精工钢结构集团有限公司 Moveable fabricated construction operating platform mechanism and construction method thereof
CN109706841A (en) * 2019-01-08 2019-05-03 广西路桥工程集团有限公司 A kind of movable hanging basket and its construction method facilitating high-strength bolt construction
CN110173103A (en) * 2019-06-24 2019-08-27 北京港源幕墙有限公司 Adhesion type removable multifunctional aerial work platform
CN110615523A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotation type netted contact body carousel work platform
CN113026581A (en) * 2021-04-24 2021-06-25 南京润华建设集团有限公司 Constant-section continuous box girder hanging basket suspension casting system
CN113664423A (en) * 2021-09-27 2021-11-19 中国建筑第八工程局有限公司 Single-rail double-sided self-walking type welding hanging basket system
CN115354840A (en) * 2022-09-06 2022-11-18 山东省水利科学研究院 Movable field aerial work platform
CN120083350A (en) * 2025-01-24 2025-06-03 中山市电力工程有限公司 Mobile work platform

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545150A (en) * 2016-11-09 2017-03-29 中交路桥华东工程有限公司 A kind of cantilevered operation platform
CN106677513A (en) * 2017-01-21 2017-05-17 浙江精工钢结构集团有限公司 Moveable fabricated construction operating platform mechanism and construction method thereof
CN110615523A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotation type netted contact body carousel work platform
CN109706841A (en) * 2019-01-08 2019-05-03 广西路桥工程集团有限公司 A kind of movable hanging basket and its construction method facilitating high-strength bolt construction
CN109706841B (en) * 2019-01-08 2020-09-18 广西路桥工程集团有限公司 Construction method of movable hanging basket convenient for high-strength bolt construction
CN110173103B (en) * 2019-06-24 2024-05-31 北京港源幕墙有限公司 Attached detachable multifunctional aerial work platform
CN110173103A (en) * 2019-06-24 2019-08-27 北京港源幕墙有限公司 Adhesion type removable multifunctional aerial work platform
CN113026581A (en) * 2021-04-24 2021-06-25 南京润华建设集团有限公司 Constant-section continuous box girder hanging basket suspension casting system
CN113026581B (en) * 2021-04-24 2022-09-13 南京润华建设集团有限公司 Constant-section continuous box girder hanging basket suspension casting system
CN113664423A (en) * 2021-09-27 2021-11-19 中国建筑第八工程局有限公司 Single-rail double-sided self-walking type welding hanging basket system
CN115354840A (en) * 2022-09-06 2022-11-18 山东省水利科学研究院 Movable field aerial work platform
CN115354840B (en) * 2022-09-06 2024-02-27 山东省水利科学研究院 Movable field aerial work platform
CN120083350A (en) * 2025-01-24 2025-06-03 中山市电力工程有限公司 Mobile work platform
CN120083350B (en) * 2025-01-24 2025-10-14 中山市电力工程有限公司 Movable working platform

Similar Documents

Publication Publication Date Title
CN204212064U (en) Convenient and fast movable construction platform for bridge construction
CN105490209B (en) Transmission line polling robot
WO2014015757A1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN205591817U (en) Railway tunnel lateral wall construction tower wagon
CN203967625U (en) A kind of overhead facility crossing frame
CN205152788U (en) But telescopic bridge testing platform of antihunting
CN205928543U (en) Pole overhauls platform
CN205529883U (en) Guardrail fitment platform
CN103015306B (en) The operational method of High Altitude Emergency erection highway crossing wire facility
CN204690597U (en) For the removable Hanging Basket of erection of track beam
CN210822510U (en) Crawler-type lifting crossing operation vehicle with claw frame
CN204532049U (en) Novel iron tower cat ladder structure
CN104060939B (en) A kind of ladder for large-scale grab bucket maintenance
CN205502614U (en) Cooling building protection canopy convenient to remove
CN207176732U (en) Segmented moves simple rack chassis
CN106159793A (en) A kind of quickly transition assembled is from lifting crossing frame
CN207498824U (en) A kind of hanger radial type single track bridge inspection car
CN205474847U (en) Bridge water -drain mast installation platform truck
CN201026920Y (en) Movable guardrail at top of automobile
CN102296926B (en) Main transformer bushing maintenance platform
CN104372746A (en) Prefabricated post-tensioning-method simply-supported T-girder concrete injection formwork support and mounting process thereof of railway bridge
CN212250138U (en) Construction operation vehicle in railway tunnel
CN204252022U (en) A kind of packaged type steel box-girder frange plate welding operation platform
CN204897102U (en) Electronic cat ladder of instrument formula
CN211665577U (en) Folding arm type anti-flexibility stretching operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200431 new road, Jingan District, Jingan District, Shanghai, 6

Co-patentee after: THE CITY CONSTRUCTION COMPANY LTD. OF CHINA RAILWAY 15TH BUREAU Group

Patentee after: CHINA RAILWAY 15TH BUREAU GROUP Co.,Ltd.

Address before: 471013 Luoyang City, Henan four channel 2

Co-patentee before: THE 7TH CONSTRUCTION COMPANY LTD. OF CHINA 15TH Corp.

Patentee before: CHINA RAILWAY 15TH BUREAU GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318