CN205012626U - A scaffold for railway tunnel maintenance - Google Patents
A scaffold for railway tunnel maintenance Download PDFInfo
- Publication number
- CN205012626U CN205012626U CN201520582745.3U CN201520582745U CN205012626U CN 205012626 U CN205012626 U CN 205012626U CN 201520582745 U CN201520582745 U CN 201520582745U CN 205012626 U CN205012626 U CN 205012626U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- roller
- railway tunnel
- matrix
- tunnel maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to a scaffold for railway tunnel maintenance, , which includes. The scaffold main part, still include: the scaffold base, its bottom is equipped with four and rail complex gyro wheel for connect the scaffold main part, and on being fixed in the rail with the scaffold main part. Compared with the prior art, the utility model discloses being equipped with four and rail complex gyro wheel on the scaffold base, can realizing wholly automatically move on the rail of scaffold, it is convenient to move, and mobility is strong, and for tunnel maintenance provides convenient, the maintenance that especially is tunnel roof and lateral wall provides the convenience, has improved railway tunnel maintenance's efficiency greatly.
Description
Technical field
The utility model relates to a kind of scaffold, especially relates to a kind of scaffold for railway tunnel maintenance.
Background technology
Scaffold (scaffold) refers to that job site is the various supports that operative also solves vertically and horizontal transport is set up.Work up and down mainly for constructor or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc., be exactly plainly build a framework, scaffold makes material to be had usually: bamboo and wood, steel pipe or synthetic materials etc.Some engineering is also worked as template with scaffold and is used, and the department such as this external advertising, municipal administration, traffic road and bridge, mine is also extensively used.
Be illustrated in figure 1 existing aluminium alloys scaffold, it forms primarily of existing scaffold base 20 and scaffold main body 3, compact conformation, and handling are quick, but owing to limiting by its stand bar structure, can only set up on level land.Along with the fast development of China's railway construction, railway maintenance also will become an important market, especially the maintenance of railway tunnel, need scaffold load and unload rapidly in tunnel and facilitate moving station, and existing aluminium alloys scaffold cannot meet this demand.
Utility model content
The purpose of this utility model be exactly in order to overcome above-mentioned prior art exist defect and a kind of scaffold for railway tunnel maintenance is provided.
The purpose of this utility model can be achieved through the following technical solutions:
For a scaffold for railway tunnel maintenance, comprise;
Scaffold main body;
Also comprise:
Scaffold base, is provided with four rollers coordinated with rail, removably connects with scaffold main body bottom it, for scaffold main body is fixed on rail.
Described scaffold base comprises four legs, and for connecting the connecting rod of four legs, described four rolling is located on four legs respectively.
Described leg comprises:
Matrix, is connected with connecting rod;
Support, is located at above matrix, for connecting pin hand cradle main body;
Roller fixed mechanism, is located at below matrix, for installing roller;
Braking mechanism, be located at below matrix, stops it to rotate for fastening roller.
Described roller fixed mechanism comprises roller shaft and bearing, and described roller shaft is located on matrix, and described roller housing is located on roller shaft, and described bearing is located between roller shaft and roller.
Described roller is provided with spoke hole,
Described braking mechanism comprises:
Brake cover, is fixed on matrix;
Brake axle, axial activity is located in brake cover, for inserting in the spoke hole of roller, and then stops roller to rotate.
Described scaffold main body is provided with staircase.
Compared with prior art, the utility model has the following advantages:
1) scaffold base is provided with four rollers coordinated with rail, the overall movement automatically on rail of scaffold can be realized, conveniently moving, mobility strong, for tunnel maintenance provides conveniently, especially for the maintenance of tunnel roof and sidewall provides conveniently, the efficiency of railway tunnel maintenance is substantially increased.
2) because the connected mode between scaffold base and scaffold main body is for removably connecting, the scaffold main body that therefore scaffold base of the present utility model can be suitable with arbitrary size is connected, compatible good, applied widely.
3) braking mechanism can make scaffold stop on rail, so that construction operation.
Accompanying drawing explanation
Fig. 1 is the structural representation of existing scaffold;
Fig. 2 is the structural representation of the utility model scaffold;
Fig. 3 is the structural representation of scaffold base;
Fig. 4 is the structural representation of leg;
Fig. 5 is the structural representation of roller fixed mechanism and braking mechanism;
Wherein: 1, leg, 2, connecting rod, 3, scaffold main body, 4, support, 5, roller, 6, bearing, 7, hole back-up ring, 8, pad, 9, nut, 10, roller shaft, 11, back-up ring, 12, screw, 13, brake cover, 14, brake axle, 15, handle, 16, spring, 17, adjusting nut, 18, jump ring, 19, matrix, 20, existing scaffold base, 21, scaffold base, 22, rail, 23, roller fixed mechanism, 24, braking mechanism.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail.The present embodiment is implemented premised on technical solutions of the utility model, give detailed embodiment and concrete operating process, but protection domain of the present utility model is not limited to following embodiment.
For a scaffold for railway tunnel maintenance, as shown in Figure 2, comprising:
Scaffold main body 3, which is provided with staircase;
Also comprise:
Scaffold base, is provided with four rollers coordinated with rail 5, removably connects with scaffold main body 3 bottom it, for scaffold main body 3 is fixed on rail.
As shown in Figure 3, scaffold base comprises four legs 1, and for connecting the connecting rod 2 of four legs 1, four rolling 5 is located on four legs 1 respectively.
As shown in Figure 4, leg 1 comprises matrix 19, support 4, roller fixed mechanism 23 and braking mechanism 24, support 4 is located at above matrix 19, roller fixed mechanism 23 and braking mechanism 24 are all located at below matrix 19, matrix 19 plays carrying effect, it is connected with connecting rod 2, roller fixed mechanism 23 is for installing roller 5, braking mechanism 24 is for fastening roller 5 and stop it to rotate, play braking action, 4, support is for connecting pin hand cradle main body 3, itself and scaffold main body 3 adopt the mode removably connected, concrete support 4 is provided with jump ring 18, scaffold main body 3 there is the snap fit portion coordinated with jump ring 18, removably connecting both being realized by the cooperation in jump ring 18 and snap fit portion.In addition, the present embodiment medium-height trestle 4 is telescope support, which is provided with the adjusting nut 17 for regulating its length, by turn adjusting nut 17, can regulate the length of support 4.
As shown in Figure 5, roller fixed mechanism 23 comprises roller 5, bearing 6, hole back-up ring 7, pad 8, nut 9, roller shaft 10 and back-up ring 11, roller shaft 10 is fixed on after on matrix 19 by junction plate to be fixed by nut 9, roller 5 is sheathed on roller shaft 10, and bearing 6 is located between roller shaft 10 and roller 5, all the other hole back-up rings 7, pad 8 and back-up ring 11 belong to conventional fastener technology.
Equally as shown in Figure 5, braking mechanism 24 comprises screw 12, brake cover 13, brake axle 14, handle 15 and spring 16, brake cover 13 is fixed on matrix 19 by junction plate, the axial activity of brake axle 14 is located in brake cover 13, spring 16 is sheathed on brake axle 14, handle 15 is located at brake axle 14 one end and is fixed by screw 12, in addition roller 5 is provided with spoke hole, brake cover 13 one end is provided with dark groove and two same radial shallow grooves arranged of two radial settings, the line of dark groove is mutually vertical with the line of shallow grooves, when braking mechanism is in idle, handle 15 is held in two shallow grooves, turning handle 15 to two dark groove line direction, because spring 16 acts on, move in brake axle 14 way roller 5 direction, insert in the spoke hole of roller 5, and then stop roller 5 to rotate.
Claims (6)
1., for a scaffold for railway tunnel maintenance, comprise;
Scaffold main body (3);
It is characterized in that, also comprise:
Scaffold base, is provided with four rollers coordinated with rail (5), removably connects with scaffold main body (3) bottom it.
2. a kind of scaffold for railway tunnel maintenance according to claim 1, it is characterized in that, described scaffold base comprises four legs (1), and for connecting the connecting rod (2) of four legs (1), described four rolling (5) is located on four legs (1) respectively.
3. a kind of scaffold for railway tunnel maintenance according to claim 2, is characterized in that, described leg (1) comprising:
Matrix (19), is connected with connecting rod (2);
Support (4), is located at matrix (19) top;
Roller fixed mechanism (23), is located at matrix (19) below;
Braking mechanism (24), is located at matrix (19) below.
4. a kind of scaffold for railway tunnel maintenance according to claim 3, it is characterized in that, described roller fixed mechanism (23) comprises roller shaft (10) and bearing (6), described roller shaft (10) is located on matrix (19), described roller (5) is sheathed on roller shaft (10), and described bearing (6) is located between roller shaft (10) and roller (5).
5. a kind of scaffold for railway tunnel maintenance according to claim 4, is characterized in that, described roller (5) is provided with spoke hole,
Described braking mechanism (24) comprising:
Brake cover (13), is fixed on matrix (19);
Brake axle (14), axial activity is located in brake cover (13), inserts in the spoke hole of roller (5).
6. a kind of scaffold for railway tunnel maintenance according to claim 1, is characterized in that, described scaffold main body (3) is provided with staircase.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520582745.3U CN205012626U (en) | 2015-08-05 | 2015-08-05 | A scaffold for railway tunnel maintenance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520582745.3U CN205012626U (en) | 2015-08-05 | 2015-08-05 | A scaffold for railway tunnel maintenance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205012626U true CN205012626U (en) | 2016-02-03 |
Family
ID=55211237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520582745.3U Expired - Fee Related CN205012626U (en) | 2015-08-05 | 2015-08-05 | A scaffold for railway tunnel maintenance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205012626U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106703384A (en) * | 2015-08-05 | 2017-05-24 | 上海法赫桥梁隧道养护工程技术有限公司 | Scaffold for railway tunnel maintenance |
CN109057297A (en) * | 2018-08-15 | 2018-12-21 | 天津核海源科技发展有限公司 | A kind of shield structural repair movable lifting platform |
-
2015
- 2015-08-05 CN CN201520582745.3U patent/CN205012626U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106703384A (en) * | 2015-08-05 | 2017-05-24 | 上海法赫桥梁隧道养护工程技术有限公司 | Scaffold for railway tunnel maintenance |
CN109057297A (en) * | 2018-08-15 | 2018-12-21 | 天津核海源科技发展有限公司 | A kind of shield structural repair movable lifting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205012626U (en) | A scaffold for railway tunnel maintenance | |
CN204001731U (en) | A kind of shuttering supporting vertical rod base fixing device | |
CN204199667U (en) | Detachable builder's jack corner tripod | |
CN203781739U (en) | Anti-reversing device used for auxiliary carrier of winch | |
CN203866658U (en) | Double-layer vibration reduction fastener manual disassembly tool kit for urban railway | |
CN106703384A (en) | Scaffold for railway tunnel maintenance | |
CN211201160U (en) | Socket type disc buckle type scaffold template | |
CN203961261U (en) | The adjustable fast-assembling stair of a kind of width | |
CN201808406U (en) | Independent wheel-lifting mechanism of carrier | |
CN204551936U (en) | A kind of steel external staircase | |
CN203063976U (en) | Electric pole conveying moped | |
CN204983712U (en) | But socket joint round pin stationary height -adjusting protection canopy | |
CN105305300B (en) | It is a kind of for replacing the device of pipe bus support column porcelain bottle | |
CN206031434U (en) | Large pipe transport vechicle | |
CN205276840U (en) | Scaffold of building engineering construction usefulness | |
CN205935617U (en) | Simple and easy scaffold frame removes chassis | |
CN209140861U (en) | Detachable mobile tooling shelf is adjusted | |
CN204645589U (en) | A kind of tool-type builder's jack bracing device | |
CN204001927U (en) | The power transmission steel pipe tower cross-arm handle that strides | |
CN208884948U (en) | A kind of operating platform | |
CN205555903U (en) | Bridge crane | |
CN207211680U (en) | A kind of scaffold | |
CN205296895U (en) | Portable steel construction bus stop | |
CN206418851U (en) | A kind of centralizer | |
CN203403663U (en) | Base of scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160203 Termination date: 20180805 |
|